3.2. SR 08-16-2010aty ar Elk -.--. River REQUEST FOR ACTION TO ITEM NUMBER Ci Council 3.2 AGENDA SECTION MEETING DATE PREPARED BY Consent A t 16, 2010 ustin Femrite, Ci En ineer ITEM DESCRIPTION REVIEWED By Pay Estimates REVIEWED BY ACTION REQUESTED The City Council is asked to approve the pay estimates as descn~bed below. BACKGROUND/DISCUSSION Listed below are pay estimates that have been submitted for approval. I have reviewed these pay estimates and find them to be accurate and in accordance with the respective contracts. FINANCIAL IMPACT PROJECT PAY EST. ~$ CONTRACTOR AMOUNT 2010 Main Street Pavement Rehabilitation 1 Rum River Contracting Co. $242,886.39 2010 Seal Coating Project 1 Pearson Brothers, Inc. $172,734.00 Line Avenue C-verlayImprovements ^ 2 Knife River Corporation $109,686.90 '~ City of Elk River portion of Sherburne County contract with Knife River Corporation for improvements to Line Avenue. ATTACHMENTS ^ Pay estimates for the above referenced projects. Action Motion by Second by Vote Follow Up S:\Engineer\2010 Memos\8-16-2010 Pay Estimate Request forAction.doc FROM: July 1, 2010 T0: August 1, 2010 PROJECT: 2010 Main Street Pavement Rehabilitiation OWNER: CITY OF ELK RIVER CONTRACTOR: RUM RIVER CONTRACTING CO. ADDRESS: 31913 124TH ST., PRINCETON, MN 55371 PHONE: (763) 389-3718 FAX: (763) 389-3213 CONTRACT ITEMS THIS PERIOD TOTAL TO DATE ITEM DESCRIPTION UNIT QTY. UNIT QTY AMOUNT QTY AMOUNT NO. TOTAL PRICE C('HRIII R.F. 1.0.RT'R FFT 1 MOBILIZATION LS 2 REMOVE CONCRETE CURB LF 3 REMOVE CONCRETE WALK SF 4 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 5 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LF 6 SALVAGE SIGN EACH 7 SUBGRADE PREPARATION RD ST 8 FULL DEPTH PAVEMENT RECLAMATION (P) SY 9 MILL BITUMINOUS SURFACE (2.0") SY 10 TYPEMV3 WEAR COURSEMLl"fURE(MVWE35035B) TON 11 TYPE LV3 NON-WEARING COURSE MIXTURE (LVNW35030B) TON 12 BTTUMINOUS MATERIAL FOR TACK COAT GAL 13 ADJUST VALVE BOX EACH 14 ADJUST FRAME AND RING CASTING EACH 15 INSTALL CASTING (R-2501-C) EACH 16 4" CONCRETE SIDEWALK SF 17 CONCRETE CURB AND GUTTER B618 LF 18 8" CONCRETE VALLEY GUTTER SY 19 8" CONCRETE VALLEY GUTTER TRIANGULAR SECTION EACH 20 TRUNCATED DOMES (PEDESTRIAN CURB RAMP) EACH 21 TRAFFIC CONTROL LS 22 INSTALL SIGN IN CONCRETE EACH 23 4" SOLID LINE WHTTE -EPOXY LF 24 4" DOUBLE SOLID LINE YELLOW -EPOXY LF 25 4" BROKEN LINE YELLOW -EPOXY LF 26 24" SOLID WHTTE (STOP BAR) -EPOXY LF 27 3'X6' ZEBRA CROSSING WHITE -EPOXY" SF COMPLETION DATE AMOUNT OF CONTRACT ORIGINAL: 08/30/10 ORIGINAL: $443,874.70 REVISED: REVISED: $ 6,000.00 $ 3.00 $ 1.50 $ 10.00 $ 3.00 $ so.oo $ 200.00 $ 0.95 $ 5.50 $ 44.34 $ 43.00 $ 2.50 $ 185.00 $ 373.00 $ 495.00 $ 3.10 $ 14.20 $ 54.00 $ 500.00 $ 256.00 $ 3,000.00 $ 200.00 $ 0.28 $ 0.58 $ 0.06 $ 6.00 $ 3.00 1.0 $6,000.00 477.0 $1,431.00 2,785.0 $4,177.50 43.9 $439.00 0.0 $0.00 1.0 $50.00 61.4 $12,280.00 29,572.0 $28,093.40 0.0 $0.00 0.0 $0.00 3,685.6 $158,479.08 0.0 $0.00 18.0 $3,330.00 20.0 $7,460.00 1.0 $495.00 2,785.0 $8,633.50 477.0 $6,773.40 7.0 $378.00 4.0 $2,000.00 18.0 $4,608.00 0.5 $1,500.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 l.o $6,000.00 477.0 $1,431.00 2,785.0 $4,177.50 43.9 $439.00 0.0 $0.00 1.0 $50.00 61.4 $12,280.00 29,572.0 $28,093.40 0.0 $0.00 0.0 $0.00 3,685.6 $158,479.08 0.0 $0.00 18.0 $3,330.00 20.0 $7,460.00 1.0 $495.00 2,785.0 $8,633.50 477.0 $6,773.40 7.0 $378.00 4.0 $2,000.00 18.0 $4,608.00 0.5 $1,500.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 0.0 $0.00 Pay Estimate 2010 main street no 1.>ds 1 OF 2 CONTRACT ITEMS THIS PERIOD TOTAL TO DATE ITEM DESCRIPTION UNIT QTY. LJNIT QTY AMOUNT QTY AMOUNT NO. TOTAL PRICE 28 INLET PROTECTION EACH 29 STANDARD PROCTOR (SUBGRADE) EACH 30 INPLACE DENSITY & MOISTURE (SUBGRADE) EACH 31 CONCRETE TESTING EACH 32 INPLACE DENSITY & Alit VOIDS (BTTUMINOUS) EACH ao 2 IS 4 17 $ 150.00 34.0 $5,100.00 34.0 $5,100.00 $ 95.00 0.0 $0.00 0.0 $0.00 $ 45.00 7.0 $315.00 7.0 $315.00 $ 185.00 0.0 $0.00 0.0 $0.00 $ 10.00 0.0 $0.00 0.0 $0.00 cnxicnxrr c e n cvTU ~ ax~nnrr i~:a.,....,u, ..a .......:..:.........m 1 MOBILIZATION (Sidewalk at Retaining wall) LS 2 CONCRETE SIDEWALK SF TOTAL Schedule 1.0 TOTAL Schedule 2.0 T TOTAL THIS PERIOD T TOTAL TO DATE 1.00 $ 500.00 1,170 $ 3.10 1.0 $500.00 1,170.0 $3,627.00 $251,542.88 $4,127.00 $255,669.88 AMOUNT EARNED AMOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT. PREVIOUS PAYMENTS AMOUNT DUE `TOTAL THIS PERIOD $255,669.88 $ 12,783.49 $ - $ - $242 886.39 255,669.88 g 127894P Y- $ - $24 ,; 39~ 1.0 $500.00 1,170.0 $3,627.00 $251,542.88 $4,127.00 $255,669.88 Pay Estimate 2010 main street no 1.x15 2 OF 2 ',PEARSON BROS., INC. 11079 LAMONT AVE. N.E. HANOVER, MN 55341-4063 BILL TO City of Elk River Atten: Phil Hals 13065 Orono Parkway Elk River, MN 55330-5600 Invoice DATE INVOICE NO. 7/30/2010 2247 - P:O. NO. PERMS __ PROJECT _Due ITEM DESCRIPTION QTY RATE AMOUNT Crs-2 P Bituminous Material For Seal Coat 57,590 2.60 149,734.00 Aggregate FA-2 Aggregate Placed 218,.900 0.10 21,890.00 PARKING LOTS Aggregate FA-2 Aggregate Placed 11,100 0.10 1,110.00 /0~-~-3~ao-'~q ~9a-'~~ 3iao-~o~' Thank You For Your Business. Total $172,734.00 Phone # Fax # (763)391-6622 (763)391-6627 1, l 10.00 Item No. Item Description Units Unit Price Contract Quantity Quantity to Date Current Quantity Amount to Date 52 2504.602 ADJUST VALVE BOX-WATER EACH $150.00 7 0 0 $0.00 53 2506.522 ADJUST FRAME & RING CASTING EACH $330.00 13 0 0 $0.00 54 2531.501 CONCRETE CURB & GUTTER DESIGN 6618 LIN FT $16.50 85 0 0 $0.00 55 2540.602 MAIL BOX SUPPORT EACH $95.00 9 0 0 $0.00 56 2563.601 TRAFFIC CONTROL LUMP SUM $1,600.00 1 0 0 $0.00 57 2575.511 HYDRO SEED, FERTILIZER AND MULCH SQ YD $0.89 1300 0 0 $0.00 58 2575.535 WATER M GALLONS $35.00 28 0 0 $0.00 59 2582.502 CENTERLINE STRIPING SKIP LF $0.04 51205 0 0 $0.00 60 2582.502 EDGE OF LANE STRIPING LF $0.04 102410 0 0 $0.00 Totals For Section 7) CITY OF BECKER: $0.00 (:ITY flE fit1C'ftfV~t LTERNATE 1) 61 2104.501 REMOVE CONCRETE CURB LIN FT $10.00 90 107 107 $1,070.00 62 2105.505 FULL DEPTH RECLAMATION(STREET)(P) SO YD $0.88 8550 8550 8550 $7,524.00 63 2112.501 SUBGRADE PREPARATION ROAD STA $87.78 18.75 18.75 18.75 $1,645.88 64 2350.501 WEARING COURSE MIXTURE TYPE MVWE450356 TON $44.92 1100 989.27 989.27 $44,438.01 65 2350.502 NON-WEARING COURSE MIXTURE TYPE LVNW350308 TON $42.29 1100 1077.89 1077.89 $45,583.97 66 2350.503 WEARING COURSE MIXTURE(DRIVEWAY) TYPE MVWE450 SQ YD $10.22 700 0 0 $0.00 67 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON $2.08 428 350 350 $728.00 68 2504.602 ADJUST GATE VALLE BOX EACH $150.00 6 3 3 $450.00 69 2506.522 ADJUST FRAME AND RING CASTING(SANITARY) EACH $330.00 2 1 1 $330.00 70 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT $33.12 80 92 92 $3,047.04 71 2531.602 CONCRETE TRIANGULAR SECTION(8" THICK) LS $1,000.00 1 1 1 $1,000.00 72 2531.604 8" CONCRETE VALLEY GUTTER SO YD $38.00 30 5 5 $190.00 73 2563.601 TRAFFIC CONTROL lS $3,400.00 1 0.95 0.95 $3,230.00 74 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT $2.00 1000 0 0 $0.00 75 2575.523 TURF ESTABLISHMENT LS $900.00 1 0.5 0.5 $450.00 Totals For Section 8) CITY OF ELK RIVER (ALTERNATE 1): . ttt19 ' Backsheet 1 135 9999.1 Incentive/Disincentive LS $20,791.00 1 1 1 $20,791.00 Totals For Backsheet 1: $20,791.00 Backsheet 2 136 9999.1 Incentive/Disincentive LS $33,748.06 1 1 1 $33,748.06 Totals For Backsheet 2: $33,748.06 Change Order 1 127 2105.501 COMMON EXCAVATION (P) CU YD $6.60 90 0 0 $0.00 128 2105.525 TOPSOIL BORROW (LV) CU YD $17.60 200 0 0 $0.00 Totals For Change Order 1: $0.00 Change Order 2 129 2021.501 MOBILIZATION LUMP SUM $3,000.00 1 0 0 $0.00 130 2221.501 AGGREGATE SHOULDERING CLASS 5 TON $16.71 150 0 0 $0.00 131 2350.501 TYPE LVWE450306 WEARING COURSE MIXTURE TON $42.61 650 0 0 $0.00 Totals For Change Order 2: $0.00 Work Order 1 113 2021.501 MOBILIZATION LUMP SUM $1,000.00 1 1 1 $1,000.00 114 2104.501 REMOVE METAL CULVERT lIN FT $4.50 173 173 173 $778.50 115 2104.503 REMOVE BITUMINOUS PAVEMENT SQ FT $1.00 1440 1440 1440 $1,440.00 116 2211.501 AGGREGATE BASE CLASS 5 TON $15.00 42 42 42 $630.00 117 2501.511 15" CS PIPE CULVERT LIN FT $106.50 13 13 13 $1,384.50 118 2501.511 18" RC PIPE CULVERT LIN FT $116.00 60 60 60 $6,960.00 119 2501.511 24" RC PIPE CULVERT LIN FT $156.00 48 48 48 $7,488.00