Loading...
5.5. SR 04-21-1997ty of ITEM 5.5. MEMORANDUM iver FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Administ~~/~ April 21, 1997 Mississippi River Rip Rap Grant Application The city has applied for and received two grants from the Sherburne County Soil and Water Conservation District (SWCD) for rip rap work in the downtown area. Additional work should be done to help preserve the riverbank. This hopefully will allow the city an opportunity to complete some park and recreation trail work in this vicinity west of King Avenue. We were not successful in our grant application last year and it seems as though we get funding every few years as the SWCD tries to spread out the funding geographically throughout the district. The city share for this project would have to come from its capital projects fund. This is where the funds came from in 1991. In 1994, the HRA, on a split vote, provided the matching funds. It should be noted that an additional grant application is being submitted for rip rap work along the Elk River/Lake Orono in the cemetery vicinity. This is one of the areas that appears to be experiencing the most rapid erosion as the city studies and tries to deal with sedimentation problems. This grant is being drafted by SWCD on behalf of the city and Steve Rohlf is working with this organization to see if 75 percent funding (25 percent local match) is possible. If this is the case the city would be obligated for up to $10,000 in local matching funds, or if 50 percent funding was necessary, then up to $20,000 in local matching funds. The source again would be the city capital projects fund. If only one application can be approved in Elk River in 1997, staff has placed a higher priority on the Lake Orono project. Recommendation Staff recommends the City Council approve the submission of the 1997 Mississippi River Rip Rap Grant request with the understanding that the local match will come from the city capital projects reserve. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 CONSULTINGENGINEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax:612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL ,NNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: ,INNEAPOLIS PRIOR LAKE ST. PAUL WASECA March 31, 1997 File: 230-000-00 Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: 1997 GRANT APPLICATION RIP-RAP WORK ALONG MISSISSIPPI RIVER Dear Mr. Klaers: As you recall, grants totaling $45,000 were received in 1991 and 1994 from the Sherburne County Soil and Water Conservation District (SWCD) for the above-referenced work. It is time to apply for 1997 funds. Discussions with Mr. Bill Bronder at the SWCD indicate that the previous program we used has been combined with other programs, but that 50% City funding would still be required. The attached application requests $25,000 from the SWCD. As in 1991 and 1994, the City must be willing to match the grant with $25,000. It would be appropriate for this grant application to be discussed and approved at an upcoming City Council meeting. Should the application be approved, please sign and date two copies of the application in the places we have marked and return them to me. This form has changed since our last application in 1996, so you will be signing the form in a different area than in the past. There are no guarantees that our application will be funded, but we believe we have a good chance. Please call me if you have any questions. Sincerely, MSA, CONSULT~G~ Mark J. Graham, P.E. MJG:tw Attachment 000-3109.mar An Equal Opportunity Employer PRIOPdTY FY 98 STATE COST SHARE SPECIAL PROJECT APPLICATION APPLICANT City of Elk River IF APPLICANT IS A GROUP IDENTIFY FISCAL AGENT PROJECT TITLE 1997 Erosion Control Project Alonq Mississippi River ESTIMATED TOTAL PROJECT COST $ 5 o, 0 0 0 FUNDrNG REQUEST $ 2 5,0 0 0 1. DESCRIBE THE EROSION OR WATER QUALITY PROBLEM. (~CLUDEPHOTOSOROTHERSUPPORT~G DOCUMENTATION) Rip Rap is currently located along the Mississippi River from the Elk River Bridge to an area ~f 600 feet west of the Bridge. Significant erosion occurs where the rip rap ends. SLR funds received from the SWCD in 1991 and 1994 have helped, but more work needs to be done. Exhibit 1 shows the project area. 2. DISCUSS THE PROJECT OBJECTIVES. The objectives are two-fold. The first objective is to control erosion problems along the Mississippi.River and to protect the River bank. The second objective is to allow City Planning to continue for a boardwalk and park along the River, as shown by~ the attached map. 3. DESCRIBE THE PROPOSED SOLUTION TO OBTAIN OBJECTIVES. The proposed solution is to continue placement of rip rap, which is the most cost effective solution to the problem. 4. DESCRIBE THE PUBLIC AND PRIVATE BENEFITS OF THIS PROJECT. (~CLUDE TONS SO~ AND SEDIMENT SAVED, PHOSPHOROUS REDUCTION, ETC.) The public benefits by this project, as it effectively minimizes sediment into the River. Based on an area 300 feet long, 20 wide and four feet deep, the amount of sediment washing into the River is approximately 24,000 cubic feet per year. The bank is severely eroded with a number of dead trees and holes. Floating debris covers the area of erosion durinqDeak flows of the River. 5. EXPLAIN HOW TI{IS PROJECT IS RELATED TO LOCAL COMPREHENSIVE PLAN OBJECTIVES. The City has been working since 1990 to address erosion concerns in this area. The City has planned to construct park improvements in the area, once the erosion problems are taken care of. 6. DESCRIBE ANY INNOVATIVE ASPECTS, NrEW TECHNOLOGY, OR DEMONSTRATION POTENTIAL OF THIS PROJECT. None. 7. PROJECT TIMETABLE: Upon approval, the City would seek bids. Construction would occur at such a time when the water level is low. The 1991 and 1994 projects were constructed in the Winter. 8. ITEMIZE ALL PROJECT COSTS. Bid items would include tree removal as required and furnishing and installation of rip rap. 9. PROJECT FUNDrNG: FEDERAL .%, $ SOURCE STATE 5 0 %, $2 5 , 0 0 0 SOURCE SWC D LOCAL 50 %, $ 25,000 SOURCE Genera]' City Funds OTHER %, $ SOURCE LANDOWNER %, $ TOTALS I00 % $ 50,000 10. HOW WILL TECHNICAL ASSISTANCE BE PROVIDED FOR THIS PROJECT? The City Engineer will prepare plans and specifications and submit them to the Sherburne County SWCD for approval. The City will take the bids and administer the project. 11. DESCRIBE THE ROLES OF ANY OTHER COOPERATING LGUs, AGENCIES, OK ORGAuNIZA/qONS IN THIS PROJECT. once the application is approved, the City would be the only agency involved during construction. Once the work is completed, the appropriate documentation would be provided to the SWCD for the appropriate reimbursement. 2 12. HOW WILL THE SUCCESS OF THIS PROJECT BE EVALUATED? Success will be evaluated by a visible reduction in the erosion along the Mississippi River bank in the downtown area. 13. DESCPJBE HOW OPERA.ON AND ~%LqrNTENANCE WILL BE PER3ORMED. (IF APPLICABLE) The City will monitor the area and perform brush control as necessary along the rip rap. 14. WOULD PARTIAL FUNDING OF TI-lIS FUNDING REQUEST BE SUITABLE AND ACCEPTABLE FOR TI{IS PROJECT? The City is offering to fund 50% of the construction cost as was done in 1991 and 1994 ' -3- SIGNATURE PAGE THIS APPLICATION HAS BEEN APPROVED BY: LGUCHAIR, Pat Klaers, City Administrator DATE IF THIS APPLICATION IS FROM A SWCD GROUP, A SUPERVISOR FROM EACH SWCD MUST ALSO SIGN BELOW. SWCD DATE SWCD DATE SWCD DATE SWCD DATE SWCD DATE SWCD DATE SWCD DATE SWCD DATE THIS APPLICATION M'UST INCLUDE ANY SUPPORTING DOCUMENTATION AND BE RECEIVED BY YOUR BOARD CONSERVATIONIST BY 4:30 PM ON MAY 1, 1997. LATE APPLICATIONS WILL RECEIVE LOWER FUNDING PRIORITY. FI:SPA,aP -4- STATE COST 5ITeRE SPECIAL PROJECT .~PPLICATION EV.&LUATION APPLICANT City of Elk River SCOR~ PRO/ECT TITLE 1997 Erosion Control Project Alono Mississippi ESTIMATED TOT,~L PROJECT COST $ s n; no~ FUNDING 1LECOMMENDATION YES NO (CIRCLE ONE) PROJECT DESCRIPTION: R }vt[: r FUNDING REQUEST $ 2 5~ ~ o n AMOUNT $ .SCORING Project Innovativeness (max. 10 points each) New Technology Multi-Agency Involvement Demonstration Potential Public Benefit (max. 10 poims each) Qualitative Quantitative Effectiveness (max. 5 points each) Anticipated Project Effectiveness Anticipated Project Longevity Extent of Land/Water Benefitted BWSR Cost-Share Efficiency (m~.x. 5 points each) Previously BWSR Cost-Shared Other Public Matching Project MaintainabiliLy Program Suitabiliu Project Completion (m~x. 5 poinu each) Is Project a Proceeding Phase Previous BWSR Involvement Available Technical Expertise Project Prior'/ry (m~x. 5 points each) Minnesota Local C orrkrlle n[s [ TOT:iL Reviewed By H:gT~P~VAL Date (TI-frS FO~¥I IS TO BE COM/:>LETED BY THE BWSR) -5- ---/1 EXISTING RIP RA¸ ER248-1 3 '// . {0/' / ~ROJECT LOCATION APPLICATION cit~ . j] Elk,, ver SlONAGE LOCAIIOtl TREE I $tl/1UII PLAHTINO --~ -- PEDESTRIAN WALKWAY IIOMAIIIIE PALER//CONCI1ETE PEDESTFtlAN WALKW;W IIOIdA/IIIE PAIE. Rli COHCHEIE .. SITE ACCESS SIGIIAGE LOCAIIOH PHASE '2 BOAHDI~IL[ VAI.[VAT .K EIST OF COURTI'ARD IHEA, CO/IHECTIOM TO IIIil{ -qTHEET. 21' OIZEI]O ,~TRUCTURE, ~/n .n~sgta ' 9arO of /ater&5oii e West Water Street ,re 200 Paul, MN 55107 2) 296-3767 < (612) 297-5615 Id Offices · "the rn Region: 394 S. Lake Avenue Room 403 Duluth. MN 55802 '.218) 723-4752 --ax (218) 723-4794 3217 Bemidji Avenue N. 3emidji, MN 56601 218) 755-4235 :ax (218) 755-4201 .~17 S. 7th Street ;uite 202 -;rainerd, MN 56401-3660 218) 828-2383 'ax (218) 828-6036 them Region: 51 Highway 15 S. 'ew UIm, MN 56073-8915 507) 359-6074 ax (507) 359-6018 0-16th Street SE uite A ochester. MN 55904 i07) 285-7458 ax (50/-) 280-2875 3x 257 :00 E. Lyon Street arshall, MN 56258 O7) 537-6O6O ix (507) 537-6388 Region: re West Water Street :ite 250 Paul. MN 55107 2) 282-9969 x (612) 297-5615 ual opportunity employer d on recycled paper MEMORANDUM March i, 1997 TO FROM RE ·Soii and Water Conservation Districts · W~yne Zellmer, Grants Coordinator · FY 1998 State Cost Share Special Project Applications The Board of Water and Soil Resources ('BWSR) is now inviting applications from Soil and Water Conservation Districts (SWCDs) for FY 1998 State Cost Share Special Project grants. Applications will be accepted from singular SWCDs and from SWCD groups that have entered into a ,-..~ -f0 joint powers agreement or memorandum of agreement. The deadline for 5~/~,'~k~.,0 submitting applications is May 1, 1997. To apply for FY 98 State Cost ~r Share Special Project grants, complete the enclosed FY 98 State Cost Sha~ Special Project Application. For this grant, $500,000 total is available. No portion of this grant may be used for technical/administrative costs. Your project must also be'reviewed by your Board Conservationist before it is submitted, so be sure to give them plenty of advance notice. Applications will be scored by the BWSR Grants Team according to the State Cost Share Special Project Application Evaluation form enclosed. By the scoring on this tbrm you will note that the BWSR is promoting Special Projects that are innovative or benefit the public. The BWSR will be requested to approve successful applications for funding on June 25, 1997. Grant Agreements will be sent in July. if you are submitting multiple applications, please prioritize them on the applications. Applications must be received by your Board Conservationists. Do' not send them to the Central Office. If there are any questions please consult your Board Conservationist. Board Conservationist Greg I_arson MASWCD H.~C~PAP