4.6. SR 01-06-1997"'ity of
iver TO:
MEMORANDUM
Mayor & City Council
FROM: Sandra Thackeray, City Clerk
DATE: January 6, 1997
SUBJECT: Consider Adoption of 1997 Fee
Resolution
**ITEM 4.6. **
On November 25, 1996, the City Council reviewed the fees for services for
1997. The attached resolution and fee schedule reflects the fees that were
approved by the City Council on November 25th.
Action Requested
Council motion to adopt the attached resolution setting fees for services for
1997.
XXelkriverXsysXshrdocXcouncilXfeesmm.doc
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
RESOLUTION 97-2
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1997
WHEREAS, the cost incurred to process various licenses, services, zoning,
and planning requests has been reviewed by the City Council;
and,
NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule
reflects the fees that will be charged for services by the City of Elk River in
1997.
Passed and adopted by the City Council of the City of Elk River, Minnesota
this 6th day of January, 1997.
ATTEST:
Henry A. Duitsman, Mayor
Sandra A. Thackeray, City Clerk
XXelkriverXsys\shrdoc\documentXresoluti\97-2fees'd°c
CITY OF ELK RIVER 1997 FEE SCHEDULE
ASSESSMENT SEARCH/CERTIFICATION:
ANIMAL LICENSES
Cat
Residential Kennel
Commercial Kennel
AUDIO/VISUAL
Dubbing Audio Tapes
Dubbing Video Tapes
Video Operator
$15/each
$5/2 yrs.
$10/2 yrs.
$50/year
$ 75/year
$5 per tape (must provide
own tape)
$10 per tape (must provide
own tape
$75 first two hours then $25
per hour ($75 minimum)
BOWLING ALLEY LICENSE:
BUILDING PERMIT:
Industrial, commercial, multifamily residential,
single family homes, and additions
State Residential Contractor License Search
Miscellaneous Building Permits
Heating, Ventilation, and Air Conditioning
Gas Fitting Permit Fee
Gas Fitter's License
Plumbing Permit
BURNING PERMITS - regular
Special Residential
Special to Clear Land
Special Daytime
CIGARETTE:
$50/10 lanes
$5/each additional lane
State permit fee, UBC Table
1 A, pluls 65% plan check fee
(valuation based on current
State of MN building valuation
data)
$5/permit
City permit fee Schedule
Exhibit C plus State
Surcharge
City permit fee Schedule
Exhibit B
City permit fee Schedcule
Exhibit A
$24/year
City permit fee Schedule D
$0
$10
$25
$25
$25/year
City of Elk River Fee Schedule
Resolution 97-2
Effective January 1, 1997
COMMUNITY PROFILE:
DOCUMENTS:
Audit
Budget
City Code
Copies
Growth Management Plan
Housing Maintenance Ordinance
Sign Ordinance
Solid Waste Ordinance
Subdivision Ordinance
Zoning Ordinance
FLAG - ('City1
GARBAGE HAULER LICENSE:
GRADING PERMIT:
LIQUOR LICENSE: Club
Intoxicating On Sale
Intoxicating Sunday On Sale
Investigation Fee
Corporation
Single
Non-Intoxicating Off Sale
Non-Intoxicating On Sale
Set Up
Wine
Temporary Non-Intoxicating
Temporary Intoxicating
MAPS:
Aerial Photos
Aerial Topography Maps
Large Base, Zoning or Land Use Map
Medium Base or Zoning Map
Medium Base Ward Map
MARKETING BROCURE:
MASSAGE ESTABLISHMENT:
Initial Fee (Includes Investigation Fee)
Single
Corporation
Partnership
Renewal Fee
Page 2
$.20/ea.
$0
$75
$25/page
$25
$5
$5
$10
$10
$25
$32 each
$60 1st truck pluls $15/each
additional truck
$25 plus City Consultant fees if
required to process application
$300/year
$4,000/year
$200/year
$250
$150
$75/year
$225/year
$75/year
$650/year
$20/day
$20/day
$6/sheet
$15/per acre
$3
$2
$2
$3/ea.
$200
$3oo
$3oo
$150
City of Elk River Fee Schedule
Resolution 97-2
Effective January 1, 1997
MASSAGE TH ERAPIST:
Initial Fee (Includes Investigation Fee)
Renewal Fee
MECHANICAL AMUSEMENT:
Mechanical Rides
Pin Ball Games
Pool Tables (Coin Operated)
Video Games
MINERAL EXTRACTION:
PARK DEDICATION FEE: (Resolution 95-89)
Residential
Commercial
Industrial
PARKING STICKERS: (Railroad Parking Lot)
Commuter Parking
PARK RESERVATION FEE:
A Deposit is Required:
Residents
Arts Council
Community Education
School District
Large Community Events
PAWN SHOPS:
Investigation Fee
PINS:
(Plastic-Elk River)
(Metal-Elk River)
RENTAL DWELLING LICENSE
SEPTIC INSTALLATION:
Page 3
$150
$100
$35/ride
$35/machine
$35/table
$35/game
$20/acre to be actively mined in
forthcoming year or not reclaimed
$5/acre approved but not
actively mined
$550/dwelling unit - 1/1/96
$600/dwelling unit - 1/1/97
$650/dwelling unit - 1/1/98
$1,750/per acre - 1/1/96
$2,000/per acre - 1/1/97
N/A
$12/space
3 stickers/space maximum
$12/space
1 sticker per space
$50
$100
$ oo
$1oo
$500
(Deposits are Refundable if the Shelter and
Surrounding Area is Cleaned of Refuse and
Debris Prior to Leaving the Area.)
$12,000/year
$1,500
$.35 each
$2.50 each
$12/dwelling unit
$60
City of Elk River Fee Schedule
Resolution 97-2
Effective January 1, 1997
SEPTIC REPAIR:
SEWER AVAILABILITY CHARGE (SAC):
(Plant replacement interceptor)
SIGN PERMITS
Up to 100 square feet
101-300 square feet
Over 300 square feet
Yearly Advertising Structure
(Billboard) Inspection
SOLID WASTE FACILITY LICENSE:
STREET DISRUPTION OR UTILITY HOOKUP PERMIT:
SURFACE WATER MANAGEMENT IMPACT FEE:
(3% annual increase) (see resolution 94-110)
TRANSIENT MERCHANT LICENSE:
WATER ACCESS CHARGE:
(Contact Municipal Utilities-441-2020)
WATER CONNECTION CHARGE:
(Contact Municipal Utilities-441-2020)
WETLAND DRAINING OR FILLING PERMIT:
ZONING/PLANNING APPLICATIONS:
Administrative Subdivision
Conditional Use Permit
Commercial/industrial
Residential
Amendments and Renewals requiring
Public Hearings
Easement Vacation
General Zoning Requests
Multiple Principal Buildings
Nonconforming Sign Alteration
$30
$1,300
$30
$9O
$150
$10
Page 4
$2,000 plus cost of reviewing
license. Amount of annual cost
incurred by the City for monitoring and inspecting
the facility plus the license
$25
$66.83 per residential lot (rural)
$133.68 per residential lot (urban)
$802.04 per acre (multifamily, commercial and
industrial)
$50/year
$300
$700
$75 plus City Consultant fees if
required to process application
$150 plus Park Dedication if applicable
$300
$1oo
$75
$1S0
$5O
$200 plus Park Dedication if applicable
$110
City of Elk River Fee Schedule
Resolution 97-2
Effective January 1, 1997
Ordinance Amendment
Plats
Permifled Home Occupations
Planned Unit Development (PUD)
Site Plan Review
Variance
Zone Change
s:document/fees.doc
Page 5
$300
$500 + $5 per lot for each lot over 50.
$15
Charge for whatever planning applications are
needed for fhe PUD, i.e. CUP, Rezoning etc.
$250
$~5o
$250
Exhibit A
City of Elk River
Fuel-Gas Piping Permit Fees
The Chief Building Inspector, before issuing any permit for the installation of
any fuel-gas piping, shall require the payment by the apphcant for such
permit of fees in the amount herein provided.
Minimum Fee
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00).
Basic Fees
The fees for all fuel-gas piping permits shall be computed on the basis of the
number of fuel-gas apphances. The fee for each apphance so provided for
shall, except as herinafter otherwise specifically provided, be Six Dollars
($6.00) for each fuel-gas apphance.
(B)
Where any such permit is issued for roughing in of fuel-gas hnes for future
apphances, a fee of Six Dollars ($6.00) shall be charged for each hne or hnes.
(c)
In addition to the Six Dollar ($6.00) charge for each fuel-gas apphance and
future fuel-gas hnes run for apphance, a Six Dollar ($6.00) charge for the
main fuel gas supply in the building shall be charged.
(D)
For the purpose of this article, a gas appliance shall be taken to mean a
furnace, range, water heater, dryer, fireplace, barbecue, etc.
ORD-fuelfoz
EXHIBIT B
CITY OF ELK RIVER
HEATING, VENTILATION, AND AIR CONDITIONING
PERMIT FEES
FEES REQUIRED
The Chief Building Inspector, before issuing any permit for the installation,
alteration, or repair of any heating, ventilation, and air conditioning
appliance items, connections or appendages, shall require the payment by the
applicant for such permit of fees in the amount herein.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than $18.00.
MAXIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be more than $100.00 for a single family home.
PERMIT FEE FOR HEATING, VENTILATION, AND AIR CONDITIONING
APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES
For any permit for the installation, alteration, or repair of the above-
referenced items, the fee shall be one percent (1%) of the valuation of the
work or as calculated under the Uniform Mechanical Code, whichever is
greater.
ordin-da/bz
CITY OF ELK RIVER
MISCELLANEOUS PERMIT FEES
EXHIBIT C
Decks
$8.00 per square foot for valuation for permit fee; plus state surcharge. Plan
check is included with this price.
Fences
Under 6 feet no charge
Over 6 feet - $15.00 plus state surcharge
Fireplaces and Wood Stoves
$20.00 plus state surcharge
$15.00 plus state surcharge for a burning appliance installed into an existing
chimney
Garages and Basement Finish
$10.00 per square foot for valuation, use building permit fee plus state
surcharge. Plan check is included with this price.
Re-Roof
Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per
square foot for valuation for permit fee plus state surcharge.
Swimming Pools
$35.00 plus state surcharge
3 Season Porches
$40.00 (x) square footage - valuation for permit fee plus state surcharge.
Plan check is included with this price.
Moving Structures
Moving structures in - $150.00 plus state surcharge
Moving structures out - $35.00 permit fee
s:Xb&zXfees.doc
EXHIBIT D
CITY OF ELK RIVER
PLUMBING PERMIT FEES
The Chief Building Inspector, before issuing any permit for the installation of
any plumbing work, fixture, or device, shall require the payment by the
applicant for such permit of fees in the amount herein provided.
MINIMUM FEE
In no case shall the fee charged for any permit issued by the Chief Building
Inspector be less than Eighteen Dollars ($18.00)
BASIC FEES
The fees for all plumbing permits shall be computed on the basis of the
number of fixture openings, plumbing fixtures, or devices provided for in
such permits, whether subsequently so installed or not, and the fee for each
fixture so provided for shall, except as hereinafter otherwise specifically
provided, be Six Dollars ($6.00) for each fixture installed or replaced or set
only (no waste or vent piping), the fee for each such fixture shall be Six
Dollars ($6.00).
(B)
Where any such permit is issued for roughing in plumbing openings only,
providing for certain proposed fixtures, which are to be installed or set later,
a fee of Six Dollars ($6.00) shall be charged for each such opening, which fee
shall be in addition to the fee charged for other plumbing work included in
the same permit.
(c)
For the purpose of this article, a plumbing fixture shall be taken to mean and
include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor
drain, or any other plumbing device arranged to be connected with the sewer
or plumbing system, either directly or indirectly, and required to be trapped.
CITY UTILITY HOOK-UP PERMIT
Building Sewer Plant ............................................................................. $18.00
Curb Stop Water Connection Permit ..................................................... $21.00
Abandoning or Repairing Water Service Permit .................................. $21.00
Storm Sewer Connection Permit and Inspection Fee ............................ $18.00
City of Elk River
Plumbing Permit Fees-Exhibit D
ALTERATIONS, REPAIRS
Page 2
For each permit for the alteration or repairing of existing plumbing work not
included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for
the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated
cost of such proposed work. For each additional Five Hundred Dollars
($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty-
five Cents ($6.25) shall be added to the above described fee for such permit.
b&zXord-plum.doc