Loading...
5.3. ERMUSR 06-08-2010Elk River Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, MN 55330-0430 UTILITIES COMMISSION MEETING Phone: 763.441.2020 Fax: 763.441.8099 TO: FROM: Elk River Municipal Utilities Commission Troy Adams, P.E. -Director of Operations John Dietz, Chair Jerry Gumphrey, Vice Chair Daz 1 Thom son, Trustee MEETING DATE: AGENDA ITEM NUMBER: June 8, 2010 5.3 SUBJECT: Review Annual Power Plant URGE Test BACKGROUND: Elk River Municipal Utilities operates and maintains four diesel generation units at our power plant. These units are contracted to Great River Energy through a Power Transaction Agreement at the current price of $2.75/kw/month based upon the proven capacity from the annual URGE test. The current contract expired October 31, 2005 but was extended on an "evergreen" basis. This allows the contract to extend the termination date on a one year incremental basis unless notice is given by either ERMU or GRE no later that April 1 S` of that yeaz. DISCUSSION: The attached spreadsheet reflects this yeaz URGE test results. Over the past yeazs, the URGE test results have steadily increased. This is due to maintenance, training, and familiarity with the plant. Once again, ERMU staff did a great job performing this URGE test. The capacity results from this test will result in $352,440 in annual payments from Great River Energy, an increase of $792 from 2009. ACTION REQUESTED: No action required. ELK RIVER MUNICIPAL UTILITIES GENERATION REPORT I, URGE TEST RUN for 2010 DATE 5/4/2010 TIME 8:00 OUTSIDE TEMP 72 . DATE 5/5/2010 TIME 8:00 OUTSIDE TEMP 51 . ENGINE TIME Kwh METER ENGINE HOURS FUEL OIL METER GAS METER #1 Start 12:49 Stop 1633.2 Stop 384.7 Stop 2580 Stop 14:09 Start 1625.4 Start 383.4 Start 2520 Urge Run 15 Minute 5/5/2010 1:15 PM 168 Load Profile Data 5/5/2010 1:30 PM 160 5/5/2010 ~-1:45 PM 160 C....:...~ un T_a_~_ 5/5/2010 2:00 PM 160 Ind. MW 0.655 ----------------------------------- #2 Start 12:35 Stop 13:50 Urge Run 15 Minute Load Profile Data I li vi ye ~ esieu ai o4a nw ror i nr II Mwh 0.78 Hrs. Run 1.3 Fuel Oil 60 1 .ngine #2 Totals Ur a Tested at 640 Kw for 1 Hr Ind. MW 0.68 Mwh 0.7 Hrs. Run 1.2 #3 Start 8:33 Stop 8826 Stop 13476.5 Stop 12:03 Start 8818 Start 13473 648 kWh 640 kWh Fuel Oil 60 Stop 664297 Start 663726 Urge Run 15 Minute 5/5/2010 ~ 10:45 AM ggg Load Profile Data 5/5/2010 11:00 AM ggp 5/5/2010 11:15 AM g8g C....:.... J4o T..._i_ 5/5/2010 ~ 11:30 AM gg0 Stop 876423 Start 576423 Gas 0 3536 kWh _..~...° .. - . -•~-•~ I~ uiyc i e~ieV a[ JJJO RW TOr l Fir II Ind. MW 3.75 Mwh 8 Hrs. Run 3.5 Fuel Oil 571 ~ Start 8:29 Stop 3398 Stop 17662.3 Stop 3626 Stop Stop 11:29 Start 3386 Start 17659.2 Start 2796 Start Urge Run 15 Minute 5/4/2010 ~ 10:15 AM 1464 ~- Load Profile Data ( 5/4/2010 10:30 AM-, 1464 5/4/2010 ~ 10:45 AM 1456 ~..,.:..., un r..._i_ 514/2010 11:00 AM 1472 274325 274325 Gas 0 5856 kW~ _..~..._ ... ......,.. I~ u~ye i eSleU a[ ObJO RW Tor 1 Fir II Ind. MW 6 Mwh 12 Hrs. Run 3.1 Fuel Oil 830 - ---------------------- Gas ----- _ngine Run Totals Urge Mwh 70.680 Fuel Oil 1521 160 Stop 1399.8 Stop 335.9 Stop 2520 Start 1392.8 Start 334.7 Start 2460 514/2010. 1:00 PM r 152 ~