ITEM 8.4.
MEMORANDUM
Mayor and City Council
Ach, City Planner~/~/~
Steve
January 21, 1997
SUBJECT: Request for Preliminary and Final
Plat Approval by Pat Heying,
Public Hearing Case No. P 96-11
Issue
Ao
Consider preliminary plat for Heying Addition, subdividing
approximately 4.9 acres into four commercial lots.
Bo
Consider Resolution No. 9%__, granting final plat approval for Heying
Addition by Pat Heying
Location
The northwest corner of Highway 169 and School Street
Zoning/Land Use
C3 (Highway Commercial) / HB (Highway Business)
Attachment
· Memo from Terry Maurer dated January 17, 1997
· Location map
· Zoning map
· Preliminary/final plat
· Utility plan
· Grading plan
· Conceptual site plan
· Resolution No. 97- ,granting final plat approval
Overview
The subject property is currently owned by the Elk River School District and
is the present location of the school district's administration offices. The
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
Memo to the Mayor and City Council (P 96-11) Page 2
January 21, 1997
School Street. The platting and development of this site will involve
eventually removing the existing administration building as well as the
associated parking lot. Beyond the administration building, the property is
presently vacant and extends northerly to the city property where the water
tower is currently located.
The property has a rising topography from south to north of approximately
30 feet. This natural rise will require the site to be developed in a series of
descending steps from the north parcel down to the south parcel. The site
will also have grading lowering some of the high points anywhere from 5 to 9
feet, and construction of ponds which will require cuts of anywhere from 12 to
16 feet.
There is some existing vegetation around the administration building that
will be required to be removed based on the proposed development plans.
The existing pine trees along Highway 169 are located in Mn/DOT's right of
way and based on the proposed plans, are not shown to be disturbed.
However, I would anticipate a request to have some selective trimming of
those trees in the Mn/DOT right of way for visibility purposes of the
commercial businesses.
Lot sizes
The plat consists of four separate commercial lots. The lots range in size
from I acre up to 1.4 acres. All four lots meet the minimum lot size
requirement in the C3 district as well as the minimum frontage requirement.
The property is proposed to be developed with common driveways and
parking areas. Therefore, the lot lines have been drawn to permit each lot to
stand on its own with sufficient parking for each business.
Easements
The plat includes the appropriate lot line easements throughout the plat.
The plat also reflects a 30 foot utility easement along Highway 169 which
currently exists as part of a recorded document. This 30 foot easement was
established to extend the 24 inch watermain parallel to Highway 169 to serve
this area. The plat will need to be modified to include drainage and utility
easements over the proposed storm water ponding areas.
In addition, there is an existing sidewalk on the north side of School Street
between Highway 169 and Freeport which currently lies outside of the School
Street right of way. This sidewalk is currently not within any type of
easement or covered by an easement document. A condition of this plat will
recommend the sidewalk be included on an easement for sidewalk purposes.
s:kcouncil\p961 lxxx.doc
Memo to the Mayor and City Council (P 96-11)
January 21, 1997
Page 3
Vehicle Access
One of the primary concerns staff had in reviewing this plat related to vehicle
access. As part of the submitted concept plan, staffwas able to review in
concept the appropriate access points to this entire development. The
existing school administration building currently has a driveway access onto
Freeport Avenue at a distance north of School Street of approximately 175
feet to the south curb line of the entrance drive. In meeting with the
developer, staff has requested that the new driveway, which will be used to
provide access to the proposed Holiday Gas Station as well as a future 6,500
sq. ft. commercial business, be moved as far north as possible. Establishing
the driveway as far north as possible will improve reaction time for vehicles
making the free right movement from School Street to northbound Freeport.
Also, eastbound School Street traffic turning north onto Freeport Avenue will
have enough time and opportunities to make a lane change to gain access to
the proposed development.
The first driveway north of School Street is proposed to be approximately 195
feet measured to the south curb line. Therefore, the proposed driveway will
be approximately 20 feet further north than the existing curb cut into the
School Street administration offices.
The other two access points as presented on the concept development plan
are further north along Freeport and would provide immediate access to Lots
3 and 4. It is worth mentioning no access will be off School Street. Staff has
discouraged this curb cut from the start due to the amount of projected traffic
between Highway 169 and Freeport. In addition, the number of weaving
movements that would occur in that relatively short distance would also
present concern. Furthermore, when there was a development proposed at
this location in 1991, the City Council also recommended eliminating any
access from this site onto School Street for basically the same reasons.
As a condition of plat approval, staff will be recommending that the plat be
approved with a condition relating to access points that future developments
will have to adhere with.
Existing Building
As mentioned earlier, the school district's administration offices are located
in the southwest corner of the subject property. With the school board's
recent purchase of the former county administration building downtown, it is
anticipated that the employees will be relocating to that new office space as
soon as it is made available. It will be recommended that prior to starting
s:Xcouncil\p9611xxx.doc
Memo to the Mayor and City Council (P 96-11) Page 4
January 21, 1997
construction on the proposed Lot 1, the school administration building be
removed and all utilities be appropriately removed or properly disconnected.
Grading of the Plat
As previously mentioned, the site has a natural grade of approximately 30
feet rising from the south to the north. The grading plan reflects a lowering
of the site which will require removal of dirt from the site. It is recommended
that grading of the entire plat be completed prior to or in conjunction with
development of the first lot. This is recommended because of the integral
storm sewer system that is proposed as well as avoiding dramatic rises in
grade from one site to the next. It will also be important for development of
the first site to clearly define limits of construction to avoid erosion from the
undeveloped portion onto the developed lot.
Storm Water Ponds
Staff was concerned from the beginning with the design of the storm water
ponds. Originally, the slope of the ponds began immediately behind the curb
surrounding the parking area and along the existing sidewalks. The side
slope of the ponds were a 3:1, which is steeper than city ordinance allows.
Staffs recommendation is to maintain a "fiat area" of approximately 10 feet
between the curb and beginning slope of the pond. This fiat area was also
requested along the existing sidewalk. Establishing a "fiat area" would allow
opportunity for landscaping to occur and provide safe separation between
pedestrian and ponding areas. Lastly, the slope of the ponds were flattened
to a 4:1 rather than the 3:1 as previously proposed.
Final Plat
The City's subdivision ordinance allows the City Council to consider
preliminary and final plat at the same meeting. Staff has recommended this
on plats that are relatively small (2 to 4 lots) with few outstanding issues.
The developers have taken the advantage of this opportunity and are
requesting final plat along with their preliminary plat application. The City
Council certainly has the discretion to act on the final plat at this time, or
request changes prior to making its final decision.
Park and Recreation Commission
The Park and Rec Commission has reviewed the preliminary plat and are
recommending the park dedication requirements be satisfied through the
s:\council\p9611xxx.doc
Memo to the Mayor and City Council (P 96-11) Page 5
January 21, 1997
payment of cash. Park dedication requirements will be based on the 1997
fees of $2,000 per acre.
Planning Commission
Since the plat consists of "four or fewer" lots the Planning Commission is not
required by ordinance to review the plat. However, staff did present the plat
and concept plan to the Commission at a previous workshop meeting. The
Commission did echo concern regarding access drives to the plat and design
of the storm water ponds.
Recommendation
It is recommended the City Council approve the following:
Ao
Preliminary plat to subdivide approximately 4.9 acres into 4
commercial lots with the following conditions:
All comments outlined in Terry Maurer's memo dated January
17, 1997 be incorporated into approval of the final plat.
Vehicle access to the proposed plat be limited to three
driveways, all occurring on Freeport Avenue. No access will be
allowed to Lot 1, Block I directly from School Street.
o
Cross access and cross parking agreements will need to be
provided for the shared driveway and parking arrangements
proposed on the plat.
Additional drainage and utility easements to cover the proposed
storm water management ponds will need to be reflected on the
final plat.
The existing school administration building will need to be
removed along with all existing utilities properly capped or
removed prior to construction commencing on Lot 1, Block 1.
o
A NPDES permit will need to be obtained prior to commencing
any grading on site.
A grading and development plan will need to be approved by the
City Engineer prior to commencing grading.
s:XcouncilXp9611xxx.doc
Memo to the Mayor and City Council (P 96-11) Page 6
January 21, 1997
8. Grading in MN/DOT right of way will require a permit. This
must be obtained and a copy presented to the city prior to
commencing work.
o
Grading of the plat will need to be completed prior to or in
conjunction with development of the first building constructed
within the plat.
10.
A surface water management fee will need to be paid prior to
releasing the final plat for recording.
11.
Park dedication will need to be paid prior to the release of the
final plat for recording.
12.
A water availability charge will need to be paid to Elk River
Municipal Utilities in the amount of $300 per lot. Verification of
this payment must be provided to the city prior to releasing the
final plat for recording.
13.
All outstanding engineering and legal fees will need to be paid
prior to releasing the final plat for recording.
14.
Any improvements made within a drainage and utility easement
shall be subject to removal at the property owner's expense if
any utility work needs to be done within the easement.
15.
An easement document be prepared covering the existing
sidewalk along School Street. This easement will need to be
executed and recorded along with the final plat.
Bo
Resolution No. 97- , granting final plat approval for the Heying
Addition with the conditions as outlined above and included on Exhibit
B of the attached resolution.
s:kcouncflXp9611xxx.doc
1326 Energy Par~
St. Paul, MN
612.64.4.4389
1.800'888.2923
Fax: 612.64,~-9~6
CJVIL ENGINEERING:
ENvIRoNMENTAL
PCANN/NG
SOLID WASTE
STRUCTURAL
SURVI~¥1NG
T~FFIC
T~NSPORT~TtON
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES iN:
MINNEAPOLIS
PRIOR ~K~
ST. PAUl
WASECA
c:0/~0 ' d
January 17, 1997
File: 230-343-11
Mr. Steve Ach
City ]Planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: HEYING ADDITION
Dear Mr. Ach:
As requested, we have reviewed the submittal package for the Heying Addition. The
information we reviewed consisted of a Preliminary Plat with a revision date of January
3, 1997; a Preliminary Utility and Conceptual Site Plan and Preliminary Grading Plan,
both with a revision date of December 30, 1996; and preliminary drainage calculations
with a revision date of January 2, 1997. All of these documents were prepared by $ohn
Oliver & Associates. As you are aware, we have had a staff review meeting which
reviewed the first submittal for this particular development and recently a staff review
meeting which reviewed the revised submktal package: Between those staff review
meetings, we have had several meetings with the Developer, his engineer, and Holiday
Companies which is a potential developer of Lot 1 at the south end. Based on all of this
information and our review, we would offer the following comments:
A. PRELIMINARY PLAT
There is an existing sidewalk along School Street on the south end of this
development that was originally built on the School District's property.
At the time of the sidewalk construction, it was determined in working
with the School District that the sidewalk could be built on their property
and after construction it would be maintained by School District staff.
Now, with the redevelopment of this property, an easement should be
provided along the south end of the plat to give the City the right to
maintain the sidewalk in future years.
In the review of the Holiday Site Plan, there is a recommendation that a
hydrant along School Street be relocated to the north to be accessible from
inside the parking lot. This will also require some additional easement to
ensure that the Municipal Utilities have the right to maintain and operate
the hydrant.
Mr. Steve Ach
January 17, 1997
Page Two
Them are two stormwater ponds shown on the Preliminary Grading Plan.
No easemems are provided on the Preliminary Plat to cover these areas.
Drainage and utility easements need to be provided to cover these ponding
areas. Also, the side lot line easemem between Lots 2 and 3 mn directly
through this pond on the west end. The drainage and utility easement
around the ponding area should be large enough to allow an area for other
utilities north of the pond limits.
The plat of the Heying Addition includes the entire right-of-way of
Freeport Avenue, which was originally grained from the School District
by easemem. This will clean up this portion of Freepot~ Avenue.
The Site Plan for the development shows two new hydrants to be tapped
into the existing 24-inch watermain along the east side of the plat. If
either of these two hydrants fall outside of the existing utility easement,
additional easement needs to be granted with this plat to cover the location
of these hydrants.
B. PRELIMINARY UTILITY AND CONCEPTUAL SITE PLAN
Sanitary sewer and water service for Lot 1 go directly beneath the pond
shown on that lot. The sanitary sewer and water service for Lot 2 go
through the north side slope of the pond shown on that lot. Extreme care
needs to be taken with these locations so that sufficient depth is provided
to protect the services from freezing during the winter months. Since both
of the proposed buildings on these two lots are located near the east side
of the lot, it may be a better solution to tap a new 2-inch water service
from the existing 24-inch main located on the east side of the property.
The plat shows three proposed driveways onto Freeport Avenue. This is
down from thc original plan, which showed four driveway locations. The
most southerly driveway location will provide access to both Lots 1 and
2. It is located approximately 20 feet farther to the north (farther from
School Street) than the existing School District driveway location. Given
the substantial amount of traffic anticipated at this location, this driveway
is shown to be three lanes wide to accommodate one inbound lane and two
outbound lanes. This way them will be a separate lane for right tums and
left turns out of the driveway. Lots 1 and 2 are also connected to the two
additional driveways located farther to the north by internal means.
Mr. Steve Ach
lanuary 17, 1997
Page Three
The middle driveway shown on Lot 3 is a concern due to the internal
layout of the lot. This driveway can be approached from the east, north,
and south, which could lead to internal traffic congestion. It is our
understanding that when a development is proposed on Lot 3, there will
also be a chance to review the specifics at that time; therefore, this issue
can wait until a specific proposal is brought forward.
C. PRELIMINARY GRADING PLAN
One of the issues that was discussed with the Developer and his engineer
was the concern that drainage from the site not be allowed to sheet out
onto Freeport Avenue. The Site Plan that has been submitted for the
Holiday Stationstore clearly shows a high point which would preclude this
from happening. It is difficult to tell from the Heying Addition Grading
Plan if the same is true of the two driveways located farther to the north.
We assume that this will be the case and that specific site plans for Lots
3 and 4 in the future will show the same high point to keep drainage from
sheeting out onto Freeport Avenue.
The building shown on Lot 2 has a finished floor elevation of 926.5.
However, the Grading Plan shows a 927 contour running into the building
on the north side. This means that a small amount of fill will be piled
against part of the building's north side and east side. There is also a
concern that the grading east of this building not cut into the side slope of
the cover over the existing watermain. It appears that the elevation
directly above the watermain maintains adequate cover, but that the side
slope to the building may reduce the cover provided on this watermain.
This should be checked and verified that adequate covet, is maintained.
The Site Plan on Lots 1 and 3 shows construction of a driveway servicing
the Car Wash and a parking isle in the existing watermain easement. This
bas been reviewed with Bryan Adams, General Manager of the Elk River
Municipal Utilities. He indicated he has no problem with this type of
construction in their watermain easement as long as the cover over the
waterrnain, including side slopes, is maintained at 71/2 feet. He also
wanted it to be made clear that this construction will be done at the
Developer's risk. If, in the future, the Municipal Utilities has to excavate
this easement to access the watermain with/n it, it would not be their intent
to compensate Holiday for temporary loss of access to the Car Wash
and/or rebuild anything that was disrupted within the easement.
inn
Mr. Steve Ach
January17, 1997
Page Four
The Grading Plan shows a detail for grading adjacent to the proposed
ponds. The detail shows a 10-foot flat area adjacent to the sidewalk and
a 5-foot flat area adjacent to the curb on the inside of the lot. These
details adequately reflect how the pond should be graded. We believe that
the Grading Plan for the pond areas does not accurately reflect these
details. It should be noted that when the ponds are constructed these flat
areas of ten feet adjacent to sidewalk and five feet adjacent to curbs need
to be maintained.
5. There are two retaining walls shown on the Grading Plan. A relatively
small one is shown on the extreme south end of the plat and a four to five-
foot high retaining wail is shown along the east side of Lots 3 and 4.
If you have any questions regarding these comments, please call.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry $. ~aurer, P.E.
TJM:tw
LOCATION
PARK
I
City of
vel'
13065 Orono Parkway · P.O. Box 490
Elk River, MN 55330
LOCATION
MAP
LOCATION
PARK
City of
·
,lver
13065 Orono Parkway · P.O. Box 490
Elk River, MN 55330
ZONING
MAP
c^s~: ,,o ?&. / /
N'
0 60 ~20 180
SCALE IN FEET
I inch = 60 feet
Bearings shown are based on the north
line of NW I/4, NE ~/4 o[ Sec. `34, Twp.
,3.3, Rng. 26, having an assumed b,earin.g
of North 89°29'21" East.
0 Denotes I/2 inch x 14 inch iron
monument set with a plastic cop
marked R.L.S. number 8194.
~' DENOTES IRON PIPE FObND
S~J~JIECT PRCF'ERTr (revL~ed):
Drainage and Utility Easements ore
shown thus: j I [
_'2L ~ ' bt
Being 10 feet in width and adjoining
right-of-way Fines, unless otherwise
indicated, also being 5 feet in width
and adjoining lot lines, unless other-
wise indicated, as shown on the plat.
HEYING ADDITION
L47
1
I
eI
511
°/
/
t
!
i
!
!
!
City of Elk R /er
Shert, Comty, N
F:reeocr[
Avenue
Sheet 2 Of 2 Sheets
Note: "75/525" is o "Court Order"
<)nd describes same property as in
prdoate deed at book 82 of deeds,
Pg. 246.
ASSUMED BENCHMA~RK:
Top Of T.N.H NE QUAD. Freer)art
SChOOl St. Of Proposed Plat Of HEYING
ADOITION.
ELEV = 919.47 Feet
OWNER & D~VELOPER:
SURVEYORS &: ENGINEERS:
John Oliver & Associates, Inc
580 Dodge Ave.,
441-2072
ZONING: Highway Camm ercidt
Denotes Building Setbacks:
40' from Hwy 169 Right-Of-Way
25' ffc~n other Right of-Way
20' rear yard
20' side ~rd
i0' parking setback
DATE: 11/13/96
BK/PG:
DRAWN BY: PC;
CHECKED BY: dO
DWO FILE: IDS-FP2
TEXT FILE:
F~LE NO: 6990.10-05 & 08
REVISIONS:
12/04/96 IQTIINFS & FA~FMFNT
1/'03/97 It')TI INFS &- FAqFblFNT
I hereby certify that this plor, was
prepared by me or under my direct
supervision and thor I am ~ duly
Registered Lond Surveyor ueder (he
lows of the State of Minnesota.
Signed:
Date: 11/13/96 Lic. No. 8194
HEYING ADDITION
ELK RIVER MN
FOR
PAT HEYING
PRELIMINARY
ADMINISTRATIVE SUBDIVISION
0 ¢0 80 I~0
SCALE IN FEET
POND GRADING DETAIL
CURB
i = --I0' =
I0:t
SIDEWALK
-- ~,--,,~ EXISTING CONTOUR
~l~I PROPOSED CONTOUR
~~ EXISTING STORM SEWER
~ PROPO~D STROM SEWER
SILT FENCE
IIIlIlIIlllIlIlllII RETAINING WALL
li
I
;I
SHEET NO. ~
RESOLUTION NO. 97 -
CITY OF ELK RIVER
A RESOLUTION GRANTING FINAL PLAT APPROVAL FOR:
HEYING ADDITION
CASE NO. P 96-11
WHEREAS, application has been made for final plat approval, pursuant to
Section 1008.08 (1)(c) of the Elk River City Code of Ordinances, of the property
legally described on attached Exhibit A and hereinafter referred to as "the
Property"; and
WHEREAS, the application for preliminary plat and final plat approval has
been referred to the City Council; and
WHEREAS, a preliminary plat of the Property was approved by the City
Council on January 28, 1997; and
WHEREAS, the proposed final plat is consistent with the preliminary plat
as approved by the City Council; and
WHEREAS, the proposed final plat complies with each of the conditions
set forth by the City Council in its approval of the preliminary plat of the Property;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ELK RIVER, as follows:
It is hereby determined by the City Council for the City of Elk River as
follows:
The proposed subdivision is consistent with the Zoning Ordinance
and conforms with all of its requirements.
The proposed subdivision is consistent with all applicable general
and specialized city, county, and regional plans including, but not
limited to, the City's Comprehensive Development Plan.
The physical characteristics of the site, including, but not limited
to, topography, soils, vegetation, susceptibility to erosion and
siltation, susceptibility to flooding, and drainage are suitable for the
type and density of development and uses contemplated.
The proposed subdivision makes adequate provision for water
supply, storm drainage, sewage transportation, erosion control and
all other services, facilities and improvements otherwise required
herein.
The proposed subdivision will not cause substantial environmental
damage.
The proposed subdivision will not conflict with easements of record
or with easements established by judgment of a court.
The proposed subdivision will not have an undue or adverse impact
on the reasonable development of neighboring land.
Final plat approval is hereby granted for the Property, subject to the
conditions set forth in attached Exhibit B.
The officers of the City are hereby authorized, once the conditions set
forth in Exhibit B are met and complied with, to sign the final plat for the
Property and to issue a certified copy of this Resolution giving final
approval of the plat.
The owner of the Property is authorized to record the final plat as required
by law and shall file proof of said recording with the City. No building
permits will be issued for the Property until the final plat is recorded.
This final plat approval shall expire two years from the date of this
resolution if the final plat is not recorded within that time.
The foregoing
resolution was introduced by Council Member
and duly seconded by Council Member
The following voted in favor of the Resolution.
The following voted against the Resolution:
The following were absent:
s:XdocumentXresolutionXp96-11.doc
WHEREUPON the resolution is adopted.
Passed and adopted this__
day of
,1997.
Henry Duitsman, Mayor
CERTIFICATE
STATE OF MINNESOTA
COUNTY OF SHERBURNE
CITY OF ELK RIVER
I, the undersigned, being the duly qualified and acting Clerk of the City of
Elk River, Minnesota, hereby certify that the above resolution is a true and
correct copy of the resolution as adopted by the City Council of the City of Elk
River on ,1997.
WITNESS my hand officially as such Clerk and the corporate seal of the
City this __ day of ,1997.
Sandra Thackeray, City Clerk
STATE OF MINNESOTA
SS.
COUNTY OF SHERBURNE
The foregoing instrument was acknowledged before me this __
, 1997, by Henry Duitsman, Mayor, City of
Minnesota.
Elk
day of
River,
Notary Public
s:\documentXresolutionXp96-11.doc
STATE OF MINNESOTA
SS.
COUNTY OF SHERBURNE
The foregoing instrument was acknowledged before me this __
, 1997, by Sandra Thackeray, City Clerk, City of Elk
Minnesota.
day of
River,
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
DOHERTY RUMBLE & BUTLER
3500 Fifth Street Towers
150 South Fifth Street
Minneapolis, MN 55402-4235
s:XdocumentkresolutionXp96-11.doc
EXHIBIT A
1) That part of the Northwest Quarter of the Northeast Quarter of Section 34,
Township 33, Range 26, Sherburne County, Minnesota, described as follows:
Beginning at a point on the North line of said Northwest Quarter of the Northeast
Quarter a distance of 417.98 feet east of the Northwest corner thereof; thence
South 15 degrees East a distance of 964.23 feet, more or less, to the North line
of School Street as laid out and established on November 21, 1983, in the City of
Elk River (said South line also being a line which is parallel with and distant
66.00 feet north of the extension east of the North line of NORTH TERRACE
ADDITION on file and of record in and for said County); thence east on and
along said North line of School Street to intersect the Westerly right-of-way line
of U.S. Highway No. 169; thence northwesterly on and along said Westerly line
of the highway right-of-way to intersect said North line of the Northwest Quarter
of the Northeast Quarter; thence west on and along said North line to the Point
of Beginning. For the purposes of this description said North line of the
Northwest Quarter of the Northeast Quarter is assumed to bear South 89
degrees 02 minutes East.
AND
That part of said Northwest Quarter of the Northeast Quarter of Section 34 lying
within the following described property:
2) Beginning at the North Quarter Corner of said Section 34, thence South
89 degrees 02 minutes East, assumed basis of bearings, along the North line of
said Northwest Quarter of the Northeast Quarter for a distance of 417.98 feet;
thence South 15 degrees 00 minutes East for a distance of 896.01 feet; thence
due West for a distance of 1982.41 feet, more or less, to intersect the West line
of the Northeast Quarter of the Northwest Quarter of said Section 34 at a point
thereon a distance of 887.07 feet south of the Northwest corner thereof; thence
North 0 degrees 45 minutes East along said West line for said 887.07 feet to
said Northwest corner thereof; thence North 89 degrees 54 minutes East along
the North line of said Northeast Quarter of the Northwest Quarter for a distance
of 1321.17 feet, more or less, to the Point of Beginning.
(This description being the same property as described in Book 75 of Deeds,
Page 252; and in Book 82 of Deeds, Page 246).
3) and lying east of a line 40.00 feet westerly of, as measured at right angles
to, and parallel with the following described line to be hereafter known as "Line
A" for the purposes of this description:
Said "Line A" beginning described as Beginning at the point of intersection
of the North line of said Northwest Quarter of the Northeast Quarter with a
s:XdocumentXresolutionXp96-11.doc
line 269.44 feet, as measured as right angles, southwesterly of the
Westerly line of the right-of-way of U.S. Highway No. 169; thence South
17 degrees 14 minutes 39 seconds East parallel with said Highway right-
of-way for a distance of 398.85 feet; thence continue southerly along a
tangential curve, concave to the west, radius 300.00 feet, for a central
angle of 18 degrees 45 minutes 23 seconds and length 98.21 feet; thence
South 1 degree 30 minutes 44 seconds West tangent to said curve for a
distance of 454.08 feet, more or less, to intersect the North line of the duly
recorded plat of ELK RIVER PLAZA, said County, and there terminate
said centerline. For the purposes of this description, the North line of said
Northwest Quarter of the Northeast Quarter is assumed to bear North 89
degrees 29 minutes 21 seconds East.
Subject to two easements to said City of Elk River for School Street and
Freeport Avenue as described in Instrument No. 299696. Also subject to
utility easements to said City of Elk River as described in Instruments No.
202405, No. 208714, No. 294915, and No. 294962, files of the County
Recorder.
Containing 4.95 acres, more or less, exclusive of the above described
street easements at Instrument No. 299696. Also subject to other
easements of record, if any.
s:\documentXresolution\p96-11.doc
o
10.
11.
12.
13.
14.
15.
EXHIBIT B
ALL COMMENTS OUTLINED IN TERRY MAURER'S MEMO DATED JANUARY 17, 1997 BE
INCORPORATED INTO APPROVAL OF THE FINAL PLAT.
VEHICLE ACCESS TO THE PROPOSED PLAT BE LIMITED TO THREE DRIVEWAYS, ALL
OCCURRING ON FREEPORT AVENUE. NO ACCESS WILL BE ALLOWED TO LOT 1,
BLOCK 1 DIRECTLY FROM SCHOOL STREET.
CROSS ACCESS AND CROSS PARKING AGREEMENTS WILL NEED TO BE PROVIDED
FOR THE SHARED DRIVEWAY AND PARKING ARRANGEMENTS PROPOSED ON THE
PLAT.
ADDITIONAL DRAINAGE AND UTILITY EASEMENTS TO COVER THE PROPOSED STORM
WATER MANAGEMENT PONDS WILL NEED TO BE REFLECTED ON THE FINAL PLAT.
THE EXISTING SCHOOL ADMINISTRATION BUILDING WILL NEED TO BE REMOVED
ALONG WITH ALL EXISTING UTILITIES PROPERLY CAPPED OR REMOVED PRIOR TO
CONSTRUCTION COMMENCING ON LOT 1, BLOCK 1.
A NPDES PERMIT WILL NEED TO BE OBTAINED PRIOR TO COMMENCING ANY
GRADING ON SITE.
A GRADING AND DEVELOPMENT PLAN WILL NEED TO BE APPROVED BY THE CITY
ENGINEER PRIOR TO COMMENCING GRADING.
GRADING IN MN/DOT RIGHT OF WAY WILL REQUIRE A PERMIT. THIS MUST BE
OBTAINED AND A COPY PRESENTED TO THE CITY PRIOR TO COMMENCING WORK.
GRADING OF THE PLAT WILL NEED TO BE COMPLETED PRIOR TO OR IN
CONJUNCTION WITH DEVELOPMENT OF THE FIRST BUILDING CONSTRUCTED WITHIN
THE PLAT.
A SURFACE WATER MANAGEMENT FEE WILL NEED TO BE PAID PRIOR TO RELEASING
THE FINAL PLAT FOR RECORDING.
PARK DEDICATION WILL NEED TO BE PAID PRIOR TO THE RELEASE OF THE FINAL PLAT
FOR RECORDING.
A WATER AVAILABILITY CHARGE WILL NEED TO BE PAID TO ELK RIVER MUNICIPAL
UTILITIES IN THE AMOUNT OF $300 PER LOT. VERIFICATION OF THIS PAYMENT MUST BE
PROVIDED TO THE CITY PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING.
ALL OUTSTANDING ENGINEERING AND LEGAL FEES WILL NEED TO BE PAID PRIOR TO
RELEASING THE FINAL PLAT FOR RECORDING.
ANY IMPROVEMENTS MADE WITHIN A DRAINAGE AND UTILITY EASEMENT SHALL BE
SUBJECT TO REMOVAL AT THE PROPERTY OWNER'S EXPENSE IF ANY UTILITY WORK
NEEDS TO BE DONE WITHIN THE EASEMENT.
AN EASEMENT DOCUMENT BE PREPARED COVERING THE EXISTING SIDEWALK ALONG
SCHOOL STREET. THIS EASEMENT WILL NEED TO BE EXECUTED AND RECORDED
ALONG WITH THE FINAL PLAT.
s:XdocumentXresolutionXp96-11.doc