LIB Memos 02-12-1992?I WATER STREET ERCELSIOR, AIINNESOTA 5$331 FpX 612.414-3928 61?-474-3?91 MEMORANDUM Eos ARCHITECTURE TO: Library Board Members FROM: Zack Johnson DATE: February 12, 1992 Re: Elk River library Eos x91123 The attached draft report addresses the size requirements for the faclllty. As Vern pointed out in his study in 1990, there is a significant lack of space in use butlding. At that ume he had recommended an additional 3,700 square feet were needed. With only some slight modlficauons and projecting a few years ahead, I am recommending you need 4,300 square feet by 1995. Please review this information for discussion at our worksession schechlled for February 18th. We will also want to start some discussion about longer term growth and locations. End of Memo EQUAL OPI'OR7t1NIT1' EMPLOYER POPULATION PROJECTIONS 1991 1992 1993 1994 1995 1996 11,700 12,300 13,000 13,715 14,815 16,000 1997 17,280 1998 17,885 1999 18,510 2000 19,160 2001 19,830 2002 20,525 2003 21,550 Source: City Staff OPPF~( The above projections include only residents within the city limits of Elk River. If we project a continued growth trend at a similar rate, the city's' population in the year 2010 will exceed 30,000. We can expect the surrounding areas to grow at a similar rate which will increase the overall size of the population served by 27%- 33% for a combined total of some 38,500 to 40,300. For the purposes of this report, we have adopted the following conservative estimates of the service area size: 1995 18,000 2000 24,000 2010 36,000 Eos Architecture 1-28-92 CURRENT BUILDING AREA i 1'Tii.i7.A'TION ~: 1. Mechanical & Rest Rooms 2. Work Area & Storage 3. Staff Lounge 4. Community Room 5. Entry & Circulation 6. Circulation Desk 7. General Seating 8. Paperhack Towers 9. Play Area 10. Juvenile Stacks 11. TaUle Seating 12. Adult Stacks 13. Wall Area (®8%) Gross Square Feet $~uare Feet: 311 503 133 607 421 19G 546 75 360 480 400 1,200 458 5,690 Eos Architecture 1-28-92 pRpFT PLANNING CRITERIA A synthesis of the available design standards and the operating philosophies of the library board and staff provided the following range of planning guidelines for determining minimum space requirements for this facility: Size of collection Linear feet of shelving Floor space for shelving Periodicals 1995 = 30,000 volumes 2000 ~ 45,000 volumes 2010 = 50,000 volumes 2,500 linear feet plus 1 foot For every 8 books over 20,000. 1995 = 3,750 lin. ft. 2000 = 5,625 lin. ft. 2010 = 6,250 lin. ft. 2,000 sq. ,ft. plus 1 sq.ft. for every 10 books over 20,000. 1995 = 3,000 sq. ft. 2000 = 4,500 sq. ft. 2010 = 5,000 sy. ft. 1995 = 65-80 titles 2000 = 80-100 titles 2010 = 80-100 titles Reader space minimum of 1,200 sq. ft. for 40 seats plus 4-5 seats per 1,000 over 10,000 of population served at 30 sq. ft. per reader space. Year Seats Sq•Ft. 1995 135 4,000 2000 160 5,000 2010 235 7,000 Staff work space 1,000 sq. ft. plus 150 sq. ft. for each full time staff member over 7. D~p~T Total floor space Expansion space 0.6-0.7 sq. ft. per capita 1995 12,700-14,800 2000 16,400-19,100 2010 25,700-30,000 one-third of shelf space 1995 1,250 2000 1,875 2010 2,080 The following form was developed to provide a brief description of the major elements in each of the areas. For the purposes of this report, we needed only to establish enough information to allow an accurate estimate of the probable construction costs. As [he future design process is started, a detailed review by the appropriate user groups should be undertaken. T1re intent and expectation is that there will be some building efficiency and economy identified through the formal architectural design process. Eos Architecture 2-18-92 pRAFT SPACE ALLOCATION PROGRAM SUMMARY ACTIVITY AREA SQIJ RF FE T RE O MFNT)Fh Rv~ 1995 ~QQQ ~Q Office 150 150 150 Work Room 400 400 500 Staff Coat Closet 15 15 15 Community Room 600 600 600 Staff Lounge 130 130 130 Main Entrance 390 390 390 Mechanical & Equipment 300 300 350 Private Rest Room 43 43 86 Public Rest Rooms 86 86 172 Storage 250 350 450 Janitorial Closet 50 50 50 Main Stacks & Reading 7,000 9,500 12,000 Walls ®6% 565 720 890 Total Area 9,979 12,734 15,783 [n order to meet the recommended standards, the following square footage areas would need to added to the existing facility: 4,289 7,044 10,093 Eos Architecture 2-18-92 ~~~ ~~ CiJRRENT SITE AREA iJTIIJZATION The library cutrendy operates in a building owned by the City of Elk River and located on Proctor Avenue at 4th Street. A review of the zoning ordinance shows the site located in a single family residential neighborhood. Any addition to the building will requke a conditional use permit. Total land area 40,300 sq.ft.(approx.) Front yard building setbacks 30' Side and rear yard setbacks 10' Buildable area ®25% coverage 10,075 sq. ft.(approx.) Parking required ®1/500 sq.ft. 20 Parking available 23 Existing building footprint S.C~'0 sq. ft.(approx) Allowable expansion 4,?" ~ sq. ft.(approxJ land area available for expansion 5,900 sq. h.(approx.) The major growd~ needs of the library are in die main stacks and reading areas. The configuration of the building on the site makes the most economical area for expansion to the souti~west side of the lot. Within the confines of the building and setback limits, the land area available for expansion is approximately 5,900 sq. ft. Tlils amount of expansion should accommodate the library's operational needs until 1998-2000. Expansion beyond this size will require the acquisition of property to the west and/or north. The actual parking required at peak lilxary times can conveniently be met by [he available on-site and adjacent street parking spaces. The [fines of over crowded parking are usually limited to events such as public meetings for the planning commission and city council. Additional parking may Ue secured through an arrangement on [he nearby school property. DRAFT ~~.- ~ Parking Property Lines -~ a~ C v O L V O 4 a 1~ Potential 1`-- Expansion Area ~- ---- Building Set 4th Street