5.3. SR 12-13-2010
MEMORANDUM
t-tiver
TO: Mayor and City Council
FROM: Phil Hals, Street Superintendent
DATE: December 9, 2010
SUBJECT: SEH Architects -Public Works Site Plan Update
For the past six months, Park Division staff, Street Division staff, and City Council
representative, Matt Westgaard have been meeting with SEH Architects to finalize the site
design for a new public works facility.
SEH representatives will be on hand for Monday's Council work session to recap the
planning process, exhibit the chosen site design, and explain the cost estimates.
2010 Correspondence/12-09-10 MC memo SEH Architects Update
Elk River Public Works Facility Master Planning Study
Project Estimate of Probable Costs
Section Introduction
Building cost is based on the following energy efficient materials/systems:
- Precast wall panels at Garage spaces
- CMU at Office/Maintenance/Shop spaces, interior walls
- EPDM roof over metal deck steel bar joists/columns
- Gas fired roof top mechanical units, ground source heat pumps
Office/Maintenance Areas Square Feet
- 1.0 Wash Bay 1,770
- 2.0 Maintenance 5,000
- 3.0 Shops 2,800
- 4.0 Offices 5,050
14,620SF x
Vehicle Garage Areas Square Feet
- 1.0 Large 37,133
- 2.0 Small 20,595
57,728SF x
New Building Construction Cost
(includes Contractor fees)
$130-$150/SF = $1,900,600 - $2,193,000
$95-$115/SF = $5,484,160 - $6,638,720
$7,384,760 - $8,831,720
Site pricing is based on the following systems:
- Relocating salt storage structure
-Fencing & landscape screening between Material Storage and playfields to the East
- 17,000square yards new pavement (7,SOOsquare yards of existing pavement to remain in place)
Site Development Costs
- 1.0 Civil Lump Sum $705,000
- 2.0 Fuel Island, removal and new above ground tanks, station Lump Sum $175,000
Soft Costs
- 1.0 Legal fees, geotechnical, permits, design fees 7% $578,533 - $679,820
- 2.0 Construction Staking 2% $14,100
Construction Contingency
(amount is typically reduced as project proceeds and additional information 10% $826,476 - $971,172
developed)
Total Estimate of Probable Project Cost $9,683,869 - $11,376,812
(based on RS Means 2010 Data)
Total Square Feet -Scheme A2 72,348 $134 - 157/SF
ELKRI 113859
,~/ 100 North 6th Street 12/06/10
-~-~ Minneapolis, MN 55403
SEH 612.758.6700
Elk River Public Works Facility Master Planning Study
Required Work via Alternate Sources
Section Introduction
Work necessary for a new facility that could be funded by other sources including Surface Water Fund, etc. and
work that could be performed by city crews with city equipment.
Site Utility Work
Lump Sum $147,000
- Storm sewer improvements
- Sewer service extension
- Water service extension
- Site lighting
Site Work performed by City Crews
Lump Sum $33,000
-Final grading
- Topsoil placement
- Seeding
- Landscaping at building
ELKRI113859
100 North 6th Street 12/06/10
~-~ Minneapolis, MN 55403
SEN 612.758.6700
Elk River Public Works Facility Master Planning Study
Alternatives
Section Introduction
Work that the City may choose to include in the project costs.
Relocate Softball Field Costs
(280' Field) Lump Sum $200,000 - $300,000
Softball Field pricing is based on the following systems:
- Fencing at perimeter
- Moderate site grading/soils correction
- Turf outfield, dirt infield
- Home & away covered dugouts benches
- Well/irrigation system
- Does not include site acquisition
- Does not include field lighting
Lighting Ballfield Costs
(Two Fields) Lump Sum $250,000 - $275,000
Lighting pricing is based on the following:
- 50/30 Footcandles
- Concrete bases
- Galvanized steel poles
- Underground electrical feeds
ELKRI113859
~~ 100 North 6th Street 12/06/10
-/-~- Minneapolis, MN 55403
SE}{ 612.758.6700
.. ~~"~
Elk River Public Works
Master Planning Study
~~
SEH
Aerial Photo
•Existing Site Conditions:
•Public Works Building
•Cold Storage
•Salt Storage
•Compost
•Material Storage
•Ball fields
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
~~
SEH
Existing Public Works Garage
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
~~
SEH
" The New Normal "
How Does it Affect Public Works and Parks Department?
"Doing more with Less"
ver
• New equipment purchasing and leasing
• Snow and ice control
• Alternate fuels
• Partnerships in delivering services
• Composting and tree disposal
• Balancing hot, cold and tempered storage
• "Weird" storage
Elk River Public Works and Fleet Maintenance Facility -~
Master Planning Study
Summary of Equipment/Misc Inventory -Streets
Existing Items - 45,000 sq ft -Garage Space
VENICLESfEQUIPMENT REQUIRING PARKING STALLS uoo,e
,we ;rppte 4aa 51D].!0 ~~ ~ Srool]
v ~ 9oC
Sian.
> .~
y >, i ,~'
e
r `- ~ `i<
1,
I
i
~X t ~ . ~
O
/ ``.
4j :~ _
/~$
a ~
~d~
`~
•'~~, ~s,
o
,t^f
~',
~~t~, ~~ Elk River Public Works and Fleet Maintenance Facility - ~
Elk. .':. Master Plannin Study
River g
Summary of Cold Storage Inventory -Streets
Existing Items - 7,800 sq ft -Cold Storage
ver
COLD STORAGE COLD STORAGE-RACK COLD STORAGE-WALL
.,:- ..
--
~,. o. ~~r. . ~::. __~ . .. ... .. ..
~7'~~_ ~ ~ @QT{~ Yttgt! 5it099s ,~f~." FOatt 5?Ua+)
~~.°~ ?'~7 ~ ~~ m OJ C.t huM sv.as ~. 5~5 Sy i1
~~~++" ! /
7:i .~. ... :~+ :s.
rs '~-r' ~ ~ ~--r'
7b 7Ja 7)? 7+0 711
YTS' Y1W07 41600] 5100!' R~t1 4~tt
pWep Om+O P.wp 0.x+0 ~
~}~ 4?Ot7+ 3tD67~ T00?5 ST0076 5'O:P YT00~
90. Ob+' dJCr.Ct G+00W GOpOe ~~'
Y?60.'W O.c..t 4ILCi1t 4+W.+Y $WJS YxA
4t.r` C~aa. 6oar~+ 0qy
9?0071 T:'OW Yf00.t 5?00~] SSOWS
N.w
~y s?Gm! Y'GCS? s~ 1 SC+a4l+
P1p. 10'.0¢
4?0@55 4(005! 5i~. Srx750
90si t3fnuo ~, ML 5'6059
~. °~+0 5*V60
5a-.W
d00/: 5?000 STM.wMS Y+ti6E6
tDN f0. Pt. .0rv.
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
~~
SEH
Summar of Vehicle and Equipment Inventory -Parks
y
Existing Items - 25,000 sq ft -Garage Space
7,800 s9 ft -Cold Storage
COLD STORAGE-RACK COLD STORAGE-WALL COLD STORAGE
>~ . _ ,
~tb~ ~C iV46 vNd' at~i! POi9 N7'7C M~0
Sew 5s~ T5n' ~ $Y ~fip MAO \-F~~ ~®
Pp)i PyT?
lLli 8'~' ~ ~{
VEHICLES/EQUIPMENT REf~UIRING PARKING STALLS
' l
W~!Y
_ i°0...']
N~eeeiiL ~
~' RV9 oOSJ ap?t M11:
.Aar f4q~ Yo. Yw Traaa
~,
rp~~ ;-A•
•` ~
~~ f~ ~~
Fu i
1 ~~ y~ ~, ~~ t ~. .,, M,
1 Y
I
~~t>~ ~~ Elk River Public Works and Fleet Maintenance Facility
Elk. ~ Master Planning Study
River
~~
SEH
Scheme A.3 Floor Plan
S
s, _~.~ ` -
{
?~.. ~~_
t
7~ ~~.~.
~_L_ _
i 1
1:=._0.
I
R,~,ma~ - ~
1611! pr 6' j
1 \ I
I \\\ I
\~\ I ~
1 \ I
~- `
- sMiu:~ vEHide
GARAGE
~_.. i
r
~ r-,~ _...
i , -
t ~ i
` 1
_
._ 1
4
FUTURE E7CPA45gN 1
1 I
r
i 1
-----------------------~
I
L .......... ....................... J
c _ ~__ ~: r
a~-c• +a'- '-c•
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
j san o~•f a'
SEH
Site Plan -Turning Movements
x
.~ll~~~~
_~
~~t~r ~f Elk River Public Works and Fleet Maintenance Facility ~-
Elk = Master Planning Study
River
Criteria for Evaluating the
Site Design Options
• Energy City
•Circulation
• vi s ib i 1 ity/Screening
•Future Expansion
•Adj acencies
•Reuse/Repurpose existing
Structures/Infrastructure
•Wetlands
•Noise
•Dust
•Access
GG ~
What was cons lde~ed .
What worked?
. »
What limitations did wend?
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
Scheme A
~J Fuel ~t sr ~ ~ e (,. ~ ~'
SCar'om~stpr Pgruf - INao-nt n< ~ ~ 4 ~:,~ ,. r ,~„`,rif ~ ~"
{, '~1g..
I1.•~rFt
Srfe~?r~
~rormwater
• C:eµl.
P rKf
~~ nFh~e
~ • ~~
fi.. «yb .. F~c Rtver Public
BallFteM ~° . SchoollNstrKt
Parking .. t~.,q®~-, „'a &
l x. y r
~\ , ..
. 34 zy'
'~~ E&Rrvpr Publt ~,.f
$ .r s~n~l oiunce
...~.
'~ ~~
' ~~~
•Minimize site footprint
•Reuse existing public works
building and cold storage
•Convert to liquid salt
system -housed within
existing P.W. building
•Preserve ball fields
•New site circulation
roadway
*Subsequent investigation
identified surveyed wetland and
city property lines
city 01 Elk River Public Works and Fleet Maintenance Facility
Elk -~-~ Master Planning Study
River
SEH
Scheme B
~~ T~~
~.
~Iland
. ~ .
_~
... ~ €
. r `_ E~kRtver ~4. ~
~ a t Public Utifiti4x Subctatiar 9v,
_- Card Stora94 ~ 4
~,~ii ~ <
We[Mind Fnr#~~ a
l nqr,
t»
Stmmrvatr r f'and
~r,~r~ ~: Eugl ~tbt~~ ~_
i)~hrnrnp tE
Q
~ * '- Ma nlenanCe
Y, ~ i K .. Salt
'~. Eta' ^ ~ ~ ~ . ~,. 5[!ormwaler
Pond
.~ ~,
`1
1,:
', ~ Corr1~7051Mtg ~ w;M ,. .. S'
~ Area
\ ..............t.,
S 'E"
\ Ballfield ~~m
Parking o„
~*`
^
. , g~~,
sin 9. i,.. ~ \ ~ ~.
--~~~~
~'.
4'1er iar i
Elk River Public
5[twnl 6istrK[
~~,
•• t` ...
~ , - ~:: .!
II
~ E& River Gubl c
E
_ _ School Oirtrxt
I
,~. _ t~
~•
-~
..
•Minimize site footprint
•Reuse existing cold storage
and salt storage structures
•Preserve ball fields
•Reuse site circulation
roadway
* Subsequent investigation
identified surveyed wetland and
city property lines
~,t~; ~f Elk River Public Works and Fleet Maintenance Facility -~-
Elk. ~ Master Planning Study
River
Scheme C
t ~d7
.y ,409
, G
E>k RBVer °g
Pu#tbC t1tAiLMS 3ubsiat~s 90,
. a 1..
7
...
~i
Shetland ._... _-- . __......_ _ _-
cad sto.age w
~
~ ~
~ ~.
lMetBnnd ' narws `
OtYtte'
St[sanwatet Pone9 4':.. ,S.
~
Salt
ltcttrrlm.,r5t
....
1
..
'~ ti
1`
y an ~~. ..
Fuel Sfatinn~.t..,®~°~' Stotmwatet
`4 / Pond
~''~. CanlsostKry
` Area
.
- -..... ....... 't
°"'r~..
g'~ai.. 4Yedand
Bag Field
Flk River Public
, Pnrkin9 c~e..~r n~...vr
~~ _. __
~.~,~
~.~.
~~.'~ ~,
.t~ver
•Minimize site footprint
•Reuse existing cold storage
v and salt storage structures
•Preserve ball fields
•New site circulation
roadway
' ~a•t
w #:_~,~
. ~.:
~-
r•u
.
Elk River PuWc r
~
School Oiunct
P
i
,~. _
~r
* Subsequent investigation
identified surveyed wetland and
city property lines
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
i
SEH
Scheme D
.
`
~~ ~
r
~
~~40ga
:::::• .:::: .... ~ o`
r
f k River °g
Pub c Utilities Su6siat,on 90,
~ '-
VJeSlana 4
. Poky kh'Be=ur»~nt t
~ '~
-
t
:~ WetlarYJ u.
Card StoeAgp rs
Stormwater Pn,ui
tE\~ ~,~~ ,,..
. ~ ~
~,
~., ~ Composting
~ Area
~_ Fuel
~ \
~,It
Vey`
~.
~.;
Y ,.
~~
..,._~
~ ..~ ~.
Stormwater
Po+W
.~'ry
y.,:t
~ .
~
~, ~ Elk River Public
S[1wol lNatrkt
`BaUF~td ''
P
..«. ,
v
t
Eik River Pubk
t stb~t Dirtnrt y
,~ ~, _
„~, .
"~
:;
•Expand site footprint
•Reuse existing public works
v building, cold storage and
salt storage structures
•Replace ball field parking
•New site circulation
roadway
* Subsequent investigation
identified surveyed wetland and
city property lines
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
SEH
Scheme E
••"•n • •' MaintenaMe ~ ~ 1' ~
Sdre. is .
Stormwaaer Porut ~. GA'•Parl tr=nE `. ~ •5.
.~ r,
~+
Sah ~ Park+
kr~,r
.... ¢ ti
,~.
'
~ ironnwarer '
.~e Pond
~,'-
CumWsteu~ tuei5taaon._
,~ 8
t a ~'
•r`
»
.,
9`
ii". Area
4' -
' VY2Siditd
Bat Field '~~; Elk River PuWK
Padcirg SCtwol (3+s1rKt
~ -
,~~~ ~ ~
~~ ~~! t
~F
cc n
C
d
a
.~'. >
' ~ `~
`
- ~ ~.~; 4 ENc River Publc
t~ Scholl f~istnct
~
-~ _
'~'~ ~ - • 1 ~ ~
~~~~~
., °~,
. '•~
•Expand site footprint
•Reuse cold storage and salt
storage structures
•Preserve ball fields
•New site circulation
roadway
* Subsequent investigation
identified surveyed wetland and
city property lines
c~t~~ of Elk River Public Works and Fleet Maintenance Facility
Elk = Master Planning Study
River
i
SEH
Scheme F
_ . ~ B uGJ~ng
t
' w
~ ~ e;~.
W'etlancf
ERkI$lPfA9" -
VJ,iS^1~,') ~`~'."tt,
, 9 "
~ ~
SBOe~anvaler Pw~d -. ~~ Ft1E751 5Igr1 -,
111
5a,t
,. ~ ..>~
~ .
alb-
ikpt
.~ ...~ ..
.,...
e....,~.:...
..
.....
w -~
~ Scarmwatet
POM
Ei
}
~UIItFKI5tiv 4l ~ w
~~ Mea Maintenance
' - tMue
.
~
~" Par
k'
F
~.
. ~' [klft ~ Elk River Putalu
-"=Y ~rtla~, ~ School pltitrKt
Hall held ~+
Parking
~>~"N°
'
' ~ EHe Rives Pubic ,
~~
. ~
~ School Oistnct
®
+~ .
~.~
•Expand site footprint
•Reuse existing public works
building, cold storage and
salt storage structures
•Replace ball field parking
•New site circulation
roadways
* SubseQuent investigation
identified surveyed wetland and
city property lines
t'; of Elk River Public Works and Fleet Maintenance Facility - -~~-
Elk -~-~ Master Plannin Stud
River ~ g y
..
d
~~~
~~
t~`rlMnnd ..
!`_=
ver
Scheme G
..
~g~ g
.~ -
Ett<~ve~ a ~ g
Vu6fl[Utdit~es Sutxlat+an i ..,.......__;
.._
`t
5 ... ~..
w errpa„~„~
- ' ~ti~~
~y
,,
•Expand yard and material
storage areas
•Separate Parks and Streets
Departments
•Reuse/add onto existing
public works building
•Relocate salt storage
•Reuse cold storage structure
•Replace ball field parking
•Reuse existing site
circulation roadways
•Separate public -compost
traffic -from public works
traffic
•Add north access road
Elk River Public Works and Fleet Maintenance Facility -~
Master Planning Study
Scheme H
$,~.
Wc~ltnd
•Expand yard and material
storage areas
3
g
elk w~
~~~==~==M= s~nxta=~~~ %~ ~ ~ •Separate Parks and Streets
s, ~
S ;~ Y f'^ )SOII11WdItY
"fi ~ ~ ,. Pond
~,
~ue,l
`:, .rArea -:
~: ~ ~_
Mal4dals VYettand
~, Storage Area S 1 Flk River Public
~~,.,, ~ ~t School District
' Statagr : i.
Departments
•Reuse/add onto existing
public works building
•Relocate salt storage
•Reuse cold storage structure
•Replace ball field parking
•Reuse existing site
circulation roadways
•Separate public -compost
traffic -from public works
traffi c
•Add north access road
fi
car, of Elk River Public Works and Fleet Maintenance Facility
Elk Master Planning Study
River
i
~j~]
Scheme I
o
~,
1 ~ ~
~ Elk River A? p
.pa Publc UttGties Substatwrr i - -_ - w
v
.~_ ~
' ~ EIk BWe~ Public '
~ P __ 1
_, ~-?
..
t
_ A*- ~ ;
} ~... `srs~~. 3
~
~
~
-+ ~
r 1
® r
®.~..'
ver
•Expand yard area
•Separate Parks and Streets
Departments
•Reuse/add onto existing
public works building
•Reuse cold storage and salt
storage structures
•Reuse existing site
circulation roadways
•Separate public -compost
traffic -from public works
traffic
•Add south access road
Elk River Public Works and Fleet Maintenance Facility
Master Planning Study
Scheme J
•Expand yard area
•New building tight to
railroad tracks
•Reuse existing public works
building and salt storage
structures
•Reuse existing site
circulation roadway
•Separate public -compost
traffic -from public works
traffic
•Add north access road
J
ar; of Elk River Public Works and Fleet Maintenance Facility -~-
Elk. ~, Master Planning Study
River
Scheme K
~ ~Te g
Elk R- er
~~9 Ih,bf~clui~•~,s SuhSt.mon ,~6 ._..
`~ ~
v,"tl n,d
~,~ .+ _#
l V~ f
•Expand yard and material
storage areas
•Reuse existing public works
building
•Relocate salt storage
structure
t~
. ,~*~
~~,,i ~: y
\ z8. Gil{! -..
i.. P
5ncrts ' ~ ~ ^y .'_.._. Gste crony
~.
nrK*utmem
j .. .. .. WeKiand
' ~ Matenais ',, ,. '~~
Sl -
"
~ '`. Elk Rive/ Pablic
.._ .
.
-
:
_ School EnsTneT
`
~
(
~al[ltpcl
4G ~
~~ .
~~ .
~
-.r..~
I ~ ~ ~~~_,_
I
~~ + .
-.,~
,~ ~ ... ~ _.
,
j y1
1
i ~~.~ .I.
Elk River PublK y
{
I .. ~
y.. _ School UISS/KT I ' ' ,
+
4
`
_~ ~
,...
, w
r +
_ _......:.. t ... ~__~ L7 I
..{
1' I x
•Reuse existing site
circulation roadway
•Separate public -compost
traffic -from public works
traffic
•Add north access road
I /
~~t; of Elk River Public Works and Fleet Maintenance Facility ~
Elk -~-1 Master Planning Study
River
~_ b
w~v~rr~ _~
G~, ,
giver
Scheme H.2
•Compact yard area. Expand
material storage area
•Reuse existing public works
J
building and salt storage
structure
•Relocate cold storage
•Reuse existing site
circulation roadways
•Separate public -compost
traffic -from public works
traffic
•Add north access road
Elk River Public Works and Fleet Maintenance Facility -~
Master Planning Study
Selected Master Plan -Scheme A.3
~~
°~~
A~~
r ~.
,~
<<
~ _ ' ,
..~
ver
~~~~~~
:
....
~
~. Elk River
}9 P'ubhc Uulrires subslatan
\_ G+na '~'~~'~
V
'~ ~ MaterW Storage.
.~.a~lWWux.aacres
~.
` ti
~,
,~
~:. ~~
~',~~
...
.~ ~`~ a~~
- +4"*,.... Gate
t ~ ~~ru
pica Salt 5lwage .)'
~ ~~t
~g
,~
9d
Stwmwater
Pond
Elk River PuWti
Sch<wl t)IS[fK[
o ''~ ~.
_
Elk River PuNk
School DiSttKL
.
y..;n ._
).~y a#
_.. } ~.
'~
'~ .
.~
•Separate yard areas
•Expand material storage
yard
•Reuse public works and
cold storage structure
•Relocate existing site
circulation roadway
•Separate public -compost
traffic -from public works
traffic
•Good visibility for office
•Maintenance bays protected
from prevailing winds
•Good solar access
•Clear site circulation
preferred counter-clockwise
Elk River Public Works and Fleet Maintenance Facility -~
Master Planning Study
~~ ~..
Selected Master Plan -Scheme A.3
-i i
9~~
,~
,ra
~"
~ ~ '!
c ~. ~~T 7~~~ ~~
~.,
?" ear a,ve. g'~
"~= Pubkc Unl+ms Svbstatron 9Q,
...... _ _ .. ..~~.. i~r _ ;.~
~.,.. .
Large 37,133
Small 20,595
Maintenance/Shops 9,570
Offices 5,050
Elk River Publk
School DuvKt
Existing sq ft
ver
#. ..
~~.
Elk Rwer Publk
School [a.stria a
Total projected project cost:
g
y
6
$9,683,869 - $11.,376,812
New Building sq ft
Cold Storage 7,800
Temperate storage 17,000
(garage area)
Salt storage 8,000
Elk River Public Works and Fleet Maintenance Facility --~~
Master Planning Study
Strxmwater
Pond
. W~