Loading...
4.6. SR 04-07-1997('ON~ULTING ENGINEERI 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 ITEM 4.6. April 3, 1997 File: 230-365-10 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: MACON STREET AND RIVERVIEW DRIVE IMPROVEMENTS PUBLIC HEARING DATE Dear Council Members: CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL ,qNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: qNEAPOLIS PRIOR LAKE SI. PAUL WASECA With the ordering of a feasibility study for the improvements to Macon Street and Riverview Drive to serve Outlots A and B of Country Crossing 3rd Addition, it will be necessary to hold a public hearing. Staff is concerned about the time frame of these improvements if they are to be completed in the 1997 construction season. Therefore, we would like to suggest that the City Council by motion designated that the public hearing be held on May 5, 1997. We will have the feasibility study prepared for the Council meeting on April 21, 1997, at which time a formal resolution adopting the feasibility study and setting the date for the public hearing can be adopted. The first notice would appear in the local paper on Wednesday, April 23, 1997. By setting the date for the hearing at the April 7th City Council meeting, this will allow staff time to prepare the notice for the newspaper and the mailed notices. If you have any questions regarding this issue, please call. Sincerely, MSA, CONSULTING ENGINEERS erry J. M~urer, P.E. TJM:tw Attachment 365-0302.apr An Equal Opportunity Employer