6.3. SR 11-06-1995L�
ITEM 6.3.
October 30, 1995
CONSULTING ENGINEERS File: 230 - 216 -30
1326 Energy Park Drive
St. Paul, MN 55108
612.644 -4389
Mr. Pat Klaers
1- 800 -888 -2923
City Administrator
Fax: 612 -644 -9446
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: MNDOT TRAFFIC CONTROL SIGNAL AGREEMENTS
Dear Mr. Klaers:
As you requested, I have reviewed the two traffic signal agreements as prepared by
CIVIL ENGINEERING: MNDOT and sent to the City recently. They are agreement numbers 72759 and 72760 -R.
ENVIRONMENTAL
MUNICIPAL The first agreement 72759 is for the equipment that MNDOT supplied for the two signals
.PLANNING located on School Street at Freeport and at Jackson Road. As you recall, MNDOT agreed
SOLID WASTE to provide the controllers and the cabinets for these two signals at a cost of $30,000 to the
STRUCTURAL City. Apparently, through some quirk in their bookkeeping, they have not billed the City
SURVEYING for this equipment until now. This agreement contains standard language about the roles
TRAFFIC and responsibilities of the City versus MNDOT.
TRANSPORTATION
The second agreement number 72760 -R is for maintenance by State forces of the traffic
ELECTRICAL/MECHANICAL signals located on School Street at Freeport Avenue and Jackson Road. In this case,
ENGINEERING: MNDOT is concerned about the maintenance of the signal at Freeport and the potential
HVAC affect it will have on the TH 169 and School Street system. In fact, the two signals are
POWER DISTRIBUTION actually looped together electronically. If the Freeport signal malfunctions, it can have a
SCADA detrimental effect on the TH 169 signal and the ability of the highway to carry traffic. In
SYSTEM CONTROLS an effort to get the City to adopt this agreement, they have also written in the signal at
School and Jackson. This agreement states that MNDOT will maintain the signals with
their forces, bill the City for the actual cost of maintenance plus materials, and expects the
City to pay promptly when invoiced. Maintenance can either be routine activities by
MNDOT personnel, or an on -call basis, if there is a problem with the signal. Phil Hals has
discussed with MNDOT his ability to do routine maintenance and adjustment on the signals.
MNDOT has agreed that Phil can do minor items that he feels comfortable with.
The maintenance agreement is written such that the City has the right to cancel it, if they
OFFICES IN: deem it appropriate. Given this, I see no problem with the City entering into both of these
•MINNEAPOLIS agreements. Each agreement has an attached resolution that needs to be considered by the
PRIOR LAKE City Council and then the agreement executed by the Mayor and City Administrator.
ST. PAUL
WASECA
230/216- 2709.oct An Equal Opportunity Employer
• Mr. Pat Klaers
October 30, 1995
Page Two
L�
•
If you have any questions or would like further information, please call.
Sincerely,
MSA, CONSULTING ENGINEERS
ti ✓�
Terry J. Maurer, P.E.
TJM:pd
230/216- 2709.oct
•
RESOLUTION
BE IT RESOLVED that the City of Elk River enter into an
agreement with the State of Minnesota, Department of
Transportation for the following purposes, to wit:
To provide maintenance and electrical energy and
provide the controllers and cabinets for the new
traffic control signals on School Street Northwest at
Freeport Avenue and at Jackson Avenue Northwest in
accordance with the terms and conditions set forth and
contained in Agreement No. 72759, a copy of which was
before the Council.
BE IT FURTHER RESOLVED that the proper City officers be
and hereby are authorized to execute such agreement, and thereby
assume for and on behalf of the City all of the contractual
• obligations' contained therein
CERTIFICATION
State of Minnesota
County of Sherburne
City of Elk River
I hereby certify that the foregoing Resolution is a
true and correct copy of a resolution presented to and adopted by
the Council of the City of Elk River at a duly authorized meeting
thereof held on the day of f 1995, as
shown by the minutes of said meeting in my possession.
City Clerk
(Seal)
0
• MINNESOTA TRANSPORTATION DEPARTMENT
TRAFFIC CONTROL SIGNAL
AGREEMENT NO. 72759
BETWEEN
THE STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION
AND
THE CITY OF ELK RIVER
TO
•
Provide Maintenance and Electrical Energy and Provide the
Controllers and Cabinets for the new Traffic Control Signals on
School Street Northwest at Freeport Avenue and at Jackson Avenue
Northwest in Elk River, Sherburne County, Minnesota.
S.A.P. 204 - 010 -02
Prepared by Traffic Engineering
ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED
• City of Elk River $30,000.00 None
Otherwise Covered
• THIS AGREEMENT made and entered into by and between the
State of Minnesota, Department of Transportation, hereinafter
referred to as the "State ", and the City of Elk River,
hereinafter referred to as the "City ", WITNESSETH:
WHEREAS, Minnesota Statutes Section 161.20 (1994)
authorizes the Commissioner of Transportation to make
arrangements with and cooperate with any governmental authority
for the purposes of constructing, maintaining and improving the
Trunk Highway system; and
WHEREAS, it was considered mutually desirable for the
State to provide two (2) controllers and cabinets for the new
traffic control signals on School Street Northwest at Freeport
• Avenue and at Jackson Avenue Northwest Such materials as
described immediately above shall hereinafter be referred to as
"State furnished materials "; and
WHEREAS, the City and State will participate in the
cost, maintenance and operation of the new traffic control
signals as hereinafter set forth;
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
1. The State has provided the controllers and cabinets
for the new traffic control signals on School Street Northwest at
Freeport Avenue and at Jackson Avenue Northwest. Estimated cost
for State furnished materials is $30,000.00. City's share is 100
percent.
•
72759
-1-
• 2. Upon execution of this agreement and a request in
writing by the State, the City shall advance to the State an
amount equal to its share of the costs. The City's costs shall
be based on the estimated cost for the State furnished materials.
3. Upon compilation of the actual cost for the State
furnished materials the amount of the funds advanced by the City
in excess of the City's share will be returned to the City
without interest and the City agrees to pay to the State that
amount of its share which is in excess of the amount of the funds
advanced by the City.
4. Upon completion of the work contemplated at the
intersections of School Street Northwest at Freeport Avenue and
• at Jackson Avenue Northwest,..it shall be the City's
responsibility, at its cost and expense, to: (1) maintain the
0
luminaries and all its components, including replacement of the
luminaire if necessary; (2) relamp the new traffic control
signals and street lights; (3) clean and paint the new traffic
control signals, cabinets and luminaire mast arm extensions; and
(4) provide the necessary electrical power for the operation of
the new traffic control signals with street lights installations.
It shall be the State's responsibility, to maintain the traffic
signal cabinets and control equipment, repair knockdowns of the
traffic control signal systems, perform all other traffic control
signal and street light maintenance, and be responsible for the
72759
-2-
timing and operation of the new traffic control signals, all on a
reimbursable basis with the City.
5. The State and the City shall enter into Traffic
Control Signal Maintenance Agreement No. 72760 -R, for the
intersections of School Street Northwest at Freeport Avenue and
at Jackson Avenue Northwest, covering maintenance of the traffic
signal cabinets and control equipment, repair of knockdowns of
the traffic control signal systems, performance of all other
traffic control signal and street light maintenance not performed
by the City, and the responsibility for the timing and operation
of the traffic control signals by State Forces and the terms and
conditions covering payment therefore by the City.
• 6.. Any and' all .persons engaged in the aforesaid work
to be performed by the City shall not be considered employees of
the State and any and all claims that may or might arise under
the Worker's Compensation Act of this State on behalf of said
employees while so engaged, and any and all claims made by any
third party as a consequence of any act or omission on the part
of said employees while so engaged on any of the work
contemplated herein shall not be the obligation and
responsibility of the State. The City shall not be responsible
under the Worker's Compensation Act for any employees of the
State.
•
72759
-3-
•
APPROVED AS TO FORM:
City Attorney
CITY OF ELK RIVER
By
Mayor
(City Seal)
By
City Administrator
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL: DEPARTMENT OF TRANSPORTATION
•
By
District Engineer Assistant Commissioner
Operations Division
Dated
APPROVED AS TO FORM AND EXECUTION:
Assistant Attorney General -
State of Minnesota
72759
-4-
DEPARTMENT OF ADMINISTRATION
By
Dated
DEPARTMENT OF FINANCE
By
Dated
•
RESOLUTION
BE IT RESOLVED that the City of Elk River enter into an
agreement with the State of Minnesota, Department of
Transportation for the following purposes, to wit:
For maintenance of the traffic control signals by State
Forces on a reimbursable basis at the intersections of
School Street Northwest at Freeport Avenue and at
Jackson Avenue Northwest in accordance with the terms
and conditions set forth and contained in Agreement
No. 72760 -R, a copy of which was before the Council.
BE IT FURTHER RESOLVED that the proper City officers be
and hereby are authorized to execute such agreement, and thereby
assume for and on behalf of the City all of the contractual
• obligations contained therein.
CERTIFICATION
State of Minnesota
County of Sherburne
City of Elk River
I hereby certify that the foregoing Resolution is a
true and correct copy of a resolution presented to and adopted by
the Council of the City of Elk River at a duly authorized meeting
thereof held on the day of , 1995, as
shown by the minutes of said meeting in my possession.
(Seal)
•
City Clerk
•
MINNESOTA TRANSPORTATION DEPARTMENT
TRAFFIC CONTROL SIGNAL
MAINTENANCE AGREEMENT NO. 72760 -R
BETWEEN
THE STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION
AND
THE CITY OF ELK RIVER
FOR
• Maintenance of the Traffic Control Signals by State Forces on a
reimbursable basis at the intersections of School Street
Northwest at Freeport Avenue and at Jackson Avenue Northwest in
Elk River, Sherburne County, Minnesota.
S.A.P. 204 - 010 -02
Prepared by Traffic Engineering
•
ESTIMATED AMOUNT RECEIVABLE AMOUNT ENCUMBERED
None None
Otherwise Covered
• THIS AGREEMENT made and entered into by and between the
State of Minnesota, acting through its Commissioner of
Transportation, hereinafter referred to as the "State ", and the
City of Elk River, hereinafter referred to as the "City ",
WITNESSETH:
WHEREAS, pursuant to Minnesota Statutes,
Section 161.39, the Commissioner of Transportation may upon
request provide technical and engineering advice, assistance and
supervision to any county or municipality; and
WHEREAS, the City and the State did enter into
Agreement No. 72759, dated
to
participate in, among other things, the maintenance and operation
is of traffic control signals on School Street Northwest at Freeport
Avenue and at Jackson Avenue Northwest within the limits of the
•
City; and
WHEREAS, said Agreement provides that the State shall
maintain the traffic signal cabinets and control equipment,
repair knockdowns of the traffic control signals, perform all
other traffic control signal and street light maintenance not
performed by the City, and be responsible for the timing and
operation of said traffic control signals, all at the cost and
expense of the City; and
WHEREAS, it is considered mutually desirable that the
State shall maintain the traffic signal cabinets and control
equipment, repair knockdowns of the traffic control signal
72760 -R
-1-
• systems and perform all other traffic control signal and street
light maintenance not performed by the City, for the City
according to the terms and conditions hereinafter set forth;
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:
1. The State shall provide labor, material and
equipment to maintain and keep in repair the traffic control.
signal cabinets and control equipment, knockdowns of the traffic
control signal systems and all other traffic control signal and
street light maintenance not performed by the City, and shall be
responsible for the timing and operation of the traffic control
signals on School Street Northwest at Freeport Avenue and at
Jackson Avenue Northwest.
• 2. Upon completion of work performed, the State shall
submit to the City a detailed invoice in duplicate listing all
labor, equipment and materials used where work on the traffic
control signals was performed by State forces in accordance with
the terms and conditions of this agreement.
•
The City agrees to reimburse the State for
services provided hereunder as follows:
a) Direct labor charges shall be reimbursed at
the actual hourly rates paid to State forces
performing the work.
b) Fringe benefits shall be reimbursed as a
percentage of direct labor charges, such
percentage to be determined by the State
72760 -R
-2-
• Accounting and Finance Section at the
beginning of each State fiscal year from the
current cost accounting data.
c) Overhead costs shall be reimbursed as a
percentage of the total of direct labor
charges, fringe benefits and the cost of any
materials, equipment and personal expense
provided, such percentage to be determined by
the State Finance and Accounting Section at
the beginning of each State fiscal year from
the current cost accounting data.
d) Any material used shall be reimbursed at
• their actual cost to the State.
•
3. Upon receipt of said invoice, the City shall
promptly pay the State the full amount due. In the event the.
City fails to fulfill any monetary obligation created by this
Agreement, the Commissioner of Transportation may withhold
payment of State Aid money to the City to the extent provided by
Minnesota Statutes, Section 161.38, Subdivision 6.
4. Either party may terminate the terms and
conditions covering maintenance and operation for the traffic
control signals covered by this agreement upon providing 30 days
notice to other party. The City's termination must be
accomplished by a resolution of the City Council. The State's
termination must be accomplished by a letter from Mn /DOT's
72760 -R
-3-
0 . '
Assistant Commissioner. Upon termination it shall be the City's
responsibility, at its costs and expense, to maintain and keep in
repair the traffic control signals. Upon termination, the timing
of the traffic control signals shall be determined by the City's
Traffic Engineer.
S. Any and all persons engaged in the aforesaid
maintenance work to be performed by the State shall not be
considered employees of the City and any and all claims that may
or might arise under the Worker's Compensation Act of this State
on behalf of said employees while so engaged, and any and all
claims made by any third party as a consequence of any act or
omission on the part of said employees while so engaged on any of
• the work contemplated herein shall not be the obligation and
responsibility of the City.
•
6. This Agreement shall continue in force for a term
of one year, commencing on the date it is signed by the Assistant
Commissioner of Transportation. Upon the expiration of such
term, this Agreement shall continue in force from year to year
provided that in no event shall this Agreement be extended beyond
the period for which either party may legally bind itself.
72760 -R
-4-
•
APPROVED AS TO FORM:
City Attorney
CITY OF ELK RIVER
By
Mayor
(City Seal)
By
City Administrator
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL: DEPARTMENT OF TRANSPORTATION
is District Engineer
Operations Division
APPROVED AS TO FORM AND EXECUTION:
Assistant Attorney General -
State of Minnesota
•
72760 -R
-5-
By
Assistant Commissioner
Dated
DEPARTMENT OF ADMINISTRATION
By
Dated
DEPARTMENT OF FINANCE
By
Dated