4.2. SR 05-19-2003g3ver
13065 Or0n0 Parkway
Elk River, MN 55330
MEMORANDUM
Item# Ieo_m fi _ 2.
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Scott Harlicker, Senior Plannei~/
May 19, 2003
Northstar Corridor Update
At the NCDA meeting held on May 1~ the Authority received a report on the state
legislative process. As of May 14th, funding for the Northstar Corridor was included in the
Senate and House bonding bills. No action has been taking on those bills. Federal funding
should be induded in the T21 reauthorization bill.
Phone: 763.441.7420
Fax: 763.441.7425
DOCUMENT2
www. ci.elk-river, mn.us
4.
5.
6.
7.
8.
9.
NCDA
Agenda
May 1, 2003
4:30 p.m.
Sherburne County Government Center
Elk River, MN
Minutes of the March 6, 2003 Meeting*
Recognition of Lewis Stark, Departing Executive Committee
Member
Executive Committee Appointments*
Mn/DOT Grant Agreement*
Public Information Update*
State Legislative Update*
Federal Legislative Update
Construction of the Hiawatha LRT Project Update
Other
a. Next Meeting: June 5, 2003
* Attachment
Action Requested
Approval
Approval
Approval
Information
Discussion
Discussion
Information
DRAFT DRAFT DRAFT DRAFT
NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY
Regular Meeting Minutes
March 6, 2003
The Northstar Corridor Development Authority met on March 6, 2003, in regular session at the
Sherburne County Government Center, Elk River, Mimaesota.
The following members, alternates and citizens were present: Mary Richardson, Bob Barnette,
Jason Tidemarm, Bria~ Bensen, Peg Aho, Steve Novak, Steve Billings, David Loch, Paul
McCarron, Dan Erhart, Robert Kirclmer, Derails Berg, Tom Gamec, Bruce Nawrocki, Paul
Ostrow, Scott Harlicker, Duane Grandy, Tim Yantos, Lewis Stark, Felix Sclnniesing, Ewald
Petersen, Jolm Norgren, Patrick Cairns, Gary Hammer, Woody Bissett, Bob Johnson, Kaye
Bechtold, Greg Bruestle, Dan Lieser, Art Daniels, Jolm Himle, Jim Barton, Luci Botzek, Jeff
Dehler
1. Duane Grandy, Chairperson, called the meeting to order at 4:35 p.m.
A motion was made by Ewald Petersen, seconded by Lewis Stark and carried
unanimously to approve the agenda of March 6, 2003, and the minutes of January 9,
2003.
3. Executive Committee Report:
A motion was made by Jolm Norgren, seconded by Paul Ostrow and carried
unanimously to approve the recommendation of the Executive Committee that the
NCDA authorize the Chair to finalize negotiations and execme the contract
amendment with Anton, Lobov & Associates, Inc. by extending the term of the
Agreement through June 30, 2003, increasing the contract amount by $8,500.00,
and modifying the scope of services, and also waive the insurance requirements in
Section E paragraph 1 of the original agreement. Bob Johnson asked staff for
clarification of expanded services to be performed by Paul Anton. Mary
Richardson noted that the expanded scope of services would provide additional
strategic and advisory services on the project including documentation and
presentation of findings to policymakers.
4. State Update:
Report on Briefing of Governor Pawlenty: John Himle presented an update on the
meeting with Governor Pawlenty at United Defense. He noted that the economic
analysis was very compelling to the Governor and his staff and that we should
know soon if they embrace the issues. Tim Yantos handed out a copy of the power
point presentation made and an informational sheet on conclusions made by some
of the presenters.
Bob Johnson noted that the Governor was in St. Cloud 7 or 10 days following the
presentation and when asked about Northstar, he referenced an incorrect cost
benefit ratio. Mr. Jol2~son asked what steps are being taken to ensure that this issue
Northstar Corridor Development Authority
March 6, 2003 Minutes
Page Two
and the correct data is out there. Tim Yantos noted that the NCDA is making a list
of answers to all questions received from the presentation for future discussion with
the Governor and his staff. Mr. Yantos also noted that Paul Anton will be making a
presentation to the Legislature sometime this session.
Legislative Activities: Bill Sc1='eiber handed out a list of bills which include
appropriations for the Northstar Project and copy of HF 688 which would abolish
regional rail road authorities. Steve Novak noted that the Senator Dean Johnson is
positive that the Senate will allow the NCDA to make a presentation to the
Transportation Committee which will give the Project an opportunity for a flee
press conference.
John Himle noted that Northstar Corridor updates will be sent out to over 11,000
people this week and over 350,000 people will receive the next Corridor
Newsletter. Mr. Himle also noted that staff and Mr. McCarron are stmXing a whole
new series of media tours throughout the State and that a videotape will be sent out
to over 120 cable stations.
5. Legislative Update:
FY 2003 Appropriations: Paul McCarron provided an update on the fiscal year
29003 appropriations. He noted that on February 13, 2003, it was announced that
Minnesota will receive $164.16 million in federal funding. Of this amount,
Northstar Commuter Rail Project will receive $5 million.
FY 2004 Appropriations Request and Reauthorization Request: Discussion was
held on the fiscal year 2004 appropriations request and reauthorization request. Paul
McCarron noted that Congressman Sabo and Oberstar will coordinate getting the
Northstar Project onto the funding list. Congressman Kennedy is taking the lead on
this issue. Tim Yantos noted that the reason why the Project did not get
recommended status is because the Project did not get the State match.
Other: Next Meeting: The next meeting of the Northstar Corridor Development
Authority is scheduled for Thursday, April 3, 2003, at 4:30 p.m. at the Sherburne
County Government Center.
A motion was made by Paul Ostrow, seconded by Patrick Cairns and carried
unanimously to adjourn the meeting at 5:20 p.m.
Duane Grandy, Chairperson
Date
H:',~Admndata'~,COMM1TTE\Corridor NCDAX.2003\Mmutcs",0320603 NCDA Draft.doc
Agenda Item #3
Executive Committee /
Capital Budget Committee
and
Commuter Rail Corridor Coordinating Committee (CRCCC)
Members:
Commissioner Duane Grandy, Chair
Benton County
3135 Quarry Road NE
Sauk Rapids, MN 56379
320/968-5000
H) 320/252-633t
Fax: 320/259-4244
Steve Billings
Councilmember
City of Fridley
5215 Lincoln Street NE
Fridley, MN 55421-1868
763/571-5457
Fax: 763/571-1655
Sbillings@qwest.net
Commissioner Arne Engstrom
Sherburne County
20800 Meadowvail Road
Elk River, MN 55330
763/441-3869
Fax: 763/241-2707
LeRoy Pauley
l--laven Township
1940 37th Street SE
St. Cloud, MN 56304
320/251-4797
Commissioner Mark Stenglein
Hennepin County Regional Railroad Authority
A-2400 Government Center
Minneapolis, MN 55487-0240
612/348-7882
Fax: 612/348-8701
Paul Ostrow, Vice Chair
Councilmember
City of Minneapolis
350 South 5th Street, Room 307
Minneapolis, MN 55415
612/673-2201
Fax: 612/673-3940
Commissioner Dennis Berg
Anoka County
2100 3rd Avenue
Anoka, MN 55033
763/323-5700
Cell: 612/590-1415
H: 763/753-3014
Fax: 763/323-5682
MEMORANDUM
Agenda Item #4
DATE:
TO:
FROM:
RE:
April 25, 2003
NCDA Members
Executive Committee
Grant Agreement
It is anticipated that Mn/DOT will be submitting to the FTA a grant
application for the 2000 - 2001 Congressional Appropriations for the Twin
Cities Transitways. The NCDA's share of this funding will be $4,077,850.
In order to access these funds, the NCDA must enter into a Grant
Agreement with Mn/DOT. The proposed scope of work and budget for the
grant agreement is attached.
Action Requested: That the Authority authorize its chair to finalize and
execute a grant agreement with the Minnesota Department of
Transportation for $4,077,850 which incorporates the scope of work as
attached.
Northstar Corridor Development AttthoriO,
2 I00 3'~' Avenue, Anoka, Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www.northstartrain.org
NORTHSTAR CORRIDOR SCOPE OF WORK
FFY2000 Grant and Local Match
1. Update Ridership $I87~500
The current ridership forecast is based upon the 1990 census data because it was the only
data available at the time. Also, the forecast process is somewhat unique since it includes
elements from two separate metro areas i.e., Twin Cities and St. Cloud with addition of
some assumptions about home based work trips from the non-modeled area between the
Twin Cities Metro area and St. Cloud.
The ridership, or demand forecast, is one of the critical data elements used to calculate service
requirements and cost effectiveness of the project. The FTA has raised some questions regarding
calculations for incremental ridership.
Since the 2000 census data is now available and FTA has raised the issue, it is prudent to review
the forecast process and recalculate the ridership demand based upon cun'ent census data. Since
the FTA will require an update during final design it would be useful to have the process
reviewed and information developed as soon as possible
2. BNSF Negotiations and Related Research $375~000
In order to construct and operate the Northstar Commuter Rail Project on the freight railroad
owned by BNSF, it will be necessary to negotiate long-term agreements with the BNSF relating
to capacity improvements, railroad usage rights, construction, risk and liability allocation and
operations. Additional research is necessary regarding capacity modeling, risk management, tax
and other legal issues. In addition, agreements must be drafted and negotiated with the BNSF.
3. Value Engineering $187~500
VE is a process of systematically applying standardized techniques to review design, products, or
services and to identify improvements and means to achieve them. VE must achieve the desired
program functions at the lowest possible life cycles cost.
The VE exercise follows Preliminary Engineering and will involve certified value engineers and
technical representatives from oversight agencies, BNSF, and appropriate members of the PE
consultant team. The VE effort will review trackway and systems designs, rolling stock,
commuter rail operations and interface with freight rail, and station facilities. The products of
the VE session will be recommendations to reduce costs and to improve the effectiveness of the
proposed commuter rail system. VE is required by FTA.
4. Public Involvement $250~000
Public involvement has been a key element of the success of the proposed commuter rail in the
Northstar Corridor Ongoing activities to keep the public informed and involved in decision
making during next phase of work will include additional newsletters, public meetings, project
updates, travel to operating systems, small group meetings with affected property owners,
operating and maintaining the website, and other tools as necessary. In addition, funds may be
used to promote the Northstar Conm~uter Bus, which is operating as a precursor to the rail, in
order to build ridership over the next several years.
5. Transit Oriented Development $93~750
Transit Oriented Development (TOD) is the development that occurs around (typically ¼ to ½
mile) transit stations. Ideally, it is compact mixed use development that supports the individual
city development plan but also contributes to increased ridership for the transit system.
TOD activities to date have included developing information and assisting corridor cities in
amending comprehensive plans, developing zoning ordinances and otherwise supporting city
efforts to develop and maximize the transportation investment in the best interest of the city and
the transit project.
FTA considers land use, and pm'ticularly TOD, one of the foremost criteria in evaluating transit
projects. The Northstar TOD efforts to date have been very favorably received by FTA. Such
efforts have also resulted in concrete development scenarios for-stations at Coon Rapids-
Riverdale, Anoka, and Elk River.
The budgeted task would continue the TOD education and coordination effort.
6. Station Studies $100~000
The Northstar Project occupies 82 miles of the BNSF railway between Rice and Minneapolis
with eleven stations. The station locations and physical design elements have been developed,
reviewed, and approved by; each city, the NCDA Board, and Mn/DOT, all as required by
Minnesota law.
The Ramsey station has been included in the draft environmental analysis. While the station is
not included in the final project definition, the City of Ramsey has done extensive study and
planning for a new town center and transit station. The City has concluded that a slightly revised
station location meets their needs and has therefore requested that NCDA reconsider addition of
a commuter rail station in Ramsey.
NCDA has previously eliminated the Ramsey Station in favor of stations at both Anoka and
Coon Rapids-Riverdale. The Board has, however, agreed to re-evaluate the feasibility of a
Ramsey station in the revised location on the basis of the new information and a request from the
City. The budgeted funds would enable a review of all prior information together with the new
information developed by the City.
Representatives of the City of Sauk Rapids have requested addition of a station directly serving
the Sauk Rapids community. Very little analysis of station sites has been completed to date. The
proposed funding would provide a feasibility analysis including review of potential sites, site
evaluation, site selection, and project impacts.
7. Administration/Project Management $1707000
Administrative support will be required for consultant selection, contract administration, and
other administrative functions.
2
8. Right of Way Acquisition
Acquire real property at designated station locations.
Total FFY2000 Grant and Local Match for Northstar Corridor
$729,250
$2~093~000
SUMMARY OF PROJECTS FOR FFY 2000
Responsible Description Federal Dollar Local Total Dollar
Agency Grant Share Project
Request
Met Council Central Corridor $500,000 $125,000 $625,000
Mn/DOT Red Rock Corridor $709,500 $187,500 $897,000
Mn/DOT Northstar Development $1,655,500 $437,500 $2,093,000
Authority
M n/DOT Mn/DOT $135,000 $135,000
Total for FFY 2000 $3,000,000 $750,000 $3,750,000
NORTHSTAR CORRIDOR SCOPE OF WORK
FFY2001 Grant and Local Match
1. Procurement for Final Design $1257000
Analyze and develop appropriate contract packages for final design including but not limited to
commuter rail stations, maintenance and layover facilities, track and signal improvements, and
rolling stock. Requests for proposals including scope of work for final design of selected contract
packages would be developed.
2. Vehicle/Equipment Procurement and Specifications $627500
Outline specifications for rolling stock have been prepared as part of Preliminary Engineering.
Considerable experience in the specification and acquisition of locomotives and passenger
coaches has been gained over the last ten years as new commuter rail projects have come on line.
The Northstar Project proposes to review and evaluate the current outline specifications, evaluate
various acquisition scenarios, and develop specifications and an acquisition strategy for
locomotives and coaches for the Northstar Project.
3
3. Administration/Proiect Management $180~000
Administrative support will be required for consultant selection, contract administration, project
financial administration, and other general project oversight.
4. Right of Way Acquisition
Acquire needed property at designated station locations
$2~698~600
Total FFY2001 Grant and Local Match for Northstar
$3~066~100
SUMMARY OF PROJECTS FOR FFY 2001
Responsible Description Federal Local Total
Agency Dollar Share Dollar
Grant Project
Request
Met Council Central Corridor $1,225,000 $306,250 $1,531,250
Mn/DOT Red Rock Corridor 987,650 262,500 1,250,150
Mn/DOT Northstar Development 2,422,350 643,750 3,066,100
Authority
Mn/DOT 215,000 - 215,000
Total for 2001 $4,850,000 $1,212,500 $6,062,500
4
NORTHSTAR
COMMIITER RAIl.
UPDATE
Broad Bipartisan Support Shown for Northstar Commuter Rail
Legislation Introduced in Minnesota House Authorizes Funding for Commuter Rail
A bipartisan coalition of 35 Minnesota House lawmakers introduced legislation to authorize state funding for the
Northstar commuter rail project. House File 1233, authored by Rep. Kathy Tingelstad (R-Andover), would provide the
$123.2 million in Iow-interest state bonding needed to construct the rail line.
"Northstar commuter rail is the most cost-effective option for addressing the current and future transportation needs of
the Highway 10 corridor. I'm thrilled that 34 other legislators in the House of Representatives have joined me in
sponsoring this bill - it's proof of the bipartisan commitment that exists to reduce congestion on our highways," said Rep.
Kathy Tingelstad.
House File 1233 has been referred to the Committee on Transportation Finance and is expected to have its first hearing
on April 23rd. In the Senate, the Capital Investment Committee has included $10 million for Northstar commuter rail in
its bonding bill.
You can track the progress of Northstar through the legislature on our web site: www.mn-GetOnBoard.com.
Northstar commuter rail is an excellent investment.
For every federal, state and local dollar spent $1.15 in benefits are created. The State of Minnesota will realize
a benefit of $2.97 for every dollar it spends on Northstar.
Northstar commuter rail is the most cost-effective choiCe for
this corridor,
Comparison of construction and 15 years of operations costs shows:
- A busway would be 50 percent more expensive
- Adding a new lane to Highway 10 would be double the cost
Northstar will move people.
Current ridership projections show that Northstar will carry at least 5,000 passengers each day (10,000 tri
day), which is the equivalent of adding 1 1/2 lanes of highway capacity during both morning and evening ru s h
hour traffic times.
Northstar commuter rail can be operational in less than four years,
No major highway improvements are scheduled or funded for this corridor through 2020. Because
Northstar uses existing track, the construction time for Northstar commuter rail is substantially less than new
roads or busways. Passengers would be able to ride Northstar commuter rail as soon as fall 2006.
The Star Tribune on April 7th endorsed the Northstar commuter rail project -
you can find the furl editorial on our web site. Here are a few excerpts:
"Gov. Tim Pawlenty often says that he wants to do for Minnesota what makes sense. Adding the Northstar
commuter-rail line to the transportation grid makes sense. The administration and Legislature should restore the line to
their bonding priorities and, thus, to the federal government's list of favorable projects. To do less would go against the
wishes of most residents of central Minnesota, where the proposed line enjoys wide approval."
"Nowhere is it written that Minnesotans must be confined to traveling only on roadways. Offering choice is consistent
with market principles, especially when the price is lower. Employing under-used railroad right-of-way for moving
people, whether by commuter trains, light-rail lines or busways, makes sense."
21'0013rd Avend'~; An~ka;' Mynn~:6ta 55303_2265. :
1-888-478-NSTAR (6782) (763) 323~5700 Fax: (763) 323-5682
www. mn-GetOn Board.com
How can we afford Northstar when we face a budget shortfall?
The State of Minnesota has two methods to pay for goods and services. One source is the state's general
fund -- that's the budget that is over $4 billion short. The general fund pays for the state's day-to-day
expenses (salaries, programs, energy, computers, etc.).
The other revenue source is money made available by bonding. The state borrows money from selling bonds
to pay for building infrastructure like libraries, community centers, local museums and hopefully, Northstar
commuter rail. It's similar to borrowing money from a bank to buy a house or a new car. Northstar's request
would come from this source.
Rep. Tingetstad acknowledged that the state's budget deficit makes funding transportation a challenge during
the 2003 legislative session. "Even with the deficit, Minnesota needs to improve its transportation," she
explained. "Northstar is the most cost-effective option for this corridor, and a smart investment for the state."
"In difficult economic times, we should be using Iow-interest bonding money to put people to work on projects
like Northstar," said Senator Don Betzold.
What people are saying...
Army Reservist
Some day I hope to be able to drive to Rice and
catch the train to northeast Minneapolis where I
do my National Guard drills. I have been driving
for 8 years and it has cost me a lot of money.
- Little Falls Resident
Business Leader
We have taken surveys where over 100 people in
the office here said they would be interested in
actually taking the commuter rail if it was
available.
- Duane Arens,
Connexus Energy
Earlier this month, the NCDA
launched the updated Northstar web
site at www. mn-GetOnBoard.com.
Featuring the latest news on
Northstar commuter rail, the new site
is a great resource. It includes an
enhanced route map with station
details and the presentations .made
to Governor Pawlenty in February.
Visitors can also find ways to help
make Northstar a reality. Check it out
today!
Chief Authors: Rep. Kathy Tlr
Rep. Jim Abeier (R-Anoka)
~gelstad (R-Andover) and Sen.
Sen. Dean Johnson (D-Wilimar)
Rep. Al Juhnke (D-Willmar)
Rep. Connie Bernardy (D-Fridley)
Rep. Jerry Dempsey (R-Red Wing) Sen. Mike Jungbauer (R-East Bethel) Rep. Char Samuelson (R-New Brighton)
Rep. Greg Blaine (R-Little Falls) Rep. Phyllis Kahn (D-Minneapolis) Rep. Alice Seagren (R-Bloomington)
Rep. Dan Dorman (R-Albert Lea) Rep. Margaret Anderson Keltiher (D-Mpls) Rep. Dan Severson (R-Sauk Rapids)
Rep. Keith Ellison (D-Minneapolis) Sen. Dave Kids (R-St. Cloud) Rep. Dean Simpson (R-New York Mills)
Sen. Leo Foley (D-Coon Rapids) Rep. Jim Knoblach (R-St. Cloud) Rep. Judy $oderstrorn (R-Mora)
Rep. Barb Goodwin (D-Columbia Heights) Rep. Bernie Lieder (D-Crookston) Rep. Doug Slang (R-Cold Spring)
Rep. Mindy Oreiling (D-Roseville) Rep. Denny McNamara (R-Hastings) Rep. And), Westerbcrg (R-Blaine)
Rep. Tom Hackbarth (R-Cedar) Rep. Doug Meslow (R-White Bear Lake) Rep. Kurt Zellers (R-Maple Grove)
Rep, Alice Hausman (D-St. Paul)
Rep. Michael Nelson (D-Brooklyn Park)
Don Betzold (D-Fridley)
Rep. Mary Ellen Otremba (D-Long Prairie)
Rep. Jim Rhodes (R-St. Louis Park)
Rep. Frank Homstein (D-Minncapolisj Rep. Bud Nomes (R-Fergus Falls)
Note: Authorship is limited to 35 members of the House of F~epresentatives and 5 members of the Senate.
Commuter Rail is the Best
Transportation Option
for the Northstar Corridor
Commuter rail is the most cost-effective choice
Comparison of construction and 15 years, of operating costs
Northstar will carry the same number of people that an upgrade
to the highway would car/3~ at around one-third the cost
si,500 ]
$1,250
$1,000
$750
$500
$250
$0
$1,090
$502
T
Northstar
$749
Busway
Hwy 10 Upgrade
[] Construction Costs [] 15 Years Operating Costs
Adding additional capacity to Northstar commuter rail is also less
expensive than other transportation. Cost to add 25% capacity:
· Northstar: $25.8 million
· Busway: $39.2 million
· Adding a lane to Hwy 10:$1,090 million
Analysis by independent economist Paul Anton, compares:
· Commuter rail: 1,800 passengers/hour; 82-mile stretch from Rice to Minneapolis
· Adding a lane to Hwy 10:1,210 passengers/hour; from 35W to Big Lake
· Dedicated busway: 1,800 passengers/hour; from Minneapolis to Big Lake
Northstar's benefits exceed its costs
Benefit-cost ratio:
A benefit of $1.15 will be realized for every federal, state
and local dollar spent.
v' Each dollar spent by the State of Minnesota will realize
a benefit of $2.97.
Northstar Corridor Development Authority
2100 3'" Avenue, Anoka, Minnesota 55303-2265
(763) 323-5700 Fax: (763) 323-5682
www. rn n-GetO n Boa rd. com
2003 METROPOLITAN TRANSITWAYS DEVELOPMENT BOARD
LEGISLATIVE TRACKING UPDATE
April 23, 2003
COMMENTS/ FINAL ACTION
ISSUE HF/AUTHOR SF/AUTHOR HOUSE STATUS SENATE STATUS FINANCIAL IMPACT
Copitol Inveslment Bonding SF 2 Possed Copitol S10M omended
Bill Longseth Investment ond info bill for
Finonce Committees Northstor
- on Senote Floor. Commuter project
ond$ ] M for
Centrol Corridor
Tronsltwoy.
House Omnibus HF627 Appropriotes $3.6B
Transpodation Bill Kuisle tronsportotion/tron
sit/Iocol roods
$550M in trunk
highway bonding.
Transpodalion funding HF196 SF48. Transportation Policy Finance Committee 6-cent gas tax
package. Juhnke Dean Johnson increase, gas tax
indexing, truck
highway bonding
8( 11 county metro-
wide half-cent
sales tax
referendum.
Melropolitan Transpodalion HF1546 Referred to Fuel tax increase
Fund Frhardt Transportation with portion to be
Finance 4/16; not designated to
Included In the House Rushline Rail and
omnibus bill. Cedar Avenue
busllne.
Metro Transitway Proposal HF1395 SF1476 Transportation Finance Committee Fuel taxes
Hausman Marko Finance increased,
Heard April 8; not highway funds
included in House distribute, one-half
omnibus bill. cent transportation
sales tax imposed-
COMMENTS/ FINAL ACTION
ISSUE HF/AUTHOR SF/AUTHOR HOUSE STATUS SENATE STATUS FINANCIAL IMPACT
money
opproprioted.
Metropolitan fiscal disparities HF1385 Transportation Any county that
program adjustment far Lenczewski Finance Committee ~ provides an
operating subsidies of light rail 4/1/03; not in operating subsidy
transit system provided, omnibus bill. to a light rail transit
system is eligible
for a reduction in
Its contribution to
the area wide net
tax capacity
Light Rail local 60% operating HF627 Included in omnibus
(40% Hennepin, 20% transportation bill.
Minneapolis and
Bloomington).
Trunk Highway Improvement HF4/HF1192 Transportation 1/3rd removal of
Bonds Westerberg Finance - laid over for significant
Severson possible Inclusion in highway
Jocobson omnibus funding bill. bottlenecks within
Juhnke 7-county metro
Nelson P. area.
Establish Metropolitan Transit HF153 Transportation Policy; Metropolitan
Authority Juhnke not in omnibus bill. transit authority
established,
certain Met
Council and
transportation
duties transferred
and sales and use
tax imposed on
member counties.
Southwest Transit Corridor HF745 Transportation. Policy; Prohibits certain
Adolphson not included in rail and bus transit
omnibus bill. actions by
Commissioner of
Transportation/Met
COMMENTS/ FINAL ACTION
ISSUE HF/AUTHOR SF/AUTHOR HOUSE STATUS SENATE STATUS FINANCIAL IMPACT
Councll/Hennepin
County RRA. in
southwest metro
area transit
corridors.
Cenlral Corridor Transit Way HF271 SF249 Transportation Transportation Policy $2.6M
Hausman Moua Finance; heard, laid & Budget Division - appropriated for
over; not in omnibus heard April 15. major investment
bill. study, engineering
and
implementation.
Central Corridor Transit Way HF1281 SF1181 Transportation Transportation Policy $2.6M
Hausman Moua Finance; not heard. & Budget Division - appropriated for
heard April 15. major Investment
study, engineering
and
Implementation
Rush Line Corridor Transit Way HF481 SF6~9 Transportation Transportatian Policy Autharizing
Meslow Lourey Finance; heard but & Budget Division - Issuance of $1M in
Lesch not Included in heard April 15. state bonds;
Johnson, S, omnibus bill. appropriating
Nelson, P. money.
Wasiluk
Brooklyn Center Permanent HFS11 SF513 Heard in Finance Requiring Met
Transit Center Hilstrom Scheid Transportation Council to build a
Nelson, M. Rest Finance; amended permanent transit
Carlson Higgins into omnibus center in Brooklyn
Mullery transportation bill. Center.
Ellison
Wakota Bridge Mitigation HF525 Transpodation Appropriating
Sieben Finance; not heard. $800K for bus
service to mitigate
effects of Wakofa
Bridge
construction
project,
COMMENTS/ FINAL ACTION
ISSUE HF/AUTHOR SF/AUTHOR HOUSE STATUS SENATE STATUS FINANCIAL IMPACT
HOV Lanes on Hwy. 3(24 and HF1168 Transportation Policy; Regulating use of
35W heard and included high-occupancy
in omnibus bill. vehicle lanes on
marked Interstate
highways 394 and
35W.
Cedar Avenue Bus Transit HF570 SF518 Heard but not Finance Appropriating $5M
Way Gedach Knutson included in omnibus and authorizing
Wilkin Belanger bill. issuance of state
Atkins Pariseou bonds for Cedar
Holberg McGinn Av. bus transit way;
Wardlow Mefzen Introduced
2/24/a3.
High Speed Passenger Rail HF1165 SF1286 Transportation Policy Referred 3/13 Gives authority to
System Hausman Kiscaden · Committee - not Finance Committee commissioner of
heard, transportation in all
aspects of
planning and
operation of
system,
Red Rock Commuter Rail HF1473 SF1424 Referred 4/7 to Referred 4/7 to Engineering and
McNamara Marko Transportation Finance; heard April environmental
Finance; not heard. 15 In Transportation review $1M bond
Policy & Budget Issue and
Division, appropriated.
Nodhstar Commuter Rail Line HF53 Transportation Appropriation of
Opatz Finance $120M - Authorize
issuance of state
bonds for
construction of
Northstar corridor
rail.
HF 1233 SF27 Finance Appropriating
Tingelstad Betzold Heard April 23. money to the
~4v
COMMENTS/ FINAL ACTION
ISSUE HF/AUTHOR SF/AUTHOR HOUSE STATUS SENATE STATUS FINANCIAL IMPACT
(33 authors) Kteis commissioner of
Johnson, DE transportatian
Jungbauer (DOT) and
Foley authorizing the
issuance of state
bands for
construction of the
Northstar
commuter rail line
($123.3M).
HF116
Goodwin Transportation
Hausman Finance Northstar
Nelson, M. commuter rail line
Bernordy funding provided,
Lesch bonds issued and
Clark money
Abeler appropriated
($120M).
C: \ Doc \ IG \ 2003leg \JtPowers\03 Legislative Tracking Grid.wpd
NOTE: Any bill with GO Bonding included was restricted from being amended to the Transportation Finance Omnibus Bill.