4.1. SR 04-28-1997~ty of
iver
TO:
FROM:
DATE:
SUBJECT:
Item # 6.1.
MEMORANDUM
Mayor & City Council
~~tri~l::r~:~ty Admin~
Fencing Issue
The city has received a request to place the issue of fencing along Highway 169
from 193rd Avenue to Main Street on the City Council agenda. Attached is this
request along with some background information on "how the fence project got to
this point". Regarding this letter requesting this agenda item, please note that
Doctor Eng has requested to have his name removed from the list.
The total cost for the fence for both sides of Highway 169 from Main Street to
193ra Avenue is estimated at $160,000 for a five foot fence. The city may
ultimately ask for a six foot fence if this project proceeds. The city, under
normal circumstances, would be obligated for 40 percent of this cost as a local
match. However, if the city agrees to maintain the fence, we may have the
entire capital cost financed by MnDOT. Per direction from the City Council on
3/31/97, the city has asked for this to happen, and we know that in the long run,
maintenance of the fence may ultimately be more expensive than the capital cost
for the project.
Regarding the timing of the fencing project, please see the attached 3/31/97
MnDOT letter whereby, at the end of the letter, it is suggested that the fencing
and lighting projects proceed together. The lighting project has already received
preliminary approval and is scheduled to be funded in July, 1997.
An unknown at this time is whether or not MnDOT would fund less than the
total proposed fence project. By this I mean the city does not know if MnDOT
would fund the fence project if it was only between School Street and 193ra
Avenue, or if it was only on the east side between School Street and 193~a
Avenue, or if it was only on the west side of Highway 169 south of School Street
and on the east side north of School Street.
Also attached for your information is a letter from MnDOT dated April 11, 1997,
regarding the city's concern about the red/red timing on the signals.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
Jt~T~ECH AUTOMOTI~,~ INC.
279 CARSON ~TREET
ELK RIVER, MN 55330
(612)441-4653
DEAR ELK RIVER CITY CO~IJNCIL MEMBERS
TO WHOM IT MAY CONU"~RI~.
ELK RIVER AREA BUSINESSES L~)~CATED/~ONG HIGHWAY
ARE REQLIESTtNG A MEETING OIlI~AF~,IL 28, 199'7 REGUARDING
THE FENCING OF"'~G~AY 16t~t;~RO~ 193~ MAIN STREET.
MANY OF US ARE OPPOSED AND WOU~E TO DiSCUSS~
THIS MATTER.
qq/-/'7 o~
IIIIBB &teerterson Chiropractic
TO:
COMPANY:
FAX #:
FROM:
PAGES: / (Includ~g this one)
Message:
/"or prob/em.v with
Your (.;uide 77) Bet/er Health
~ Carson Street
ilk River, MN 55330
(~12)241-9500
~m ABI~ Auto Body & Glass in Elk
is (612)241.0584.
this cover sheet and 0 additional
MEMORANDUM
To: City Council
From: Dick Erickson, Pastor Central Lutheran
Date: April 23, 1997
I would be at this meeting if I didn't have to lead a community grief/support group this
evening.
It is my hope that we will have the hindsight to construct a fence and bridge system on
Highway 169. If I had my way, we would also have a bridge over School Street as well.
It is crucial for the welfare of our community that we be proactive in the awareness of
the values and the threat inherent in the growth of housing and commerce on both sides
of this hectic highway.
In a city that is under question as to its valuing of children, we must be conscious of the
presence of those who walk and run - not only of those who drive as we thrive.
Dear Crossings are a must for a community that cares.
Richard D. Erickson
Minnesota Department of Transportation
District 3
1991 Industrial Park Road
Baxter, MN 56425
March 31, 1997
Toll
Tel: 218/828-2460
Fax: 218/828-2210
Free: 1/800/657-3971
Mr. Terry H. Maurer, P. E.
MS& Consulting Engineers
1326 Energy Park Drive
St Paul, MN 55108
Dear Mr. Maurer:
C.S. 7106 (T.H. i69)
Elk River Fencing and Lighting Projects
I have reviewed the minutes provided on the public involvement process and I agree with your assessment
of the mm out. In reading through the comments, the comments were mainly positive. There were a few
who advocated using the funds for a bridge rather than fencing and lighting. The pedestrian bridge
enhancement project appears to be high enough on the list to make the Fiscal Year 2000 programming.
I have discussed this proposal with Jim Povich and Don Raisanen. The city could choose to initiate the
fencing project under the Local Initiative (municipal agreement) Program. The city would be reimbursed
for costs per an agreement at the time of letting. In reviewing the cost participation policy, we feel the
State's responsibility is 60% of the construction costs (see page 17, 8.13.1 FENCING, 3rd paragraph).
If the city accepts total responsibility for the maintenance of the fence, it would reduce the city's
construction cost participation.
I look forward to a concept plan prepared by the city. As indicated by phone last week, Mn/DOT's
lighting section will design the lighting project for a summer 1997 letting. Due to our limited construction
personnel, I suggest the city let the lighting and fencing projects together.
If any questions arise, don't hesitate to contact me.
Sincerely,
Gary P. Dirlam, P.E.
District 3 Traffic Engineer
Enclosure:
CC:
D. L. Rai sanen/G. N. Kreutz er/J. P o vi ch
Dave Solsrud
Curt Eastlund
Cai Puttbrese
Rick Amebeck/Randy Reznicek/Craig Robinson
Tom Dumont
Pat Kiaers, Elk River City Administrator
Bob Busch/Lori Vanderhider
An equal opportunity employer
lO/SILTING ENGIlEE~
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
i-800-888-2923
Fax: 612-644-9446
h20, 1997~
230-347-90//
Mr. Gary Dirlam
District 3 Traffic Engineer
MnDOT
1991 Industrial Park Road
Baxter, MN 56401
TRUNK HIGHWAY 169 PUBLIC PARTICIPATION
CITY OF ELK RIVER
Dear Mr. Dirlam:
CIVIL ENGINEERING:
ENVIRONMENTAL
_-,NNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
-ICES IN:
..NNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
Enclosed are the minutes from the various meetings that were held regarding the lighting
and fencing along the TH 169 corridor in the City of Elk River. As you can see from
the minutes, there were no attendees at the two meetings that were set up specifically for
the business owners. We believe this is a good indication there is no opposition to the
fencing. It was our concern that there would be some business owners who perceived
fencing along their property would be aesthetically unpleasing along with other problems
such as litter.
After you have had a chance to review these minutes and talk with Jim Povich and Don
Raisanen, please let me know what MnDOT's position is regarding funding for the
fencing. As I indicated in our phone conversation, it would be my intent to have
something prepared for the April 7, 1997, City Council meeting.
Also enclosed is the concept plan we talked about for the south frontage road in Western
Elk River. As you can see from the concept plan, there is a major intersection at Joplin
and also one at Waco Street. The median opening by the County Courthouse is still
shown, but there is no definition of how that will operate in the future. As I indicated
when we talked with Terry Humbert regarding this issue in 1995, the decision was to
leave the County access question unanswered until such time as the road was extended.
The options would be for this County access to be left as is, to close the median creating
a right-in/right-out only, or to close the access totally. However, the City felt in 1995,
that the County needed to be a participant in that discussion, and I believe MnDOT
agreed. It was felt that this question was better left unanswered until the road
construction was more imminent.
An Eaual Onnortunitv Emnlover
Mr. Gary Dirlam
March 20, 1997
Page Two
Finally, please let me know as soon as you f'md out whether or not MnDOT has time
available to construct the TH 169 corridor lighting in 1997. As I indicated, it is the
City's desire to have it in place this year. The City is willing to take the lead on that
project if MnDOT does not have staff available.
If you need any more information or have any questions, please feel free to give me a
call.
Sincerely,
MSA, CONSULTING ENGINEERS
TJM:tw
Enclosures
cc: Mr. Pat Klaers, City Administrator
347-2003. mar
ON~I'LTING ENGINEEIi,N
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
06, 1997~~
-347~/
Mr. Pat Klaers
City Administrator
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
TH 169 SAFETY IMPROVEMENTS
PUBLIC PARTICIPATION PROGRAM
Dear Mr. Klaers:
CIVIL ENGINEERING:
ENVIRONMENTAL
SOLD WASTE
STR.J'CTURAL
SURVEYING
IRA:FiC
TRANSPORTA'TION
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POv/ER D!STRIBUTION
SCADA
SYSTEM CONTROLS
As you are aware, the City Council had authorized us to initiate the Public Participation
Program along the TH 169 corridor anticipating potential fencing and/or lighting projects.
This letter is to inform you that the Public Participation Program has now been
completed. There were five individual meetings scheduled with the interested parties
along the corridor. Those five meetings were as follows:
School District
Commercial properties north of School Street
Residential properties north of School Street
Commercial properties south of School Street
Residential properties south of School Street
The School District meeting was held one-on-one with myself and Ron Bratlie. As you
might imagine, the School District was very supportive of both the fencing and lighting
projects. They had no specific comments to be entered into the record, but they did
indicate that they did support the proposed project and would do anything they could to
help them along.
No business owners showed up for either of the two meetings scheduled with business
owners north and south of School Street. The meetings scheduled for the residential
properties north of School Street was very minimally attended. The residential meeting
for the properties south of School Street had a much better attendance. However, the
majority of those on the sign-up sheet actually were residences living north of School
Street.
OFFICES IN:
INEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
Attached for your information are meeting minutes from the two residential meetings,
along with sign-up sheets. I have also attached the mailing lists that were sent out for all
four of the scheduled meetings, excluding the School District meeting.
230/347-0514.mar
An Equal Opportunity Employer
Mr. Pat Klaers
March 6, 1997
Page Two
A brief summary of where I understand the potential funding for these two improvements,
together with the proposed pedestrian bridge, is as follows:
Lighting Improvement
· The draft of State Transportation Improvement Program (STIP) shows the
lighting program in fiscal year 1998 which would mean money would be
available for that project in July of 1997. MnDOT was able to stick that
program into fiscal year 1998 because a previous programed project was pushed
back one year. That STIP will be approved some time in late May or early June
of 1997. One item of note is the lighting project was recently changed on the
STIP from all MnDOT funding to 50% MnDOT 50% local.
Fencing Improvement
· The fencing project was proposed by MnDOT in the safety program which falls
under the ISTEA funding mechanism. However, it did not appear anywhere on
the fiscal year 1998 to year 2000 STIP. This indicates that the fencing program
did not rate high enough when measured against other projects in MnDOT's
safety program to be programmed in the next three fiscal years. We still have
the request in to MnDOT that if it is not funded by the ISTEA program to look
at funding it with State monies through a cooperative agreement project. If we
are successful in getting funding through a cooperative agreement, it will be
partial funding, with a local contribution expected from the City.
Pedestrian Bridge Project
· The pedestrian bridge is currently rated as the fourth highest project in Region
7W. Region 7W is one of the four planning regions for our District. When all
four regions' projects are merged into one overall list, the pedestrian bridge will
likely fall as the fourth highest rated project, but it should still end up high
enough on the overall list to receive funding for Fiscal Year 2000. This would
mean that the money would be available in July of 1999. Again, this draft
STIP, which the pedestrian bridge project appears on, will be adopted in late
May or early June of this year.
Please advise me if there is any additional work you would like us to proceed with
regarding these TH 169 safety improvements at this time.
Sincerely,
MSA, CONSULTING ENGINEERS
Te~ ~J~. ~urer, P.E.
TJM:kh
230/347-0514.mar
1326 Energy Park Drive
SL Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
CIVIL ENGINEERING:
ENVIRONMENTAL
MUNICIPAL
~NNING
SOLID WASTE
STRUCTURAL
SURV~q'ING
TRAFFIC
TRAN$,~DRTATION
ELECTRICAL/MECHANICAL
F. NGiNF. ERING:
HVAC
POWER DISTRIBUTION
~CADA
SYST~.M CONTROLS
r)FFICES IN:
,~NNEAPOUS
PRIOR LAKE
ST. PAUL
WASECA
MINUTES
TH169 CORRIDOR PUBLIC PARTICIPATION MEETING
Thursday, February 20, 1997
City Hall
Staff Present: Terry Maurer, City Engineer
Andy Brotzler, MSA
Meeting #1 (5:30- 6:30 p.m.) for Business Owners along TH169 south of School
Street. No business owners were present for this meeting.
Meeting #2 (6:30-7:30 p.m.) for Residents living south of School Street, east of
TH169. See attached sign-up sheet for attendance.
Terry Maurer, City Engineer, stated that the City has been working with MnDOT to
facilitate safety improvements along TH169 between Main Street and 193rd Avenue. The
City is requesting MnDOT financing for the improvements which include fencing and/or
lighting on the TH169 corridor. He stated that MnDOT is requesting a Public
Participation Program as part of the project development process.
Terry Maurer reviewed the following issues that have taken place to-date regarding safety
concerns along Highway 169:
MnDOT has extended the timing of the yellow lights by one second and moved
some loop detectors further away from the signal light intersection.
MnDOT studied the timing of pedestrian crossing and determined that no change
was necessary.
Installation of warning flashers is being studied by MnDOT.
It has been suggested that the 45 mph speed limit be extended further north.
MnDOT is studying this request.
City staff is studying the possibility of constructing a pedestrian bridge. An
ISTEA Grant Application has been submitted requesting funding for this
construction.
Fencing along the TH169 right-of-way is being considered between Main Street
and 193rd Avenue.
Lighting along the TH169 corridor between Main Street and 193rd Avenue is
being considered.
Terry went on to explain that the lights would be standard 40-foot high cobra headlights
placed every 150-feet on opposite sides of the highway so, essentially, there would be a
light every 300-feet on each side of the highway. He also explained that the type of
fencing being considered is a 5-foot high chain link fence that would be installed along
the right-of-way. He indicated that MnDOT would request that the City provide the
electricity for the lights and take on a normal maintenance, such as relamping or
repainting, if necessary. MnDOT would maintain responsibility for major repairs such
230/347-2411.feb
An Equal Opportunity Employer
TH169 CORRIDOR PUBLIC PARTICIPATION MEETING MINUTES (Continued)
as a light being knocked down due to accident. He indicated that with the fencing being
considered, there was a concern that the right-of-way would be opened up on the north
end by the entrance to Elk Park Center and on the south end by the intersection of Fifth
Street on the east side of the highway. He also indicated that there may be concerns about
the aesthetics of the fencing since MnDOT will not be responsible, nor will the City have
manpower or time available to pick up litter or trim weeds. This would likely fall to the
responsibility of the adjacent property owners or a civic organization.
Terry indicated that no design had been ordered yet. The purpose of the meeting was not
to discuss specifics regarding the improvements, but to take public input, comments, and
try to answer any general questions the public may have. With that, the meeting was
opened up to the public.
COMMENTS
Joel Rademacher, 11224 190th Avenue NW - he stated that he is more in favor of the
fence. Fencing he thought was a good idea. He doesn't believe there is a safe place to
cross the highway and crossings are not marked properly. Signal lights do not provide
a long enough time for pedestrian crossing. He would prefer that the CJ. ty focus their
attention on a safe way to cross the highway, preferably with a pedestrian bridge.
Linda Twaddle, 18994 Zane Street NW - she said she was confused with MnDOT's
position of not wanting to increase pedestrian crossing time by one to two seconds. She
did not feel there was adequate time for pedestrian crossing at the intersections. She
wondered what MnDOT was losing if they lengthen the pedestrian light times.
Steve Schoemaker, 11106 190th Avenue NW - he asked what the cost of the pedestrian
bridge would be and what was holding up funding for its construction. He thought the
solution to the safety problem was to put the bridge up rather than to spend money on
lights and fencing. He related these to spending money on Band-Aid solutions. He
suggested that the money that would be spent on light and fencing be put into a pot with
addition contributions from MnDOT, the City, and the County to get enough to fund a
pedestrian bridge.
Pat Korte, 19031 Main Street NW - he stated that a pedestrian bridge would not force
use. He thought the fencing was a good first step. He sees both adults and children
crossing TH169 between the intersections. He suggested that the fence and lights be
installed as soon as possible, and a pedestrian bridge be in the immediate future.
Tom Cruz, 11146 190th Avenue NW - he questioned why the intersection of School
Street and Elk Hills Drive at TH169 was not square. He thought that squaring up the
intersection would reduce pedestrian's exposure to vehicle traffic when crossing. It seems
230/347-2411 .feb 2
TH 169 CORRIDOR PUBLIC PARTICIPATION MEETING MINUTES (Continued)
to take longer to cross because it is not square. Terry answered that it is not square
because of the much higher traffic volume on the west side on School Street due to Elk
Park Center. Two left tums onto School Street from TH169 causes the geometrics to be
different on all four lengths of the intersection. He indicated that this could not be
changed. Mr. Cruz went on to indicate that the amount of traffic now, and future traffic,
is a major concern. The best thing to do would be to put an overpass over TH169. He
felt that the amount of traffic makes it tough for pedestrian crossing at the intersection.
He also indicated that his daughter is a school crossing guard and he is concerned with
her crossing the highway. If he is not available to pick her up after school, he does not
allow her to perform her duties as a school guard. Suggests a pedestrian bridge be built
as soon as possible.
Jeanie Williams, 19041 Zane Street NW - she agreed with Tom Cruz's comments. She
is not happy with MnDOT's comments regarding the crossing. She wants a safe place
to cross without getting stuck on the island at the intersections.
Sue Schoemaker, 11106 190th Avenue NW - she commented that MnDOT's test of the
time to cross the signal last fall was not realistic. Having people out there with orange
vests on and MnDOT trucks around did not model the real event. Regardless of what the
MnDOT experiment showed, she does not feel that the crossing is safe. She stated that
MnDOT is concerned about moving traffic and not necessarily concerned about the lives
of the residents of Elk River.
Joel Rademacher, 11224 190th Avenue NW - he stated that being a second driver in the
line at School Street, the light is green and then is yellow by the time he gets to the
intersection. The timing is off and it should be checked.
Tom Cruz, 11146 190th Avenue NW - he is concerned about the article that appeared in
the paper that stated that one in four cars are running red lights. Terry commented that
MnDOT has indicated that at any given time, 20 percent of the timing on their traffic
signals could be in error. When the public sees a situation, as indicated by Joel
Rademacher, they should call either City Hall or MnDOT and MnDOT will check it out.
Mike Twaddle, 18994 Zane Street NW - he stated that the number of existing residential
units on the east side of the highway and the potential for a significant increase number
in them in the near future, along with all the business interests, schools and pedestrian
pathways on the west side makes safety for pedestrians crossing the highway a top
priority. He stated that he did not know how to correctly cross at the at grade crossing
until MnDOT explained it. He wondered how we could expect the children to know how
to cross it. He realizes that we will need to educate through parents, school, and police
force. He stated that we have to fence the right-of-way even though he would like to see
a pedestrian bridge. He felt that without the fence, there would be no way to funnel the
230/347-2411 .feb 3
TH169 CORRIDOR PUBLIC PARTICIPATION MEETING MINUTES (Continued)
people to the pedestrian crossing and that the public would have a tendency to take the
easiest way. He is in favor of lights along the corridor. He says that the corridor is very
dark, especially in the winter. With the headlights of cars often dirty, it is very difficult
to see. He stated that MnDOT constantly gives cookbook answers to each of these unique
situations and they need to be looked at with unique solutions to the problems in Elk
River. The City needs to help do something soon. They have waited too long already
and the money needs to be found.
Linda Twaddle, 18994 Zane Street NW - she indicated she would not allow her kids to
walk across the highway. She said that we all have a tendency to jaywalk but need to be
encouraged to use the crosswalk. She stated that she has stopped often times along the
highway near the water tower and has never seen a police car come by while she has been
stopped there. We need more enforcement along the corridor of pedestrian rules, along
with vehicle laws. Need to do something to address the issues related to the two deaths
in the last year and all of the "almost" accidents. She felt that it had to be a collaborative
effort between State, City, County, and citizens.
Jerry Hagen, Saxs Foods - He explained the involvement of the Chamber of Commerce.
He felt that there was actually a business issue for the safety of the business customers.
We need to have MnDOT know that businesses are getting into the lobbying and
contacting state-level representatives. He asked those in attendance to talk to other
businesses in the community and make them aware of the Chamber's efforts and have
them contact Jerry if they were unaware of what the Chamber was trying to do.
Steve Schoemaker, 11106 190th Avenue NW - he asked about the park dedication fees.
He stated that all the properties on the east side of the highway had paid park dedication
fees and he wondered if those monies could be used to help fund some of the
improvements since it appears that they have not fi~nded a park improvement on that side.
He asked how much money was in the fund and what it was used for.
Ted Schoetzko, 19054 Zane Street NW - he indicated that if you don't hit the pedestrian
cross button, there is not enough time to get across. Why doesn't MnDOT change the
phasing of the lights. He went on to state that the left turn from southbound TH169 at
193rd tums green without any cars at the intersection.
Steve Rusher, 11189 190th Avenue NW - he asked whether retiming of the lights is a
MnDOT issue. It was stated that MnDOT does control the timing of the lights. He also
stated that after the accident last fall, he saw kids crossing in the middle of the highway
corridor and not at the intersections. A police officer was traveling on the highway at that
time and did nothing. He indicated that he felt there needs to be more law enforcement
of the pedestrian laws along the corridor.
230/34%2411.feb 4
TH169 CORRIDOR PUBLIC PARTICIPATION MEETING MINUTES (Continued)
Tom Cruz, 11146 190th Avenue NW - he asked a question of whether we need more
overhead crossings if more homes are to be built. He indicated that he thought a second
elevated pedestrian crossing should be built by 193rd Avenue.
Lester Morris, 19337 Denver Street NW - he indicated that he worked for the Mille Lacs
Indian Nation and that he has been working with MnDOT for a project improvement on
TH169 near the Mille Lacs Band facilities. He indicated that they have been having
trouble but have found a way through them and he was going to provide to Jerry Hagen's
committee a summary of how they were able to get their project accomplished. He stated
that he now lives in Elk River and was concerned when he saw that the City Council
meeting that MnDOT appeared at on cable t.v. because the answers given by MnDOT at
that meeting were identical to the answers he received when discussing the improvements
that were requested near the Mille Lacs Casino. He indicated that he wanted to help the
community any way he could from his experience in dealing with MnDOT.
Daryl Thompson, City Council Member - he indicated his position on the lighting and
fencing. He was in favor of most of the comments he had heard tonight. He went on to
comment about meetings with the State representatives. It was his understanding that one
of these representatives was considering authorizing a bill in the State Legislation to try
and get funding for the pedestrian bridge. He also indicated that in an earlier meeting
with MnDOT, they indicated that they would extend the red-red timing at the
intersections. He had wondered if that had been taken care of.
Connie Levang, 19047 Nowthen Boulevard - she indicated that she drives northbound on
TH 169 quite often and that she is very comfortable with the timing of the lights. She
does not perceive that there is undue delay for the traffic on the highway due to timing
for cross streets and/or pedestrian. She would not have a problem as a motoring person
to have the time extended slightly and wondered what MnDOT's objection to doing that
was. She also commented that the corridor is very dark and she thought lighting would
be a good idea.
There being no further comments, the Public Participation Meeting ended at 7:55 p.m.
SDG:kh
230/347-2411 .feb 5
February 20, 1997
Mr. Terry Maurer
P. O. Box 490
Elk River, Minnesota 55330
Dear Mr. Maurer,
This letter is in regards to improvements needed on the stretch of Highway 169
between Main Street and 193rd. Several times I have attempted to write this letter and
each time I find that my emotions seem to cloud the points I hope to make regarding
this issue.
My opinion is that the speed limit along this stretch should immediately be reduced, with
the 45 mile an hour speed zone extended further to the north. This area of highway
also has a definite need for fencing, lighting system and pedestrian overpass! It is my
understanding that the fencing and lighting may be initiated this spring.., this is
wonderful news!
My above views on the needs of this part of our community have been there since the
day we moved to Elk River eight years ago. My concerns were so strong that both of
my children were required to become school patrol guards as training for the time they
would become independent enough to cross "the highway."
As a member of this community and a bereaved mother of a son who was killed
October 16, 1996, on this road, I f,.'-~el strongly about this issue. Perhaps attendance at
the community focus meetings seems Iow, and you wonder how important is this issue.
to the public? Please do not confuse attendance with concern. I am sure that the
people who had signed petitions and attended council meetings asking for highway
improvements last fall assume that our city officials are actively addressing and
developing a plan to improve this "highway to heaven!"
There have been numerous accidents directly related to increased traffic flow and the
speed limits. Last fall two people were killed.., please, let's not wait any longer to
make these much needed improvements.
Sincerely,
Linda Twaddle
CC: Mayor Hank Duitsman
February 10, 1997
])ear Mr. Yaurer,
We live in the Deerfield III addition and are
very concerned about the safety issue of getting
across Highway 169. As avid walkers, we frequently
need to cross that busy highway to go to Elk Park
Center, etc.
In o~r opinion, a fence would not solve the
problem. Pedestrians do need to take responsibili.ty
for their o~m safety by crossing ~the highway in
designated walkways, but they cannot factor in those
negligent motorists who choose to run red lights.
Therefore, we feel a much safer solution for
pedestrians would be the construction of a walk bridge
across Highway 169.
Thank you for your attention.
Sincerely,
INFORMATIONAL HEARING ATTENDANCE REGISTRATION
Project:T.H. 169 Corridor between Main Street & 193 Avenue
Hearing Date: February 20. 1997 from 6:30 p.m, - 7:30 p,m,
Location: Ci.ty of Elk River. 13065 Orono Parkway. City Council Chamber
NAME ADDRESS PHONE NO.
c:\forms\informat, wpd
INFORMATIONAL HEARING ATTENDANCE REGISTRATION
Project:T.H. 169 Corridor between Main Street & 193 Avenue
Hearing Date: February. 20. 1997 from 6:30 p.m. - 7:30 p.m.
Location: Ci.ty of Elk River. 13065 Orono Parkway. City Council Chamber
NAME ADDRESS PHONE NO.
c:\forms\informat, wpd
1326 Energy Park Drive
St. Paul, MN 55108
612.644-4389
1-800-888-2923
Fax: 612.644.9446
February 5, 1997
File: 230-347-90
Dear TH 169 Business Owner:
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvemenu along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT financing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
CIVIL ENGINEERING:
ENVIRONMENTAL
MUNICIPAL
PLANNING
SOUD WASTE
STRUCTURAL
SURVEYING
TRAFFIC ~· . . .
TRANSPORTAIION
Thursday, February 20, 1997
5:30 p.m. - 6:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway-.
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
I:K)WER DISTRIBUTION
SCADA
SYSTEM CONTROLS'
OFFICES IN:
MINNEAPOUS
PRIOR LAKE
ST. PAUL ~:
WASECA ::' '.
yoUr input into the development of this project is imp6rtant. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry I. Maurer, P.E.
TJM:kh
347-2905.jan
An Equal Opportunity Employer
{'O~['LTI~£~GI~EEILX
1326 Energ,/ParkDrlve
St. PouI, MN 55108
6~2-644-4389
1-800-888-2923
Fax:612-6~.9,~6
February 5, 1997
File: 230-347-90
Dear TH 169 Corridor Residents'
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvements along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT financing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
CIVIL ENGINEERING:
ENVIRONMENTAL
~UNICiPAL
.NNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
'TH 169 CORRIDOR PLrBLIC pARTIcIPATioN 1vIEETING
Thursday, February 20, 1'997
6:30 p.m. - 7:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway
'qCES IN:
,,~INNEAPOUS
PRIOR LAKE
ST. PAUL
WA,SECA
Your input into the development of this project is important. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J. 1V~kfirer, P.E.
TJM:kh
347-2906.jan
TRUNK HIGHWAY 169 CORRIDOR
PUBLIC PARTICIPATION MEETING
THURSDAY, FEBRUARY 13, 1997
CITY HALL
Staff Present:
Terry Maurer, City Engineer, Andy Brotzler, MSA,
Sandra Thackeray, City Clerk
Meeting #1 - 5:30 - 6:30 for Business owners along East side of Highway
169. No business owners were present for this meeting.
Meeting #2 - 6:30 - 7:30 for residents hving along the east side of TH #169.
Those present included Daryl Thompson, Tom Warner and Mike Kedrowski..
Terry Maurer, City Engineer stated that the City has been working with
MnDOT to facilitate safety improvements along TH 169 between Main Street
and 193ra Avenue. The City is requesting MnDOT financing for the
improvements which include fencing and/or lighting along the TH 169
corridor. He stated that MnDOT is requesting public participation as part of
the project development process.
Terry Maurer reviewed the following issues that have taken place to date
regarding safety concerns along Highway 169:
· MnDOT has extended the t~ming of the yellow lights by one second.
· MnDOT studied the t~ming of pedestrian crossing and determined that no
change was necessary.
· The installation of warning flashers is being studied by MnDOT.
· It has been suggested that the 45 mph speed limit be extended further
north. This request is being studied by MnDOT.
· City Staff is studying the possibility of constructing a pedestrian bridge..
· Fencing along Highway 169 right-of-way is being considered.
· Lighting the Highway 169 corridor is also being considered.
Tom Warner - stated that he is in favor of lighting the 169 corridor,
however, he is not totally in favor of fencing. He indicated that the main
issue is to get people safely across Highway 169 and feels that the best way
to accomplish this is with an overpass. He indicated that a fence would not
always deter people from crossing the highway because there is always the
potential of people going around or over the fence. Tom Warner indicated
that the $200,000 needed for corridor fencing would be better spent by adding
it to the cost of a pedestrian bridge and walkways. Mr. Warner also indicated
that it is vital that the City consider acquiring land for a bridge overpass and
walkways.
Mike Kedrowski indicated that he is in favor of moving ahead with the
lighting project but not sure that a fence will keep people from crossing the
Highway. He indicated that a bridge overpass would better accomplish this.
There being no further comments, the public information meeting ended at
7:00 p.m.
Sandra Thackeray
City Clerk
s:~minutes\16921397.doc
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
CIVIL ENGINEERING:
EN~RONMENTAL
MUNICIPAL
~JqNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTAI'ION
February 5, 1997
File: 230-347-90
Dear TH 169 Business Owner:
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvements along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT financing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
Thursday, February 13, 1997
5:30 p.m. - 6:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway
ELECTRICAL/MECHANICAL
~,NGiNEE,RING:
hYAC
FDWER DISTRIBUTION
ECADA
SY, ST~ CONI~OLS
:FICES IN:
~JNNEAPOUS
PRIOR LAKE
ST. PAUL
WASECA
Your input into the development of this project is important. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J. M~/urer, P.E.
TJM:kh
347-2905.jaa
[O.~[LTI.~G £~LEEIL~
1326 Energy Par~ Drive
St. Paul, ~N 55]08
612-644.,~389
1-800-888-2923
Fax: 612-644-9446
February 5, 1997
File: 230-347-90
Dear TH 169 Corridor Residents:
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvement,; along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT fifiancing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
CIVIL ~.NGINEERING:
ENVIRONMENTAL
MUNIOPAL
PLANNING
$OUD WASTE
' STRUCiU~L
StaViNG
TRAFFIC
TIL~NSI~)IITATION
Ek~'CTIIlCA L/MEOqANICAL
&NGINE~..RING:
HV~C
,I~OW~ DI~IItUTI, ON
5CADA
~STEM CONT~C. LS.
OFFICES IN:
MINNEABDUS
PRIOR LAKE
ST. PAUL
WASECA
Thursday, February 13, 1997
6:30 p.m. - 7:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway
Your input into the development of this project is important. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
Te~ j.~a~(er, p.E')/'~.c~
TJM:kh
347-2906.jan
INFORMATIONAL HEARING ATTENDANCE REGISTRATION
(1LBIiLTI.X'G £Xl;I,EER,~
Project:T.H. 169 Corridor between Main Street & 193 Avenue
Hearing Date: February 13. 1997 from 6:30 p.m. - 7:30 p.m,
Location: Ci.ty of Elk River. 13065 Orono Parkway. City Council Chamber
NAME ADDRESS PHONE NO.
/~~2-~-~/ /~'~.5~7 -~=~~.~ ~e,-~/3~¢
c:\forms\informat, wpd
£ONN[LTINGENGINEERN
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
t-800-888-2923
Fax: 612-644-9446
February 5, 1997
File: 230-347-90
Dear TH 169 Business Owner:
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvements along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT financing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
CIVIL ENGINEERING:
ENVIRONMENTAl.
MUNICIPAL
ANNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
Thursday, February 13, 1997
5:30 p.m. ~ 6:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway
ElECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
Your input into the development of this project is important. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
OFFICES IN:
AINNEAPOLIS
PRIOR LAKE
SI. PAUL
WASECA
TJM:kh
347-2905 .jan
An Equal Opportunity Employer
('ONS[LTING ENGINEERS
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
February 5, 1997
File: 230-347-90
Dear TH 169 Business Owner:
As you may be aware, the City Council of Elk River has been working closely with
MnDOT to facilitate safety improvements along the TH 169 corridor between Main Street
and 193rd Avenue. The City is hopeful it will obtain MnDOT financing for a fencing
and/or lighting improvement. In anticipation of this financing, the City has taken the lead
on this project. Part of the project development process involves public participation.
Therefore, the following meeting has been scheduled to solicit your input on the proposed
projects:
CIVIL ENGINEERING:
ENVIRONMENTAL
MUNICIPAL
~,NNtNG
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
Thursday, February 20, 1997
5:30 p.m. - 6:30 p.m.
Elk River City Hall
City Council Chamber
13065 Orono Parkway
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES IN:
,iNNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
Your input into the development of this project is important. Please plan to attend. If
you are unable to attend, written comments can be submitted to City Hall in care of me.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J. Maurer, P.E.
TJM:kh
347-2905 .jan
An Equal Opportunity Employer
Brenda Mack
·Arby's / Sbarro
19182 Freeport Street
Elk River MN 55330
Joyce Kongsjord
Brauns Fashions
19128 Freeport Avenue
Elk River MN 55330
Lois Downey
Chin Yuen Express
19168 Freeport Avenue
Elk River MN 55330
Gene Molitor
Maggie's Hallmark
19i86 Freeport Street
F.~k River MN 55330
Rene E. Van der Haeghen
Pak Mail Centers of America
19112 Freeport Street Ell3
Elk River MN 55330
~.4dy Sanborn
Sa!ina
19112 Freeport Avenue gl 15
Elk River MN 55330
Brian Davies
Taco Bell
19131 Freeport Avenue
Elk River MN 55330
Peter Meade
Tar~//956
19146 Freeport Avenue
Elk River MN 55330
Mariys Thorson
Target//956
19146 Freeport Avenue
Elk River MN 55330
T Sauve
Target//956
19146 Freeport Avenue
Elk River MN 55330
Karen Olivo
Vision World
19166 Freeport Avenue
Elk River MN 55330
Patricia Knutson
Wendys International
19179 Freeport Avenue
Elk River MN 55330
st~Linegar ~/
~AME ~k River Red-E-Mix
; ver
~scher
~ME ~ River Red-E-Mix
~ver MN ~0
~u ~ Johmon
Abra Auto Body and Glass
275 Carson Street
Elk River MN 55330
Marge Remarcik
Balloons Ink
20295 Twin Lakes Road
Elk River MN 55330
5
Dr. Dennis Gallenberg
'Barrington Oaks Veterinary Hosp.
710 Dodge Avenue
Elk River MN 55330
Debbie Biggins
Burger Time Restaurant
229 Carson Street
Elk River MN 55330
Dr. William Tregaskis
Central MN Mental Health Center
730 Dodge Avenue #101
Elk River MN 55330
Fashiohristian ~
10989 l~enue NW
J McDowell
'Circle C Convenience Center
568 Dodge Avenue
Elk River MN 55330
_Cla_ssi yL~F~ar
Elk/River MI~ 55330
Brian Brehmer
Clem's Fish & Seafood
19424 Evans Street
Elk River MN 55330
Coldwell~r Vision
325 M.~hfStreet~
EJlc'River MN ~"5330
Rod Riske
Cub Foods
19216 Freeport Street
Elk River MN 55330
Toby LaPointe
.~ Domino's Pizza
592 Dodge Avenue
Elk River MN 55330
Del Overho!ser
Econar Energy Systems Corp
19230 Evans Street
Elk River MN 55330
E_conar E~ystems Corp
EIjg,R'fver MN 553'39
Dana Johnson
Edina Realty Inc.
592 Dodge Avenue
Elk River MN 55330
P.O.B.,,~i2'~.,,~
EJk'River MN "55~30
Mary Eberley
Elk River Insurance Agency
710 Dodge Avenue
Elk River MN 55330
5
~iet~Kreger ~
Elk River~~ll Inc.
ver
22460~9
~ver MN ~5330
Bill ~d Julie Fish
Elk River Print~g & Pa~ Plus
596 D~ge Avenue
Elk River MN 55330
Rob Rich
Elk River Tire & Auto/Goodyear
P.O. Box 280
Elk River MN 55330
Fairview ~inic Elk River
290 Ma~.~-~t
Elk~t?OV'~r MN 553"315,.,
Tim Hayes
Farmers Insurance
650 Dodge Avenue
Elk River MN 55330
Jeff Engen
First National Bank of Elk River
19157 Freeport Avenue
Elk River MN 55330
.~g~ver MN 55'~30
Guardi~f Elk River
E~ref~iver MN 5'3330
Lynn Hartley
Hartley Associates
200 5th Street Suite F
Elk River MN 55330
McDonald's of Elk River
380 3rd~//306 700 Dodge Avenue
'l~?~t~r MN '~0-3012. Elk River MN 55330
Becky Becket
Heigl Mortgage and Financial Corp.
710 Dodge Avenue Suite A
Elk River MN 55330
irch
Angela $. George
Home Security Abstract & Title Co.
564 Dodge Avenue NW
Elk River MN 55330
~onny Sleyster
Indy Lube Inc.
522 Dodge Avenue
Elk River MN 55330
Jim Rogness
.IR Tech Automotive, Inc.
279 Carson Avenue NW
Elk River MN 55330
Edward ~& Co.
John Morrow
KFC
P.O. Box 187
Elk River MN 55330
~e r&vley
McD~River
700
Ellc,,'Kiver MN
Perry Coonce
Minnesota Sports Federation
592 Dodge Avenue
Elk River MN 55330
Liz Tveite
Minuteman Press
19264 Evans Street NW
Elk River .MN 55330
Mo in Of oe
Sean Weldon and Darrell Dunn
North Central Insurance Agency
200 5th Street Suite J
Elk River MN 55330
Mitchell Kruger
Norwest Mortgage Inc.
564 Dodge Avenue Suite D
Elk River MN 55330
Nybe~ociates
r.,tx ~tver mrq 55330
J_ohn 'v~~ Associates Inc.
Elke'ttiver MN '"'-.,.~330
Lynn Caswell
John Oliver & Associates Inc.
580 Dodge Avenue
Elk River MN 55330
Onhop~nsultants
1~. Dave Edwar,,,,,ds/'~
290 M~et NW
~~;ants
~K~ver MN ~ 55330
~~~venue
~eapolis MN ~54~
Dan Smi~
Per~ of Elk River
18838 Dodge Street
Elk River MN 55330
myl~ Gjess~g
Piz~ Hut
260 Carson S~reet
E~ ~ver MN 55330
~nc
P.O. B~
~mou~ MN ~ 55~1
Ga~ San~ire
Re~ Premier Real~
650 Dodge Avenue
Elk River MN 55330
Paul Norland
Riverdale ~ Galle~
19276 Eva~ Street
E~ ~ver MN 55330
Rick Foster
~ Riverside Development Comply
19230 Ev~ S~eet
Elk River MN 55330
5
Marly Glines
Riverside Development Company
19230 Evans Street
Xlk River MN 55330
Charlie Peltier
Ron's Foods
321 Baldwin Avenue
Elk River MN 55330
'~.ald L. Dargi~,.-
El~iver MN "'x,,55330
Jerry Hagen
Sax Food & Drug
19424 Evans Street
Elk River MN
'55330
E~v'River MN 'x55330
Sherb e~ty Abstract & Title
E~iver MN ~5330
Gloria Farley
Steenerson Chiropractic HeaI~ Ctr
7~0 Dodge Avenue Suite A
Elk River MN 55330
~ark Steene~
~~ractic Heal~ C~
sui ,
T Smi~ ~
TS C~ '
El~iver MN 5~0
~Wa_ter La~s.& Eco Systems Eng.
Diana Ellingson
The Wedding Chapel Bridals Inc.
592 Dodge Aver:ue
Elk River MN 55330
_Zie?le~on Co. Inc.
P.O. ~
Big Wheel Rossi
508 Freeport Avenue
~lk River, MN 55330
Carol's Dance Studio
684 Freeport Avenue
Elk River MN 55330
Famous Footwear
19174 Freeport Street
Elk River MN 55330
H & R Block
730 Freeport Avenue
Elk River, MN 55330
Landmark Personnel Inc.
506 Freeport Avenue Suite 11
Elk River MN 55330
ReNee Salzer
'Mauriees
19180 Freeport Street
Ell River MN 55330
Mike Treraholm
Payless Shoe Source
19134 Freeport Street
Ell River MN 55330
Kamie Stenvold
Animal Inn Pet Food Outlet
19160 Freeport Street
Ell River MN 55330
Mike Asperheim
Radio Shack
19178 Freeport Street
Ell River MN 55330
Ot ieen Lantz
Sally Beauty Supply
19162 Freeport Street
Elk River MN 55330
Mike Waz
Smoke Shop
19112 Freeport Street
Elk River MN 55330
St. Maximilian Catholic Bookstore
756 Freeport Avenue
Elk Rive~' MN 55330
Darlene Olson
Sunroom Tanning Studio
716 Freeport Avenue
Elk River MN 55330
Annette Skrove
Video Update
19141 Freeport Street
Elk River MN 55330
5
Brian Scott
Sher. Co. Insurance Agency of E.R.
650 Dodge Avenue
Elk River MN 55330
5
Dr. David DeSimone
Northwest Family Dental Center
710 Dodge Avenue
Elk River, MN 55330
Carrie McElhone
Family Restaurant
600 Dodge Avenue
Elk River MN 55330
Joe Thies & Penny Klatt
Barrington IV Hair
592 Dodge Avenue
Elk River MN 55330
5
Shirley Inderieden
Tan Terrific
564 Dodge Avenue
Elk River MN 55330
5
Orr Mickelson
Farmers Insurance
650 Dodge Avenue
Elk River MN 55330
Bill Dodds
William R. Dodds Ltd.
730 Dodge Avenue //107
Elk River MN 55330
Jackson Hewitt Tax Service
650 Dodge Avenue
Elk River MN 55330
Edward W. Bobb CPA
650 Dodge Avenue
Elk River MN 55330
Christenson Communications
592 Dodge Avenue
Elk River MN 55330
Play It Again Sports
19268 Evans Street
Elk River, MN 55330
Shelly Stoltz
,.)For Your Nails Only
19424 Evans Street
Elk River MN 55330
Mike
Allied American Mortgage
19230 Evans Street Suite 100
Elk River MN 55330
,~New Horizon Child Care
19280 Evans Street
Elk River MN 55330
lO,SILTING ENGI.~EERS
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
December 20, 1996
File: 230-347-80
Mr. Dave Solsmd
District Preliminary Design Engineer
MnDOT
3725 12th Street North
PO Box 370
St. Cloud, MN 56302
RE: CITY OF ELK RIVER
Dear Mr. Solsmd:
CNIL ENGINEERING:
ENVIRONMENTAL
MUNICIPAL
iNNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES IN:
,,INNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
As you may be aware, there has been a lot of discussion concerning improvements to the
Trunk Highway 169 corridor through Elk River, due to the recent fatalities on this stretch
of roadway. Working closely with Tom Dumont, I am anticipating that the City may
undertake a fencing and/or lighting project in the summer of 1997. This would be on the
section of highway from Main Street to 193rd Avenue. I recently met with Gary Dirlam
and Tom Dumont to discuss the procedure the City should use in undertaking this type of
improvement, with potential MnDOT reimbursement at a later date. They suggested that
a public involvement process would need to be laid out and implemented prior to the design
of any improvements. They suggested that I prepare the broad framework for a public
involvement process, and mn it by you for your review and comment.
The purpose of this correspondence is to broadly discuss such a public involvemem process
and look for your expertise on a few issues. We would anticipate having separate meetings
with groups that may have an interest in the fencing and/or lighting project. I would
envision that the interested groups would include the following:
A. The Deerfield Neighborhood located north of Elk Hills Drive and east of Highway 169,
B. The Elk Park Center Commercial properties,
C. The Elk River School District,
D. The commercial properties located south of School Street/Elk Hills Drive. This group
would also include the Perkins Restaurant; and
347-2005.dec
An Equal Opportunity Employer
Dave Solsrud
December 20, 1996
Page Two
E. The residents located south of School Street. This would include the Barrington Place
neighborhood, the apartment complexes located between 5th Street and Main Street, and
the residential neighborhood just to the east of this area.
The first question we would have is what is the best way to notify these groups of an
informational meeting. We could use City tax rolls and do direct mailings. We could use
a word-of mouth campaign through a fairly well organized neighborhood group in the
Deerfield neighborhood. The Chamber of Commerce may be another avenue for notifying
the businesses. The final idea we thought of would be an ad in the local newspaper. A
direct mail notice would be the most work for the City, but it certainly would provide for
the best response at the meetings.
The second question we have concerns the need to have a public hearing before the City
Council after the individual group meetings are held. If you believe one would be
necessary, we could facilitate this through a newspaper ad, along with ads posted on the
cable TV and, possibly, the City newsletter, depending on publication schedules.
We would appreciate any and all input you can give to this type of process. We would
anticipate trying to begin the implementation some time in the latter part of January, trying
to complete the process within about three months, so that a project could be designed and
hopefully let and constructed in calendar year 1997.
Please call when you have a chance to review this information. I would be happy to meet
you at your office at any convenient time to discuss this issue further.
Sincerely,
MSA, CONSULTING ENGINEERS
CC:
Gary Dirlam, District Traffic Engineer
Pat Klaers, City Administrator
TJM:tf
347-2005.dec
CONSULTING ENGINEER~
1326 Energy Park Drive
St, Paul, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
C!VIL ENGINEERING:
ENVIRONMENTAL
~UNiCIPAL
x, NING
SOLO ','VAST,}
STRUCTURAL
SURVEY ",,G
TRAFFIC
TRANSPORTATION
ELEC FRiCAL/MECHANiCAL
ENGINEERING
HVAC
POWER DISTRIBUTION
SCAD;,
S" STEM CONTRO:S
OFFICES IN:
,NNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
November 21, 1996
File: 230-347-80
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: FENCING OF TRUNK HIGHWAY 169 RIGHT-OF-WAY
Dear Council Members:
Council Member Farber had requested that I put together additional information regarding
the cost and timing of a potential project to fence the TH 169 corridor. In doing so, I
have contacted Tom Dumont, MnDOT Assistant Traffic Engineer, regarding the
specifications for such a project. He indicated that the specifications for fencing would
consist of a 6-foot high, 2-inch mesh, cyclone fence with a tension wire at the top. He
also looked back on some previous MnDOT projects and indicated that the typical bid for
this type of installation was approximately $12 per linear foot. I also contacted a
representative from Century Fence who Tom recommended, regarding the earliest start
date and time to complete such a project. He indicated that any start date before April
1st would have significantly higher cost due to frost and snow conditions. He also
indicated that a project to fence the TH 169 corridor from Main Street to 193rd Avenue
would take approximately one to two weeks.
It appears that each side of TH 169 from Main Street to 193rd Avenue is approximately
6,600 feet long. Therefore, using the estimated bid price supplied by MnDOT, the cost
of fencing each side of TH 169 from Main Street to 193rd Avenue would be $79,000, or
a total of $158,000.
As I had indicated at last Monday's City Council meeting, we should hear by January
1997 whether a fencing project will be programmed and funded by the MnDOT Safety
Program. Regardless of the outcome, we will have sufficient time after January of 1997
to put together specifications and get a project underway as early as weather permits in
the spring of 1997.
If you have any questions or would like additional information, please call.
Sincerely,
MSA, CONSULTING ENGINEERS
Terrier/', P.E.
TJM:tw
347 -2106. nov
An Equal Opportunity Employer
CON~ULTINGENGINEE~
1326 EnergyParkDrive
St. PauI, MN 55108
612-644-4389
1-800-888-2923
Fax: 612-644-9446
April 2, 1997
File: 230-347-80
Mr. Tom Dumont
Assistant Traffic Engineer
MnDOT District 3
3725 - 12th Street North
P.O. Box 370
St. Cloud, MN 56302
TH 169
CITY OF ELK RIVER, MINNESOTA
Dear Mr. Dumont:
CIVIL ENGINEERING:
ENVIRONMENTAL
NICIPAL
rLANNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ELECTRICAL/MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
'FICESIN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
WASECA
In follow-up to our recent conversation regarding the red/red timing on the TH 169
signals, the following questions arose at a recent City Council meeting:
Given the number of near misses along this corridor due to people running red
lights, would it make the corridor potentially safer by extending the red/red
timing on the signals from 1.5 seconds to approximately 2 to 2.5 seconds?
The Council also asked exactly how the 1.5 seconds for a red/red is determined
and would adding .5 to 1 second make the intersection any safer and/or have any
negative influence on the ability of the highway to move traffic?
I was not quite sure how to answer these questions. I suggested to the City Council that
a letter to you, as experts on signal timing issues, would be the best way to get the
answers. Would you please respond at your convenience and I will pass your comments
on to the City Council.
If you have any questions regarding this issue, please contact me.
Sincerely,
MSA, CONSULTING ENGINEERS
Terry J(. I(,Iaurer, P.E.
TJM:kh
347~0202 .apr
CC:
An Equal Opportunity Employer
Minnesota Department of Transportation
District 3
3725 12th St. N.
P.O. Box 370
St. Cloud, MN 56302
April 11, 1997
1997
Mr. Terry Maurer
MSA Consulting Engineers - Elk River City Engineer
1326 Energy Park Drive
St. Paul, Minnesota 55108
T.H. 169 - CS 7106
City of Elk River
Tel: 612/255-4181
Fax: 612/255-3257
Toll Free: 1/800/657-3961
i(320) 6s4-s]os
Dear Terry:
I received your letter expressing the city council's interest in extending the red/red (all red) timing
at signalized intersections along TH 169 in the city of Elk River. I will attempt to answer your
questions on how the "all red" is timed and the effects of extending the "all red" interval.
The Manual of Uniform Traffic Control Devices says that "the yellow vehicle change interval may
be followed by a short all red clearance interval" to clear the intersection.prior next green phase.
Past timing practice did not include an all'red interval after the yellow; when the yellow
terminated the red and the cross street green appeared simultaneously. At the onset of the green
a "startup" time of 1 to 3 seconds (perception/reaction) was expected to provide an intersection
clearance similar to the current all red interval. Studies showed that it took 1 to 3 seconds for
vehicles to notice the green, decide to go, take foot off the brake, check for traffic, and then
accelerate and finally move the vehicle. The practice of using the startup time is diminishing
although this clearance time is still available if the green is not "jump started". Our practice is to
provide an all red interval in addition to the startup time for additional safety measures.
The ail red is figured by adding 20 feet (length of vehicle) to the width of the intersection, ( length
from the stop bar to the center of the farthest cross street through lane), then dividing this total by
85% speed (55 mph documented from speed study) in feet per second. The current all red timing
is figured with the posted 45 mph speed which yields longer all red times. This statewide
methodology provides adequate time for vehicles to clear the intersection without encouraging
running of the red light.
Would an additional 0.5 to 1.0 seconds have a negative effect on moving traffic? I do not think
this small amount of time would adversely'effect travel time on TH 169. We do have serious
concerns extending, the all red beyond the statewide guidelines: Regular c0mmu{ets have a
tendency to notiCe the interval lengths and use to' their advantage. Adding the additional (0.5 to
1.0) seconds to the eXisting 1.5 interval could encourage red light running. A more critical
concern is deviating form the State timing guidelines. For example, ifa driver experiences a 2.0
An equal opportunity employer
to 2.5 second all red on TH 169 in Elk River and then expects this same red time at other similar
intersections where only 1.5 seconds are programmed, this could lead to serious consequences.
Due to these reasons we are very cautious in deviating from state guidelines. We've been
informed that the city has applied for additional enforcement to help police the TH 169 corridor.
We feel this is a positive step to help control the red light running.
This Spring during our biannual signal preventative maintenance review we will again review the
timing and safety issues on TH 169. I will keep you abreast if any changes are made after the
review.
Sincerely,
Thomas L. Dumont
Assistant District Traffic Engineer
CC~
D.L. Raisanen/Kreutzer/Povich
Rick Arnebeck
Gary Diflam
Tom Davidson