5.8. SR 06-21-2010City of
Elk -,.~
River
To
City Council
Agenda Section
Community Development
Item Description
REQUEST FOR ACTION
Meeting Date
June 21, 2010
Consider Adoption of 171ST Focused Area Study Plan
Action Requested
Approval of the 1715L Focused Area Study as drafted.
Item Number
5.8.
Prepared by
Jeremy Barnhart, Planning Manager
Reviewed by
Reviewed by
Summary
The 1715f Avenue Focused area study is a land use plan developed over the last 17 months, providing land
use and public investment guidance for over 900 acres in the southern portion of the community.
The plan discusses and provides recommendations on:
• preferred location of a future interchange/ intersection onto Highway 10/169.
• preferred land uses as access to Highway 10/ 169 changes over then next 20 years.
• ways to maximize the benefits of the commuter rail station.
• ways to maximize the City owned Gateway property.
• ways to tie all the divergent properties together into a cohesive, promotable
neighborhood.
Planning Commission Discussion
The Planning Commission reviewed the plan at their meeting on June 8. No one commented on the plan.
The Planning Commission noted that the acknowledgement page should be changed to reflect new
commissioners.
Economic Development Authority Discussion
The EDA reviewed the plan at their meeting on June 14. As of this writing, comments were not
available.
Please note: A correction was made on page 66 of the FAST Study Plan which was distributed to you
last week. Please replace this page in your copy.
Attachments
• Corrected Page 66 of FAST Study Plan
• Staff Report to Planning Commission dated June 8, 2010
• Staff report to Economic Development Authority dated June 14, 2010
N:\Departments\Comxnunity Development\Planning\Projects\FAST Study Area\FAST staff report CC for adoption June2010.doc
Action Motion by Second by Vote
Follow Up
N:\Departments\Community Development\Planning\Projects\FAST Study Area\FAST staff report CC for adoption June2010.doc
IMPLEMENTATION
STRATEGIES FOR DEVELOPMENT &
REDEVELOPMENT
Implementation of the master plan is not a single action, but a series of steps.
These steps will betaken over time in phases. Initial focus should be on several
implementation initiatives that lay the foundation for change. Initially, public
investments such as street and infrastructure improvements will play a key role in
setting the table for private development to occur in the FAST. Part of this strategy
becomes the effective use of finance tools available to the City.
Phasing
To act as a basis for analyzing implementation issues and to focus in on first steps
needed to begin development and redevelopment, a phasing plan has been created
(see Figure 7.~). The phasing plan builds from other known investments and responds
to site readiness.
It is anticipated that full development of the ~7~st Avenue FAST will take roughly z5
years to accomplish assuming a return to a relatively stable & growing real estate
marketplace. The phasing plan suggests two general phases marked by the transition
of Highway ~o/t6g to a limited access freeway, and remaining areas suggested as
retain/infill areas.
Earlier Phases
There are three sub areas suggested for earlier phase development totaling roughly
8o acres. They are the East Elk River Gateway sub area (east of Highway io/T6g), the
Hinge sub area immediately north and the Point sub area where the vacant Saxon
auto dealership and Americ inn Hotel exist. Development here possess the most
financial and market feasibility. However, development in these areas must follow
the new infrastructure investments which will establish the framework for future
development.
Later Phase
The later phases of evolution will likely occur with the transition of Highway ~o/16g
from it's current access configuration, to a two signal access configuration, to
ultimately a freeway configuration and as ridership builds on the commuter rail line.
Before these areas "ripen" for redevelopment, they will need to respond to the shift in
transportation patterns and build on the financial infusion of earlier phase projects.
Retain / fn fill:
There are three areas of the FAST labeled in the phasing plan as "retain/infill". These
areas are not suggested for active pursuit of redevelopment because of the quality of
development. These areas include the Northstar Business Park, Elk River Station and
the small pocket of single family housing around Kleivers Marsh and the housing along
the river. These areas of infill are independent of the phasing schedule.
G6 17130. pvE'rltlE-'' FocusedArec S7udt ~..~~•a ... W.,.....
Ells REQUEST FOR ACTION
River
To
Planning Commission
Agenda Section
Planning Items
Meeting Date
June 8, 2Q10
Item Description
Consider Recommendation to Adopt 1715` Focused Area Study
Plan
Action Requested
Staff recommends approval of the plan as drafted.
Item Number
5.6.
Prepared by
Jr~Gs~~y Barnhart, Planning Manager
Reviewed by
Jeremy Barnhart, Planning Manager
Reviewed by
Baclc~roundlDiscussion
The 1715` Focused Area Study is the result of ~, ~ ~L 17 months of long range, collaborative planning with
MnDDT, property and business ~ W ~~ers, elected and appointed city leaders. The plan provides a
framework from which future land use decisions can be made and evaluated. These decisions will include
possible regulatory changes, including anticipated Comprehensive Plan amendments, zoning ordinance
amendments and zone changes. The plan anticipates the need for future infrastructure improvements.
The plan, and the resulting regulatory amendments and infrastructure investments, are intended to
position properties within the area to be able to accommodate expected changes in access and traffic
circulation.
The plan also sets the stage for development of design guidelines. Eventually, design guidelines are
envisioned to impact both street/sidewalk design, and private development.
Financial Imo_ act
None
Attachments
Plan
Case File: 171st Focused Area Study
Page 2 Final Adoption
Overview
The plan as attached is fairly consistent with the original plan reviewed by the joint group on May
10, 2010. Based in part on the comments received during that meeting, the following changes were
made:
• Minor modifications to Development Framework Diagram and Infrastructure Diagram.
This includes adding commercial to the west side of the lot west of the bank on Yale Street.
The plan provides the tools for eventual development of design guidelines. One of the original
goals of the plan was to suggest ways the study area can distinguish itself as a prime development
district. Creating cohesive character will help in that goal.
• Streetscape Typology Diagram. The diagram on page 56 identifies the street types within the
study area. Design guidelines will be developed to guide the development of these separate
streets, with separate into a cohesive character. Comprehensively, the area will develop its
one character, forming "a place" that can be identifiable and marketable.
• Labels for the four different street types. Beginnuig on page 56, each of the four main street
types are given streetscape improvement examples, again, with the goal of establishing "a
place".
Finally, the plan establishes a framework for implementation, identifies major tools that should be
developed, including regulatory and financial priorities.
• Expanded Implementation Chapter
o Implementation initiatives diagram
o Interim second signal approach to infrastructure
o Priority areas for near term initiatives
0
Comprehensive Plan
With approval of the FAST Plan, it is anticipated that the plan will be incorporated into the
comprehensive plan formally, likely later this summer. This will be via a separate action, public
hearing, etc.
Natural Resources
The plan attempts to recognize the unique natural resources within the study area, identifying the
large wetland complex south of 1715` Avenue. The plan attempts to capitalize on these features in
establishing an enjoyable place to live, work and shop.
Parks
The plan does not identify any specific locations for future active parks, but does indicate the desire
to retain existing open spaces, including the enhancement of some wetlands within the plan area.
Additionally, the plan highlights the benefits of a future trail parallel to the river along the western
portion of the plan area, but does not specify the preferred location.
N:\Departments\Community Development\Planning\Projects\FAST Study Area\FAST staff report PC fox adoption June2010.doc
Case File: 171~~ Focused Axea Study
Page 3 final Adoption
Transportation
Much of the plan's evolution was based on the location of a future interchange. The plan includes
the use of existing infrastructure where possible, and the development of new connections,
including south the 165th Avenue, a new intersection on Highway 10 near 167th Avenue. The plan
also identifies the benefits of additional connections from the study area to Carson Street to the
north, Twin Lakes Road over the tracks at 173rd Avenue.
The eventual build out of the area will increase traffic throughout the study area, most notably on
Twin Lakes Road, 171St Avenue, and Highway 10/169. The plan anticipates the need fox
roundabouts at several key intersections, in part to keep traffic moving, but also to prevent traffic
back-ups blocking intersections and train lines. Amore defined transportation plan, using the land
uses and densities prescribed, will need to be developed to establish long term traffic control
measures.
Action Motion by Second by Vote
Follow Up
N:\Departments\Community Development\Planning\Projects\FAST Study Area\FAST staff report PC for adoption June2010.doc
~l REQUEST FOR ACTION
`ver
To
Economic Development AuthoritP
Agenda Section Meeting Date
June 14, 2010
Item Description
Consider Recommendation to Adopt 171` Focused Area Study
Plan
Action Requested
Staff recommends app:.., Y al of the plan as drafted.
Item Number
5.
Prepared by
.Jeremy Barnhart, Planning Manager
Reviewed by
Cathy Mehelich, Economic
Development Director
Reviewed by
BackgroundlDiscussion
The 171` Focused Area Study is the result of over 17 months of long range, collaborative planning with
MnDQT, property and business owners, elected and appointed city leaders. The plan provides a
framework from which future land use decisions can be made and evaluated. These decisions will include
possible regulatory changes, including anticipated Comprehensive Plan amendments, zoning ordinance
amendments and zone changes. The plan anticipates the need for future infrastructure improvements.
The plan, and the resulting regulatory amendments and infrastructure investments, are intended to
position properties within the area to be able to accommodate expected changes in access and traffic
circulation.
The plan also sets the stage for development of design guidelines. Eventually, design guidelines are
envisioned to impact both streetJsidewalk design, and private development, all with the goal of
establishing a promotable and discernable character for the area.
Financial Impact
None
Attachments
Plan
Case File:
Page 2
171n Focused Area Study
Final Adoption
Overview
The plan as attached is fairly consistent with the original plan reviewed by the joint group on May 10,
2010. Based in part on the comments received during that meeting, the following changes were made:
1. Minor modifications to Development Framework Diagram (page 37) and Infrastructure
Dia~.~.~~ (page 4Q). This includes adding commercial to the west side of the lot west of the
bank on Yale Sheet and reducing the extension of Yale Street into private r~.,Yerty south of
the new intersection.
The plan provides the tools for eventual development of design guidelines. One of the original goals of
the plan was to suggest ways the study area can distinguish itself as a prime development district
Creating cohesive character will help in that goal.
2. Streetscape Typology Diagram. The diagram on page 56 identifies the street tapes within the
study area. It is expected that the streets themselves, and their spatial relationship to
buildings, parking, and people will play a key role in the development of character of the
area. With the widely diverse street types, including residential, industrial, and Twin Lakes
Parlywpy, design guidelines will need to be established to combine these areas into a
cohesive, promotable, and identifiable character. Creating a character will work to position
this area as a destination, one which all businesses can benefit.
3. Labels for the four different street types. Beginning on page 56, each. of the four main street
types are given streetscape improvement examples, again, with the goal of establishing "a
place". These are guidelines at this point, it will be suggested that in the future these be
incorporated formally, likely in design guidelines as part of a zoning ordinance.
Finally, the plan establishes a framework for implementation, identifies major tools that should be
developed, including regulatory and financial priorities:
4. Expanded Implementation Chapter (page b1)
o Priority areas for near ~.~~~~~ initiatives (page 67)
o Interim second signal approach to infrastructure (page 68)
o Implementation initiatives diagram {page 70)
Comurehensive Plan
With approval of the FAST Plan, it is anticipated that the plan will be incorporated into the
Comprehensive Plan formally, likely later this summer. This will be via a separate action, public
hearings, etc.
Natural Resources
The plan attempts to recognize the unique natural resources within the study area, identifying the large
wetland complex south of 171St Avenue. The plan attempts to capitalize on these features in
establishing an enjoyable place to live, work and shop.
N:\Departments\Comtnunity Deoel.,r.,..:..t\Planning\Pmjects\FAST Study Area\FAST staff..:~.._~ EDA for adogtion June~310 Changes DH.doc
Case File:
Page 3
171 Focused Area Study
Final Adoption
Parks
The plan does not identify any specific locations far future active parks, but does indicate the desire to
retain existing open spaces, including the enhancement of some wetlands within the plan area.
Additionally, the plan highlights the benefits of a future trail parallel to the river along the western
portion of the plan area, but does not specify a preferred location.
Transportation
Much of the plan's evolution was based on the location of a future interchange. The plan includes the
use of existing infrastructure where possible, and the development of new connections, including south
the 165` Avenue, a new intersection on Highway 10 near 167` Avenue, and Yale Street. The plan also
identifies the benefits of additional connections fLw~.. the study area to Carson Street to the north and
Twin Lakes Road over the tracks at 173 Avenue.
The eventual build out of the area will increase traffic throughout the study area, most notably on Twin
Lakes Road, 171 Avenue, and Highway 10/169. The plan anticipates the need for roundabouts at
several key intersections, in part to keep traffic moving, but also to prevent traffic back-ups blocking
intersections and train lines. Amore defined transportation plan, using the land uses and densities
prescribed, will need to be developed to establish long term traffic control measures.
Land Uses
The Plan does not suggest wholesale rezoning of the area, eliminating existing uses. As has been
communicated from the beginning, it is expected that existing uses will be allowed, and new uses will be
added. Staff anticipates an overlay district over specific potions of the plan, and is working on
developing this ordinance for formal review, likely later this summer.
It should be noted that land uses in several areas of the plan do not change at all, including Yale Street
residential, and the area east and north of the commuter rail station.
Planning Commission
On June $, 2010, the Planning Commission reviewed the plan, and recommended approval as drafted,
with the exception of updating the names on the cover sheet to reflect new commissioners.
Next stews
This item is scheduled for review by the City Council on June 21, 2010.
Action Motion by Second by 'Vote
Follow Up
N:\Departments\Community Development\Planning\Pmjects\FAST Study Area\FAST staff report EDA for adoption Jutte~Ifl Changes DH.doc
® ~
r~
u
y,
~:
~. _
~ ~s
~{
ag a
• ac mow~e~~ements
Economic Development Authority:
Pat Dwyer, Chair
Dan Tveite
Ron Touchette
City Council:
Mayor Stephanie Klinzing
Paul Motin
Nick Zerwas
Matt Westgaard
Jerry Gumphrey
Planning Commission:
Kevin Scott, Chair
Dana Anderson
Pete Lemke
Chad Westberg
Chad Staul
Ryan Austed
Troy Ives
City Staff:
Lori Johnson, City Administrator
Jeremy Barnhart, Planning Manager
Cathy Mehelich, Economic Development Director
For further information contact: -...
:.:..
Elk River Planning Department
13065 Orono Parkway
,.
EIk River, MN 55330 ' ''~ ~`~
Phone: 763.635.1000
Jeremy Barnhart, Planning Manager
email: jarnhart@ci.elk-river.mn.us
:..,~~-
s3
~~ ~.
spy 1. .. :¢¢
•
•
M incro~uct~on
The master plan for the Elk River ~7ist Avenue FAST outlines a course for change
responding to both the near and long term development & transportation realities
impacting the site. The FAST ultimately becomes a series of unique, interconnected
districts showcasing residential, office, retail and industrial uses within the fabric of
an enhanced open space and transportation network centered on the Northstar
Commuter Rail Station and Highway ~0~~69. The z5-3o year planning horizon
recognized and guides land use and transportation changes for the area to allow
for both near term investment with a constant eye toward the future vision. The
master plan for the FAST provides the framework for a future development pattern
recognizing strong development potential in the area today and the economic, political
and environmental constraints for future development. To some degree, the vision
challenges the current pattern of development, but is also grounded in reality ensuring
the master plan doesn't exceed the development capabilities of Elk River and that the
timetable for implementation is feasible.
•
INTRODUCTION
n
With the City owning 75 acres of land in the center of the study, known as the Gateway
Business Park, and the recently opened Northstar Commuter Rail Line the time is now
for planning major investments in the area to maximize the long term benefits for the
community. The Northstar commuter rail will likely bring more than just trains to the
FAST. As the first commuter rail line in Minnesota, the arrival of the train presents an
opportunity for both near term and long-term investment in the area. The Northstar
station will provide an attractive location for business and housing like Elk River Station
over the next several years. Over time, as development and intensifies, the master
plan envisions the station area transforming into a unique, successful transit-oriented
district with the economic and cultural benefits of other station area villages located
along more mature commuter rail lines such as the METRA line in suburban Chicago.
The commuter rail station is anticipated to provide a level of immediate benefit
to prospects for service retail, office, industrial and residential development.
While the rail station will initially provide an important marketing advantage,
use of transit will likely become more ingrained in our transportation patterns
over time. As redevelopment occurs and density in the study area increases,
the station's benefit to development will become much more measurable.
Regarding destination retail development, it is anticipated that Highway ~o~~6g
improvements will be the driving force. For the foreseeable future, destination
retail development will rely on highway access and visibility. However it is
anticipated that, over time, the commuter rail station will assume increasing
importance in delivering benifit to retail venues in the study area.
The Elk River ~7ist Avenue FAST will have an employment focus, leveraging key assets
such as the Northstar line, Great River Energy and the Elk River Resource Recovery
Facility and reinforce Elk River as a regional hub. The plan seeks to maximize land
value and create nearly 6,500,000 square feet of retail, office and industrial space, and
create an estimated 900 million dollars of development value for the City of Elk River
at the maturity of the plan. The master plan also seeks to develop upwards of z5oo
housing units and provide an array of household alternatives at varying prices amidst
new parks and open spaces allowing recreational and social opportunities for all ages
and the opportunity to connect within the community.
The master plan for the ~7ist Avenue FAST seeks to develop a successful zest century
economic model. The plan contains the details and parameters for future development
and redevelopment with a focus on implementation and providing the flexibility to
respond to future opportunities and challenges.
~1
L_~
~ eacK~roun~
The i7~st Avenue FAST project area offers one of the more important development and
redevelopment sites within the City of Elk River. With the strong orientation toward
Highway ~o~i6g and the newly opened Northstar Commuter Rail Station in the fall of
zoo9, the dynamics of land use in this portion of the community are likely to evolve.
In order to plan for the future of the FAST, background knowledge of the study area
is vital in order to fully understand the potential of the site. This chapter begins with
an overview of exiting land use and transportation conditions describing the starting
point for the master plan. The chapter concludes with an analysis of the opportunities
and challenges of these existing conditions.
BACKGROUND
•
SITE C 0 N T E XT within close proximity. The Kelley Farm, a registered national historic landmark is
Situated in the southeast portion of located just south of the study area along the banks of the Mississippi River off of
Elk River, the initial FAST project area Highway io~169.
comprised nearly 70o acres. With the dust north of the study area a large commercial center exists at the intersections of
addition of the second phase, the land Highway ~6g and Main Street and extends north to School Street and includes Wal-
west of Highway ~oJi69 totalling z3o acres Mart and Home Depot as major retail anchors. Great River Energy has a power plant
the overall project area has grown to 93o and satellite offices located northwest of the study area across Highway X69 and has
acres. an ongoing operation with the Refuse Derived Fuel (RDF) Plant in the southern portion
of the study area to produce energy from pelletized waste created at the plant.
The project area is bound by the
Mississippi River to the west with State
Highway ~o~16g bisecting the study area
running parallel to the river. Along the
northern edge of the project area a range
of land uses exist from office and industrial
uses west of Twin Lakes Parkway to high
and low density housing and parkland
toward the northeast. Much of the land
to the east and south of the project area is
owned by Cargill Corporation, nearly 750
contiguous acres. About half of the land,
mostly to the south, is currently utilized as
agricultural research with the remaining
land area comprised of a large wetland
complex which defines the majority of
the eastern edge of the project area and
extends in to the site.
The Burlington Northern Sante-Fe rail
line also bisects the site moving from
northwest to southeast and carries a large
number of heavy rail trains each day in
addition to the Northstar commutertrain.
The Northstar station is located in the
center of the study area, approximately
two miles from Downtown Elk River to
the northwest.
A number of community parks are
adjacent to the study area. Hillside City
Park, Kliever Marsh Park, Kliever Lake
Fields, Babcock Memorial Park and the
.Youth Athletic Complex (YAC) are all
Figure z.r Site Context Map
r ..
`F`"
1718C. QV2nll2 Focused Area S7udy
.~-`...;
BACKGROUND
•
•
rte,
STUDY AREA
The i7~st Avenue FAST project area comprises 93o acres of land, of which approximately
zi5 acres are wetlands of floodplains. The wetlands are essentially two large bands
running east to west through the project area. There are nearly goo acres of public
right-of-way for streets and the rail line, and ~6o acres are currently developed lands
that are not anticipated to change. These developed lands include the built portions
of the Northstar Business Park (9 acres), Elk River Station housing development (39
acres), the service~commercial areas west of Highway io (zz acres), the single family
residential surrounding Kleiver's Marsh (4o acres) in the northeast corner of the study
area, and the residential neighborhoods along the river (37 acres). The remaining land,
approximately 455 acres, will be the focus of potential land use alterations for the
Figure z.z: Study Area Map
FAST project. Of these 455 acres, roughly
~zo acres are northeast and z58 acres are
southwest of the rail line on the east 76
acres are west of Highway io.
The Gateway area is a 75 acre area of
city owned land situated south of i7~st
Avenue. This land, acquired from Cargill
via agreement, mandates no residential
use on the property until zozo. The
portion of land immediately east of the
Gateway property, west of the railroad
tracks is owned by Cargill. The agreement
shows a roadway connection through
the Cargill owned land to 165th which can
occur anytime at the City's expense.
The Minnesota Department of
Transportation also owns land in the FAST
area. MN DOT is currently using the zo
acres of land just north of 75th Avenue
for aggregate extraction.
The Northstar commuter rail station in
Elk River opened in November of zoog,
with commuter service to downtown
Minneapolis. The commuter station will
have an 80o car surface parking lot, drop-
offand twin rail platforms for commuters.
The station sits in the heart of the study
area along the northern side of the rail
line and along Twin Lakes Parkway the
major roadway spine through the project
area.
Twin Lakes Parkway isenvisioned as asub-
regional collector for southeast Elk River.
The four-lane road with median is newly
constructed from the commuter station
north, and is envisioned to continue to
the southeast through the Gateway &
Cargill property in the future serving
the businesses and residents of east Elk
River.
Major utility lines also run through the
project area. A natural gas line with a goo' '"°"°
~ TT'18t. CN2rK.J2 FocusedArea STudy y 5 F/
,~
BACKGROUND
•
easement runs north to south, essentially
paralleling Ulysses Street through the
southern portion of the project area.
Large electric transmission lines extend
from the Great River Energy (GRE) plant
along the northern wetland corridor to
the east. One line parallels the rail line
near the Northstar station and extends
south to the RDF plant.
EXISTING LAND USE
Residential
Residential land uses are generally located
in the northeast portion of the project
area and along the river edge as indicated
in Figure z.3. The most recent residential
project, Elk River Station, was completed
in zoo7. The 39 acre high density
development includes a mixture of senior
rental and owner occupied townhomes
and is located just east of the commuter
rail station. Single family homes comprise
the remaining residential uses, and are
situated north and south of 175th Avenue
around Kleivers Marsh and the northern
wetland complex.
Commercial
Commercial uses are generally located
along Highway io~i69 north of i7~st
Avenue. This land use primarily
encompasses auto related uses, including
a large auto dealership, auto repair and
auto body shops. Small service related
uses also exist within the commercial land
use.
Industrial
Industrial uses include three primary
areas, the Northstar Business Park, the
RDF plant, and the industrial uses near
the station and along Ulysses Street.
The Northstar Business Park in the
~'
~ 6 i 17130. C]V2ilU2 Focused Area STudy ~
~~~
~ ~Y-~---
~ ,w~
®,„a„..,.,.,~
~ ~~
~ ~....
~~
~.., M-.-~.~..
..,..~..
Figure z.3: Land Use Map
northwest contains light industrial and
light manufacturing uses. Much of the
construction has occurred within the last
three to five years, and only two parcels
remain open for development. The
RDF plant located along 65th Avenue
is roughly 4o acres and includes a public
recycling facility. The central portion of
the study contains two large trucking
companies north and south of ~7~st on
the south side of the rail line and small
warehouse and manufacturing uses along
Ulysses Street. An area north of 173rd
Avenue has been improved with the
construction of Vance Street, but has yet
to see industrial development.
Undeveloped
Much of the land area between ~7~st
Avenue and 65th Avenue is undeveloped.
The city owns the 75 acre Gateway tract
of land and Cargill owns an additional
8o acres being utilized for agricultural
research.
EXISTING ZONING
As the influence of Highway ~o~~6g
illustrates, much of the uses adjacent to
the roadway today are zoned highway
commercial. Light industrial zoning exists
for portions of the Gateway area east of
the natural gas line as well as for smaller
parcels along Ulysses Street. The RDF
plant has an underlying zoning of light
industrial with solid waste facility overlay
zone. Elk River Station and areas around
the transit station are zoned planned
unit development, including the two
trucking facilities north and south of i7~st
Avenue. The Northstar Business Park
has a business park zoning promoting a
higher design and construction quality
than traditional light industrial zones. In
the northeast single family residential
zoning is split between Rya south of 75th
Avenue and Ric north of 75th Avenue.
The Cargill owned land in the southeast
portion of the project area is zoned
agricultural research.
Figure z.4: Zoning Map
BACKGROUND
BACKGROUND
a
a
V
6
t
0
z
0
0
7
EXISTING TRANSPORTATION
Road Network
Highway ~o~i69 is the primary arterial running along the western boundary of the study
area. Today the roadway is afour-lane, at grade regional highway and has average daily
traffic counts (ADTs) of nearly 35,000 trips per day. Currently, the primary access point
to the project area is the signalized intersection at i7~st Avenue. Additional access
points exist attwo un-signalized intersections at 173rd Avenue and 165th Avenue and
a handful of parcels have right-in, right-out access or additional median crossings for
access. Some of these median will be closed with MnDOT'd mill and overlay project
scheduled in zoi3.
Twin Lakes Parkway serves as the primary collector for the FAST, as traffic from
southeast Elk River is funneled south to Highway ~o~t6g to the signal at ~7ist Avenue.
The roadway has been improved as afour-lane with a median from Main Street to the
transit station, and as a four lane road with no median from the station to Highway
io~~69. The roadway is anticipated to carry nearly zo,ooo cars per day in the future
and extend to the southeast through the study area to Jarvis Street in the southeast
corner of Elk River. Twin Lakes Parkway represents the only rail crossing in the project
area. A previous rail crossing was located at 173rd Avenue, but was relocated to the
current location for the Northstar station development. Currently only a small portion
of 173rd Street remains from Highway ~0~~69 to the rail line and then connects south
with Ulysses Street to form the built internal road network west of the tracks. 75th
Avenue in the northeast serves as a collector for the residential uses beyond the
project area, bringing people to Twin Lakes Parkway. The only private streets exist
within Elk River Station.
Transit
The Northstar commuter rail began operation in fall of zoog. The rail service provides
five daily commuting trains to downtown Minneapolis with one reverse commute
train per day. The average trip time from Elk River to downtown Minneapolis is
approximately 35-38 minutes.
Existing rail line crossing at study area
Rail
The two heavy rail lines are owned and operated by Burlington Northern ~ Sante-Fe
and operates as a major corridor for cross country rail transport. On average, nearly
6o to 8o trains per day move through the project area with speeds in excess of 7omph.
_ ~ Noise and safety concerns will be significant considerations for land uses adjacent to
the rail line.
Sidewalks & Trails
A limited number of sidewalks and trails exist within the project area. Those trails
that have been built came with recent developments such as Elk River Station and the
roadway improvements along Twin Lakes Parkway and 75th Avenue.
171St. QV2r1U2 Focused Area S7udy I
Northstar commuter rail train
•
RELATED PLANNING EFFORTS
The master plan for the ~7~st Avenue FAST exists in the context of major transportation
planning efforts for the primary transportation corridors through Elk River. These
transportation planning studies and their outcomes are critical in defining the future
land use direction for the ~7ist Avenue FAST. Key decisions on land use will likely be
determined by the location of a future interchange for Highway io~i69, as over time the
corridor transitions to a limited access freeway and all existing accesses are eliminated.
The following is a review of the transportation and land use planning efforts related
to the ~7~st Avenue FAST.
2002 Inter-Regional Corridor Management Plan
In zooz MN DOT, working with input from the city of Elk River, completed an Inter-
Regional Corridor Management Plan identifying alternative strategies for upgrading
Highway io~~6g south of Highway ion in Elk River to a limited access freeway. The study
identified two options for a future six lane freeway alignment; `Alignment A' essentially
running parallel to the rail line roughly 400' away and `Alignment B' the existing
Highway ~0~~69 corridor. The study also identified two interchange locations within
Elk River between Highway ioi and the eastern boundary of the community for either
alignment. One would be located near Jarvis Street and the other near 65th Avenue.
While the planning effort was completed in zooz, MN DOT still has not identified any
funding for this project in their 3o year capital improvements program.
Highway ~o&t69 Preliminary Design and Environmental Documentation Study
Currently underway are two M N DOT studies funded by the City investigating ways to
solve traffic bottlenecks in Elk River along Highway io heading west through historic
downtown, Highway X69 heading north through a major commercial area of the
community, and the poi & io~~69 interchange. The two studies identify a preferred
reconstruction plan for the major interchange at ~o~ and io~i69, the Main Street and
School Street intersections along Highway i69 and the intersections along Highway
io moving through the downtown area west to Lake Orono. Amore detailed review
of these regional transportation planning efforts are discussed in the assumptions
chapter of this report.
Elk River Comprehensive Plan
In zoo3 the city of Elk River completed a Comprehensive Plan update for the community.
At the time of the update much of the land within the FAST project was undeveloped.
In general, the City designated highway commercial uses along the Highway to~~69
corridor with light industrial uses beyond. North of the rail line high density housing
was selected as the future land use. Two additional transportation initiatives were
identified as part of the Comprehensive Plan update. The first initiative was to create
a connection between i7~st Avenue and 65th Avenue through the extension of Twin
Lakes Parkway, and the second was to investigate a roadway connection between
CSAH iz and Highway io~i6g on the far eastern boundary of the community.
BACKGROUND
BACKGROUND
•
OPPORTUNITIES &
CHALLENGES
Existing conditions for 171st Avenue FAST
present terrific opportunities, as well
as numerous challenges. This master
plan looks to capitalize on the inherent
opportunities within the study area and
address the challenges that exist today. A
summary of opportunities and challenges
follows:
Opportunities
» Northstar Commuter Rail Station: The
Northstar Commuter Rail Station will
likely bring additional traffic increasing
development interest. In the long term,
as the Northstar commuter rail continues
to mature by adding trains, extending the
line north to St. Cloud and providing more
reverse commute trips, the Northstar line will
continue to play a key role in the evolution o f
the study area.
» Orientation and access to Highway to/tdg:
A primary transportation corridor in the
northwest metro, Highway to/169 has the
potential to draw new of Tice, retail and
industrial uses within the FAST area. In the
near term, smaller more service oriented
uses could develop near the existing signal at
171st to help serve the commuter rail station
and residents o f southeast Elk River. Longer
term with the transition o f the roadway into
a freeway section, larger retail and of fice
users would likely be attracted to the new
interchange location. The visibility provided
by Highway to/t6g alone is a tremendous
asset f or the 171st Avenue FAST. The volume
o f tra f f is moving through the interchange
at the Highway tot & to/169 provides high
visibility for a potential iconic development
in the north, while at the southern end o f
the study area the vast acres of agricultural
land provide a threshold f or another iconic
{ 10 17181. CJV2r1U@ Focused Area STudy ~
•"
~~ t~
:~
ti
~`
w".
~ a~ ~.
t -.
bookend development and views deep into the site. The RDF plant may have the potential to
reinvent itsel f as an iconic anchor f or the area at the southern gateway to Energy City.
Twin Lakes Parkway: Envisioned as the sub-regional collector for east Elk River, Twin Lakes
Parkway has the potential to be a strongcommunity corridor. Nearly all businesses and residents
o f east Elk River will utilize Twin Lakes Parkway f or access to and f rom the larger regional highway
system. Streetscape enhancements, appropriate lighting, landscapingand pedestrian amenities
along the corridor will help trans form Twin Lakes Parkway into a complete street section for
automobiles, bikes and pedestrians. The physical design and geometry o f the roadway is an
important consideration for establishing the development and transportation patterns and can
Figure z.5 Opportunities and Challenges Map
BACKGROUND
aid in better positioning land in the project area f or development or redevelopment.
» Gateway Business Park: The 75 acre city-owned gateway business park land is situated in the
south central area o f the FAST. The green field site allows flexibility f or the city in determining
transportation improvements and land use decisions for the broader area.
» Energy: The excess steam generated at Great River Energy's power plant facility could potentially
provide portions o f the FAST area with a district heating/ cooling opportunity. Combining the
RDF plant and the Energy City brand for Elk River could spawn economic development with a
green energy production and green industry focus f or in the FAST area.
Natural Systems: The Mississippi River provides the greatest natural amenity opportunity for
residents f or recreational use. The large wetland complex o f fers great amenity opportunities
f or residential and o f Tice development. The sweeping views over wetland and the preservation
or enhancement o f the existing natural wetland and woodland vegetation can help emphasize
some o f the distinct characteristics o fElk River. Combined with an integrated trail network to
connecting these natural amenities with city parks and commercial nodes these broad natural
systems can be a tremendous asset to the FAST project area.
Challenges
» Future transportation and access changes for Highway to/~69: One of the biggest challenges
for the i7~st Avenue FAST will be understanding how f uture transportation shifts will a f feet
access & circulation through the study area for existing uses and for any new development
prior to Highway ~o/~6g becominga limited access freeway. Findings way to make intelligent
investments in the near term without negatively impactingpotential future investments will
be crucial.
» Potential environmental issues: In the near term, the environmental issues will likely surround
wetland mitigation strategies in concert with green field development. However in the long
term, with the abundance o f automotive and trucking uses in the FAST potential issues with
soil contamination may exist with redevelopment. Environmental clean-up o f potentially
contaminated sites could become costly endeavors, particularly in ex-urban communities with
abundant green field development potential.
» Noise - Highway to/~6g and the rail line: Noise levels f rom the f refight trains as well as highway
tra ffic on Highway ~o/i6g will likely have an impact on residential land uses in the study area.
Finding the appropriate location for residential uses and determining the proper uses adjacent
to the rail lines must consider noise levels and identi f y potential mitigation techniques.
» Major utilities: An existing natural gas line bisects the southern hal f of the site constraining
--~
Existing wetland complex within the study area
development potential, as no structures or signi ficant grading can occur within the easement.
The location will also have a larger impact on the internal roadway system and overall parcel ~ ~ ~ ' ~,
configuration for the FAST. In addition to the gas line, large transmission lines run through the ~,~~
~~ ~. ~~
center of the study area between Great River Energy and the RDF plant. ~~- 4~ ~ °",;,:,~
1T13t. QVe11lA2 Focused Area STudy
Gateway area owned by the city
Elk River Resource Recovery Facility (RDF Plant)
Great River Energy Power Plant Facility
•
•
•
• OBJECTIVES
oB~ectves a~~
assumPt~ons
Before the planning effort commences with design alternatives, it is paramount that
the core objectives for the project are understood. These project objectives help
to ground the planning process ensuring the goals set forth by the City of Elk River
are met. After discussion with the City Council, Planning Commission and Economic
Development Authority (EDA) at the beginning of the phase one, and again at the start
of the phase two planning effort, and continued evaluation throughout the process,
the core objectives for the Elk River FAST are as follows:
Leverage commuter rail station and city-owned lands as triggers for
development.
The Northstar commuter rail has attracted noticeable attention as the first commuter
rail line to begin operation in the Twin Cities. Determining the appropriate level of
development anticipated to follow the commuter rail must be strategic.
The city owned Gateway land represents the strongest opportunity for future
development. The questions surrounding development in the Gateway focus on
the appropriate uses and scales and what level of infrastructure investment will be
needed to facilitate development. The central location of the Gateway affords the city
significant influence over infrastructure and development investment giving the city
broad control of the future of the FAST.
~.~I
OBJECTIVES AND ASSUMPTIONS
•
Establish long-term vision for study area that will encourage practical and
achievable development while optimizing community value.
Establishing abig-picture vision for the FAST that is practical and achievable is an
important goal. The broad community vision must be in concert with the economic
realities of infrastructure investment and achievable tax value, but at the same time
provide a strong community image for the project. How can the FAST become both
economically and environmentally sustainable while leveraging assets of the Gateway
and the commuter rail station?
Identi f y ways to better link study area with broader community.
Addressing roadway connections, trails and potential transit options for both the
near and long term must be identified as part of this plan in order to strengthen the
economic ties to greater Elk River.
Suggest how study area can distinguish itsel f as prime development district.
In order to set the FAST area apart from other development areas in the region,
the master plan should suggest the critical design criteria to establish the district.
Opportunities exist with transit-oriented development, innovative energy initiatives
and low-impact development.
•
~~~"
_: ~`
X14 17181. QV2r1U@ Focused Area STudy
. °~.~,a
OBJECTIVES AND ASSUMPTIONS
•
GENERAL ASSUMPTIONS
In order to plan for appropriate land use and transportation investments for the i7~st
Avenue FAST, certain assumptions were made in order to focus the planning effort
and set a distinct framework and vision for the future. General assumptions for the
planning effort follow:
Major transportation improvements will be a primary development trigger.
The often familiar trend in commercial real estate will likely play out in the FAST,
new development and redevelopment typically follow transportation and public
infrastructure improvements. The first primary trigger for development will be the
Northstar commuter rail station. The allure of the first commuter rail line in Minnesota
will likely solicit interest from the development community. Additional roadway
improvements through the Gateway will likely also trigger development in the area in
the near term. In the future, the reconstruction of the ~o~~io~~69 interchange and the
conversion of Highway ~o~~6g to a limited access freeway will trigger significant land
use and transportation pattern changes in the in the ~7ist Avenue FAST.
Twin Lakes Parkway will beextended tobecome asub-regional collector for
improved access for east Elk River.
The Elk River Transportation Plan identifies Twin Lakes Parkway as urbanizing collector
from CSAH iz to the signal at ~7ist Avenue. The transportation plan also indicates
the continuation of Twin Lakes Parkway to 65th Avenue serving as the sub-regional
collector for southeast Elk River.
Land uses will become more intensive over time.
As infrastructure improvements are made and ridership increases with the Northstar
commuter rail it is likely more intensive development will occur throughout the FAST
project area.
Future Highway ~o/t69 access to study area will be farther south than ~7~st
Avenue intersection due to MN DOT spacing requirements.
The current intersection of ~7ist Avenue and Highway ~o~t69 is less than i mile from
the major interchange at Highway ~o~ and Highway ~o~~6g, a typical rule of thumb for
interchange spacing. MN DOT mandates the future interchange must by at least i
mile south of the Highway ioi & ~o~~6g interchange for safety purposes, allowing for
proper construction of on ramps and off ramps. A location not supported by MN DOT
will likely not be implemented.
Study area is in development competition with other districts in & outside Elk
River.
Within Elk River a large commercial center exists just north of the project site along
Highway ~6g near Main Street and School Street, and captures much of the commercial
business for the community. In the future a broad employment and commercial
OBJECTIVES AND ASSUMPTIONS
•
redevelopment area is planned for portions of the gravel mining area further north
along Highway 16g. Regionally, an new commercial center anchored bySuper-Target
(relocated from Elk River) was recently developed across the Mississippi River in
Otsego. At the intersection of Highway 101 and Interstate 94 in Rogers a broad area
of commercial and retail uses exists.
Existing transmission lines and gas main are likely fixed.
Due to the extensive costs of relocating major utilities and the lengths these utilities
extend through the site the master plan assumes it is unfeasible to relocate these
utilities through the project area.
Any new river crossing (bridge) in Dayton or Ramsey would not substantively
change development strategies for the study area.
The location of the proposed future river crossing is situated too far south along
Highway 10169 to have any major development impact on the site.
REGIONAL TRANSPORTATION ASSUMPTIONS
The 171st Avenue FAST is situated at the nexus of major regional roadway corridors
in the northwest metro which have a significant impact on the future of the study
area and the community of Elk River. The following are the regional transportation
assumptions for the master plan:
Highway improvements planned by the State will be key determinant in timing
and type of redevelopment in the ~7~st Focused Area Study.
Understanding the timing and scope of future changes for the corridors will allow for
the appropriate planning and level of investment relative to the future improvements
in the corridor.
Transportation will guide development strategies and vice versa.
Location of a future interchange location will have the significant impacts land use
surrounding the interchange.
Elk River can influence transportation investments with plans for
development.
Through the preparation of this master plan and subsequent studies, the City has
the ability to influence MN DOT for the locations and timing of transportation
improvements which will have the broadest benefit for the FAST.
X16 , 171St. QV2rll.12 Focused Area STudy
MN DOT has three key transportation
studies:
Inter-regional Corridor Management Plan
(zooz): This plan identi fees alternatives for
upgradingHighway 1o/~6g to a limited access
freeway south of the Highway ion & ~0/~69
interchange through Elk River, Ramsey and
Anoka. Construction and funding are not
currently in MN DOT's 3o-year program.
Highway 169 Preliminary Design and
Environmental Documentation Study
(underway): This study identi Pies preferred
plan for ~o~/~6g interchange as well as the
pre ferred reconstruction plans f or the Main
Street and School Street interchanges north.
Construction and f unding are not currently in
MN DOT's3o-year program.
Highway to Preliminary Design and
Environmental Documentation Study
(underway): This study will identify a
preferred plan for Highway~oupgrades from
just west o f ~0/101/169 interchange, through
Downtown Elk River west to Lake Orono.
OBJECTIVES AND ASSUMPTIONS
•
•
~~
~~~;~~
~ ~~
,'
. ~
'17'130. QV~lU2 Focused Area STudy 17 /
Figure3.i: Regional Transportation Assumptions Map
/ ~II
~.J
~^
~`
+'-~I;`
a'
~= D 4.
'~ i
~ ~
~ ~
•
co ~cePt eva~uat~on
Continuing the evolution from the Phase One study, the Phase Two concept evaluation
began with an exercise in determining the final stage of the infrastructure and
transportation network for the study area. This focused the planning horizon and
assisted in creating an approach for near-term, interim and long-term land use
and transportation solutions for the study are to be further refined. Four concept
alternatives were then explored for the ~7ist Avenue FAST, each with a different
focus for land use, particularly from the rail line west to the river. Uses ranging from
housing to industrial and business park uses along with commercial and retail uses
were evaluated in conjunction with alternatives for the future interchange location
and consequent local roadway network. Lastly, detailed options for an interim second
signalized intersection and future interchange location were created to better assess
the impacts to private property, natural features and broad cost comparisons.
•
CONCEPT EVALUATION
•
PHASE ONE PREFERRED
DEVELOPMENT
FRAM EWORI<
Building off of the work completed in the
Phase One Development Framework,
many of the land use directions have
remained the same for Phase Two. Uses
north of the rail line have not changed.
More intense mixed use development
immediately adjacent to the station
will also remain as well as the industrial
uses proposed for the far northwest
near Vance Street. Also unchanged are
potential for industrial uses on the future
Cargill property in the southwest
The changes from the Phase one plan
result in transportation alterations
affecting land use for primarily the area
south of 171st Avenue. The extension of
• Twin Lakes Parkway and the configuration
of the future interchange play a major
role in the land uses that can exist on
the available land surrounding the
interchange.
'~
FUTURE ACCESS SCENARIOS
~~`,"..
_ ~ ` $
In order to better understand the preferred planning horizon envisioned for the
171st Avenue FAST the Economic Development Authority was asked as a kick-ofF to
the second phase of the development planning to evaluate a range of scenarios that
examined transportation strategies for the study area. These scenarios explored
various interchange locations and the potential that a signalized option may be the
ultimate transportation solution. The following scenarios were used to set a course
for the more detailed land use and transportation planning to evolve in the second
phase of the FAST project.
u.1=
q~ tr20 r 17131. CN2f1U2 Focused Area STudy
`-
~.
Fig. 4.i Phase One Development Framework Plan, June zoo9.
CONCEPT EVALUATION
n
U
n
u
Scenario ~:
» Signals as the long term access solution
» Interchange is so far out that planning leaves development in
limbo
» Signals at existing ~7~st and existing 165th
Scenario z:
» Interim signals at ~7tst Avenue and 65th Avenue
» Long term interchange located at the location identi fled in the IRC
prepared by MNDOT
» Con f licts with existing and near term development
» Consensus o f the City o f Elk River was that planning f or the "end- » Consensus o f the City o f Elk River was an interchange location south o f
game" scenario o f an interchange makes the most sense for the 65th fails to benefit the existing business in the study area and is too
long term bene fit o f the community far removed f rom the Northstar commuter rail station.
» Long-term questions on whether or not Cargill would ever develop the
adjacent land were another concern.
CONCEPT EVALUATION
n
~~
» Long term interchange located at existing ~7~st Avenue signal
location.
» Concensus o f the City o f Elk River was the interchange located here
would be challenging. Dimensional constraints and existing developed
properties would drive up the overall cost o f the interchange, and
may displace more business than attract new ones.
scenario 4
» Long-term interchange location similar to what was identified in the
Phase One study for the FAST area, somewhere between 67th and
65th Avenue.
» Consensus o f the City o f Elk River was that this approach to the long-
termtransportation patterns makes the most sense. The location is in
close proximity to existing business and the Northstar commuter rail
station and would be located in currently undeveloped land.
» Options to explore further with this concept were also discussed.
The potential to have a near term signal at 67th or at the future
interchange location should be further explored in lieu o f 65th Avenue
to create a stronger near term connection to the existing business, the
• Gateway industrial park and a more direct, second access to Highway
io f rom the Northstar commuter rail station.
22 p 171St. CN2f1U2 Focused Area S7udy
j ;^
Scenario 3: Scenario 4:
» Interim signals at t7~st Avenue and 65th Avenue » Interim signals at the existing ~7~st Avenue and 65th Avenue
intersections.
CONCEPT EVALUATION
•
LAND USE AND TRANSPORTATION
ALTERNATIVES
Once a general approach to the future transportation patterns was agreed to, the
consulting team explored a range of concept alternatives for land use and local
transportation patterns. Since the land use patterns north of the rail road tracks were
not anticipated to change from the phase one plan, the following concepts address
land use, connectivity and transportation from the BNSF rail line, west across Highway
~o~i6g to the Mississippi River. The following are the four concept alternatives with
corresponding pros and cons for each:
CONCEPT ALTERNATIVE #1
Pros
Continuous public access to the river
Increased housing options on the river
Broad open space connections
Prominent civic uses along the river
Cons
Transition of existing single family
neighborhood
Limited highway commercial uses at the
future interchange
CONCEPT EVALUATION
•
CONCEPT ALTERNATIVE #2:
Pros
» Continuous public riverfront with trail and
passive open space
» Increased housing options along the river
» Broad open space connections
Cons
» Transition of existing single family
neighborhood
» limited highway commercial uses at future
interchange location
•
,24 1T18C. gV2r1U2 Focused Area STudy
_.:
Concept Alternative #2
C]
C]
CONCEPT EVALUATION
CONCEPT ALTERNATIVE #3:
Pros
» Interchange located furthest north for
existing businesses and Northstar commuter
rail station
» Limited impact to existing single family
neighborhood
Cons
» No north/south connection f or west side o f
Highway ~o
» Signal proximity may be a problem, less than
preferred i/z mile spacing
» Extensive costs for additional bridge crossing
to connect to upper west side of Highway
io/~6g
» Limited development capacity at future
interchange location
~"c~ncept Alternative #3
CONCEPT EVALUATION
L'
CONCEPT ALTERNATIVE #4:
Pros
Expanded commercial potential at
interchange, potential to integrate
redevelopment o f RDFplant in the future
Increased housing options along the river
Cons
Limited impact on existing single family
neighborhood
Limited depth o f development between
existingsingle family and Highwayio
•
Alternative #q
g,26 ; 17181. W2r1U@ Focused Area STudy
CONCEPT EVALUATION
LAND USE AND TRANSPORTATION
RECOMMENDATIONS
A public open house was held on the four concept alternatives to gauge reactions
from residents and business owners. Many had concerns about redevelopment of the
single family neighborhood along the river as well as a public riverfront trail through
the backyards. Additionally, business owners were concerned about access long-term.
Generally, a concept which includes a north south connection along Yale street at
t7oth Avenue to a newly created frontage road along Highway ~oJ~6g in front of the
existing business would be preferred, rather than connecting through the residential
neighborhood or providing no north J south connection on the west side. The location
of the interchange should be located as far north as possible and with limited impact
on the existing residential neighborhood.
DETAILED SIGNAL AND INTERCHANGE OPTIONS
To better understand the impacts of the future interchange near 67th Avenue, the
consultant team prepared three options for both anear-term signal approach and
a corresponding long-term interchange design option. This approach allowed the
members of the EDA and community to see the impacts on individual properties and
allow for a discussion to ultimately pin down a preferred future interchange location.
Each option contained a north south connection along the west side of Highway toJ~69,
a direct alignment of the extension of Twin Lakes Parkway with the future interchange
and assumes a full diamond interchange, as directed by MNDOT. Differences in the
options addressed the alignment long-term of Highway ioJ~69, potentially flattening
the curve and pulling the roadway east to provide more dimensional space on the
west side of the road for local roadways and development. The signal and interchange
options looked at three locations for the interchange, right at 167th Avenue, one about
300' further south and a third roughly 800' south of 67th.
C]
CONCEPT EVALUATION
Signal Option A:
» 3oo'south of~67th Avenue
» Limited impact to existing residential neighborhood
» Frontage road along Highway to/~6g in f ront o f existing business in
an existingdrainageond utility easement
Interchange Option A:
» 3oo'south o f 67th Avenue
» Limited impact to existingresidentialneighborhood
» Frontage road along Highway io/~6g in f ront o f existing business in
an existing drainage and utility easement
CONCEPT EVALUATION
,I ,J
u
_g
r ~
L_J
Signal Option B:
» 3oo'south o f 67th Avenue
» Limited impact to existing residential neighborhood
:Option - B
tfia Gtirt~nl FhST Stvd~+
Interchange Option B:
» 3oo'south o f 167th Avenue
» Limited impact to existing residential neighborhood
» Frontage road along Highway ~o/~6g in f ront o f existing business in » Frontage road along Highway ~0/~69 in f ront o f existing business in
an existing drainage and utility easement an existing drainage and utility easement
CONCEPT EVALUATION
n
u
n
u
Signal Option C:
» 3oo'south o f 67th Avenue
Interchange Option C:
» 3oo'south of 67th Avenue
» Limited impact to existing residential neighborhood » Limited impact to existing residential neighborhood
» Frontage road along Highway ~0/~69 in f ront o f existing business in an » Frontage road along Highway to/~69 in front o f existing business in an
existing drainage and utility easement existing drainage and utility easement
CONCEPT EVALUATION
EVALUATION OF CONCEPT ALTERNATIVES AND
SIGNAL & INTERCHANGE OPTIONS
As part of the evaluation of the planning process, each of the four concept alternatives
went through a public and stakeholder review process. Newsletters were mailed to
all landowners in the project area and individual meetings were conducted with key
land owners. A public open house was held at Elk River City Hall in February zolo and
project web-site was created to review presented materials and to post comments.
Additionally, the consulting team facilitated a panel of experts roundtable evaluation
of the concepts. The round table provided expert professional opinions on a broad
range of topics relative to the concepts and the FAST area in general. The following
are summaries of the comments from the general public, key landowners, and panel
of experts leading to the refinement of a single preferred master plan direction for
the FAST:
Public Comments
Most of the comments from the public open house focused on the location of the
interchange. Generally, a preference for signal and interchange option A with limited
disturbance to existing single family neighborhood worked best as most felt it afforded
a connection for existing & future businesses. However, some felt the roadway design
• in this concept had poor traffic flow to the new interchange. Most agreed that land
uses along Highway 10169 should remain commercial on both sides. Other comments
suggested it was nice to have housing within walking distance of the station and at
the intersection of the entry to the Northstar station and Twin Lakes Parkway traffic
control and pedestrian safety is a priority. Additionally, consideration for bike facilities
such as bike racks and bike lockers should be considered for commuters at the station
and more trail connections to the station should be implemented. Residents and
business owners both agreed there was a need for strong wayfinding and signage
to direct patrons from Highway 10169 to businesses not immediately adjacent to the
highway.
Landowner Meetings Comments
The consulting team met with five of the larger landowners in the project area about
the future plans for their property. All expressed a desire for their existing businesses
to remain and expressed concerned about future transportation changes and impacts
to their existing business. The consulting team also met with residential groups, the Elk
River Station, Pulman place and the townhome association on Yale Avenue.
Panel o f Expert Comments
Early in the phase one process, an effort to gain broader feedback from the professional
development community outside of Elk River, the consulting team conducted a panel
of experts round table meeting on the concept alternatives in order to gather input
from a broad spectrum of expertise outside of Elk River, but familiar with the market
. conditions surrounding the FAST. Participants ranged from commercial and residential d -
'f713t. W2fllJE' Focused Area ST«d, j1 ~€
~t
CONCEPT EVALUATION
•
developers, transportation experts from MN DOT and the Northstar Rail Authority,
as well as areas of expertise in public finance, market potential and energy. All panel
members had no vested interest in the study area and allowed for a critical outside
perspective on the three concept alternatives. The comments below were made by
panel participants and are organized by transportation, land use, amenities and finance
categories.
Comments in BOLD resonated with the group as critical elements.
Transportation:
» Reconstruction o f the got/~6g interchange as a comprehensive project will likely not happen
within our planning horizon (zo-3o years) due to f unding realities. Alternatively, "band-aid"
transportation improvements necessitated by tra f fic and safety problems will be the
norm.
» New Highway ~o interchange accessing the site is possible and would be looked at favorably by
MN/DOT in order to clean up sa fety and tra ffic problems caused by current intersections. An
interchange could happen independently o f other highway improvements.
» MN/DOT will likely close additional median crossings accessing the study area from Highway
~o in the next several years to improve sa f ety. It will likely limit those access points toright-in/
right-out only.
•
» Northstar rail is expected to open in November zoo9. The Elk River train station is projected to
have goo riders/day. Northstar in formation is at www.mn-GetonBoard.com
» Northstar Rail is planning one morning and one evening reverse-commute train per weekday.
Ridership demand may pressure more.
» Studies suggest that % o f employees/residents in the walking zone o f an LRT station will use
transit. Commuter rail capture rates will be less than LRT.
» When choosing whereto live, many people "drive" to the point they can a fiord.
» There is some talk o f legislatively limiting or surcharging "vehicle miles traveled". This could
create a market incentive for transit-oriented, compact development.
land Use:
» Early in its evolution, the commuter rail station will have only a minor impact on large
scale retail development in the study area but will drive relatively small amounts o f
convenience retail near the station. The commuter rail station is seen as a plus for
o f jice, industrial and residential uses.
» Highway and train noise is a big issue for residential development - a land use buffer
is needed between corridors and housing.
» Housing demand is built on job creation. Job creation in the study area should be key focus. The
commuter train could be an o Bice/industrial marketing bonus f or the study area.
;'
m
`'.~?:~,
» FHA financing o f residential development is dependent on noise levels.
171St. QV2flU2 Focused Area STudy I
CONCEPT EVALUATION
•
» Job-based commercial development market is currently declining.
» Development objectives outlined in the three alternatives could not be realized
without Highway ~o interchange.
» Long-teen market assessment:
Easiest: senior & rental housing, industrial
• Moderate challenge: o f Jice, residential condos
• Tough: retail (interchange would impact this), strict eco- focused industrial
» Absorption o f the amount o f of lice shown in some concepts would belong-term (more than a
decade)
» Existing and adjacent uses make the study area an opportunity for "eco-focused"
development -especially eco-industrial. Even as few as 5 synergistic uses would be a
great success.
» Need to think about development that could occur on the river-side o f Highway ~o in order to
put the study area in better context.
» RDF plant could be bene ficial use. Its visual character should be revamped.
» The study area seems like a place that could play to the market niche of low impact,
eco-based.
» Maybe two development scenarios need to be explored, one that assumes rapid economic
recovery with business as usual in real estate development and another with protracted recovery
and an altered real estate/transit climate.
Amenities:
» Rail station will be a residential and commercial development marketing bonus.
» It will be in the study area's best interest to get more reverse-commute trains.
» Excess steam f rom GRE could stimulate commercial market interest.
» Creating a pedestrian environment and trail/sidewalk links will be critical.
Finance:
» City will likely need to subsidize development in some form.
» In today's dollars, a new Highway ~o interchange budget would be roughly $~5 million. This would
likely need City financial involvement to occur.
•
~,
^
ire,
•
~eve~o~~nent
Framewor^~c
• The master plan for the i7~st Avenue FAST outlines a course for change over a i5
year planning horizon. The FAST will ultimately become a series of unique districts
showcasing residential, office, retail and industrial uses within the naturalized setting
of Elk River. The master plan acknowledges significant transportation pattern changes
and respects uses adjacent to the study area. The master plan guides land use and
transportation changes for the area allowing near term investment always with an eye
toward the future vision.
C]
DEVELOPMENT FRAMEWORK
HIGHLIGHTS Land use:
» Intensi fled mixed-use at transit station: Over time, as the Northstar line matures and more The Future Development Framework Plan,
people are looking for convenient access to transit, the area around the transit station will Figure 5.z, illustrates the major patterns
emerge as a prime location for housing o ffice and neighborhood retail with a compelling village of development, transportation and open
atmosphere. spaces shaping the vision for the 171st
Avenue FAST.
» Diverse employment base: The master plan suggests a focus on a creating a range o f job
opportunities beyond a living wage for Elk River. Industrial uses will promote a focus on The Future Development Framework Plan
manufacturing, energy and green business and commercial and office uses will create for prescribes land use categories ranging
opportunities from science and technology to research and development. from commercial and industrial uses
» Eco-business park: An ecological focus for the f uture industrial uses leverages the "Energy City"
brand o f Elk River. Opportunities for shared facilities, reduced energy and emissions and re-use
o f manu facturing by-products will position the area as one o f Minnesota's first "Zero Waste"
business park.
» Residential villages: Building on the success o f Elk River Station, the master plan suggests areas
for a dense, compact and urban form of residential development, These distinctive villages
uniquely responding to the site by taking advantage o f natural amenities and topography and
supply residents with a range o f housing options and li f estyle choices.
to a new mixed-use transit center with
density ranges from z4-3z units per acre.
Figure 5.3 depicts ranges of density and
intensity for each land use type. This land
use typology, more clearly articulates the
development intensity, building scale,
and general character for each of the land
uses.
» Strengthened pedestrian connections: A network of recreational trails and comfortable In general, land use designations vary
• sidewalks will knit together the study area with enhancedwalkingandbikingexperiences.This slightly from the 2003 Comprehensive
system o f public, highly pedestrian spaces and facilities will provide a crucial amenity framework Plan. The mixed-use designation becomes
for high-quality development and redevelopment. more prevalent and depending on specific
» Enhanced natural systems & open space amenities: Building on the f ramework established
by the large wetlands and surrounding city parks, the master plan suggests opportunities for
additional public parks, plazas and urban spaces. Preservation o f signi ficant landscape f eatures
are critical steps to ensuring the essence o f the FAST and the Elk River scenic landscape.
» Near term & long term focus: With the impending transportation changes to the adjacent
regional highways, the master plan suggests ways f or development to occur in a shorter window
o f time while at the same time outlining the necessary steps to ensure near term development
blends with the f uture development and transportation patterns.
Land USe Acres Units
Existing Residential 55 52
Higher Density Residential 155 1,675 - 2,230
Transit Center 120 400 - 530 35,OC
Totals: 930 2,127 - 2,812 925,000 1,895,000 3,632,000'
Figure 5.r Development Yield Summary
""
r
areas within the project area, certain
mixed-use designated areas are targeted
toward commercial or retail use, while
other areas guide office or residential
uses. Figure 5.1, the Development Yield
Summary, outlines the projected level of
development for each land use.
For the purposes of further discussing
land use and development character, the
171st Avenue FAST has been divided into
sub-area as illustrated in the following
chapter. Figure 6.1, highlights the various
sub-areas within the development
framework plan.
j6 ; 1718C. CN2nU2 Focused Area STt J,
Retail Office Industrial
Sq. FL Sq. Ft. Sq. Ft.
DEVELOPMENT FRAMEWORK
C7
•
Future ~eve~oPment Framework Pan
...1
'~^ti, -- ~ ~.. ,~ ~~~
++ yy ~ Y{ ~ # ~~~ R4
w
~ 1/ ~ 1
~ t
~ ..emu. _._.. _~~~.-- n............~.~.~._r ~f~-~~ r~
{
~..
®C
`--~`> ~
~~ ', wJ+
'1
b
~ . ' i.
;-
~ 4 ~ ~,
~~ ~
s
,~~`
'~'~
~ <^~
8
a
- t *t
!l,
4 ~1
,. 4 el 1 1
~ - ., R.~.
~
Le~~nd: .
,.
^ Eaigin~RwwMMisl 66&r Yq. f-~••"^
^ Him at+.+a
R~d~~trl u~ ,~~
' t, ~
` Lsmit ClnW 120 Al '~
~
^ .9l11~,`~. f ~ „
3~A1 fP .
~
.
3 .q
y~
DEVELOPMENT FRAMEWORK
•
1718C. QVer1U2 Focused Area STudy
ng Residential:
higher Density
residential: 155 AC.
transit Center: 120 AC.
Service/Commercial:
35 AC.
Destination Retail: 45 AC.
Temporary Destination
Retail: 25 AC.
bs Area: 245 AC.
~an~ use r~r~es
DEVELOPMENT FRAMEWORK
•
TRANSPORTATION INFRASTRUCTURE:
Highway to/~69
As the expert panel indicated early on in the master plan process, Highway io~i69 is
the key for success of the i7~st Avenue FAST. The presence of the regional highway
provides the traffic and visibility making retail, commercial, office and industrial
development possible. The transition of Highway io~i69 to a freeway will be a
significant trigger for development and redevelopment and integral to the roadway
change will be the placement of the future interchange.
Futurelnterchange
The location of the future interchange has significant land use impacts. The master
plan examined numerous scenarios for the interchange. Option A worked the best to
balance the desires of the existing businesses for the interchange to be as far north as
possible without compromising the existing single family neighborhood to the west.
This location coupled with the direct routing of Twin Lakes Parkway to the interchange
provide a direct route to the Northstar commuter station. Ultimately, the location
of the interchange is closer to the built environment and will likely increase property
values further into the built area and increase the chances of broader development
areas benefiting from the interchange.
Additional Considerations for Highway to/~69
In zo~z, MN DOT plans a resurfacing of Highway io~~69. As part of this project, it is
understood that M N DOT will be closing all medians except for ~7~st and 165th Avenue
for safety reasons. Altering access points in this manner will likely initiate some
turnover for uses along Highway io~i69 and strengthen the need for more internal
roadway connectedness. In the future, the city should work with MN DOT to further
investigate overpass options near i7~st Avenue to better connect the land uses west
of Highway io~i69 to the study area.
Rail Line
The master plan suggests providing an additional crossing of the BNSF rail line near
173rd Avenue. This additional crossing will allow for improved traffic flow for the
•_, ,. .
commercial and industrial uses in the north of the study, rather than funneling all traffic
to Twin Lakes Parkway to cross the rail line. As the city lobbies to shift the rail line
{ ? 'y"~ north near downtown, the city should investigate the feasibility of either an at-grade
t - ~~' or grade separated crossing in this location. While creating an additional crossing is
~ ` ~'' `' ~ ~° challenging, it is still worthwhile as something to strive for to create better and more
- ~,,.,;~;~``~ intensive development.
iee._ __._-.r
An additional rail crossing should be consid~~~ ed r:
~73rdAvenue The opportunity for a rail spur off of a major freight rail corridor could be significant
for industrial uses in the FAST. The master plan suggests a parallel spur line to serve
the industrial uses surrounding the RDF plant.
'"
-~,
7T'13C. gV@rNJ2FocusedAreaSTud~ 39
DEVELOPMENT FRAMEWORK
~~
TransPOrtat~on ~nFrastructure ~~a~ram
Cluwmovm [Ik Rhnt f~i( 7MJni
a6ond river
~` Manh
i '~...~,~....»rtJ'.ni I
imp ~~
Iine Crossing and 6~81#Sian Of
173rd. Averrtre Oa l~ria Lawrws
~~
separated rail cto~ssia~, aitlrer
at hin Lakes Park~rav ar
•
a north/soutfr oonnectlorr >#
Eapkxe bail eli~rrrnersts along river er
akxr~ the frorrtade road f---~~i
Eupora Nrtt~ar~e
" A/ aoaws a+lard
i66blr awFw
oo~wtl to auod~-
see
`~ ~a Flk Wrvce Station I
~.~,, .---~--.J
Potential future rau spur
F~rteueion of lw~n iakgs Parkway
Cii D~P~
• ~~ oaFa.we
• nord aypaw.,A! Mr
3Y~odnd ~dY~ aed d~
~d
Exta~rrsian of Twin Lakes
Parkway to soutlnrelm eMt Ri4+e-
harder `$Irbr~i0nal ctrilector'
YWtlJ4lhleti~
Gwtytke
A
Futorrm bail. aea~rracbloai
rFrar
5~4~ Transportation Infrastructure Diagram
~d0 , 17~SC. C7V2f1U2 Focused Area S7udy I
DEVELOPMENT FRAMEWORK
GREEN INFRASTRUCTURE:
The Mississippi River, expansive wetlands, native oaks, and pine groves provide a
distinct character for the project area. The protection and enhancement of these
landscape features are important elements to retain as development occurs in the
district. These natural features provide added value to surrounding development
and provide recreational opportunities when public trails are integrated to the open
space network. This master plan suggest establishing a framework for development
patterns centered around existing natural systems, stormwater treatment, parks and
open space and trails, or green infrastructure.
Open Space, Wetlands, Natural Features
The development pattern in the FAST is truly shaped by natural features. With almost
z5% of the land area in the wetlands or floodplains, these natural systems are highly
visible and contribute to the scenic character of the area. The northern and southern
wetland reaches provide natural breaks between development zones, and the plan
promotes providing increased public access to the edges of these natural systems. The
plan also encourages the preservation native vegetation. As development occurs and
where appropriate, existing topography and larger stands of existing trees should be
preserved to maintain the scenic character for the FAST.
• Parks
The master plan suggests the potential creation public park space along the river front
and in the Northern Heights sub-area and a strong connection north to Hillside City
Park. A number of public parks are adjacent to the site and connections to these parks
are important to attract residents and employment to the study area.
Viewsheds
Viewsheds into the site from along Highway io~i69 are important to signify the
FAST project area. Site designs reflective of the natural setting of Elk River should
be considered. Internally, the large wetlands afford sweeping views of the natural
landscape and development should take advantage of these assets.
Stormwater Treatment
The master plan encourages the stormwater infrastructure features such as
stormwater ponds, infiltration basins and bio-swales are designed as natural open
space amenities for the surrounding development. Furthermore, these features
should be interconnected to the broader system of wetlands and natural areas as
illustrated through the Pinnacle and Office Village sub-areas.
Urban Forest
The master plan encourages the preservation of existing vegetation and establishing
a strong canopy of urban street trees throughout the FAST.
•
stormwater treatment as an amenity
The natural systems are highly visible and contribute
to the scenic character of the site.
Connections to nearby parks are important
DEVELOPMENT FRAMEWORK
green ~nFrastructure ~~a~ram
1~ ,
.. r ..- - - ~. ' F
' 1101181Ygh _ ~ ~ ~ -
~~~ ~ ~ ti ~ 'mod' .,~ ~ ~ ~" .~ . ~'*
Y'
-~ ~ _ ~ . ~ Khever take
~ _.~ ~. 6iMds _ ~ _ ~,' .
Babcock ,~ p~ a~+r~.t ~~ ~' NiII51d¢
~ 4" l:itti PBfF:: •"
Park: ~>_ ; i '-,X x:~' Mar Park ~ '~.
I ' _ ~ hlaish _y _ -~
'~"Y.
w ~ yn
•~ ~ r
+, -
,~ ~ ~ .--5
i. ~ ~~ .. E
:n.t t + ..i'tt '
'~. 'a .
-----~• Mvflh:taf
- ~iF. ~ - .- COnlmutPf Poaal
/P~a'' s 'c- 51a>rvn
• •.rr~t
"~-~-.
Legend:
Gny Park
F Opan San
~aL~Y Reeraarkfn
F ,
..~/~ PoLOntlal Park Gparnlon
~ Bufler 2aM!
LMP i „
WcWnds/6i
Figure 5.5: Green Infrastructure Diagram
e}2 , 171St. QV2f1U2 Focused Area STudy
~..`" T~
t. ~ ~~ ~ .. ~.~.
±..~, '~.ti.v' y
. _ ;.~-
? ~ RUf.Planl !
,` ,
~~
.~`
ifi . ,,
.~`
,,;C•1
_ "~., ~~~
MteUaY ~'
Fam+
YOuUr
At1N2tiC
Compl~ac
\~ .,, r~~~r.
~~\
DEVELOPMENT FRAMEWORK
•
•
TRANSIT SYSTEM:
Northstar Commuter Rail Station
The Northstar commuter rail is a plus for growth in the FAST area, but not a primary
driver for change. As the system matures and ridership grows it is important the
station meets the demands of the patrons. Adequate parking will be a necessity. While
the current lot provides 70o spaces, additional space may be needed in the future. A
parking deck or ramp structure should be considered for the station in consideration
with mixed-use development before more surface parking spaces are added since little
land exists for development immediately adjacent to the station. Providing adequate
facilities for bike commuting are also suggested. Bike lockers allow a safe, secure
location for commuters to store their bikes. A well integrated trail system will further
promote bike commuting to the Northstar station.
Community Circulator Bus
With the potential for more increased reverse commute trains, the city of Elk River
should examine the feasibility of a community circulator bus to work in concert with
the Northstar schedule. The circulator would connect community employment
centers, downtown and commercial centers to the Northstar station eliminating the
need for the automobile for some commuters.
IMPACT ANALYSIS:
A fully developed plan for the i7i5t Avenue FAST will impact the existing public
infrastructure systems in the area. With the introduction of development and
redevelopment in portions of the project area, improvements to the public systems
will be necessary and advantageous to foster more intensive development.
Roadway and Tra f fic Analysis
As the master plan for the i7~st Avenue FAST indicates, the road network is critical to
the long-term success of all uses within the plan, especially when access restrictions are
implemented along Highway io~i69. It is anticipated that upgrades to the intersection
at i7i5t Avenue and Highway ~0~~69 addressing grading, sightlines and stacking will be
needed as development occurs in the FAST. Additionally, internal roadway connections
from development areas will need to be designed to mesh with the extension of Twin A circulator bus would connect other key activity
centers in Elk River with the Northstar station
Lakes Parkway to the south through the Gateway in order to facilitate traffic flow
through the area.
Infrastructure
Initial analysis by City staff of the sewer and water indicates that upgrades to major
infrastructure systems will be needed at some point during the development time
line. Most impacts will come from realignment of sanitary sewer and water lines with
roadway improvements. The overall capacity for sanitary sewer and water flows will
need to be further studied as development proposals come forward. Additionally,
further electrical network planning will need to occur in the project area.
A parking deck or ramp maybe needed in the future
to accommodate increased demand for the Northstar
commuter rail.
Bike lockers allow a secure location for commuters to
store their bikes
I•
P ~~ ;;::
1
•
ceve~o~~ne+t
• cHaracte
The FAST will ultimately become a series of unique districts orsub-areas showcasing
residential, office, retail and industrial uses within the naturalized setting of Elk River.
As part of this chapter, the development character of each of these sub-areas is
examined further. While certain areas will likely see little or no significant change,
much of the FAST will undergo a transformation into vibrant places to live, work and
shop within the community.
C7
DEVELOPMENT CHARACTER
n
SUB-AREA DESIGN
CHARACTER
The sub-area design character approach for
the master plan looks at multiple aspects o f
development character and prescribes the key
urban design principles to follow for each sub-
area. These key principles include identi fication
o f building, parking loading and service zones
and the relationship between the enhanced
street network and access to development
parcels. Zones for stormwater treatment,
critical bu f fer areas and areas for preservation
o f natural vegetation and wetlands are also
illustrated. Each sub-area is analyzed around
these key urban design principles, and
highlighted in the text are the individual design
criteria for development in each district. This
vignette study approach organizes and aligns all
o f the unique districts in the project, matching
• the overall developement framework for the
~7~st Avenue FAST master plan.
Mixed Use and Commercial Sub-Areas
STATION AREA VILLAGE
1 ~ The area immediately
` adjacent to the Northstar
` !station is envisioned
ti as vibrant mixed-use
'~ I district. .. .
As intensification of
development occurs
over time, this district will include vertical
mixed-use at the primary intersection to
the transit station. Residential uses are
envisioned north of the station on both
sides of Twin Lakes Parkway and adjacent
to the park and ride lot. Long term,
housing could develop in conjunction
with a parking structure as development
intensifies and ridership increases. Ofiice
is the along Twin Lakes Parkway south of
the transit station, with larger mid-rise
• buildings framing the street and smaller
buildings further from Twin Lakes Parkway. The development is organized to promote
internal circulation for streets and drives and easy pedestrian navigation. Connections
between sidewalks, trails and public gathering places are vital to maintaining the
success of commercial uses and attracting residents to the district.
The character of Twin Lakes Parkway is distinctly urban throughout the entire district
combining an attractive, comfortable streetscape, while still functioning as a collector
roadway. The round-a-bout at the re-aligned intersection of ~7~st and Twin Lakes
Parkway facilitates the turning movements of the projected traffic volumes. Along
the street storefronts and business occupy the ground level, while amenities such as
broad sidewalks and outdoor plazas with benches and landscaping and properly scaled
lighting create a safe and comfortable environment for pedestrians. Trails along the
wetland edges tie together with sidewalks and outdoor plazas. On-street parking
exists for small segments of Twin Lakes Parkway in front of retail uses. In general,
parking and loading areas should be located internal to the larger development
blocks utilizing shared or district parking to maximize development along the street
frontage and further distance buildings from the rail line noise. In addition, extensive
landscape bufFers should be planted and maintained on both sides of the rail line for
noise attenuation. A strategic approach for stormwater allows for building orientation
toward both natural amenities and internal stormwater treatment systems, bringing
increased value to development.
'1T13C. QV21'lU@ Focused Area STudy
DEVELOPMENT CHARACTER
•
THE HINGE
. This district offers some
'- ~ potential for retail
- ,' development in the near
' term due to the
I }~` signalized intersection at
~I ~ 171st Avenue. The
challenge for this district
will be maintaining successful near-term
development once the interchange is
constructed and access from Highway
10169 is shifted away from the current
intersection.
The intersection at Highway 10169 and
171st Avenue will likely remain the primary
access for the FAST for some time into the
future. As residential uses develop north
and the commuter rail begins operation, it
is likely developers will become interested
• in smaller, convenience retail and
commercial uses at this location.
~} ~.
.~ ~s ,
1~ ~,
t
~~ District
With the inevitable closure of the 171st Future Hinge Sub Area Vignette5tudy
intersection, the key for continued success development.
of commercial or retail uses in this area
will center on building orientation and
connectivity. Buildings must be designed
to have a "front" toward 17tst Avenue and
toward Twin Lakes Parkway anticipating
the transportation shift.
Additionally, an internal street connection
should be south of 171st Avenue through
I d k k
Wetlands provide significant development constraints for individual landowners, but
district wide they provide the opportunity to better organize the development pattern
through a strategic wetland mitigation approach to optimize development potential
for both private and City owned land. Jointly, with the wetland mitigation, a district
wide stormwater treatment approach will help minimize stormwater infrastructure.
Last, a trail network along the periphery showcases the natural systems and provided
additional connectivity.
the Gateway an to Twin La es Par way. HIGHWAY 10169 SERVICE & COMMERICAL
This roadway will help ensure viability This area represents a narrow strip of existing commercial properties
long-term and adequate vehicular ;running along the western edge of Highway 10169. Limited change
circulation near term as a solitary access i , - +
is evisioned for this area. The parcel sizes are narrow and are well
point out to 171st will not allow for ~y ;.. ~~,, situated for smaller, service related commercial uses that can benefit
left hand turns due to stacking issues ~+- ~- ~ from the highway visibility.
at peak times. Thus, the integration of ~ ~.=
the northern portion of the Gateway
property for design considerations of this
...district is critical to ensuring successful
s ~ __
`48 171St. C1VE'rK.12 Focused Area sTudy
_:
DEVELOPMENT CHARACTER
•
EAST ELK RIVER GATEWAY
This district responds to
;I .- the preferred location
-t`..___ of the future
~~- interchange along
`~ Highway 10169 and
~'~ ~ ` ~ ( suggests a large area of
'r highway commercial
land use (18 acres) on
the southwestern side of the interchange
and transitioning to residential
overlooking the river. On the east side,
there is a small area of retail adjacent to
the RDF plant as well as land designated
as "Temporary Destination Retail." This
areas, roughly 15 acres, falls within the
future right-of-way for the interchanges.
Here the city must balance the level of
near-term public infrastructure and
private investments, knowing the future
interchange will be built one day. The City
owns a large portion of this area and
could utilize a land lease approach for
development in this future right-of-way
area. This district will ultimately become
the gateway to the commuter rail station
and East Elk River.
WEST OF HIGHWAY 10~169~
The land configuration on the west side of
Highway 10169 is better suited for larger
commercial users due to larger parcel size
and limited utility ~ wetland obstructions
that are found on the east side.
Additionally, this portion of the sub-
area depicts an organized development
approach for parcel access, placement
of buildings, parking, loading, and
stormwater treatment. All of which are
established by the access and spacing
requirements for the future interchange
and envisioned parkway contining
Sub Area Vignette Study
~ BUILDfN6 20NE
PARKING ZONE
ENHkMCED STREETS
PARCEL ACCESS
STORMWATER
TREATMENT ZONE
BUFFER
WETLAN65f
' PRESERYEC 4EGETATION
EAST OF HIGHWAY 10~169~
One of the major changes from the Phase One plan shows a direct connection of Twin
Lakes Parkway to the new signal and future interchange location. The roadway has
been configured to create larger development parcels to the southeast for destination
retail and office users. A collector road is envisioned to connect to the east through
the Cargill property and beyond the retail visibility off of Twin Lakes Parkway, more
industrial and business park uses would be developed. If the access to 165th were to
south bisecting the residential and the be replaced with a new signal at the future interchange location, the City would need
i commercial uses. to construct this segment of road to connect to Cargill and the Youth Athletic.
'17'131. C1V@rllJ2 Focused Areo STudy
M-
DEVELOPMENT CHARACTER
Employment Districts
NORTHSTAR BUSINESS PARK
Only two parcels remain for development in the Northstar
Business Park and marketing efforts should continue to complete
`~' ~ the business park. The remaining sites are smaller, irregular
~~~ shaped and bisected by the natural gas line. Simple site studies
~~' illustrating development potential could allow prospective
buyers to better visualize the site potential. Further subdivision
of the larger lot may help attract smaller buyers.
POTENTIAL POST 2020 BUSINESS PARK
This sub-area is situated on Cargill owned land and is planed for
light industrial use with the eco industrial brand. Development
;,
.y, '- ~ will not occur on this land until 2020, unless Cargill's plans
`,~ change. A collector road continues to the south through the
sub-area and establishes the development pattern. Parcels
~'' would range in size from roughly 5 to 1o acres and would have
,i an organized development pattern between all of the parcels
~''! of building location & expansion area, parcel access, parking &
• loading and stormwater treatment.
Generally, buildings are located toward the street with parking at the side and
loading in the rear. Access for loading and stormwater treatment facilities could be
shared between parcels. The streetscape of the collector road unifies the industrial ~
business park setting with appropriate lighting, signage, boulevard trees and sidewalks
connecting employees north and west to the retail uses and commuter rail station.
A heavy rail spur could exist for the industrial uses running parallel to the existing rail
line, but no negotiations with BNSF have occurred as part of this plan.
RDF PLANT
,~ As the eco-industrial park concept evolves for the southern
-;'~. '~, ~ ~ portion of the FAST, a reinvented RDF plant could play a large
~ role in the success of the overall area. The city should work
~`,~t closely with the RDF plant on future planning to refurbish the
,~ ~ facility as anchor for the eco-industrial park. As the waste to
~~ ~~ energy industry continues to grow, the addition of the rail spur
may become integral to the future of the RDF plant. Finally, with
the sweeping views across the agricultural lands from the south Faribault Energy Park -An example of an iconic
building site for the RDF Plant.
there is a tremendous opportunity for the facility to become the
marquee signaling the entry to the eco-industrial park, and iconic gateway to "Energy
City" along Highway 10169. The architecture and site design of the 4o acre parcel
should announce the presence of something special, rather than a non descript
industrial use. Conversely, if the RDF Plant goes away, the site could transition in the
long term to retail use, based on the size and location of the parcel adjacent to the
interchange.
x,50 17190. CJV2nlJ@ Focused Area 57udy
Example of a typical Business Park building
DEVELOPMENT CHARACTER
•
•
OFFICE VILLAGE LONG-TERM
-- Any redevelopment
1 within this district
-.~ would likely not occur
u n t i l m a j o r
.yf- transportation
,` r_
patterns change. The
redevelopment would
.~ `
occur within the
boundary of the existing road network
and natural gas line.
Generally, larger office ~ office showroom
uses would exist along Highway ~0~~69
taking advantage of visibility and the
relatively flat topography. Smaller,
flexible office uses would locate along
Ulysses Street where topography and the
natural gas line pose challenges for larger
building footprints. At the center of this
district are strong roadway connections
linking adjacent districts to the north
and south.
This new central roadway provides more
direct access to Twin Lakes Parkway via
~7~st Street and connects employees
to the commercial areas in the Hinge
and around the commuter rail station.
Again, a collective stormwater treatment
approach maximizes development
efficiency and serves as an amenity for
development.
Overall, an organized district development
pattern is implemented across parcel
boundaries and takes into consideration
building placement, the internal street
network and parking & loading access
to ensure a district wide pattern that
functions for surrounding sub-areas as
well.
h STOiiMWATER _v 1
~ ~ TREATMENT ZOit~ ~ ~i
1 l
BUFFER ~,
h Y ~ 1
wEt~aaDSi
E$ERVED 4EGET~TIOk. `~
~ 11
Office Village Sub Area Vignette Study
Small office/office showroom design character
- )~
DEVELOPMENT CHARACTER
•
THE PINNACLE
~ The Pinnacle sub-area is
L._,
the narrow, under-
-'__i utilized area in the far
northwest of the study
,~ ,
~` area between the rail
- ~ -! line and Highway 1o~16g.
Access is challenging for
much of the site, but an
opportunity exists with strong highway
visibility. The timing of access changes
along Highway 10169 will have large
effect on development and redevelopment
in this district.
NEAR-TERM
With limited access and numerous small
parcels it is unlikely major redevelopment
will occur in this sub-area in the near-
term. Rather, capitalizing on recent
• investments with the extension of
Vance Avenue, select small industrial
users with limited access needs and
relatively limited investment fit for the
undeveloped portion of the district.
Redevelopment of the two vacant sites
north of 73rd Avenue could allow for
office or office showroom uses, however,
a median crossing will be closed at 173rd
Avenue with the planned zo13 MN DOT
resurfacing project could impact any high
trafFic uses.
fir'.
~_ Ir"U BUIIDIHC
Y®-~7 PAfiKING
-_ o eau' x~o awu
` ~ ~~
E ~
..
ieN
~~
The frontage road will remain as the 7hePinnaclesubArea-Near7ermVignetteStudy
primary access for uses along Highway
1 o~16g, but the intersection at 173rd create attractive building fronts and organizing the development pattern. The
Avenue should be reconstructed further organization must include well landscaped parking to the front or side of the
east with any redevelopment for building, and well screened loading and storage areas located behind the buildings.
additional safety measures. Extending Stormwater treatment can take on an entire sub-area approach and become
Vance Avenue to the frontage road and internal to the larger blocks of development. This framework of streets, utilities and
the addition of district signage icons will Stormwater treatment sets the stage for broader long term redevelopment which
help increase visibility for small business could occur with an additional access to the north.
behind the frontage road users. As these
t.-~~~ses evolve, steps should be taken to
~: _~
17130
QV2r1U@ Focused Area STud
52
x
.
;
y
;
DEVELOPMENT CHARACTER
•
~LONG-TERM~
With the reconstruction of the Highway
ion and io~i69 interchange and proposed
access road connecting to Carson Street,
an opportunity exists for corporate
campus site taking advantage of the
highway visibility and river views. This
additional access in conjunction with the
opportunity for an additional railroad
crossing at 73rd Avenue will provide
greater chances for this sub-area to
redevelopment at a more intense level.
The long-term development intensifies
around the earlier pattern of
infrastructure investments from streets
& utilities to stormwater. Vance Street
becomes the primary spine heading north
to the Carson Street connection and the
existing frontage road is removed, but
• still contains the utilities and serves as a
fire lane for the development.
Buildings are oriented toward the
highway to capture the visibility and
the central stormwater treatment area
is treated as an enhanced amenity for
the employees. A buffer is maintained
along the rail line and smaller office
users fill in near the tracks. Parking is
internalized and interconnected between
the buildings and strong, more direct
roadway and sidewalk connections back
to the commercial and retail areas at the
Hinge and Station Area Village sub-area
are constructed.
t •. ~~ •,
a ~.,
--~.-,~~
sw~oina
rapKiNc
c~ iac• rii: aao
~ e:~
4
f «~
7T'13t. CN@IlU2FocusedAreaSTuc.y 53
The Pinnacle Sub Area -Long Term Vignette Study
n
U
•
DEVELOPMENT CHARACTER
Residential Neighborhood Districts
,,~ r ~ Z-
_ ,_.
l ~ ~°',
,,;
;.
~, ~::,.
KLIEVER'S MARSH AND RIVER WEST
RESIDENTIAL NEIGHBORHOODS
The existing residential uses surrounding
Kliever's Marsh and nestled along Yale
Street along the Mississippi River are not
anticipated to see and significant change
as a part of the FAST study.
ELK RIVER STATION
Elk River Station is a
`~., `"'ti`~ `- successful model for
a~"~ higher density
~~~~ ~~
~, ~ housing near the
transit station. The
1 development
/i J provides multiple
yam/
housing options, in a
well organized,
compact development pattern.
Existing Single Family Homes Surrounding Kliever's Marsh
Existing Elk River Station with a range of housing types
HILLSIDE HEIGHTS
This district showcases
I "';,
,,,, ~` a range of housing
~~ options and takes
;~.
advantage of wetland
,~~..•- _. views and wooded
rolling topography. A
F ~ design priority will be
~'~ creating a physical
connection between
Hillside City Park to the north and the
large wetland complex on the southern
boundary and developing park spaces
and a continuous public trail network
along the periphery of the wetland.
The internal street network connects
with the existing street network on
adjacent property and establishes smaller
organized development parcels within the
• district. Housing types respect adjacent
uses by scaling down from larger stacked
housing near the intersection of 175th
Avenue and Twin Lakes Parkway to more
detached villa & townhome housing types
near the existing single-family uses to the
east.
Building placement emphasizes the
street within the center of the district,
taking advantage of long views across
the wetland and preserving existing
woodlands in the north. High quality
streetscapes with sidewalks, boulevard
trees and pedestrian scaled lighting
should be considered on all streets of the
district.
DEVELOPMENT CHARACTER
Hillside Heights District Vignette Study
DEVELOPMENT CHARACTER
C]
LOCAL STREET NETWORK CHARACTER
The street system changes in the master plan are suggested in order to improve traffic
circulation and pedestrian connectivity to the rest of the community. The majority of
roadway alterations are integrated to extension of Twin Lakes Parkway south to the
future interchange and the conversion of Highway io~~69 to a freeway.
Twin Lakes Parkway
Twin Lakes Parkway provides the infrastructure framework for organizing future
development and redevelopment in the study area. The master plan envisions
the roadway as a four lane collector with a planted median with a 4o mile an hour
design speed, and lower speeds through the Station Area Village sub-area. Access
management along the roadway defines the development pattern and general parcel
configurations for numerous uses. Full intersections require a minimum ofone-eighth
mile between them, while right-in, right-out access occurs at roughly 30o feet intervals.
The master plan suggests the use of round-a-bouts at major intersections along Twin
Lakes Parkway through the study area;175th Avenue and ~7ist Avenue. Rounda-
bouts inthese locations will aid in traffic flow and will be designed with large radius
and roll-up aprons to accommodate truck traffic. A traffic signal is suggested for the
intersection at the transit station providing a safe crossing and to benefit the retail
uses in the mixed use district. The ~zo' right-of-way for Twin Lakes Parkway should
• continue throughout the project area.
T1iNin LCiKe3 PC~Y`KWGY 3eCtiOn (n1DCeD USe
~ ~
Commercial Street
Residential Street
Q ~ Office/Industrial Street
Di3tl'1Ct)
~,
Pedestrian Zone 10n-Street Travel Lanes Median Travel Lanes On-Street Pedestrian Zone
D~rbinn /~nrnar D~r~inn l~nrnor
Streetscape typology diagram
Q Twin Lakes Parkway
DEVELOPMENT CHARACTER
Residential Streets
Streets within residential districts organize the development pattern into a curvilinear
grid responding to natural systems & topography. These streets are traditional in
character with opposing drive lanes, on-street parallel parking, turf boulevards,
sidewalks, street trees and lighting. Residential streets have a 60' right-of-way.
~ ~ .w S. .. ...
•
•
On-Street I Travel Lanes I On-Street)
Parking Parking
i
.,, ~a,;
~- ~'y.
Travel Lanes
Un-Street Narking
Pedestrian Zone
commerc~a~ street section
~~,~~ '~~
"! * R~ .
y +` r
'~ '!~?~
.~~
}~
Amenity Zone
U~vd.
Pedestrian
Zone
Commercial Streets
Commercial streets in mixed-use and
retail areas have extensive streetscape
elements. Site furnishings such as
benches, bike racks and trash receptacles
should be installed on wide sidewalks.
Pedestrian scaled street lighting and
boulevard trees will provide separation
from the street. Commercial streets have
a 70' right-of-way.
..
,_:
17130. QV2f1U@ Focused Area STudy 57
~; ,` ,,..
DEVELOPMENT CHARACTER
0 ffice & Industrial Streets
Streets through office and industrial districts are wider to accommodate truck traffic
and include parallel parking, turf boulevards, sidewalks, street lights and boulevard
trees. Office and Industrial Streets have a 70' right-of-way.
Blvd.
+t~
.~.
_. ...
On-Street
~I~i
Travel Lanes
~ noustna~ street section
Trails
Trails support two equally important
functions within the FAST, the first for
recreational use and the second to support
bicycle commuting to the Northstar
station. The plan calls for trails along the
extension of Twin Lakes Parkway, trail
connections to surrounding city parks,
and trails along edges of natural open
space amenities.
Trails are also envisioned to connect
across Highway 10169 to the Mississippi
River creating linkages to Historic
Downtown and to the Kelley Farm.
•
X58 17130. gV2f1Ue Focused Area STudy
t-
Setback
On-Streei Blvd. Pedestrian
Parking Zone
Trails provide a recreational and commuting function in the FAST
SetbacK
IPedestrianl
DEVELOPMENT CHARACTER
~J
•
SUSTAINABLE DEVELOPMENT
Throughout all sub-areas in the ~7ist Avenue FAST, sustainable development is a
fundamental goal. The following are aspects of sustainable design focus for the
master plan:
Energy Generation: In addition to utilizing excess steam from the GRE facility to
reduce energy demand for the study area, potential for on-site or district wide energy
generation initiatives are a focus of the master plan. Solar, wind and geo-thermal
are all viable options for alternative energy sources. Solar panels could be used for
operation of solar hot water systems or photovoltaics could be installed converting
the sun's rays captured by the solar panels into direct current energy. Smaller helical
wind turbines could line the rail line capture wind energy created by trains, and larger
wind turbines could be implemented in the industrial zones. Geothermal technologies
such as ground source heat pumps can function as heat source or heat sink depending
on the season providing climate control for various building types.
Toward Zero Waste: A goal for the industrial and commercial districts outlined in the Smaller helical wind turbines fit individual
plan is striving for zero waste or recycled by-products from manufacturing operations. developments
The city should promote and seek out groups of business that could share in the eco-
industrialpark model of recycling industrial by-products to eliminate waste.
LEED Building certification: LEED building certification should be considered for
buildings in the FAST, and be utilized as a benchmark for new development. The
Leadership in Energy and Environmental Design (LEED) program under the U.S. Green
Building Council certifies buildings for energy efficiency, waste reduction, use of
recycled materials and other sustainable construction practices. Architectural features
and non-mechanical systems such as window placement, high ceilings, overhangs and
natural ventilation are passive design strategies which can be utilized to warm buildings
in the winter and promote healthy indoor air quality.
Dark-sky friendly lighting: The master plan promotes reducing light pollution and
reducing energy consumption of outdoor lighting and suggests that outdoor lighting
in both private and public spaces include full cut-off optic light fixtures for "dark-sky
friendly".
Innovative stormwater practices: All districts described in the master plan outline
collective and integrated approaches for stormwater treatment. Opportunities range
from stormwater retention ponds and created wetland to bio-swales and rain gardens.
In more intensely developed districts, cisterns, green roofs and porous and permeable
paving are all recognized stromwater treatment alternatives in the master plan.
LEER is used as a benchmark for new development
Rain gardens and infiltration swales should be
considered for stormwater treatment
77'13t. QV2r1U2 Focused Area S7udy
Solar energy for heating water and direct current
energy
Full cut-off optics provide dark sky friendly lighting
~. ~ ..,,~
se~.
•
:.P
r imP~ementat~on
Implementing the master plan for the ~7~st Avenue FAST is not a single step. Achieving
the vision established in this plan involves a series of interrelated actions spanning a
number of years. The vision may have to adjust reflecting changes in market dynamics,
land ownership, community goals, economic prospects, or consumer preference, yet at
the same time it is important to protect the vision against short-term opportunities that
undermine the long term vision. With good planning, consistent policy implementation,
and adherence to the vision, development will eventually reach the critical mass that
leads to success. This chapter provides a guide for actions and investments required
to implement the master plan and realize the vision for the i7ist Avenue FAST.
•
IMPLEMENTATION
•
i
# 62 ; 17181. CN211U2 Focused Area S7udy
KEYS TO IMPLEMENTATION
Several factors will be crucial in successfully realizing the vision set forth by the
community and the EDA within this master plan. These keys apply regardless of the
actual form and timing of redevelopment:
Patience & Commitment to Vision. Commitment to the plan and patience go hand-in-hand.
This plan does more than simply seek to attract new development to southeast Elk River; it
seeks to move the area toward a vision for the future. Commitment to the plan means the
willingness to actively promote public and private investments that achieve the vision, and to
deter developments that do not meet the objectives o f the plan. Not all o f these decisions will
be easy.
Strategic Investments. I f financial support for the plan was unlimited, the need for strategic
decisions would be less important. With limited funds, every expenditure is crucial. It is not
possible to immediately undertake all o f the initiatives described in this plan. Needs and
opportunities not contemplated in the plan may arise in the future. Every investment must be
evaluated f or its impact on achieving the vision f or the f uture o f the ~7ist Avenue FAST.
Public & Private Partnerships. Removal o f the physical and economic barriers to development
and redevelopment for the ~7~st Avenue FAST may require public finance assistance. The
complexity o f development and redevelopment envisioned for the area clearly demonstrates
the need f or public financial participation. Private investment will not be su f ficient to pay for all
costs associated with redevelopment. A strong public/private partnership is required to make
development and redevelopment financially feasible and promote the desired development.
The need established in this plan does not make public f inancial assistance an entitlement,
and on-going planning will de f ine and substantiate the nature o f assistance f or each step
o f implementation. This approach ensures that public monies are used to achieve desired
public outcomes and not simply make development more a f fordable (or pro fitable) f or the
developer.
Financial Planning. The ability to make strategic investments relies on the continued evolution o f
financial planning. Implementing the plan cannot be viewed as a series o f independent projects
but rather a series o f interrelated actions. Some public improvements serve a broader area and
not a single project. Revenues will come f rom multiple projects. Some public investments will
be required prior to private redevelopment. The ability to coordinate public actions with the
revenues f rom private development will be key to the success o f the plan. Failure to consider the
implementation relationships between elements o f the plan will lead to missed opportunities
and increased risk for the City.
ROLES & RESPONSIBILITIES
Implementing this plan will rest with many entities in the community that share a vision
for the future for the 171st Avenue FAST. A clear understanding of implementation
roles and responsibilities promotes the effective use of limited resources.
IMPLEMENTATION
•
City o f Elk River
The ultimate responsibility for implementing the plan rests with the City of Elk River.
The Planning Commission and the City Council will provide direction on staff resources,
development project review and public investment. Managing development and
redevelopment for the ~7~st Avenue FAST will primarily fall to the Planning and
Engineering Departments of the city. The lead role in managing implementation for
the City falls to the Planning Department. The actions to betaken by the Planning
Department to implement the plan include:
» Application o f land use controls to guide private development.
» Review o f development plans and proposals.
» Coordination o f planning for capital improvements needed to facilitate redevelopment.
» Creation of plans to finance forpublic redevelopment investments.
The Engineering Department leads the design of public infrastructure improvements
needed to support development and redevelopment for the i7~st Avenue FAST.
The Engineering Department is a key player in planning for future roadway and
transportation improvements, including on-going conversations with MN DOT on
regional highway improvement projects affecting the project area.
• The Park and Recreation Board is responsible for planning, building and maintaining
parks and trails through the project area.
Economic Development Authority (EDA)
The i7~st Avenue FAST is important location for economic development in the
City of Elk River. It is the EDA that will keep the momentum of development and
redevelopment moving in a direction envisioned by the plan and adopted by the City.
Several EDA actions make them an important player in the successful implementation
of the plan:
» Provide a framework for coordinating e (forts o f the community. With limited resources, it is
essential that the community work in unison to undertake redevelopment. The knowledge and
experience gained f rom the planning process allows EDA members to e f ficiently and e f f ectively
take steps needed to implement the plan.
» Work to ensure that development and redevelopment initiatives in t7~st Avenue FAST are a
recognized priority f or City Council members representing the area.
» Take on a more active role than in the past. Actively perusing critical properties for
redevelopment or utilizing land leasing opportunities for near term investments could be new
roles f or the EDA.
» Create an annual redevelopment "action plan" to monitor progress toward implementation.
This action plan would outline key steps to occur during the year, including descriptions o f
. actions, responsible parties and funding. It forces the parties to not only consider what needs
to be done in the comingyear, but also why identi feed steps were not taken in the prioryear.
. ,..,, .
17131. QVQI'11J2 FocusedArea STuc. 6j j
IMPLEMENTATION
» Work with property owners to promote the maintenance and revitalization o f existing
buildings.
Provide guidance to the City to ensure that proposed development projects and public
improvements are consistent with the plan.
Promote development projects with sustainable design practices.
Work to find the appropriate f unding options for development and redevelopment.
Community at Large
The community of Elk River must stay involved as the development of the FAST area
continues over time. The community must work together with decision makers and
provide the necessary input for any new development to respect existing land-owners
and meet the vision of the 171st Avenue FAST.
Provide a singular focus for the plan. The knowledge gained from the planning process will
allow members o f the community to e f ficiently and e f fectively comment on development and
redevelopment proposals.
Continue public involvement. Open House comments and review o f development proposals.
LAND USE CONTROLS
The initial focus of implementation will be on actions needed to establish the master
plan as the official guide for development for the 171st Avenue FAST. These procedural
steps in implementation involve the adoption of key policy documents and updated
development controls.
Approve the Master Plan
The first implementation step is City Council action to approve this master plan. City
Council approval sets the stage for subsequent actions. The master plan is used
to inform subsequent planning efforts such as comprehensive plans, zoning and
allocation of resources.
Amend Land Use Controls
Plan approval is the trigger for taking other actions needed to guide land use for the
171st Avenue FAST in accordance with this master plan. Land use controls not only
promote the desired development outcomes, they also prevent development that is
not consistent with the plan.
Comprehensive Plan
Step one is to update the City's Comprehensive Plan with the new "Future
Development Framework Plan", Figure 6.1 and the new land use plan designations
consistent with the vision of this master plan. Amending the Comprehensive Plan
creates the foundation for all other implementation actions. Consistency with
.. , the Comprehensive Plan is a statutory requirement for zoning regulations, capital
X64 ; 17180. gV2r1U2 Focused Area STudy
•
improvements and redevelopment projects.
Zoning Regulations
More direct control of development comes from zoning regulations. Existing
regulations will require modification to conform to this plan. Part of the necessary
modification is enabling, allowing the type and form of development proposed in this
master plan. Other regulation changes are restrictive, forming a barrier for private
investment that is inconsistent with the plan.
Zoning changes are likely needed in order to implement the Land Use Plan. Detailed
analysis and formal recommendation of any zoning changes will be handled by the City
of Elk River along with adoption of this master plan.
Design Guidelines
Design guidelines serve as a communication tool between the EDA, the City, property
owners and developers. Aspects of the design guidelines could be incorporated into
a pedestrian overlay zoning district for portions of the FAST. Design guidelines should
become a standard tool in evaluating proposed development. Design guidelines
should be rooted in the district vignette studies established in the master plan chapter
• of this document.
IMPLEMENTATION
IMPLEMENTATION
STRATEGIES FOR DEVELOPMENT &
REDEVELOPMENT
Implementation of the master plan is not a single action, but a series of steps.
These steps will betaken over time in phases. Initial focus should be on several
implementation initiatives that lay the foundation for change. Initially, public
investments such as street and infrastructure improvements will play a key role in
setting the table for private development to occur in the FAST. Part of this strategy
becomes the er'fective use of finance tools available to the City.
Phasing
To act as a basis for analyzing implementation issues and to focus in on first steps
needed to begin development and redevelopment, a phasing plan has been created
(see Figure 7.i). The phasing plan builds from other kno~nm investments and responds
to site readiness.
It is anticipated that full development of the ~7~st Avenue FAST will take roughly i5
years to accomplish assuming a return to a relatively stable & gro~n~ing real estate
marketplace. The phasing plan suggests two general phases marked by the transition
of Highway ~oJ~6g to a limited access free~a~ay, and remaining areas suggested as
retainJinfill areas.
Earlier Phases :
There are three sub areas suggested for earlier phase development totaling roughly
8o acres. They are the East Elk River Gateway sub area (east of Highway ~oJ~6g), the
Hinge sub area immediately north and the Point sub area where the vacant Saxon
auto dealership and Americ inn Hotel exist. Development here possess the most
financial and market feasibility. However, development in these areas must follow
the ne~v infrastructure investments which will establish the framework for future
development.
Later Phase ;
The later phases of evolution ~n~ill likely occur with the transition of Highway ~oJi69
from it's current access configuration, to a t~n~o signal access configuration, to
ultimately a freeGVay configuration and as ridership builds on the commuter rail line.
Before these areas "ripen" for redevelopment, they will need to respond to the shift in
transportation patterns and build on the financial infusion of earlier phase projects.
Retain / In fill:
There are three areas of the FAST labeled in the phasing plan as "retainJinfill". These
areas are not suggested for active pursuit of redevelopment because of the quality of
development. These areas include the Northstar Business Park, Elk River Station and
the small pocket of single family housing around Kleivers Marsh and the housing along
.: -..
~r the river. These areas of infill are independent of the phasing schedule.
j .
~~~
~K'ti
-~
~i6 . '7130. avenue Focused Arec sTudy ,.,~~~~.,.~.»~~ ,~a ,,,., ~.~~~ , WdJ...~rµ ~~.,,,~„a,., . ,. ,.m.~„~~~, ~~.,~ ,, ~.L,~.~,,, w~,,, .~.~....~ .,.~ .~m~.,~,~ ~ ~.,~~,.,., ~.~....,u.,........~.. ~,.,.~...~~u.,..~.~...,,,,
* ~. .
N011`d1N~W~~dWI
•
IMPLEMENTATION
•
.7
critical to development success for the FAST.
Implementation Initiatives
Implementation of the master plan for the ~7tst Avenue FAST will span many years and
include many complex activities. It will likely be more than twenty-five years before
the vision for the FAST is fully realized. There are, however, many actions to be taken
in the near term -the next one to ten years. These actions (identified in Figure 7.z) are
The initial focus of implementation will be on actions needed to establish the master
plan as the official guide for development for the ~7~st Avenue FAST. The first
implementation step is City Council adoption of the master plan. City Council approval
sets the stage for all subsequent public actions and the confidence needed for private
redevelopment activities.
During the early years of the FAST development, there are several critical actions that
can be taken to reduce development constraints, allow for greater investment in public
amenities and enhance the creation of a sustainable neighborhood. Pre-interchange
development with an additional signalized access can be used to set the stage for the
post-interchange development with enhanced financial opportunities. Suggested
activities to enhance project success include:
» Strategically stage development so that it builds market momentum and early projects act as
positive demonstrations o f great things to come in the FAST.
» Build high-quality streetscapes, natural areas and pedestrian links because these amenities will
drive future market interest.
» Create convenient, sa fe linkages between various trail routes f or bike commuting.
Key initial activities are identified in Figure 7.i and are further described below.
Twin Lakes Parkway & ~7~st Avenue
Congruent with the East Elk River Gateway and Hinge sub area development, the
construction of Twin Lakes Parkway will begin to establish future transportation
patterns for the FAST. The re-alignment of the intersection at i7~st Avenue and the
extended Twin Lakes Parkway combined with an enhanced streetscape for both
roadways will help attract new development to Gateway Business Park and other
properties south of ~7ist Avenue. Official mapping of Twin Lakes Parkway should also
be considered. Official mapping is an official platting process to secure right-of-way
for future roadway improvements. The roadway is platted with the county and will
be transferred to the city at the time of development.
A Second Signalized Intersection -Interim Access
Additionally, MN DOT would consider a proposal to create a signal at the proposed
interchange location. The second signal would trigger closing all individual property
access points and focus access to ~7~st Avenue, the new signal and right-in ~ right-out
access points at 73rd Avenue and 165th Avenue. This new signal and intersection
'~ m
468 1T18C. CN2rlU2FOCUSedAreaSTud~
.''
IMPLEMENTATION
C7
would allow for more near-term development in the East Elk River Gateway sub area
to the east of Highway 10169. This new signal would also mean the construction of
additional supporting roadways. The first, on the east side of Highway 10169 would
be the extension of a collector roadway from Twin Lakes Parkway through the Cargill
property to connect with 165th Avenue to provide full access to Cargill's operations and
the Youth Athletic Complex. On the west side of the highway, a frontage road would
be constructed adjacent to the right-of-way of Highway 10169 within a existing access
easement. Additionally, a connection running north and south along the west side of
Highway 10169 is needed for access to business, residents and fire safety.
East Elk River Gateway
The city-owned Gateway land is green field land offers the greatest opportunity for
early development in the FAST. Significant investment will be need for utilities and
roadway infrastructure. A development goal will be to creating enough development
intensity required to generate financial resources to assist in achieving the vision
here in other parts of the FAST. Other districts will involve challenging but necessary
acquisition and demolition, as well as infrastructure and amenity investments. The
East Elk River Gateway sub area east of Highway 10169 will establish the future
development pattern and character for the 171st Avenue FAST.
• The Hinge
The Hinge sub area is the likely location for commercial and retail uses to development
in the immediate future. Establishing an internal roadway network through the sub
area will facilitate the proper trafFic circulation between the extended Twin Lakes
Parkway and 171st Avenue. The organization and design of the development here will
set the tone for the future development character throughout much of the FAST and
will include streetscape identity, trails and wetland mitigation.
k¢.
a
'R13C. W2~llJ2 Focused Area S7udy fig ~
I IMPLEMENTATION
IMPLEMENTATION
FINANCING
A detailed financial analysis was not performed as part of the planning process. There
area many financial variables involved with complex development planning projects.
The following information highlights the key tools currently available to finance
implementation of the master plan.
Tax Increment Financing
The costs of development and redevelopment may be too great to allow new projects
to be financially feasible. The situation poses the classic "but for" situation in State
law governing tax increment financing. "But for" the use of TI F, the development as
proposed would not occur. It is clear that the desired redevelopment will not take
place without the removal of physical and economic barriers by the City. Tax increment
financing is the only tool with the capacity to accomplish these objectives.
As with other elements of the master plan, projections for the use of TIF are both
comprehensive and conservative. The plan seeks to provide a clear understanding
of what might be required with the goal of reducing public financial commitments
as the plan is implemented. The result can be found in other large redevelopment
settings. As redevelopment begins to transform an area, market forces improve. As
the potential income from rents and sales grow, private development can carry more
• costs of redevelopment.
This master plan assumes that all of the redevelopment projects will be included in
TI F districts. In simplest terms, TI F allows the City to capture the property taxes from
redevelopment and use these monies to pay for the investments required to undertake
the development. Financial analysis conducted through the planning process clearly
shows that private development will not alone support the investments required for
implementing the master plan. The costs of desired development and redevelopment
are likely too great to consider all new projects to be financially feasible.
This plan does not offer a primer on the use of TIF since the City is familiar with
the intricacies of TIF from its use on other redevelopment projects. Instead,
implementation of the plan requires attention to the key issues that influence the
use of TIF:
Project Area:
TIF relies on two types of areas. The "project area" is a broader area with common
development goals. The "tax increment financing district" is the specific parcels from
which tax increment is collected. The project area is important because it defines
where tax increments can be used (see discussion of "Pooling" that follows). The
project area defined for this master plan should also be designated as the project area
forthe purpose of establishingTlF districts.
~:
17181. We(lU2 Focused Area STudv t ]t
.~ `
IMPLEMENTATION
District Criteria:
The plan assumes that the TIF districts in the ~7ist Avenue FAST will be classified as
"redevelopment" under state law. The establishment of a redevelopment TIF district
relies on three basic criteria (Minnesota Statutes Section 46g.i74, Subd. io):
i. Parcels consisting o f 70% o f the area o f the TIF district are occupied by buildings, streets,
utilities, or other improvements.
z. More than 50% o f the buildings, not including outbuildings, are structurally substandard to a
degree requiring substantial renovation or clearance.
3. These conditions are reasonably distributed throughout the district.
The presence of improved parcels should not pose a constraint. The majority of the
redevelopment sites in the FAST include properties that meet these criteria. The
existence and distribution of structurally substandard buildings has not been studied.
The inspection of buildings and the related analysis of identified deficiencies are
typically used to determine the ability to meet these statutory criteria. This work is not
included in the current master planning process for the ~7~st Avenue FAST.
The City should immediately undertake an analysis of buildings in the "Phase ~"
portion of the project area. This information is essential to decision making about
• the use of TIF. There is little doubt that some buildings in the project area will be
found structurally substandard. The location of these buildings will influence the
configuration ofTIF districts. The analysis should include all parcels in the project area
where redevelopment is desired. Conducting this analysis removes one step needed
to undertake redevelopment. The City can offer potential developers certainty about
the ability to create TI F districts.
Pooling:
Some aspects of the redevelopment plan may be financially feasible (estimated
revenues exceed expenditures) while some projects must close a financial gap before
they occur. Ideally, projects that produce financial surpluses should be used to support
those with gaps. This distribution of financial recourses can occur if the projects are
located within the same TIF district. If not, then State law limits the flow of funds
between TIF districts.
The need to carefully plan the boundaries of the project area and TIF districts is tied
to the issue of pooling. The term refers to the statutory limitation on spending tax
•
increment beyond the boundaries of the TI F district. Items to be funded by TIF must
be located within the TIF district or be an amount that falls within pooling limits.
For redevelopment TIF districts, not more than z5% of tax increment may be spent
outside of the district. The actual application of pooling limits is often more restrictive.
Administrative expenses of the TIF district count against the z5% maximum. The
amount of revenue available to support eligible costs outside of the district may fall
in the ~5% to zo% range.
Time Constraints:
In a perfect world, the City would establish a TIF district and wait for redevelopment.
Current State law makes this approach a risky proposition. TIF districts are subject to
several time limitations. The most important of these limitations is the five-year rule.
After five years from the date of certification of the TI F district, the use of tax increment
is subject to new restrictions. Generally, tax increment can only be used to satisfy
existing debt and contractual obligations after this date. This rule creates a five year
window to make commitments for the use of TIF. Additionally, the geographic area
of the TI F district can be reduced, but not enlarged, after five years from the date
of certification. Therefore, if a TIF district is established without a specific plan for
development, there should be reasonable certainty that development will occur within
• five years.
The City has the ability to decertify all or part of a district and create a new one. This
action sets a new five year clock. There is a risk that the conditions used to establish
the original district will not be present in the future.
Use Limits
Several specific statutory limitations will influence the use of tax increments on
implementation of the plan.
State law requires that at least 90% of revenues from a redevelopment TIF district
be used to finance "the cost of correcting conditions that allow designation" of the
district. The majority of redevelopment and public improvement expenditures in this
plan meet this criteria. Several important limitations must be noted:
Tax increments cannot be used for "a commons area used as a public park". The plan takes a
conservative position and assumes that this limitation precludes using TIF for proposed open
space improvements. The statute does not de fine the term "public park". The City may wish
to explore this issue with appropriate legal counsel.
Tax increments cannot be used for public facilities used for "social, recreational, or con ference"
purposes. As with parks, the statute does not de fine these terms. Special rules apply to public
IMPLEMENTATION
IMPLEMENTATION
•
•
improvements, equipment, or other items located outside o f the TIF district.
Tax increments cannot be used for these costs i f their purpose is primarily decorative or aesthetic.
I f the items serve a f unctional purpose, tax increments can be used unless "their cost is increased
by more than too percent as a result of the selection o f materials, design, or type as compared
with more commonly used materials, designs, or types f or similar improvements, equipment or
items". To avoid this restriction, the right-o f-way of street to be improved should be included
within the boundaries o f a TIF district.
Other Public Finance Tools
Although the planning process focused on tax increment financing, it is likely that other
public finance tools will be needed to make long term redevelopment investments
within the t7~st Avenue FAST. This section highlights potential tools and their
application. Additional investigations will be undertaken as finance plans are prepared
by specific public improvement and redevelopment projects.
Tax Abatement
The name "tax abatement" is misleading. No taxes are abated using this tool. In
reality, tax abatement functions similar to TIF (see Minnesota Statutes Sections
46g.t8tz to 469.t8~5). Each taxing jurisdiction (city, county, school district) has the
ability to levy a property tax equivalent to taxes paid by a parcel of property. The
proceeds of this levy can be used to finance any of the public improvements and other
redevelopment activities discussed in this plan. Since tax abatement cannot be used
for property in a TI F district, the best opportunity for this tool lies with locations that
do not qualify for a TIF district.
Special Service Districts
A special service district has the capacity to finance the construction and maintenance
of the public improvements for the ~7tst Avenue FAST. In simplest terms, a special
service district is a special taxing district. It allows the City to collect money to support
services and improvements in commercial areas.
The general statutory authority (Minnesota Statutes, Chapter 4z8A) contains few limits
on the potential uses of special service districts. The nature of the improvements that
can be funded with a special service district are not defined (or limited) by statute. The
special service district cannot be used to finance services that the City provides through
the general fund throughout Elk River, unless the services are provided at a higher
level. The statute does not impose any other limitation on the nature of services.
Potential applications of special service districts for implementation of this master
plan include:
» Construction and maintenance o f streetscape.
» Construction and maintenance o f the wetland trails and other public open space.
_~ :'
'#~74 1TI8t. CN@r1U2FocusedAreaSTudy
IMPLEMENTATION
Construction o f sidewalks, trails, bridges and other improvements to enhance pedestrian
movement.
Construction and maintenance o f public parking facilities.
Other services and improvements can be undertaken and financed by a special service district if
authorized by the enablingordinance.
Grants
DEED
The Minnesota Department of Employment and Economic Development
(DEED) offers grants, loans and technical assistance for redevelopment
projects and activities for communities. Qualifying projects include housing
and commercial rehabilitation, wastewater treatment facilities and drinking
water systems, and contaminated site clean-up. Eligibility of financing
through DEED depends on a number of factors including the type of
business, size, location and type of financing needed.
The Business Development Public Infrastructure Program is a potential
grant through DEED which provides funding for infrastructure projects in
• support of economic development. This program would be a great fit for
the infrastructure improvements for Twin Lakes Parkway. The DEED web-
site (htto:llwww.deed.state.mn.us) provides a number of potential financial
resources for development and redevelopment projects in the FAST area to
spur business growth.
M PCA
The Minnesota Pollution Control Agency has various opportunities
available for receiving grants and other financial assistance for
environmental projects in Minnesota.
Environmental Assistance (EA) Grant
The Minnesota Legislature established the EA grant program to provide
financial assistance for the development of environmentally sustainable
practices in Minnesota through voluntary partnerships and goal-oriented,
economically driven approaches to pollution prevention and resource
conservation. The Environmental Assistance Grant Program consists of
a competitive, two-stage application process used to identify and assist
projects that will be most beneficial in furthering the Agency's mission
of working with Minnesotans to protect, conserve, and improve our
environment and enhance our quality of life, particularly within the focus
areas identified each fiscal year.
Small Business Environmental Loan Program
This program could be an option for business within the FAST. It provides
'17'130. QY2nU2 Focused Area 57udy
,.~
~ y~a
„3
,.75 x -`
I^
i~
~"~ I
f p
!I
~i
i
s i ~ ~ ~: ~ ~
~uu~..r.e«m,•> ui ~ ~~ ~ ~ ~ e'.e ..~~ ,~'~~~,"dV~~i a i~.fh1'