Loading...
4.4. SR 07-21-2003MEMORANDUM Item #4.4. TO: FROM: DATE: S U BJ ECT: Mayor and City Co~ Michele McPherso~r~irector of Planning July 21, 2003 Playground Quotes, Flighlands West Park Attachments · Quote - Earl F Anderson · Drawing - Earl F Anderson · Quote - Minnesota/Wisconsin Playgrounds · Drawing- Minnesota/Wisconsin Playgrounds · Approved 2003 CIP Budget Overview The City Council has approved both the 2003 CIP Budget and the overall playground design for the Highlands West Park. We have obtained quotes from two playground providers for a playground structure, swings, and track slide for the park. A fourth element, a climbing structure, is only quoted from one supplier, and therefore is not being considered at this time. The quotes for the structure, swings, and track slide are as follows: Earl F Anderson: MN/Wisconsin: $20,024.00 $23,960.00 There will be freight and tax added to the above. Staff will also utilize an on-site supervisor to ease installation. This cost is estimated to be approximately $1200. Recommendation Staff recommends that the City Council accept the quote from Earl F Anderson for the Highlands West Playground. The fourth element will be submitted for consideration by the Council once a second quote on a similar structure can be obtained. S:kPLANNlNGX~ParksM-Iighland West\7 21 03 Playgournd Approval.doc Sent EARL F. ANDERSEN 952 884 5619; 07/02/03 14:48; ]etFa2L#372;Page 2/4 i'age: [ PROPOSAL ENTERED BY: PDE QUOTE NUMBER: 0057715 QUOTE DATE: 7/2/2003 Earl F. Andersen QUOTE TO: CITY OF ELK RIVER 13065 ORONO PAR.K. WAY ELK RIVER, MN 55330 ATTN: PHONE: FAX: CHRIS LEESEBERG 763-635-1033 (763) 441-7420 (763) 635-1090 SHIP TO: CITY OF ELK RIVER % HIGHLAND WEST PARK 13065 ORONO PARKWAY ELK P. IV'ER MN 55330 QTY ITEM NO DESCRIPTION PRICE EACH EXT. PRICE FOR HIGHLAND WEST PARK PLAY EQUIPMENT PER PLAN # C6190D1 CUSTOM PLAYSTKUCTLTRE, SWINGS, TRACKRIDE PLAN INCLUDES THE CUSTOM PLAY STRUCTURE, SWINGS, & TKACK ILIDE. BY LANDSCAPE STRUCTURES, INC. 1.00 2100 APOLLO CLIMBER- TECHNO DYNAMO 11,210.00 11,210.00 224.00 WOODFIBER CU. YARDS SOFT STEP (ASPEN) WOOD FIBER 17.25 3,864.00 14" DEPTH THAT SETTLES TO A 9" DEPTH. (DOES NOT INCLUDE FILTER FABRIC) 224.00 WOODFIBER CU. YARDS DELIVERY OF WOOD FIBER 1.95 436.80 2.00 INSTALLSUPV INSTALLATION SUPERVISOR - 2 WEEK DAYS 550.00 1,100.00 INSTALL SUPEKVISIOR TO WORK WITH CITY STAFF. 2 WEEK DAYS, 8 HOURS ON SITE - BASED ON ACTUAL TIME ON SITE. SEE SCHEDULE - ESTIMATED TIME. 1.00 PLAYGROUND 20,024.00 20,024.00 NOTE: This quotation is valid for 30 days. Please call for confirmation after that date. Prices are NOT based SUBTOTAL 36,634.80 on prevailing wages. DISCLAIMER FOR UNKNOWN CONDITIONS: The following disclaimer applies only when installation is quomd. This quotarion is based on the area being fre~ of all debris such as, bm not limited to the following: *concrete foot/rigs o.- blocks of any type. 'Bedrock or rocky conditions of any type. *Tree stumps, trees, cans, bottl~, metal or any other debris. ,Utilities requiring any hol~ to be dug by hand. *if ama is not aec.~ssible to a bobcat and other equipment necessary for installation. *lf water exists in sit~ ama or foohngs after they are dug. "Or ar.5' other unknown comlitions not listed ar visible. SALES TAX 2,424.26 FREIGHT 1.761.53 TOTAL 40,820.59 FOB: FACTORY TERMS: NET $O DAYS Shipmem approx. 4-6 weeks upon receipt of order and subject to credit approval. Do you require a 24-hour delivery notice? [-'] Yes [-"] No Approved by: Signed Date CONTR. SCTDR TOCO~TJtL,M ALL OUANTITIgS , w/ut t'enn Ave ~: ~[uu · t~ioormngton, ~vim 55431 · Phone: 952-884-7300 · 1-800-862-6026 · Fax: 952-884-5619 www.efa-mn.com · e-mail: parkandrecinfo @ era-nm.corn OR trafficinfo @ era-mn, corn EEO/AA I]]6 1 9DD 1 BIZ:ALE: 1 /1 6" = 1 '-D" Earl R Andersen, Inc. 9701 Penn Ave. S., Suite 100 Bloomington, MN 55431 (952) 884-7300 www. efa-mn.com FAX (952) 884-5619 1-800-862-6026 I ,,,/' APOLLO ',,~' ~ 2~00 CONCRETE BOR~ I I ~ / ' ./ :TY [ed F. ~dm'sen. liE BORDER PLAYGROUNDs/ QUOTATION TO: City of Elk River- Planning Dept. 13065 Orono Parkway Elk River, Mn 55330 Attn: Chris Leeseberg Phone: 763-441-2953 Fax: 763-441-7425 Date: 16-Jut-03 Quote No. D2042H Drawing No. D2042H Project: Elk River City Park Plan Drawing D2042H Qty Unit Description Price Extension 1 Lump Sum PowerScape Plus 5" Aluminum Post System Playstructure, $23,960.00 $23,960.00 Mfg. By GameTime. See Attached Equipment List and Drawings Pdce Includes: Factory Installed Locking System for Easy Installation Oversized 49" Post Center Formed Steel Deck System Entry Archways on AIl Vertical Climbers Independent Play Components Per Attached List Freight to Jobsite Included All Applicable Sales and Use Taxes Included Unless Otherwise Noted, Prices Shown are Materials Only, They DO NOT Include: Assembly, Installation, Edging, Safety Surfacing, Removal of Existing Equipment, Surface Preparation, Landscaping or Bonding. NOTE: Unless oaherwise stated the followln~ applies to the purchased items requirinE installation. ~/[innesota Wisconsin Playground Inc. Will not be responsible for accepting delivery or storage of equipment, s~to preparation, unforeseen obstructions (may incur additional charses), or disposal of packaging nateriais. Owner or General Contractor shall hold Minnesota Wisconsin Playground, Inc. harmless in the event of injury due to insufficient resilient safety surface. Owner is ~sponsible for dire~t access to site for large trucks. A flat dirt surface should be prepared prior to our arrival. Unless otherwise stated ail excavated material is to remain on site and all installation shall be done in one trip. All material is guaranteed speoifled. All work is to be completed in a workmaafikc manner according to standard practice. Any alteration or division t?om above specifications involving extra costs must be executed upon written orders and will become an extra charge over and above the purchase agreement. All Agreements are oontingent upon strikes, scoidents or delays beyond our control. Owner is to carry fire, tornado and other necessary inSurance. Prices Good For 30 Days Sub Total Shipping / Installatio@ Date: 4 - 6 Weeks A.R.O. Freigl~t Prices Based on,~.,.V~/ges W/l~ou,~/_ Prevailing Wage Adjustments Installation Signed By: ~ y...../v Tax Harl~n Lehman CPSl Accepted By: Total With Acceptance - Terms of Sade - Payment is Due Within 30 Oays PO Box 27328 · Goider~ Valley, MN, 554-27 · 753.546.7787 · 1.800.622.5425 e-mail info~mnwiplay, com· www.mnwipla¥.com $23,960. O0 Included Not Included Included $23,960.00 · Fax 763..546.5050 7T-O" '~' -- -- '-" X BORDER X BY OTHERS "/~ ~~~ I ~~-~-~ [ ~ I ~ ~ ~' ~ ~ ~ ~2 // ~ P~ ~ ~ ~ p~ ~ / // J ACCESSIBILI~ KEY ~A ~QUIRmEm Fm SmU~RE m 5-12 ~S Om ~ T~SFER ACCESSIBLE = BLUE/mT~(TOT~ ~N~O~ ~ ~A~Y~~ ~ ~ I~ "EO'O. ~}j ~ GROUND ACCESSIBLE = BROWN /TOt~ ~ ~ ~ ~P ~ R~'O, ~ EL~ATED NOT ACCESSIBLE = MAGENTA L~ ~ or ~u~o ~ ~ ~ ~ 4 ~'D. ~ NON PARTICIPATING ~ B~CK ~ ~ Is ~ ~ ~G ~ ~ ~ ~ RAMP ACCESSIBLE = RED ~s~u~~~a~~ ~ ACCESS ROU~E = GREEN ACCESS BY O~ERS ~IS PRt~ IS ~E PROP~ ~ MINNESOTA MQ .BY S~d&~..~.~dbul~By.,:: I PO Box 27328 - Golden Valley, MN 5~27 C Jty Park BE US~. COPI~ ~ REPRODUCED W~OUT ~P[AYQROUND2 F~ 763.~0.~ Elk River, Minnesota roBE ~PRE55~ WR~ P[RaI~I~. Enriching Childhood Through Play.~/ E-Mail info~mnwiplay, com . ~ r - ,o'-o' ~ 7/~/~ ~ D2042H Budget Item Amount Comment/Explanation [-~gh]ands East $50,000 T~s item is currend¥ Playground under consideration. Lions Park c~ Lights $21,000 Carryover from 2002 [] Skate Park $41,500 Currendyunder discussion Concrete* see attached expense llst $3,000 [] Rear Patio of LPC Baldwin Park $16,000 Carryover from 2002, Improvements includes ADA improvements YAC Concession $21,000 Labor only, Area 728 stand framing Baseball has obtained materials Trott Brook Barn [] Interior Finish $15,000 This could be less if in- Work house labor can be used. $6,000 Contract work, remove [] Siding existing, sheath, and install metal siding to weatherize the building for year-round use Undeveloped Park Improvements $10,000 [] Great Northern Trail Gates [] Great Northern Trail grading analysis, north of Cty33 Prairie Seed $2,000 Supplies ~ Picnic tables $5,720 Will be constructed in- house (22) ~ Identification $4,350 Metal and vinyl for sign signs faces (30) $4,000 [] Misc materials Tax $500 Total $200,070 FINAL APPROVED PLAN TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Members Michele Bergh, Recreation Manager July 21, 2003 Recreation Department Update Highlight of Summer Programs Summer is going very well. We have many of our traditional programs running as well as some new sports camps that are going very well and our expanded theme day program, which is now 5 full days a week and includes outings. We have 12-30 children participating in the Lions Den Summer Camp, depending on the day of the week. Tuesdays and Thursdays are our most popular days - these are the days we have outings. Safety Camp was a big success once again. The numbers were down a bit, with about 80 children participating, but we had a great group and some new topics. Safety Camp is such a great example of several city departments working together. Summer Staff We have approximately 30 staff members this summer working the various programs. This is similar to past years. I am very pleased with all the staff and have had positive feedback from the participants as well. Lions Park Center The center is busy almost every day. Major events have been occurring about once a month. We are continuing to look for ways to market the facility. Fall Programming Our September/October 2003 program guide is at the printer and will be delivered the first week in August with the Star News. We have Girl Power, Parent's Night Out, Skating Academy, Pee Wee Sports, Lions Den (offering activities on all non-school days), leagues, and more available. In November, we will be adding a program at the Boys and Girls Club on Saturdays and Sundays in which you can purchase a pass and then attend during hours we will have staffed and have activities planned. We hope that this program will generate revenue to help with the rental fees we are paying. Skate Park The skate group has raised $7,000 to date. They continue to work on their fundraising efforts. They are looking at purchasing a few pieces now with the money they have so far to get something in this season. The soil corrections are almost done and then the concrete pad will be put in place. Wellness Committee We have a walking program in place now that includes a component based on the FISH philosophy. The FISH philosophy is a moral builder that encourages employees to fred ways to have fun while they work, to be in the moment when dealing with other employees and customers, to "make someone's day", and to choose their attitude every day they come to work. This program runs through the end of the summer. We also have a team of 10 employees who are participating in the Relay for Life event in August.