Loading...
3, 4, & 5 SR 05-12-1997CON~ILTING ENGINEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 May 8, 1997 File: 230-220-10 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: EAST ELK RIVER IMPROVEMENTS ITEMS 3. 4. & 5. CIVIL ENGINEERING ENVIRONMENTAL MUNICIPAL ~NNiNC- SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTAIION ELECTRICAL/MECHANICAL ENGINEERING ~VAC POWER DiSTRiBUTION SCADA SYSTEM CONTROLS OFFICES IN: iNNEAPOLIS PRIOR LAKE ST. PAUL WASECA Dear Council Members: As directed by the City Council, we have prepared the East Elk River Planning Document, a copy of which is attached to this letter. This document summarizes the work that has been done over the last two to three years regarding extension of trunk utilities and major transportation corridors in the eastern area of Elk River. As work was being completed on this document and the major transportation corridor alignment concept, staff had an opportunity to discuss these issues with the potential developers of the Wadde Schultz property and the potential developers of the Earl Hohlen property. The developers of the Wadde Schultz property have submitted a petition along with an escrow amount for the preparation of a Phase I Eastern Area Feasibility Study to analyze providing trunk sewer and water to their development. We are also anticipating a petition and escrow amount from the developers of the Earl Hohlen property for the same study. As work was being completed on the road alignment for the realignment of CSAH 13 and the further extension south of County Road 12 to 171st Avenue, Steve Ach and I had an opportunity to review this with Bob Vandenberg. Also, Steve Ach, Steve Rohlf, Pat Klaers, the Mayor, and I had an opportunity to meet and discuss this road alignment with Roger Eull and Dirk Barrett, Paul Ebner, and Carol and George Deschenes, Ruth and LeRoy Brown, and Joe and Yvonne Kirkeide. I believe that, in general terms, the meetings all went very well. Staff and/or the Mayor would be able to comment further on these meetings Monday evening. At Monday evening's meeting, I will be prepared to discuss the Planning Document or answer any questions, and I anticipate going through the road alignment in detail. After a discussion of the issues, there are two actions staff would recommend City Council taking at Monday evening's meeting. The first action would be to approve the concept of the road alignment and authorize preparation of an official map document. By officially mapping the road alignment, we would be going the next step and detailing out the alignment by preparing essentially a plat that describes the alignment. The second action we would recommend would be to accept the petition from the developers, and 230/220-0802. may An Equal Opportunity Employer Honorable Mayor and City Council May 8, 1997 Page Two authorize the preparation of an Eastern Area Phase I Feasibility Study. We would recommend that feasibility study be authorized with two alternatives. The first, a small scale project which would include only Wadde Schultz's and Earl Hohlen's property. The second alternative would be a larger scale project which would include all the area needed to get street and utilities down to 171st Avenue at TH 10. Attached are two draft resolutions for the Council's consideration, which would authorize these two actions. If you have any questions, please call. Sincerely, MSA, CONSULTING ENGINEERS Terry J~rl~Iaurer, P.E. TJM:tw Attachments 230/220-0802.may RESOLUTION 97- A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION APPROVING THE CONCEPT OF THE CSAH 13 REALIGNMENT AND NEW ROAD EXTENSION FROM COUNTY ROAD 12 TO 171ST AVENUE, AND ORDERING THE PREPARATION OF AN OFFICIAL MAP OF THIS ROAD REALIGNMENT CONCEPT WHEREAS, the City has prepared a Draft Transportation Study which recommends the realignment of a portion of CSAH 13 and a new major transportation corridor from County Road 12 to TH 10 at 171st Avenue in the Eastern Area of Elk River; and WHEREAS, the City has reviewed the concept of the CSAH 13 realignment and new road alignment from County Road 12 to 171st Avenue; and WHEREAS, 171st Avenue between TH 10 and the Burlington Northern/Santa Fe Railroad was reconstructed in 1996 to Municipal State Aid standards, anticipating this road alignment; NOW THEREFORE BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The concept for the realignment of CSAH 13 north of County Road 12, and the road alignment from County Road 12 to 171st Avenue is hereby approved. MSA, Consulting Engineers is instructed to prepare an official map of the realignment of CSAH 13 and new road alignment from County Road 12 to 171st Avenue. Passed and adopted this 12th day of May 1997. ATTESTED: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 230/220-0802. may RESOLUTION 97- A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION DECLARING THE ADEQUACY OF THE PETITION FOR IMPROVEMENT AND ORDERING THE PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE EAST ELK RIVER PHASE I IMPROVEMENT OF 1997 WHEREAS the City has received a petition (the Petition) requesting that the City improve certain property by extending trunk sanitary sewer and water and major street construction (the improvements); and the City has reviewed the Petition and identified the owner of the real property abutting the streets named in the Petition and determined the Petition has been duly executed by the owners of not less than 35 % in frontage of the real property abutting on the streets named in the Petition as the location of the improvements; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The Petition is hereby declared to have been signed by the owners of at least 35 % of the frontage of the real property abutting on the streets named in the petition as the location of the improvement. This declaration is made in conformity to Minnesota Statutes, Section 429.035. This Petition is hereby referred to MSA, Consulting Engineers who is instructed to provided to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 12th day of May, 1997. ATTEST: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk 230/306-0202.may