12-07-1987 CCMr7
C,�.Lc) c f
Vl'-) / i-) U f- ,S .
7--V
MEETING OF THE ELK RIVER CITY COUNCIL
HELD AT THE ELK RIVER PUBLIC LIBRARY
MONDAY, DECEMBER 7, 1987
Members Present: Mayor Gunkel, Councilmembers Schuldt, Tralle, Holmgren
and Dobel
Members Absent: None
Staff Present: Pat Klaers, City Administrator; Terry Maurer, City Engineer;
Darrell Mack, Sewer Superintendent; and Dave Sellergren,
City Attorney
1. Pursuant to due call and notice thereof, the meeting of the Elk River
City Council was called to order at 7:00 p.m. by Mayor Gunkel.
2. 12/7/87 Council Agenda
Items 8.3 to 8.8 - City Administrator were added to the 12/7/87 City
Council Agenda.
WINCILM ER DOBEL MOVED TO APPROVE THE 12/7/87 CITY COUNCIL AGENDA AS
AMENDED. COUNCILMMOER TRALLE SECONDED THE MOTION. THE MOTION CARRIED 5-
0.
3.1. 11/16/87 City Council Minutes
Page 6, item 6.1. 2nd paragraph - the year 1985 should be replaced with
"1981".
COUNCILMEMBER TRALLE MOVED TO APPROVE THE 11/16/87 CITY COUNCIL MINUTES
AS AMENDED. COUNCILMEMBER SCHULDT SECONDED THE MOTION. THE MOTION
CARRIED 5-0.
3.2. 11/23/87 City Council Minutes
Page 4, Item 9 - Motion Carried 4-0 should be changed to 115-011.
COUNCILMEEMBER DOBEL MOVED TO APPROVE THE 11/23/87 CITY COUNCIL MINUTES AS
AMENDED. COUNCILMEMBER SCHULDT SECONDED THE MOTION. THE MOTION CARRIED
5-0.
3.3. 11/30/87 City Council Minutes
Page 3, first paragraph building permit should be replaced with "sign"
permit.
COUNCILMEMBER TRALLE MOVED TO APPROVE THE 11/30/87 CITY COUNCIL MINUTES
AS AMENDED. COUNCILMEMBER DOBEL SECONDED THE MOTION. THE MOTION CARRIED
5-0.
4. Open Mike
No one appeared for this item.
Page 2
City Council Minutes
December 7, 1987
5. A& n Street Improvement Prdject/Public Hearing
Mayor Gunkel explained that tonight's meeting was a continuation of the
public hearing opened on November 2, 1987. Mayor Gunkel noted that
the project will be explained by the City Engineer and further that the
purpose of the continued public hearing was for the purpose of receiving
comments from the people affected by the sanitary sewer service district
portion of the project and also for the beautification of the downtown
area.
Terry Maurer, City Engineer, distributed a 11/2/87 Main Street report to
the public and explained the project in detail at this time.
5.1. Sanitary Sewer
The City Engineer explained the sanitary sewer portion of the project.
He indicated that the trunk line along the river bank is in very poor
condition and if a break in the line were to occur, it would be
impossible to access parts of the line to repair it. He indicated that
this line is currently being used as a trunk line. The City is proposing
to construct a new trunk line, thereby using the old line as a lateral
line. Most of the residents using the river bank trunk line at the
present time will abandon that line to use the newly constructed trunk
line. Mr. Maurer explained that some people will continue to use the old
line but that eliminating the majority of the users will hopefully
lengthen the life of the line. Mr. Maurer explained that the City is
proposing to assess the residents using the new Main Street trunk line on
an area basis.
Mayor Gunkel opened the public hearing.
Chuck Brady - 1522 Main Street
Indicated his opposition to being assessed on an area basis.
Don Schumacher - 212 Norfolk
Indicated he would be using the old trunk line and questioned how the
City proposed to assess these people if this line were to break which
would force them to hook up to the new line.
Rodney Anderson - 1011 Manor Place
Same concern as Don Schumacher.
Harry Kreuser - 1910 6th Lane
Indicated he has just been assessed for sewer and water and does not feel
it is fair that he is being assessed again for the use of the new trunk
line.
Ms. Wells - 1908 8th Street
Indicated she was not hooked up to City sewer and questioned why she
would be assessed for the use of the new line.
Page 3
City Council Minutes
December 7, 1987
Barb Ernest - Paradise Park
Questioned how the improvement would serve Paradise Park. Stated her
opposition to the assessment and felt the City should look at the
property owners and how the assessments are affecting land values.
Rd N t7.PIP
Questioned what the City's position is for people who are stubbed in but
not hooked up to sewer. Also questioned whether the sewer bill contained
maintenance and expansion fees in the user charge.
Dan Anderson - 209 Norfolk
Questioned the actual condition of the old sewer line. Also questioned
the boundary for the commercial district in regards to the downtown
beautification.
John McGibbon - 1437 Main Street
Submitted a written statement to the Council stating opposition to the
Main Street intersection. He also questioned whether there were some
areas that were being assessed for the new line that would not be using
the line.
Ruby Benson - 571 Tipton
Questioned if she would be included in the sewer assessment.
Russ Olson - 1222 6th Street
Questioned the size of the lot in relation to the assessment amount.
Also questioned the sewer rates.
Barbara Ernest - Paradise Park
Indicated she felt assessment should be determined by front footage
instead of acreage. Encouraged the City to examine property values
before applying assessments to the property and expressed her opposition
to the assessment.
The City Engineer indicated that in order to not miss any residents that
may benefit from this project, all residents within a geographical area
were notified of this sanitary sewer trunk line public hearing. Because
of this notification method, it is reasonable to believe that some people
received a public hearing notice that will not be assessed for the
project because of any number of reasons, some of which were heard
tonight. All of the property owners that actually benefit from this
project will be determined prior to the assessment hearing.
5.2. Central Business District
After discussion ended on the sanitary sewer portion of the assessment,
Terry Maurer explained the details to be discussed regarding the downtown
beautification.
STREET LIGHTING
Terry Maurer indicated that if the downtown merchants choose to put in
conventional lighting, the Elk River Utilities will pay for the full cost
of the lighting and if they choose to go with decorative lighting, the
• i
Page 4
City Council Minutes
December 7, 1987
--------------------
Elk River Utilities will pay up to $25,000 of the cost but will not
install them. He further indicated that it is anticipated that the HRA
will fund $10,000 of the beautification project, which could be used for
lighting costs. Mr. Maurer explained that decorative lighting will cost
approximately $60,000 leaving an assessable amount of $25.000 if
decorative lighting is put in and -$0- if conventional lighting is
installed.
TREES
Mr. Maurer explained that purchasing and installing 61 - 1 1/2 inch trees
by the City Street crew will cost $18,300 and funding would come from the
City Dutch Elm replacement fund.
TREE GRATER
Mr. Maurer explained that the tree grates would be of a plastic type and
would be installed by City crews; but would be totally assessable and the
cost is anticipated to be around $29,000.
TRASH RECEPTACLES
Mr. Maurer explained that no decision has been made regarding trash
receptacles but they will be funded by assessments.
TEXTURED SIDEWALKS
Mr. Maurer explained that textured sidewalks would be an assessed amenity
and that he has an estimated cost of $11,800.
LIGHTING
Discussion pursued regarding lighting of the downtown. Cliff Lundberg,
Arden Krinke, and Dick Dorsey discussed lighting with the Council. Cliff
Lundberg indicated his strong feeling towards decorative lighting in
order to create a desirable atmosphere downtown and further stated he
would like to see the lights wired for sound. Arden Krinke questioned
conventional lighting as to the amount of light and the spacing of the
lights. Dick Dorsey indicated his opposition to decorative lighting
because of the added cost and because of the possibility of vandalism.
Bob McCartney of Elk River Utilities explained that the difference
between decorative lighting and conventional lighting is the amount of
light. He stated that conventional lighting gives off 50% more light
than decorative lighting.
Discussion then purused regarding who would be responsible for the
lights once they were installed in regards to replacing bulbs, globes and
vandalism.
Page 5
City Council Minutes
December 7, 1987
---------------
Discussion was then held on the matter of trash receptacles. Arden
Krinke questioned who would be maintaining the trash receptacles and who
would replace them if they should be damaged or vandalized. After
further discussion it was the consensus of the Council to allow for 12
trash receptacles at $500 each making an assessable amount of $6,000 for
trash receptacles and using the remaining $5,500 for the installation and
wiring of the lighting and radio system.
COMMERCIAL BOUNDARY
The Council discussed the commercial boundary for the downtown amenities.
Mayor Gunkel indicated that the question was whether or not to include
the commercial properties in the proposed assessment area west of Lowell
for the Main Street Beautification portion of the project.
Ron Black indicated that he was opposed to being assessed for Main Street
Amenities because his business would not benefit from the amenities.
Mr. Don Schumacher indicated his opposition to being assessed for the
downtown amenities. He stated be represented Cretex and felt the
commercial business he was representing was no different than a
commercial business across Highway 10, and stated because the commercial
businesses across from Cretex on Highway 10 are not being assessed, he
did not feel Cretex should bear an assessment for the downtown amenities.
Mr. Schumacher further indicated he would rather see conventional
lighting than decorative lighting and is opposed to planting trees
because of the maintenance to keep them alive. He indicated the
maintenance will be done by the City crews which in turn is paid for by
the taxpayers.
Ron Black indicated that when the property west of Lowell was zone
changed to commercial it was noted by the City Council that the area was
not intended to be part of the downtowr commercial but was to act as a
buffer zone between the commercial and residential property.
No consensus was reached by the Council on whether or not to include the
property west of Lowell in the Central Business District (CBD)
assessments.
PARKING LOT
Terry Maurer discussed the parking lot in Jackson Square with the
Council. He indicated that the proposal submitted from the Downtown
Committee, which was originally done by the 1984 Beautification Committee
would be approximately $24,965 for construction costs. This cost wcuid
include benches, sidewalks, and flagpole.
The second proposal submitted by Terry Maurer was for $37,000. This
would include turning the entire area into parking, thereby increasing
the parking in the downtown area.
Page 6
City Council Minutes
December 7, 1987
-----------------------
Arden Krinke questioned the Council as to their feelings on the Jackson
Square area. Mayor Gunkel indicated she has expressed her opinion on
this matter several times; her opinion being that the CBD area would be
served better by using the area as a parking lot and to utilize the river
bank as a park. Councilmember Tralle indicated be would like to leave
the parking lot as it is now and not include it in the Main Street
Project. He indicated he would rather see this area as a parking lot as
opposed to a park. Councilmember Dobel stated he agreed with
Councilmember Tralle in that he would rather see this area for parking
only. Councilmember Schuldt stated he would like to see the Jackson
Square area excluded from the Main Street Project and discuss the matter
at a later date.
Don Schumacher stated that the money spent on the area should be used to
increase the parking area in the downtown area.
Cliff Lundberg stated that the downtown people are trying to create a
unique downtown atmosphere and the green space would add to this effect.
He stated it should be considered a "town square" rather than a parking
lot.
Ron Black stated that this area is an eyesore at the present time. He
felt the Council should consider what the true use of the particular
piece of land should be. He encouraged the Council to look at downtown
areas in other communities. He noted that some communities have very
attractive park areas in the middle of the downtown area and along
highways.
After further discussion it was a Council consensus to allow the Jackson
Square area to exist in the manner it currently is until a decision is
made at a later date and to not incorporate this in the Main Street
project.
Keith Holme stated it would be a good idea to send out a poll to the
business owners asking their opinion on the downtown area. He indicated
that the park could possibly be included in the project at a later date
as a change order.
There being no other comments frond the public, Mayor Gunkel closed the
public hearing.
In conclusion, the City Engineer stated that the public hearings have
been completed for the project except for the assessment hearings. The
plans and specifications will be submitted to the State for review.
Final plans will be submitted to the Council for approval within the next
couple months at which time the City will advertise for bids for the
project.
COUNCILMEMBER TRALLE MOVED TO ADOPT RESOLUTION 87-74, A RESOLUTION A
RESOLUTION REQUESTING A THREE FOOT VARIANCE FOR PARKING ON MAIN STREET
FROM MN/DOT. COUNCILMEMBER DOBEL SECONDED THE MOTION. THE MOTION
CARRIED 5-0.