Loading...
4.6. SR 01-06-1997"'ity of iver TO: MEMORANDUM Mayor & City Council FROM: Sandra Thackeray, City Clerk DATE: January 6, 1997 SUBJECT: Consider Adoption of 1997 Fee Resolution **ITEM 4.6. ** On November 25, 1996, the City Council reviewed the fees for services for 1997. The attached resolution and fee schedule reflects the fees that were approved by the City Council on November 25th. Action Requested Council motion to adopt the attached resolution setting fees for services for 1997. XXelkriverXsysXshrdocXcouncilXfeesmm.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 RESOLUTION 97-2 A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1997 WHEREAS, the cost incurred to process various licenses, services, zoning, and planning requests has been reviewed by the City Council; and, NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule reflects the fees that will be charged for services by the City of Elk River in 1997. Passed and adopted by the City Council of the City of Elk River, Minnesota this 6th day of January, 1997. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk XXelkriverXsys\shrdoc\documentXresoluti\97-2fees'd°c CITY OF ELK RIVER 1997 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION: ANIMAL LICENSES Cat Residential Kennel Commercial Kennel AUDIO/VISUAL Dubbing Audio Tapes Dubbing Video Tapes Video Operator $15/each $5/2 yrs. $10/2 yrs. $50/year $ 75/year $5 per tape (must provide own tape) $10 per tape (must provide own tape $75 first two hours then $25 per hour ($75 minimum) BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, multifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMITS - regular Special Residential Special to Clear Land Special Daytime CIGARETTE: $50/10 lanes $5/each additional lane State permit fee, UBC Table 1 A, pluls 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee Schedule Exhibit C plus State Surcharge City permit fee Schedule Exhibit B City permit fee Schedcule Exhibit A $24/year City permit fee Schedule D $0 $10 $25 $25 $25/year City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 COMMUNITY PROFILE: DOCUMENTS: Audit Budget City Code Copies Growth Management Plan Housing Maintenance Ordinance Sign Ordinance Solid Waste Ordinance Subdivision Ordinance Zoning Ordinance FLAG - ('City1 GARBAGE HAULER LICENSE: GRADING PERMIT: LIQUOR LICENSE: Club Intoxicating On Sale Intoxicating Sunday On Sale Investigation Fee Corporation Single Non-Intoxicating Off Sale Non-Intoxicating On Sale Set Up Wine Temporary Non-Intoxicating Temporary Intoxicating MAPS: Aerial Photos Aerial Topography Maps Large Base, Zoning or Land Use Map Medium Base or Zoning Map Medium Base Ward Map MARKETING BROCURE: MASSAGE ESTABLISHMENT: Initial Fee (Includes Investigation Fee) Single Corporation Partnership Renewal Fee Page 2 $.20/ea. $0 $75 $25/page $25 $5 $5 $10 $10 $25 $32 each $60 1st truck pluls $15/each additional truck $25 plus City Consultant fees if required to process application $300/year $4,000/year $200/year $250 $150 $75/year $225/year $75/year $650/year $20/day $20/day $6/sheet $15/per acre $3 $2 $2 $3/ea. $200 $3oo $3oo $150 City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 MASSAGE TH ERAPIST: Initial Fee (Includes Investigation Fee) Renewal Fee MECHANICAL AMUSEMENT: Mechanical Rides Pin Ball Games Pool Tables (Coin Operated) Video Games MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95-89) Residential Commercial Industrial PARKING STICKERS: (Railroad Parking Lot) Commuter Parking PARK RESERVATION FEE: A Deposit is Required: Residents Arts Council Community Education School District Large Community Events PAWN SHOPS: Investigation Fee PINS: (Plastic-Elk River) (Metal-Elk River) RENTAL DWELLING LICENSE SEPTIC INSTALLATION: Page 3 $150 $100 $35/ride $35/machine $35/table $35/game $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined $550/dwelling unit - 1/1/96 $600/dwelling unit - 1/1/97 $650/dwelling unit - 1/1/98 $1,750/per acre - 1/1/96 $2,000/per acre - 1/1/97 N/A $12/space 3 stickers/space maximum $12/space 1 sticker per space $50 $100 $ oo $1oo $500 (Deposits are Refundable if the Shelter and Surrounding Area is Cleaned of Refuse and Debris Prior to Leaving the Area.) $12,000/year $1,500 $.35 each $2.50 each $12/dwelling unit $60 City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 SEPTIC REPAIR: SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure (Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATER MANAGEMENT IMPACT FEE: (3% annual increase) (see resolution 94-110) TRANSIENT MERCHANT LICENSE: WATER ACCESS CHARGE: (Contact Municipal Utilities-441-2020) WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) WETLAND DRAINING OR FILLING PERMIT: ZONING/PLANNING APPLICATIONS: Administrative Subdivision Conditional Use Permit Commercial/industrial Residential Amendments and Renewals requiring Public Hearings Easement Vacation General Zoning Requests Multiple Principal Buildings Nonconforming Sign Alteration $30 $1,300 $30 $9O $150 $10 Page 4 $2,000 plus cost of reviewing license. Amount of annual cost incurred by the City for monitoring and inspecting the facility plus the license $25 $66.83 per residential lot (rural) $133.68 per residential lot (urban) $802.04 per acre (multifamily, commercial and industrial) $50/year $300 $700 $75 plus City Consultant fees if required to process application $150 plus Park Dedication if applicable $300 $1oo $75 $1S0 $5O $200 plus Park Dedication if applicable $110 City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 Ordinance Amendment Plats Permifled Home Occupations Planned Unit Development (PUD) Site Plan Review Variance Zone Change s:document/fees.doc Page 5 $300 $500 + $5 per lot for each lot over 50. $15 Charge for whatever planning applications are needed for fhe PUD, i.e. CUP, Rezoning etc. $250 $~5o $250 Exhibit A City of Elk River Fuel-Gas Piping Permit Fees The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the apphcant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas apphances. The fee for each apphance so provided for shall, except as herinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas apphance. (B) Where any such permit is issued for roughing in of fuel-gas hnes for future apphances, a fee of Six Dollars ($6.00) shall be charged for each hne or hnes. (c) In addition to the Six Dollar ($6.00) charge for each fuel-gas apphance and future fuel-gas hnes run for apphance, a Six Dollar ($6.00) charge for the main fuel gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. ORD-fuelfoz EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION, AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING, VENTILATION, AND AIR CONDITIONING APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES For any permit for the installation, alteration, or repair of the above- referenced items, the fee shall be one percent (1%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. ordin-da/bz CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES EXHIBIT C Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.00 plus state surcharge Fireplaces and Wood Stoves $20.00 plus state surcharge $15.00 plus state surcharge for a burning appliance installed into an existing chimney Garages and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-Roof Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.00 plus state surcharge 3 Season Porches $40.00 (x) square footage - valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures Moving structures in - $150.00 plus state surcharge Moving structures out - $35.00 permit fee s:Xb&zXfees.doc EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fixture, or device, shall require the payment by the applicant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00) BASIC FEES The fees for all plumbing permits shall be computed on the basis of the number of fixture openings, plumbing fixtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fixture so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fixture installed or replaced or set only (no waste or vent piping), the fee for each such fixture shall be Six Dollars ($6.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed fixtures, which are to be installed or set later, a fee of Six Dollars ($6.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (c) For the purpose of this article, a plumbing fixture shall be taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK-UP PERMIT Building Sewer Plant ............................................................................. $18.00 Curb Stop Water Connection Permit ..................................................... $21.00 Abandoning or Repairing Water Service Permit .................................. $21.00 Storm Sewer Connection Permit and Inspection Fee ............................ $18.00 City of Elk River Plumbing Permit Fees-Exhibit D ALTERATIONS, REPAIRS Page 2 For each permit for the alteration or repairing of existing plumbing work not included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated cost of such proposed work. For each additional Five Hundred Dollars ($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty- five Cents ($6.25) shall be added to the above described fee for such permit. b&zXord-plum.doc