Loading...
6.2. SR 04-28-1997ity of iver TO: FROM: DATE: SUBJECT: Item # 6.2. MEMORANDUM Mayor & City Council f~ Pat Klaers, City Admi~]~ator April 28, 1997 Update on Liquor Store Construction Project After the Liquor Store Annual Report is presented I would hke to update the Council on the status of the Liquor Store construction project and its financing. Lori will take the lead and discuss with the Council where the city is at in working with the local banks to fund the construction project. The biggest issue with the construction project since the concrete and masonry bid issue has been resolved is the elevator in the new store. We had to change the elevator from what was in the bid package in order to handle pallets of freight (beer and liquor) in order to more safely and quickly move the stock from storage in the basement to the main floor and vice versa. The elevator as bid met the ADA requirements for the public and staff and was mainly put into the proposal in case the city would ever use the basement for selling products. One of the big issues in changing the elevator to handle freight was also to have the elevator meet the ADA requirements. A different elevator has been authorized and this change has added about $10,000 to the project total and will come out of the construction contingency budget. It should be noted that if the elevator is out of service for any reason, there is also a conveyor in the project which will allow product to be moved from upstairs to downstairs and vice versa. At this point we hope to use the conveyor that is in the existing store and relocate this piece of equipment. We have met to discuss furniture, fixture, and equipment (FF&E) for the new facility and we have decided that the construction manager will be taking the lead on coordinating and securing many of these items. This was not part of the construction manger contract and will be paid as a reimbursable for time spent. The biggest FF&E item is the cooler and having this coordinated with the construction project. We also need assistance in coordinating the installation of security cameras, the card key system for the doors, and signage, among other things. Overall the project is starting off on schedule and no problems of significance has been noted. We have had a series of phone calls from various unions, but nothing of substance has disrupted the project. Footing for the project are scheduled to be installed this week. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425