4.5. SR 05-19-1997ity of iver MEMORANDUM Item #4.5. TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, Cit~strator May 19, 1997 Liquor Store Attached for your review is a list of the sixteen bid packages (plus three subcontracts) the City Council awarded which shows which firms are union and which are nonunion. Councilmembers may or may not have received calls from union business agents and representatives indicating their displeasure with the city in that the entire project was not a union project. The Council can expect union representatives to be at this City Council meeting to express their unhappiness with the city. Please note that the bid award recommendation for Package #7 - Windows and Store Front - is to a union firm. Construction Manager Mike Parsons of Greystone has advised me that if the ten contracts that were awarded to nonunion firms were actually awarded to the lowest responsible union firm bid, then the project would have been $43,000 higher. This $43,000 additional cost would have added 5 percent to the liquor store project. The city has always awarded building contracts based on the low responsible bidder without regard to union representation. This was the case with the City Hall, Fire Hall expansion, Library expansion, Ice Arena, and Liquor Store. One item of note is that the Ice Arena project required a prevailing wage clause as the city received state funds for this project. The City Hall project was awarded to Bor Son as the General Contractor and Bor Son is a union firm. The City Hall project was picketed and two gates were established toward the end of the project. Additionally, Shaw, the major contractor in the Ice Arena project was also a union operation. As far as I know, the city has never authorized a construction project to be bid out only to union firms. XXelkriver\sys\shrdoc\council\unionlst.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 B-IS-1997 1=1&PM FROM GREYSTONE CONSTR. 612 &4B &191 P. 1 List of companies - BP # DESCRIPTION 81DDER t Coterie & mason~ 4 Mechanical . 5 Electrical 6 Roofing 8 Ca~pentry & Specialties g Dl~/wall,. framing & EIFS 9sub EIFS 10 Painting l~ &12 Carl~lVCT 14 Landscaping & in'igafion 2 Steel 2 sub Steel erec¢on 3 Sitework 4 eu,b Firm prot~io~ 7 Windows & Stor~fro~ 13 OH doo~& clo~k ecI. 15 Elevator 16 Preca~t concrete Five Start Welding Fab. Inc. Annsteel Deck, Julian M, Johnsof~ 8rother~ Fire Pmte~'tien Gateway AGC In¢ Door Sen4=e o~ St Ck~ Schindler EJevator c°qx~tion Molin Concrete Produc~s Company St Cloud Forrest Lake Zimmerman Buffalo Rice PieFz St Paul Brootdy~ Park Sauk Rapids' Rogers Anoka St Paul St Cloud Minnetonka Line Lakes merit merit merit merit merit medt merit merit merit union union union union union union union Post-it~'Fax Note 7671 Jp g%,, 1 Co~De~. Co, Phone e P~ne ~ ~x ~ Fax ~ 'ity of iver Item #4.5. MEMORANDUM TO: FROM: DATE: Mayor & City Council Pat Klaers, City Admin~trA~tor May 19, 1997 SUBJECT: Liquor Store Bid -Windows and Store Front Attached for your review is some material from Greystone Construction Company regarding the awarding of the rebid of Package #7 - Store Front and Windows - for the Liquor Store. Also attached is a schedule for the project and an updated bid versus budget status report. It should be noted that the bonds for this project that are being issued by the local banks are being revised to reflect this lower bid amount (versus the original budget). The city will be asking the banks to finance approximately $1.25 million. Additionally the city is paying $150,000 for this project with cash on hand. The amount of the bonds is higher than the project bid amount to cover the furniture, fixture, and equipment items (the largest of which is the cooler), soft costs for the architectural and construction manager fees, financial charges, plus miscellaneous fees such as SAC, survey costs, soil testing, etc. Staff concurs with the recommended action as listed in the Greystone Construction memo. Recommended Action It is recommended that the City Council approve a motion awarding the Store Front and Window (Bid Package #7) contract to Gateway AGC, Inc., St. Paul, Minnesota, in the amount of $44,080. s:\council\pkg#7.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 GREYSTOlgE CONSTRUCTION COMPANY_ 1221 East Fourth Avenue, Suite 110, Shakopee, ~ 55379 612 496-2227 445-4191 fax Date: To: From: Re: May I5, 1997 Pat Kla~rs, City of Elk River Mike Parsons, Construction Manager Northbound Liquor Store, Elk River, MN Recommendation -- award of bid package #7 Based on City Council action taken April 7th, the aluminum storefront & window design was revised slightly. The rebid was advertised locally and in Metro area plan services. Rebids were received and publicly opened on May 8th at City Hall. Aluminum storefront & window design revisions With input from City staff, architect Tushie Montgomery and Greystone Construction representatives, the following changes to plans and specifications were incorporated: · Aluminum was revised from a custom color to a standard dark anodized aluminum finish. · Certain clerestory window frame material was revised in width & one horizontal framing member was eliminated at the clerestory end windows. · Automatic entrances -- the number of emergency breakaway sections was reduced, while maintaining the Code required exit quantity. · Automatic entrances -- a list of additional acceptable manufactureres was provided. · Glass -- certain glass was revised from tempered glass to standard glass where allowed by Code. · Glass -- exterior glass was revised from clear glass to timed glass with a low emissivity coating. The glass revision is designed to reduce glare at the checkout counters and improve energy consideration related to Winter heat loss and Summer heat gain. · Window and storefront sizes remain unchanged. Bid results · The original low bid received March 18th for storefront & windows was $62,531. · The budget for storefront & window work is $37,316. · The bids results for the REBID of bid package #7 are attached. The low responsible bidder is Gateway AGC, Inc., with a bid of $44,080. This bid includes the alternate for low-e glass option. The finn has a solid, enduring reputation in the area. The bid is a good price for the work. · The revised bid from Gateway AOC Inc. provides a savings to the City of ($18,451) Reconimended Action It is recommended that the City Council approve a motion awarding the aluminum storefront and window (bid package #7) contract to Gateway AGC Inc. of St Paul, Minnesota. No~tbo~nd Liquors, .-ik River, MN DESCRIPTION BIDDER JM. LB/INUM STOREFRONT I ~NDOtN6 & RELAIED WOR~ 7 "# 7 "# Galeuray Glass Company I~n No~hwestem Glass Co., (bid da~Tcation e~) Hoffer's Inc Empirehouse. Inc Hawnon Contract J BID t I SECUl BASE BID I -RITY I SI Paul $ 42,230 YES Minneapolis $ 51.500 YES Bloominglon $ 54,854 YES Minneapolis $ 56,799 YES Minnea~is $ 69,529 YES ALUMI~ILIM STOREFRO~T I Y~ldl:)(:wvs & RELATED WORK (OI~(~NAL BiO ALUMINUM STOREFRONT I RINO~ & RELATED WORK 7 Empireho~se, Inc Midland Glass Comflany $ $2,531 BUDGET $ 37,316 ALTERNATE #1 LOW-E GLASS IN LIEU OF TINTED GLASS BASE BID & ALTERNATE #1 2,500 1,511 2,317 1,500 $ $ S $ 54.000 56,365 59.116 71,029 j) (18,451) GREYSTONE CONSTRUCTION COMPANY 5/9/97 ~ i BELOW GRADE BLOCK I i ~ i ~ DRAINTILE AND WATERPROOFINGm i ~ ! ~ i ~ i BACKFILL FOUNDATIONm i ~ i BSMT PLMBG~m i ~ ~ i ~ ~ ~ SITE PREP WORK~ ~ i ~ EXTEIOR CONCRETE WORK~ i SET ROOF STEELm~mm ~ ~ ~ ~ R00F CURBS, LMBR,DRNS~ ~ ~ ~ POUR BSMT SLAB~ ~ ~ ~ CLEAR STORY WALL FRAMING~ ~ ~ ~ ~ ~ ~ ~ STEEL STAIRS~PLMBG DRAINS~ ~ ~ RUBBER MEMBRANE R00F~ ~ ~ ~ ~ POUR TOPPING SLAB~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ELEC ~ MECH ROUGH IN '~ ~ DRYWALL · WINDOW5~ ~ ~ ~ ~ ~ ~ ~ ~ ~ INT DOORS ~ ~ ~ ~ ~ ~ ~ MECH ~ ELEC FINISHES ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ REMAINDER ~ ~ ~ RUN D~TE I~FEBq7 LS FLOAT ~--~ ~ DESC Const~ctio~ ~e~ START DATE I~MAR~? A .... ESTONE Greystone Construction Company onTn DRTE 13MnRq~ CRITIC4L FINISH DRTE O~OCTq~ 10:~3AM FROM GREYSTON~ UUN~I~. Ol~ ~= ~,~, CSR CCD-1 CCD-2 BUDGI= ~ STATUS CO # BP $ DESCRflPTION BIDDE;R BASE ~ID SUDGE~ (UNDER) 0 ~ C~e ~d M~ MSC C~e. ~. 211,230 291.000 ~9,7T0) 0 ~ S~I F~e S~ ~ S ~ ~. 79,500 106.~0 (26.500) 0 ' 3 S~o~ Jul~n M. J~ Co~r~ C~. 94.800 79,710 15,090 0 0 0 0 B 0 lO 0 '11 0 0 13 0 14 0 15 0 1 3 P 3 0 o 0 o P I 15 ~ch~n~'el Aneer,on M~..han~, In~. 88,7~9 93,244 (4.495) E~r~l ~e~ f~. I~. 74,971 6Z,000 12.971 Ro~g a & S Sh~t M~I & R~g, ~. 55.782 52,448 3,334 ~ ~n~ · Sz~n~) ~a~ GI~ c~y ~,080 37,316 ~7~ C~nt~ en~ s~t~e ~ ~a~ c~. ~. 31,500 40.725 (9,225) O~, F~i~ ~ ~I~S R ~ ~ 0~,. ~ 49,7g0 58,502 (8,712) pa~g Ski,~ ~e~. I~. 13,27~ 13,500 (~25) ~eI / VCT MuPpie ~{ ~, I~ 9,16Z 13.3~ (4.182) ~ Or~ er~ S ~ny 7,880 4.820 3,060 ~ ~,nd ~ ~. O~ ~ ~ S~. C~ 10.497 13,600 (3,103) L~aec~ ~d Irrig~ He~ La~ 17,500 22.030 (4,530) E~vator S~[~ E~ ~at~ 26.700 28,000 (1,300) ~ecas~ ~e ~li~ Co~ete ~ C~ny 24.545 19,826 4,7~ 9 Pond work in highway eight of way. Bid package fig altern$~e 500 A]~ema~e ea~ t~ ~n ~v~gs (1,800) S~o ~e. e~l ~ 6,000 ~n~ ~* ~.330 ~u~fion~ ~i~ & ~u (5) 1~ Rev~ slze ~ ske te~ ~, 2" to 3" 95 Re~ etev~, from 2~tO 5~, 4'~" ~ tO ~e palWt8 9.650 To~l. 500 (1.800) 6,000 1.330 11,448 95 9,650 $ 936,065 $ (88,881) -7.4% (4) reb~ lot ~enttef co~t savings (5) ~icing ~,'~n~ - Gopher. M$C Bid alt Bid alt Bid aR PR-2 PR-1 PR-1 PR-1 PR-1 PR.1 PR-1 PR-1 SI-4 SI-3 041797 fax 0416~t7 tax P P P - p P P P P P P P P P P P P P P 15 10 I0 ? ~ete ~ ~vel ~ DEDUCT(S1395) ~ete ~ie~a e~e Da~L DEDUCT ($9~) Neon I~ m eeve, ADD ~,~ Water meter s~henge (~de~on Mech) Dock ~veler pit s~e ~a~fica~on Revise from ~t to vel in front of ~ler Elevator power revision Pond s~e ~a~e, do avo~ telephone ~b~ in ROW 16 Bott~ return floor o~ning 2 Site dimension ~a~tion Add stoop ~ s~ir (1.395) (990) 3.300 290 1.120 315 650 405 Page