Loading...
6.9. SR 06-16-199716.9. Howard R. Green Company CONSULTING ENGINEERS June 11, 1997 File: 230-277-30 CONS[LTING Formerly MSA Consulting Engineers Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: JOPLIN STREET/TH 10 SIGNALIZATION CHANGE ORDER NO. 1 Dear Council Members: Attached for your consideration is Change Order No. 1 to the Joplin Street/TH 10 Signalization project. This proposed change order consists of two items. One is a change to the wiring of the warning flasher that is part of the signal system. This change in the wiring configuration was requested by MnDOT. The second component of the change order is to add an Emergency Vehicle Preemption (EVP) system to the signal installation. This is a system that will allow emergency vehicles with emitters to change the signal to a green phase as they approach so they will not have to cross the intersection under a red condition. The total change order is in the amount of $5,118.30. Approximately $4,500 is the cost of the EVP system and the remaining cost is for the change in the wiring. According to the Cooperative Agreement with MnDOT concerning this signal installation, they should participate in half of the cost associated with this change order. Once approved by the City, we will forward a copy to MnDOT for their information. If you have any questions regarding this issue, I will be in attendance at your June 16, 1997, City Council meeting. Sincerely, HOWARD R. GREEN CONSULTING ENGINEERS TJM:tw Attachment 277-1108.jun 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 CHANGE ORDER No. 1 PROJECT: OWNER: (Name, Address) CONTRACTOR: CONTRACT FOR: Joplin Street/TH 10 Signalization City of Elk River 13065 Orono Parkway Elk River, MI{ 55330 Bauerly Bros. Inc. 4787 Shadow Wood Drive Sauk Rapids, MI{ 56379 Signal, Street, & Utilities DATE OF ISSUANCE: June 11, 1997 OWNER's Project No. 230-277-30 ENGINEER: Howard R. Green Company, Consulting Engineers 1326 Energy Park Drive St. Paul, FRg 55108 ENGINEER's Project No. 230-277-30 You are directed to make the following changes in the Contract Documents. Description: Add Emergency Vehicle Preemption (EVP) system to the signal system and change wiring to the warning flasher as requested by MD_DOT. Purpose of Change Order: See above. Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE: Original Contract Price $ 666,711.10 Previous Change Orders No.__ $ -0- to No. Contract Price prior to this Change Order $ 666,711.10 Net Increase of this Change Order $ 5,118.30 Contract Price with all approved Change CHANGE IN CONTR3tCT TIME: Original Contract Time 120 days or date Net change from previous Change Orders days Contract Time Prior to this Change Order 120 days or date Net Increase of this Change Order days Contract Time with all approved Change Orders $ 671,829.40 RECOMMENDED: Orders 120 days Or date APPROVED: APPROVED: By Howard R. Green Company EJCDC No. 1910-8-B (1983 Edition) By City of Elk River By Bauerly Bros. Inc. C0#1-230.277