Loading...
8.3.B. PRSR 02-08-2006Item # 8.3.B. ver MEMORANDUM TO: Parks and Recreation Commission FROM: Michele Bergh, Recreation Manager DATE: February I, 2006 SUBJECT: Hillside City Park Grant Item The Parks and Recreation Department would like to apply for a grant through the DNR Outdoor Recreation Grant Program. This grant is due to the DNR by March 31, 2006 and, if awarded, would be for work performed in 2007 and 2008. Background Hillside Ciry Park has become a very popular facility for mountain biking with a regional draw. We have received many letters of support for improvements at this facility. The total proposed budget is $199,022. The grant would cover 50% of the project expenses. I have attached a budget and a site plan for your review. Action Requested Staff requests the Parks and Recreation to recommend authorization allowing staff to apply for this grant. Proposed Budget Facility Description Estimated Expected Cost Completion Date Two shelters-16x30 Install two shelters including concrete $48,990 August 31, and 16x16 ad underneath 2007 Bring water to site Remove bituminous pavement, saw cut $11,623 August 31, bituminous, saw cut concrete curb, 2008 remove concrete curb, install 1" copper water service, connect to existing HDPE watermain, curbstop, aggregate base cl V, bituminous pavement, concrete curb, restore een areas Paved access Pave access road and 20 stall parking $70,000 August 31, road/ arkin area 2008 Landscaping Add shade trees around parking area $ 3,000 August 31, and add shrubs and rocks around sign 2008 area Entrance sign and kiosk $ 7925 August 31, 2007 Drinking fountain/jug Stone fountain with attached jug filler $ 2,590 August 31, filler 2007 4 benches $ 2,600 August 31, 2007 Rock climbing play area Two play structures- Mt. Hood and $40,304 August 31, Mt. Kilimanjaro rock climbers including 2007 12" de th wood fiber Screening for portable 3 sided screening for portable toilets $ 3,000 August 31, toilets made out of natural wood 2007 6 Picnic tables, 4 garbage 6 heavy duty picnic tables- 2 ADA $ 8,990 August 31, cans, grills compliant and 4 standard tables, 4 2007 arba e cans, 2 famil -sized rills Total Cost $199,022