Loading...
3.4. SR 01-18-2011REQUEST FOR ACTION TO ITEM NUMBER Ma or and Ci Council 3.4 AGENDA SECTION MEETING DATE PREPARED BY Consent anua 18, 2011 ustin Femrite, P.E. ITEM DESCRIPTION REVIEWED By Waste Sludge Pump Replacement and Control System Lori ohnson, Ci Administrator Modifications REVIEWED BY ACTION REQUESTED Authorization to accept the low quote received from North Star Pump Service, to complete the replacement of the waste sludge pump and modification to its control system at the wastewater treatment facility. BACKGROUND/DISCUSSION As discussed at the January 10, 2011 City Council workshop, the existing wastewater treatment facility has been experiencing problems with excessive solids from the final clarifiers, overloading the sand filters. The problem needs to be mitigated soon to avoid potential discharge permit violations. The excessive solids overflowing from the final clarifiers axe caused by the "re-suspension" of solids. This problem could be mitigated by increasing the amount and frequency for sludge wasting. However, sludge wasting is currently limited by the capacity of the existing waste sludge pump and its control system. The existing waste sludge pump is more than 30 years old and limited in its capacity. Its current control system is an old style system installed in 1995, and only allows sludge wasting twice a day. It is recommended that the existing waste sludge pump and its controls be replaced as soon as possible. Two new centrifugal pumps (one duty pump and one backup pump) with variable frequency drives are recommended. The new controls would include an operator interface touch-pad screen allowing adjustment of operation by the operator. FINANCIAL IMPACT Two quotations for the proposed upgrade were solicited for the Council's consideration and are summarized as follows: North Star Pump Service $62,177.00 (+ Tax) Quality Flow Systems, Inc. $74,460.00 (+ Tax) Both quotes also included an additional price associated with the complete replacement of the existing control panel. It is not required to have the complete panel replaced at this time. As such, we are not recommending moving ahead with the listed adder. Funding for the project will come from the Sanitary Sewer fund. The project was originally estimated to cost $80,000. C:\Users\jmiller\AppData\Local\Microsoft\Windows\Temporary Internet Files\Low\Content.IES\CGX6A63Z\i-18- 11%20Sludge%20pump%20RFA[1].doc ATTACHMENTS • Two Quotations Action Motion by Second by Vote Follow Up C:\Users\jmiller\AppData\I,ocal\Microsoft\Windows\Temporary Internet Files\Low\Content.IES\CGX6AG3Z\1-18- 11 %20Sludge%20pump%20RFA[1]. doc ---~- ', 924 247~n S~ e..~ ?~~'. _~ ~~ ~ , - ~~ce; (9aj 469-? ~ __ fax: (ss23 4es-526 ~ `, -- i~l~ ~'~" ~8'~E.~~,~~~.i'li~~ "~ Gomrtnle~tr~~E r~ar~'~starrsupserviae,etsm Cit;~ csf Elk River - ~Ul° Ianur~ 2t7, 2~'~" ~~ R~slr~ia~ fir. 'Ei~: iii~~er, t~ ~~3~~ Att: Gary Leirrrr~e Re: WWi'F Rec}rcl~ Statit~n Gary, e are phased to offer yc~u cur prc~pcssal fear tuv~ rye pumps, at~taati~ c~ntr~l,modiilicati+ans, pnw~r distrihtstinr~, valves, piping, Arad ras~ailataors of dll pr~g~se~i equiprne~p as i~!lcxs, a~~cc3~ ~s~r~ss x~a~~ratic Contrals (2) Crane Qer~ring Tv1~de, 71C1i~ serifs ~, a U x ? z ~ 3 '~~rtical ~rY-Pii Pumps, 25taft, ~€3ir3~h.; 5" suction, ~" discharge, design cohdition a~ ~~~~. gprrt 45' TIC using 8.79hp C o~Ji ~~, ~~F. x.796 ':Includes bass stands, suction elbaws, 7'EFC inverter ratet3 mc~tars. (~.) ~.ot o: f~" s~~ian Pi~i~g and c~r~~let~l;= ~}~~?~~i~g~„ d#~arge p~~irtg tc f~~cerr~~; ~~~ ~„ discttarg~_piiai~g plug ~alve~. ~~~ ~~r disc~~a~-~e s~i{~ir~g s~rit~gfl~~ ~;~~~c~ ~al~res, ~~~~ 6" sucticrr-; ,~ipiri;p?~~ ~ai~es. (1~ Lt~t of purt~psfiand insfiali~tions, in~ludes'leveling, grouting, and al,gnrr~~t~t, ~~~:~ Automatic ~ar~t~~l 3~'it~dific~ti~ns i~~l€adin~; - ~~} af.5e~p'~~i'~'s ~ai~~~tu~3isht:~erD~~ ~~~ - {~; i~~CC e~r~.i~tsure +ce~aling fans ar~d thermostats - i2) ~t~~- circuit ~red~~ ~~ gets - ~~.1 1tY' i~~rrnan interface ScrQers, ~~1~°' •~~= high resalutio Cont. Pump SiS, l~t~ta[Nilk~ F'~ii~ ~~ G~srl F'alte[ Sales & epalC ~~ ~`~l~€e ~ ~i l~eprs ~~ntai ~~~~. ~° ~a~s us ~~ for€ra~3ir; ~~~i~^tet~anc~ Ens~ections i~ala ~r~~i:~ ~~ s~ ~z~ -774 ~"' 3id~~ ii~u ~~'~r ~~7-~~~34 ~ ~ar3 ~Si~ tFa~~il ~~~-~{~~~ tsS~ cic~~n C~ ~2? r~--°~?i~ ~;" i=~~s~} I.~~hrai~~~ l~:i~~ 3$~-~'~i?~~ l K~~~~ ~~~J ax~7- -, ~.-_ 9295 247t~ S#r~~t ~Y. r,.1c., .~ar~<- ~ - ~'? L~~tevs'3ie,'M55094 < < ~' ~ '~;' r L C}ffice: X952} 469-7422 - _ fax: (952) 469-5246 __ _ ~1~ i~t: _ et _~~_$..~` .-_ ~" ~I"G'~ r~~rths#ar~a~rrnpsererice.corn ~I}GRtV~f-~~r1~sJ~i ~ ti~r~~Ci~ #~°~4C3T~ ~f1.R~. ~1~ Auteara~a#ic Cc~n#roi CV9~~€€~::~#~ans ~?r~~. -111iC~~electracel miring, con~~i~s, fiitin~s, andma#~rials - P~~ ~rngr~mrrrng#c~ t~per~t~ s~~stetrt't (1.} Lot~of ittst~ii~~~~r~, ~tdt"~--~ar~, any #rairting ~"atat ~"u~-r2-~e~~ &~rice . fs2,177.tMi ~nvtsinctud`ang tax, ~Ereight ~ttowed} Adders: Cc~~i~lete repPacer;~r~# supervis~r~ ~~,#cxa#ic Ctin#rol Panel wi#tt new Aden Bradley aJt?S Ftiw to ir~~e±-face~~ri#~te~is~ing~ystertt, Tote ~~de~ Prue. $3U,~92~t?0 (r:ot inctudir~g tax} PI~Gse i~t me kn€~w"rf*hnre are an~~ goes#ir~s rsrrriodsficat~on r~~tri~ed. The lead times fc~r PLG programming urc~~aEa ~ 4 ~r~~I;s, tl~~ ~€p.~re #-~ weeks, att ~i~~ anci vatves 1-? ~areeks. _~ Sir~~ereh,,~ ~' ~~ - ~. ~ ~' Mict~ae( Riippa y ~' E~r~p Sates, tns~.aliticr ~ F~ap~~~° _~ 4. '. ~ar~~r~P ~a~tel Sate9 ~ ~~~ir ~' ~ta~tve Pip^ i~e~ir ~~rxt~f l~~srk~a~~ ; ; ~~~~ss r~~€rr~;~~ _v ~~e~a~~a~ ~ir~~~r{a~~~ i~~~ec~ica~s ~ ~~~~ ~~~_ ~~~-~~7 ~' f~~sm ~~~~ ~~2~ 597~22~ ~ ~~~~ ~ui~~ g~a~~ ~9c3-1 9 F~~~W; 3~?~t#~# ~2) 59'7-2~~ `is `s~~rat t~rrt~sa~ ~~~ 2°,~~?iT ~,' eta f°~~s~~; ~~:•~i2) 7- UALITY FLOW SYSTE 800 6`" Street NW New Prague, MN 56071 January 5, 2011 TO: City of Elk River Attn: Gary Leirmoe Subject: VWVfP Recycle Station Engineer: BDM Phone(952)758-9445 Fax(952)758-9661 Dear Gary; Please find below our proposal to supply finro new pumps, control modifications, piping, and all required labor for a complete project. Recycle Pumas 8~ Control: Two (2) "KSB" Sewabloc Model K150-315lGV, 15hp, 230/460/3, 6" heavy duty vertical non clog sewage pump capable of pumping 500 gpm @ 45' TDH. To include: - Pump stand/ 6" suction elbow - 15hp, 1160 rpm, TEFC 15hp, EPACT efficiency motor Four (4) 6" plug valves Two (2) 6" swing flex check valves One (1) 6" piping to complete the piping of the two pumps to the suction header and discharge outlet of the building One (1) Concrete work around the base of pumps One (1) Control upgrade to include the following as a minimum: - (2) 15hp Mitsubishi Series 700 VFD's installed in the MCC - (2) Cooling fans in MCC compartments - (2) Feeder breaker buckets - (1) Color touch operator interface for mounting in the existing enclosure -All required electrical wiring, conduit, and materials - All required programming modifications as required One (1) Installation, start-up and training. One (1) Freight to the jobsite Total Delivered Selling Price - -$74.460.00(+ tax) (freight allowed to the jobsite) Adder: Add $13.870.00 (+ tax) to the above price if we install a complete new Allen Bradley 505 PLC and control panel vs. utilizing the existing Allen Bradley 503 PLC and panel. We prepared this based on the pump design conditions provided. In the event this changes we would need to modify our proposal accordingly. If you have questions or wish for our proposal to be quoted different, please give me a call. INC. Sincerely, ~at~ic~ /~a~a~ Patrick Malay