6.1. SR 05-19-1997ITEM 6.1. ,_.,y of MEMORANDUM TO: MAYOR AND CITY COUNCIL River FROM: STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR DATE: SUBJECT: CONDITIONAL USE PERMIT REQUEST FOR MINERAL EXCAVATION BY BAUERLY BROS. CU 97-2 OVERVIEW Bauerly Bros., Inc. are requesting a conditional use permit to excavate gravel from an approximately 151 acre site. The location of the property in question is east of Highway 169 and south of 225th Avenue. A vicinity map is attached. Bauerly Bros. are slightly different than most gravel miners in the fact that they mine to produce product only for their own use; to be used in their road construction business. The pit proposed will be active only when Bauerly Bros. have a road construction job in the vicinity. They estimate the pit will be active for twenty years. The land affected by this request was included in the city's recent Environmental Impact Statement (EIS) on mineral excavation. The land included in the study was rezoned to ME/Mineral Excavation Overlay District to put adjacent property owners on notice of the intent to mine these properties. Therefore, the property in question is already zoned correctly (ME) to allow gravel mining. The subject property is close to the shoreland district for a pond attached to Trott Brook, which lies to the east. However, no property included in this shoreland district is proposed to be effected by the mining. A check of the Biological Survey for Sherburne County does not show any rare or endangered plant species or habitats. Further, the EIS did not identify any threatened wildlife species on this property. Attached is a draft conditional use permit for this request. This conditional use permit contains standard language included in all permits for mineral excavation. In Section 3, titled "Conditions", paragraphs 9 through 21 contain conditions particular to this proposal. f.'\shrdoc\b &z\stever\baurcup.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441'-7425 ATTACHMENTS · Vicinity map · Site plan · Cover letter from Bauerly Bros., dated January 21, 1997 · Letter from adjacent property owner, Jeff Lawson, dated April 7, 1997 · Letter from Bart Engineering regarding wetlands, with attached aerial photo, dated April 7, 1997 · Memo from the City Engineer, dated April 16, 1997 · Draft conditional use permit NEIGHBORHOOD CONCERNS City staff facilitated a meeting between Bauerly Bros. and the neighbors adjoining the proposed pit on March 5, 1997. The neighbors had the typical concerns with dust, noise, etc. The conditions proposed by staff to address these concerns seemed agreeable to those at this meeting. The neighbors where also in agreement to allow Bauerly Bros. a chance to see if they could crush gravel 24 hours a day and not be an intrusion to the neighborhood. Bauerly Bros. had a further meeting with Jeff Lawson, who is the closest neighbor to the proposed haul road. This haul road is proposed to be in the location indicated on the attached site plan for the life of the pit. A letter from Mr. Lawson is attached. Staff received additional comments from a neighboring resident who was not at the staff facilitated meeting. This resident was not against mining on this property, but strongly recommended that berms be placed adjacent to 225th Avenue and that this road be blacktopped by Bauerly Bros. to hold dust down and for safety sake. Staff also asked the city engineer to review the safety issue on 225th Avenue, his memo on this subject is attached. GROUND WATER In the mineral excavation EIS ground water levels under this site have been estimated between 943 feet and 945 feet above mean sea level. Bauerly Bros. are proposing to mine to an elevation of 947. Mining can take place below ground water, but concerns for protecting it increase. Staff is recommending Bauerly Bros. are a minimum of three feet above ground water with their mining operation. f.'\shrdoc\b &z\stever\baurcup.doc With this as a condition ground water monitoring is probably not necessary unless some problem arises. Bauerly Bros. are not proposing a wash operation at this site. Further, a spill can be detected and cleaned up prior to affecting the ground water. Major equipment repair is not proposed on this site. Bauerly Bros. will be required to submit a thorough spill prevention and control plan. WETLANDS Five wetlands have been identified on the site (see attached site plan and report by Barr engineering). Bauerly Bros. have decided to avoid impacting these wetlands by keeping mining activities a minimum of 100 feet away. Additional wetland protective measures are listed in the draft conditional use permit. DUST Because of the crushing proposed with this operation, an air emission permit from the Minnesota Pollution Control Agency (MPCA) is required. In addition, staff is recommending that water is used to hold dust down. Bauerly Bros. have stated that they prefer to use Calcium Chloride, which can be more effective, but it is a salt. Staff is concerned with the effects of calcium chloride on wetlands. Another dust issue is debris that will be left on Highway 169 from the additional truck traffic. Bauerly Bros. have a street sweeper and will clean this intersection as needed. 225TH AVENUE There is a hill on 225tl~ Avenue between Highway 169 and the proposed entrance to Bauerly's pit that does not allow for adequate site lines. Further, a fiat landing on this road prior to Highway 169 is needed to safely handle heavy truck traffic. At a minimum, to address these safety issues and to help hold dust down staff is recommending that 225th Avenue from a point east of Bauerly's pit access to Highway 169 is re-graded and blacktopped. Since Bauerly Bros.' proposal is the major reason causing the need for these improvements, staff is further recommending they are responsible for the materials and labor for installing class-V and blacktop. Shiely company was required in a similar situation to build a turn lane on County road #33. The Planning Commission felt strongly enough that these improvements to 225tl~ Avenue are necessary to ensure this operation is safe that they recommended Bauerly Bros. do not receive a gravel license in 1999, if the improvements listed are not accomplished. f:\shrdoc\b&z\stever\baurcup.doc Staff does not feel it is reasonable to require Bauerly Bros. to do this entire project, so we are not recommending they be responsible for the grading needed to get the road in shape. Grading this portion of 225th will be somewhat less than $10,000. Further, it will be hard to justify assessments to other property owners adjacent to this road since they are not causing the need for the improvements and have large frontages. Staff is recommending the grading portion of this project is taken from the Street Reserves or Overlay Fund. Another option for funding the city's portion of this project is landfill surcharge. State Statute 115A.921, Subd. 1. directs that $.25 out of every $1.00 the city collects in surcharge be used only for "purposes of landfill abatement or for purposes of mitigating and compensating for the local risks, costs, and other adverse affects of facilities". It may be possible that this portion of landfill surcharge could be used to compensate the property owners on 225th Avenue, who are the first ones down wind from the landfill, for the dust and litter they contend with from that operation. The compensation would be in the form of an upgrade of 225th Avenue without an assessment. Hard-surfacing 225th Avenue would also help mitigate the negative effect of dust from the landfill by eliminating dust caused by traffic on this road. City Attorney, Kevin Johnson, is reviewing whether or not this is a legitimate use of this fund. The abatement/mitigating/compensating portion of the landfill surcharge the city collects is quite sizable with limited uses the city can put it to. If the attorney deems upgrading 225th Avenue is an appropriate use of this money, staff is recommending all of 225th Avenue within the city limits is blacktopped without assessing the adjacent property owners. Bauerly Bros. would still be responsible for the costs previously outlined. If the council is in agreement with doing part or all of this road, they need to direct the engineer to prepare the necessary plans and solicit bids. TREE PLANTING AND OAK WILT A portion of the affected property is wooded. Bauerly Bros. are proposing that farming be the end use of this property after reclamation with trees replaced on the perimeter of the property. The wooded areas that will be disturbed by this proposal are made up largely of oaks. Therefore, oak wilt is of concern. The draft conditional use permit contains stipulations to deal with oak wilt. f:\shrdoc\b&z\stever\baurcup.doc CRUSHING 24 HRS. A DAY FOR 25 DAYS Their is a proposed crushing operation associated with this request. As previously stated this will require an MPCA Air Emission permit. Bauerly Bros. are proposing to reduce the number of days per year that they crush gravel by doing it 24 hours per day verses the normal 12 hour day that is allowed. The neighbors surrounding the site indicated to city staff that they are open to the 24 hour a day crushing with some reservations, noise being the primary one. A precedent for 24 hour a day crushing has been established at another Bauery pit in Elk River. In this other pit the adjacent neighbors were willing to live with the extended hours to limit the number of days crushing took place. Staff is recommending that Bauerly Bros. are allowed to crush gravel 24 hours a day for a maximum of 25 days a year. If Bauerly Bros. can not run theft crushing operation in a way that is compatible with surrounding properties, this issue will be brought back to the Planning Commission and City Council as a public hearing to review if these extended hours shall be revoked. BERMING The site is somewhat screened from Highway 169. The other potential area of screening that was discussed at the neighborhood meeting was in the northeast corner of the site adjacent to 225th Avenue. It was undetermined whether or not screening would be effective in this location because the topography drops off sharply toward the area to be mined. Bauerly Bros. are meeting with the residents in this location and staff will update the Council at your meeting. An area of potential berming that came up after the meeting with the adjoining neighbors is along 225th. Staff recommends berms in this location. FUELING/REPAIR Bauerly Bros. will have a generator at this site, but it is contained along with its fuel source in a semi-trailer. Further, fueling of vehicles will be from tankers so no permanent on-site storage of fuels is anticipated. No repair of equipment is proposed on site unless it is extremely minor. Bauerly Bros. will remove equipment that is in need of repair to their shop facility in Sauk Rapids. f.'\shrdoc\b&z\stever\baurcup.doc RECLAMATION FARMING The final contours shown on Bauerly Bros.' site plan are consistent with those proposed in the city's mineral excavation EIS. Bauerly Bros.' end use, farming, is consistent with the city's comprehensive plan, which indicates agricultural uses on this property. Bauerly Bros. are proposing a series of ten acre phases. Staff is recommending each previous phase is reclaimed prior to commencing on the next, with some exceptions for areas containing haul roads and storage. The draft conditional use permit has a number of conditions placed regarding reclamation. The Council may wish to add language regarding tree planting. RECOMMENDATION The Planning Commission is recommending approval of Bauerly Bros. request to mine gravel on the referenced property under the stipulations addressed in the conditional use permit. f:\shrdoc\b&z\stever\baurcup.doc City of 13065 Orono Parkway · P.O. Box 490 Elk River, MN 55330 LOCATION MAP CASE' cu 97-2 N January 21, 1997 Bauerly Bros., Companies Quality Asphalt Paving Mr. Steve Rohlf Zoning Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Conditional Use Permit Application Ernest and Doris Toth Property Dear Steve, As per the requirements of the City of Elk River ordinance, the following information is being provided as part of our request for a conditional use permit. Bauerly Bros., Inc., is requesting a conditional use permit for the operation of an aggregate processing operation (the miner) on the property of Ernest and Doris Toth (the property owner). Ernest and Doris Toth's property is located in the established mining district within the City of Elk River. Specifically, the property east of TH 169 in the extreme NE corner of the district. The complete legal description is as follows: S: 3 T: 33 R: 26 PID #75-103-4201 91.19 acres W 1/2 SE ¼ andW 1/2 SE ¼ SE 1/4 PID #75-103-4202 20 acres E V2 SE ¼ SE ¼ PID #75-102-3401 40 acres W 1/= S 1/2 SW 1//4 151.19 Total Acres The purpose of the proposed extraction is for the mining, processing and storing of aggregate materials for use on state, county, township and other local road construction projects. We estimate the time to mine this gravel 4 78 7 Ntt',),'. Z3 N.E. · Sauk Rapids. i~[~¥ 56,3 79-9(590 612-251-9472 o Fa.¥ 612-251-0011 Ail Equal Opportunity Employc~ area to be approximately twenty years, with the final acreage restored within one year following the final year of processing. Mining and restoration will take place in 10 acre increments (phase 1 is slightly over 10 acres and phase 2 is slightly under). After the first 10 acres have been mined, we will begin processing on the adjacent 10 acres while restoring the previous acreage mined (as indicated on contour map). Our crushing operation will move across the property as staging occurs. The crushing will be accomplished with a portable crusher that will operate approximately 20 to 35 working days per year. This could vary by the amount of work in the area and is an average over the next five (5) years. Please refer to the attached diagram for the layout of our aggregate processing equipment. We are further requesting permission to operate our mining process 24 hours a day. Minimal maintenance will be done on site. There are no buildings, lighting or easements existing or proposed. There will be little to no runoff from the operations of the aggregate processing. Included in this packet is a copy of our NPDES permit for the regulation of storm water. If necessary, surface water is managed using detention basins along with berms and silt fencing to capture sediment prior to discharge from the property. Because our intentions are to prevent runoff as described by our NPDES permit, we did not research the estimated runoff of the area based on 10 and 100 year storm events. We will not be using water to process any of the mined material, therefore there will be no disposal or re-use of any water. The water table is estimated at 943' to 945'. A well does exist on parcel #75-103-4201 (#500316). A map delineating wetlands has been included. Bauerly Bros., Inc. will not operate within 100 feet of the indicated wetland areas. This distance should aid in our efforts to avoid creating "peaks" around the wetlands and protecting the integrity of the wetlands. Dust will be controlled by watering of haul roads and transfer areas. Stockpiles will be strategically placed around the crushing operations to help reduce the transfer of noise. Our intentions will be to build a berm along the west end of the north property line (225th Street) in an effort to screen the site. However, this will not be accomplished until we are actually mining in phase 2 where the berms will physically be. Safety fencing will be placed in areas where slopes exceed 1:1.5. Warning signs will also be placed near these perimeters. There will be no use of explosives. We will be mining to an overall depth no less than approximately 950 to 947'. The current use of this property and the adjacent land is agricultural. The Minnesota County Biological Survey from the DNR references no natural community or rare species on the subject property. There appears to be less than 3" of topsoil on site. Our operations will result in truck traffic of approximately 6 to 8 trucks on average. Our drivers are paid by the hour and not by the load. We strictly enforce safety rules and traffic laws with our drivers. For sanitary purposes, a portable satellite will be provided at the site and services a minimum of once each week. No trees will be removed between April 1 5 and July 1 5th of any year during operations. No tree stumps or limbs will be left exposed after clearing processes are complete. Trees along the property lines will not be removed. This will serve as a buffer zone between the site and adjacent property owners. In phase 1, approximately 10 trees will need to be removed along the fringe of the field. No further removal will be done so that the existing barrier may remain between the crushing operation and Jeff and Theresa Lawson's property. Restoration of the site will included; · Final slopes will be a maximum of 4: 1. · Topsoil will be stockpiled and restored to the site equivalent to the existing amount for the purpose of re-establishing vegetation for the current use, which is farming. · Slopes to water bodies will be no more than 4:1. · The entire site will be reestablished with vegetation by planting seeds and legumes native to the area. · Any trees that must be removed along property lines will be replaced with seedlings. Proposed elevations for restoration purposes are indicated by the dark broken line on the contour map. Thank you for your consideration of this permit. Sincerely, Laurie Seifert-Kissner Environmental Specialist Bauerly Bros., Inc. April 7, 1997 Dear Bauerly Bros., City of Elk River Planning/Zoning Comm/ssion, and Steve Rohlf,, As a result of our initial meeting, I would like to address several issues and get them resolved before April 22. I think it behooves all sides to get these issues behind us to provide a smooth CO-EXISTENCE in the coming years. I will be referring to some of the suggestions by the ZONING administrator at the first meeting. As a result of phases 1 & 2, my residence and family will be subject to much of the brunt of this operation, initially, so ifthe first phase can be implemented with satisfaction, it will provide a guideline for the rest of the phases. ~SSU~S; SCHOOL BUS TRAFFIC: Presently there are (2) buses in the morning 6:40 am & 8:05 am. There are also two (2) drop offs after 2 p.m. Additionally, this summer there will be a 9:00am. &12:00 BUS for Pre-School pick-up/drop off. Day Care traffic must also be considered at early morning hours and ~ evening rush hour. After the tragedy in MONTICELLO, it is imperative that SIGNS be posted for MAX. SPEED LIMIT and any other PREVENTATIVE measures be implemented. The ROAD ENTRANCE that is prescmtly planned DOES PRO _VIDE ADEQUATE VISIBILITY in both directions. One sign should be posted at the top of the hill, up from the Kregers driveway entrance, ~o warn in-bound traffic. Visibilit~ will be adversely affected by the dust; so if the road is not asphalted, then the water truck MUST BE USED frequently. TRUCKS CANNOT BE ALLOWED TO TURN RIGHT FROM THE GRAVEL PIT TO EXIT. The pit entrance to highway 169 should be the only allowed route. If there are nor provisions for this, then all bets are off'. · PRESEN'll,Y, GRAVEL TRUCKS ARE TKAVELING AT EXCESS SPEg. lbS TO AND FROM PITS IN LIVONIA TOWNS~rrv~ ON THIS SAME ROAD. THEy HAVE NOT TAKEN ANY .RESPONSIBILITY TO WATER THE ROAD_QBEY __THE SPEED LIMIT, OR EXIT THE OTHt~_D_IRECTION (WITHIN LIVONIA_ .TOWNSI-flP). _.WHICH IS A SHORTER DISTANCE. I will personally work with Steve Rohlf, to correct this situation. _L~_al in_'nmOions are an option for the residents on this road that have small children, and DAY CARE facilities. My expectations are that the City of EI.K RIVER will be PRO-ACTIVE and address it expeditiously with LIVONIA TOWNSHIP and the gravel mining co~. · KOAD ACCESS to the "PIT": Road needs to be paved. If not, then mandatory watering should be required at routine intervals. Turn lanes should be required. Access to the farm will go on for years, so I don't see this as an unreasonable request; as suggested by Steve Rohff. £/3 '~ 9983 '°N 9¥& ¥~]~ ~6~:3I £66I 'tI'~d¥ HOURS OF OPERATION: Per Steve Rob. if: There is no god given fight to work 12 hours. Ne4ghborhood poople would prefer the same hours a~ we work: ? am -5 pm Monday thru Friday. Saturdays should be few and far betw~-n with prior approval required. City ordinance needs to be revised fi.om 7 -7 p.m. to 7am - 5 lXa Residents that pay taxes to the city, county and state should be able to enjoy any time offthat they can get, without having to endure additional disruption with out any economical benefit. · CRUSHER. hours of operation and location: TBD. Summers are short enough. Location will depend on noise, vibration and aestetics. RECLAMATION PLAN in PLACE w/FUNDING: FINAL approval must meet EIS GUIDF~INES. Use of land (zoning) ~er reclamation? We have been told that the City of Elk River, will hold a bond, until reclamation is finished w/each phase. Koad path to rest of farm on subsequent phases: Even after initial phases are complete, this mad will stay in place; therefore, location is critical, due to dust, noise, drainage, aestetics, and vibration. Consulting w/Dave Bauerly, he bas committed to working with us on this, and any issues that may arise. This may include black-top or romine watering. SET-BACKS: h is felt that 50 feet is not sufficient, espedally with Arabian horses grazing on this side of the fence. Fifty (50) yards should be minimum set-back to this back line. The Valley delXh will not provide additional mining opportunities. Atter fi~rther revi~v of phases 1 & 2 boundaries, w/Dave Bauerly, this should not be an issue with my property. There is not alot of opportunity between the road location and adjacent property ~ location to mine the valley and be able to retain a 4:1 dope requirement. NOISE: Clauses are provided to correct problems that may arise daring the operation. Ai~er discussion w/Dave Bauerly, it has been emphasized to keep ALL NATURAL BERMS in place (Wooded ridges) that will provide NATUKAL SCREENING for NOISE and DUST. Clauses should be added ~o REQUII~E common s~nse use of Natural barder~ for prevention of noise, dust and aestcqics. DUST: Because of the condition of my wife's allergies, it is imperative that we minimize dust from tl~ operation. It should be noted that the ELK RIVER LANDFILL shu~ down operations on very windy days. There should also be provisions for this that apply to gravel pit mining. PROVISIONS should be included for ke~.,ping the turn lanes, the median and general condition of the 225th & Baldwin Ave. nw. in accepiabte driving condition without additional assessments by the neighborhood taxpayer. Everyone's cooperation is appreciated. Sincerely, Jeff Lawson 22715 Baldwin Ave. N.W. EIk River £/¢ 'a 999~'ofl 3¥~ YE~Tfl ~6~:~I L66I'tI'~d¥ Engineering Company 8300 Non'nan Center Drive M~nneal~otis, MN 5543 7-1026 tRbone: (612) 832-2600 Fax: (612) 832-2601 555 West 27th Street Hit~b~ncj, MN 55746 Phone: ¢18) 262-3465 Fax: (218) 262-3460 202 West Superior Street Duluth, MN 55802 Phone: ¢18) 727-5218 Fax: ¢18) 727-6450 April 7, 1997 Ms. Laurie Seifert-Kissner Bauerly Bros., Inc. 4787 Shadow Wood Dr., NE Sauk Rapids, MN 56379 Re: Wetland Delineation Dear Ms. Kissner: Enclosed is an aerial photograph showing the limits of the wetland investigation conducted on the proposed mining site located on the SE¼, SW¼ and NW¼ of the SE¼ of Section 3 (T33N, R26W) in Elk River. The field investigation of the property was completed on April 4, 1997. The site boundaries and five wetland areas are delineated on the aerial photograph. The site was investigated for wetlands according to the Routine On-Site Determination Method specified in the U.S. Army Corps of Engineers Wetlands Delineation Manual (1987 Edition). The wetlands were delineated with the assistance of aerial photography and subsequently verified during the field investigation. Since the delineation was conducted prior to the growing season, the results should be considered preliminary. The field investigation occurred under mild early spring conditions. Most of the area was free of snow cover except for some patches in woodland areas. Several small ponded areas were still frozen and could only be assessed from the characteristics of soil and vegetation noted at the edge of the ponds. Ponded/flooded areas that may meet the criteria of a wetland were delineated as wetland. However, it is questionable whether the soil and/or the vegetative criteria of a wetland would be met in Wetland No. 1. This area was delineated as wetland in the absence of available soil and vegetative information due to flooding. The other areas delineated as wetland (No's 2,3,4 and 5) have a significant presence of hydrophytic (wetland) vegetation which is indicative of wetlands. Cattail, sedge, bulrush and reed canary grass were the dominant forms of vegetation in these wetlands. Laurie Kissner April 7, 1997 Page 2 The saturation of the soil, attributed to the recent snow melt, made it difficult to assess hydric soil indicators such as soil color and chroma. However, hydric soil indicators were noted at the edge of most of the wetlands with the exception of Wetland No. 1. If you have any questions regarding this wetland delineation, please contact me at 832-2724. Sincerely, Rick Lestina Wetlands Biologist CON~['LTINGENG[NEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 April 16, 1997 File: 230-356-11 Mr. Steve Rohlf Building and Zoning Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 BAUERLY BROTHERS, INC. CONDITIONAL USE PERMIT Dear Mr. Rohlf: CIVIL ENGINEERING ENVIRONMENTAL N~OPAL ~NNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION As you requested, I have reviewed the Bauerly Brothers, Inc. Conditional Use Permit (CUP) Application for an aggregate processing operation on the property of Ernest and Doris Tolthe, located off of 225th Avenue. As we discussed, my review has been primarily from a traffic standpoint. I have reviewed the information provided by Bauerly Brothers and the letter submitted by Jeff Lawson of 22715 Baldwin Avenue, as well as making a site visit and discussing the issues with Phil Hals, Street Superintendent. I believe the concerns from a traffic standpoint can be broken down to three main issues: Dust control and/or the hard surfacing of the access road from the plant and 225th Avenue to TH 169. ELECTRICAL/MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS 'FICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA Safety issue as to whether or not adequate sight distances are available to elimi- nate conflicts between trucks accessing the plant and vehicles using 225~h Avenue. 3. Issue of the landing area as 225th Avenue approaches TH 169. The information provided by Bauerly Brothers indicates that truck traffic will result in approximately six to eight trucks on average. This statement is rather confusing. Does this mean there will be six to eight trucks hauling on an average day and, if so, how many trips are these trucks expected to make? What really is important is how many truck trips would be expected on an average day during the summer and also how many truck trips will be added to 225th Avenue annually over the 20 year operation of the aggregate plant. I believe it would be safe to assume that during the construction season when the aggregate product is being used that the number of truck trips add to 225th Avenue can be expected to be substantial as compared to current traffic on the road. An Equal Opportunity Employer Mr. Steve Rohlf April 16, 1997 Page Two Therefore, I believe it is not unreasonable to expect Bauerly Brothers to participate in the hard surfacing of 225t~ Avenue from their plant to TH 10. This would also seem to be consistent with how the City treated other similar applications. However, after reviewing the situation with Phil Hals, it is not as simple as just paving that section of roadway. Currently, the roadway section is substandard and not ready for paving. There should be additional work done to the roadway to establish ditches and drainage, along with a better landing area at the intersection with TH 169. The other issue that complicates this is the existence of additional gravel operations just out of the City of Elk River in Livonia Township that also use 225~h Avenue to access TH 169. As a compromise, I would suggest that through the CUP application, Bauerly Brothers, Inc., be required to participate to a certain level in the upgrading of 225th Avenue either now or sometime in the near future. The timing to be determined by the City of Elk River, since they will also have a participation in the upgrading of that road. Bauerly Brothers' contribution could either be in the form of cash or in-kind services such as gravel and/or bituminous sUrfacing. With regard to the issue of safety and visibility for trucks accessing 225~h Avenue from the plant operations, I would suggest that appropriate signing indicating to vehicle traffic on 225~ Avenue that there is a plant access and may be slow moving vehicles accessing 225~h Avenue would be appropriate. If you have any other questions regarding this application, please call. Sincerely, MSA, CONSULTING ENGINEERS TJM:kh 356-1605.apr CITY OF ELK RIVER AGREEMENT FOR ISSUANCE OF CONDITIONAL USE PERMIT FOR MINERAL EXCAVATION THIS AGREEMENT, made and entered into this day of , 1997, by and between the CITY OF ELK RIVER, a municipal corporation organized under the laws of the State of Minnesota (City), and BAUERLY BROS., INC., a Minnesota corporation, hereinafter referred to as (operator); WITNESSETH: WHEREAS, Operator has made application to City for approval of a conditional use permit to operate a gravel mining operation within the City on property legally described as follows: The west half of the southeast quarter (W1/2 of SE 1/4), and the west half of the southeast quarter of the southeast quarter (W 1/2 of SE 1/4 of SE 1/4), and the east half of the southeast 1/4 of the southeast 1/4 (E 1/2 of SE 1/4 of SE 1/4), all in Section 3, Township 33, Range 26, Sherburne County, Minnesota. Also the west half of the south half of the southwest quarter (W 1/2 of s 1/2 of SW 1/4), Section 2, Township 33, Range 26, Sherburne County, Minnesota. (the Property); and WHEREAS, the City of Elk River Planning Commission and City Council have held hearings on Operator's request for a conditional use permit, at which hearings all citizens of the City of Elk River and other interested parties have had the opportunity to be heard on the application; and WHEREAS, the City Council by motion adopted May 19, 1997, approved a conditional use permit for the operation of a gravel mining operation (the Operation) on the Property, subject to certain conditions, including that Operator enter into a License Agreement and Conditional Use Page 2 Permit Agreement with City so as to fully comply with the City's Mineral Excavation, Zoning, and other applicable Ordinances; and WHEREAS, the City's Zoning Ordinance requires that a Conditional Use Permit be issued and that a Conditional Use Permit Agreement for mineral excavation ]~e enterecl into. NOW, THEREFORE, in consideration of the premises and the mutual promises and conditions hereinafter contained, it is hereby agreed as follows: 1.) Entire Agreement- Except as otherwise provided herein, this Agreement shall constitute the Conditional Use Permit for the Property and, together with the License Agreement to be executed by City and Operator, shall govern the parties rights, responsibilities, and obligations with respect to the Operation, subject to the compliance by all parties with applicable city ordinances and state and federal laws. 2.) Warranty of Operator- Operator hereby warrants and represents to the City , as inducement to the City's entering into this agreement, that the Operator has a valid lease for the operation and the fee owner of the subject property shall also enter into this agreement. 3.) Conditions- The following general conditions shall apply to the Operation: (01) This Conditional Use Permit authorizes Mineral Excavation (gravel) from the Property. (O2) All mineral excavation and processing operations on the property shall comply with the City's mineral excavation, zoning and other applicable ordinances; with the terms of this Conditional Use Permit agreement and the license agreement to be executed by the City and operator; with the City of Elk River's Environmental Impact Statement on mineral excavation; and with the application materials and plans submitted by the operator, which plans and materials are the basis for the City's approval of the Conditional Use Permit. (03) The operator shall orally notify the City of any violations of this permit within 24 hours and follow this with notification in writing within 4 working days of the violation. The operator shall notify the City annually in writing of the total area and amount of material mined and projected estimates of area and amount of material to be mined in the following year. This is to be done at time of license renewal. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc (O4) (05) (06) (O7) (08) (09) Page 3 The license must be renewed annually and shall run from January 1st through December 31st. The annual license fee is that which is specified by City Code at time of renewal. This license fee is not in lieu of gravel tax collected by the County and a portion of which the City receives. Violations of this Conditional Use Permit may result in suspension or revocation. The City Building and Zoning Administrator and/or his/her agents shall be permitted to inspect the operation for compliance with the conditions of this permit during normal hours of operation. The City's approval of this Conditional Use Permit is subject to the approval of appropriate permits by other governmental agencies. No explosives shall be allowed for this operation. Reclamation Reclamation shall be implemented on an annual basis pursuant to the reclamation plans submitted by the operator. bo Each year a plan for that year's reclamation shall be approved by the Building and Zoning Administrator prior to issuance of the annual mineral excavation license. The reclamation shall include top soil from the site being preserved and put back into place after mining. do The vegetation established for the reclamation must be maintained until it is self sufficient. Contours, finished grades, details of erosion control methods, and settling ponds, shall comply with the plans submitted and the city ordinance at the time of reclamation. go Each ten (10) acre phase shall be reclaimed prior to work commencing on the next phase, other than areas that must remain part of the mining activity such as haul roads and storage. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 4 (10) (11) (12) Traffic ao Except for localized jobs, traffic through Elk River associated with this operation shall be limited to U.S. Highway 10 and 169. Haul trucks shall not be allowed to make right turns onto 225th Ave. when exiting the property. Dust Control A permit from MPCA regarding air emissions shall be obtained when required and particulate emission standards shall be met by the operation. bo All equipment shall be located as to reduce dust to adjacent properties. C° Water, but no chemical agents, shall be used to control dust as necessary. do The City reserves the right to require additional measures to be taken, if warranted by dust problems, including but not limited to reducing stock pile heights, requiring routine sweeping of US Trunk Highway 169 at its intersection with 225th Ave. and temporarily closing the facility. Hours of Operation All mineral excavation, processing, and sales activities shall be conducted between the normal hours of 7:00 a.m. and 7:00 p.m., Monday through Saturday with the following exception: Crushing may take place twenty-four hour a day for a maximum of 25 days per year, provided that this operation does not unreasonable annoy adjacent property owners. Problems arising from the extended hours (including, but not limited to, dust, traffic, glares, noise, etc.) shall first be directed to Bauerly's for resolution, then to city staff if need be, and finally to the Planning Commission and City Council of the City of Elk River (with public hearing) to determine if the extended hours shall be revoked. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 5 (13) (14) (15) (16) (17) (18) Noise ao The noise from screening and crushing associated with this operation shall be controlled by equipment location on site, the placement of stock piles, and the type of equipment used. Noise levels associated with this operation, shall at no time exceed State standards. Co The City reserves the right to require additional measures be taken, if warranted by noise. Equipment Maintenance The operator shall have an approved hazardous waste license and properly dispose of or recycle all waste. b. Only minor incidental repairs shall be allowed on site. Lighting Lighting from the operation shall be directed away from adjacent residential property. Glare, whether directed or reflected as different from general illumination, shall not be visible beyond the limits of the immediate site. All sources of artificial light shall be so fixed, directed, designed, or sized, that the minimum subtotal of their illumination shall not increase the level of the illumination on nearby residential property by more than. 1 foot candles in or within 25 feet of a dwelling, or more than .5 foot candles on any part of the adjacent property. The piling, storing, or keeping of old machinery, junk, debris, or abandoned motor vehicles, shall be prohibited on this site. Mining activities shall not cause excessive vibration off site. If excessive vibration becomes an issue, the City reserves the right to take appropriate measures to alleviate the problem. Groundwater protection measures shall include: The operator shall file with the City an emergency spill response plan. The operator shall adhere to this plan in the event there is a spill. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 6 bo The operator shall provide the Fire Department with a copy of their flammable or hazardous materials. Co All fueling equipment must comply with appropriate state and federal regulations. d° All incidences that have the potential to adversely affect groundwater, including but not limited to spills, shall be verbally reported to the City within 24 hours. This verbal notification shall be followed up in writing within 4 working days. The addition of a wash plant to this operation shall require an amendment to this permit. Mining activities shall be a minimum of 3 feet above ground water. The city reserves the right to require the establishment of on site ground water monitoring wells and the monitoring of site wells if warranted by problems arising from the operation. ho The appropriate storm water permits shall be obtained by the operator from MPCA. i. On site sanitation facilities shall be provided. jo Wetlands on the site shall not be adversely affected. Mining activities shall not be allowed within one hundred (100) feet of the ordinary high water mark of wetlands on or adjacent to the property. The city may impose additional restrictions to the operation if warranted by conflicts with wetlands and shall order restoration. (19) Fencing and signs [every fifty (50) feet] warning of the inherent dangers associated with the operation shall be installed and maintained where slopes exceed 1:1.5. (20) To prevent oak wilt, tree removal necessitated by the operation shall not be conducted between April 15 and July 15 and oak stumps shall be grubbed out prior to April 15. Mechanical damage to trees not being removed shall be avoided. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 7 (21) Six (6) foot high berms and two rows of four (4) foot high spruce with ten (10) foot spacing shall be erected adjacent to the entire length of 225th Ave. during the first year of operation in phase two, as identified in the attached plans. (22) The operator is responsible for cost of materials and labor for the installation of class-V and bituminous on 225th Avenue from the pit access to US Trunk Highway 169. Further, a mineral excavation license shall not be issued for this operation in 1999, if the above mentioned improvements to 225th avenue are not completed by November of 1998. 4.) General Provisions- (01) Permits- Operator agrees to comPly with all of the provisions hereof and agrees to save and hold the City harmless from any and all claims or actions arising from the operations of the Operator on the Property. (02) Binding Effect- The terms and provisions hereof shall be binding upon, and inure to the benefit of the heirs, representatives, successors, and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Operation and shall be deemed covenants running with the land. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers and encumbrances of all or any part of the Property, and all recording fees, if any, shall be paid by the Operator. (03) Severable- In the event that any portion of this Agreement shall be held invalid for any reason, the same shall not affect in any respect whatsoever the validity of the remainder of this Agreement. (04) Waiver- Any waiver, whether express or implied, by any party of a breach of any provision of this Agreement will not operate as or be construed to be a waiver of any subsequent breach of this Agreement. \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 8 (05) Notices- All notices and demands specified herein shall be deemed appropriately and timely given when delivered personally or deposited in the United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). The addresses of the parties hereto are as follows until changed by written notice given as above: If to the City at: City of Elk River ATTN: Building and Zoning Administrator 13065 Orono Parkway P.O. Box 490 Elk River, Minnesota 55330-0490 If to the Operator at: Bauerly Bros., Inc. Attn: Laurie Seifert-Kissner 4787 Highway 23 N. E. Sauk Rapids, Minnesota 56379 (06) Incorporation by Reference- All plans, special provisions, proposals and specifications, submitted pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as fully as if set forth herein in full. IN WITNESS WHEREOF, the City and Operator have caused this Agreement to be duly executed on the day and year first above written. CITY OF ELK RIVER FEE OWNER (S) OF PROPERTY: By: By: Its: Mayor By: By: Its: City Administrator OPERATOR: BAUERLY BROS., INC. By: By: \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc Page 9 STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ day of , 1997, by Henry A. Duitsman, the Mayor of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ day of , 1997, by Patrick D. Klaers, the City Administrator of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA SS. COUNTY OF The foregoing instrument was acknowledged before me this ~ day of , 1997, by , the of Bauerly Bros., Inc., a Minnesota corporation, on behalf of the corporation. Notary Public \\elkriver\sys\shrdoc\b&z\stever\gravcup2.doc STATE OF MINNESOTA SS. COUNTY OF SHERBURNE Page 10 The foregoing instrument was acknowledged before me this __ day of , 1997, by , the of Bauerly Bros., Inc., a Minnesota corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA SS. COUNTY OF The foregoing instrument was acknowledged before me this __ day of , 1997, by , the fee owner of the subject property. Notary Public STATE OF MINNESOTA SS. COUNTY OF The foregoing instrument was acknowledged before me this ~ day of , 1997, by , the fee owner of subject property. Notary Public This instrument was drafted by: City of Elk River Building and Zoning Department 13065 Orono Parkway PO Box 490 Elk River, MN 55330 X\elkriver\sys\shrdocXb&z\steverkgravcup2.doc