Loading...
7. PRSR 08-10-2005Item # 7. MEMORANDUM TO: Parks and Recreation Commissioners FROM: Bill Maertz, Director of Parks and Recreation DATE: August 4, 2005 SUBJECT: Directors Report 1. DNR Grant Awards for Top of The World Addition The City of Elk River has been awarded 1.2 million dollazs towards the acquisition of 80 acres of land adjacent to Top of the World Park. 2. Conservation Partners Grant for Highlands East The City of Elk River has been awarded a matching grant of $6,000 for prairie and woodland restoration work at Highlands East Pazk 3. Rain Garden and Filter Strip at Orono Park Grading and planting were finished in late June and plants aze well established. Curb cuts and paving will take place in August. 4. Outsourcing Grounds Maintenance In 2006 staff has budgeted for grounds maintenance of City Hall, the library, Northbound and Westbound Liquor and the area around Lions Park Center to be handled by a private contractor. This will provide an opportunity for Pazks and Recreation Maintenance staff to focus on park maintenance and projects. Staff is exploring the establishment of low maintenance native plantings along Twin Lakes Boulevard to further reduce time spent mowing. Culvert Upgrade Under CR 77 Tiller Corporation is planning to install a culvert for their conveyors under CR 77. Tiller will abandon this structure in approximately 15 years. There is an option for the city to pay for a size upgrade to 12' by 14' that would allow it to converted to a pedestrian underpass. The cost of this upgrade is approximately $80,000. Staff is investigating funding options. 6. Trail Easements and Park Dedication When making recommendations on park dedication questions, there appeazs to be some confusion as to what constitutes the Park Commissions mission. The commission is requested by staff to focus on the question of cash or land, based on the goals of the master plan. Planning staff will use the trail master plan as a template to obtain easements. Planning Director, Michelle McPherson has provided a memo clarifying the various methods of obtaining land for trails. ATTACHMENTS: Grant Letter from DNR: Scenic and Natural Areas Grant Letter from DNR: Remediation Grant Grant Letter from DNR: Conservation Partners Grant Information from Tiller Corp. regarding culvert Memo from Planning Director Minnesota Department of Natural Resources 500 Lafayette Road IO St. Paul, Minnesota 55155-40 August 1, 20051 Mr. Bill Maertz Parks Director, City of Elk River Lions Park Center Elk River, MN 55330 RE: Proposed Grant Award of $500,000 Top of the World Addition Dear Mr. Maertz: I am pleased to inform you that your application for the Remediation Fund Grant Program has been selected for funding. We anticipate being able to offer you a grant for the amount shown above contingent upon the final processing of your application. Final processing of your grant may require subnuttal of additional information. You will be contacted shortly by a staff member from the Local Grants Program regarding the final processing requirements for your application. Do not incur any project costs. This notice does not constitute final approval of your project. Any work completed, money spent, or obligations incurred by your project prior to final approval are ineligible and cannot be paid for with grant funds. We are looking forward to working with you on this project. If you have any questions, call Joe Hiller at 651/296-4891. Congratulations! Sincerely, 2~rn Wayne M. Sames, Supervisor Local Grants Program DNR Information: 651-296-6157 1-888-646-6367 7"f Y:651-296-5484 I-800-657-3929 An Equal Opportunity Employer ~~ Prin[ed on Recycled Paper Containing a Mininnnn of I07~ Pos[-Consumer Waste Minnesota Department of Natural Resources ~o 500 Lafayette Road St. Paul, Minnesota 55155-40_ Mr. Bill Maertz Pazks Director, City of Elk River 1104 Lions Park DriveC Elk River, MN 55330 RE: Proposed Grant Award of $6,000 CPOS-012 Highland Park Dear Mr. Maertz: I am pleased to inform you that your application for the Conservation Partners Gran[ Program has been selected for funding. We anticipate being able to offer you a grant for the amount shown above contingent upon the final processing of your application. Final processing of your grant requires submittal of additional. information which must be completed in a timely manner. You will be contacted shortly by a staff member from the Local Grants Progratti regazding the final processing requirements for your application. Do not incur any project costs. This notice does not constitute final approval of your project. Any work completed, money spent, or obligations incurred by your project prior to final approval are ineligible and cannot be paid for with grant funds or used as the local matching share. Projects must be completed by June 30, 2008. If your project must begin before July 1, 2006, please complete and return the enclosed Project Timeline and return it to us before July 31, 2005. We are looking forward to working with you on this project. If you have any questions, call Joe Hiller at 651/296-4891. Congratulations! Sincerely, ~~ 72t .~6~-'~~'rerr` Wayne M. Sames, Supervisor Local Grants Program Enclosure DNR Information: 651-296-6157 I-888-646-6367 TTY: 651-296-5484 1-800-657-3929 An Equal Opportunity Employer ~~ Printed on Recycled Paper Containing a Minimum of IO~Ir Post-Consumer Waste Minnesota Department of Natural Resources 500 Lafayette Road St. Paul, Minnesota 55155-40 July 14, 2005 Mr. Bill Maertz Parks Director, City of Elk River 1104 Lions Park Drive Elk River, MN 55330 RE: FY 2005 Natural and Scenic Grant Program City of Elk River, Top of the World Grant Award: $400,000 Dear Mr. Maertz: I am pleased to inform you that your application has been recommended for funding at the amount shown above. Funding for this program is funded through the federal Land and Water Conservation Fund (LAWCON), and from appropriations by the State Legislature from Capital Bonding and the Environmental and Natural Resources Trust Fund upon recommendation of the Legislative Commission on Minnesota Resources. We anticipate being able to offer you a grant for the amount shown above contingent upon the final processing of your application. DO NOT incur any project costs. This notice does not constitute final approval of your project. Any work completed, money spent, or obligations incurred for acquisition or development of your project prior to final approval are ineligible and cannot be paid for with grant funds or used as the local share. The Local Grants Program staff are looking forward to working with you on this project. You will be contacted shortly by a staff member from the Local Grants Program regarding the final processing requirements for your application. If you have any questions, call me ai (651) 296-1567. Congratulations. Sincerely, Wayne Sames, Supervisor Local Grants Program DNR Information: 651-296-6157 1-888-646-6367 TTY: 651-296-5484 1-800-657-3929 An Equal Opportunity Employer ~~ Printed on Recycled Paper Conminine a Minimum of 109r Post-Consumer Waste ~',,, JU ~. ~, ~`~'~l ~l~r: o` ii/ C_5_ McCrossan Canstructivn, /nc_ Hox 124H. 7Bfi5 JefFerson Highway, Maple 6rnve, Minnesota 55311-6240 7634254167 Fax: Estimating 7F3/425-0570 ~ Arlministntion 763ig75-1255 June 16, 2005 Mr. Pete Olson, Area Manager Barton Sand & Gravel 7200 Hemlock Lane, Suite 2 Maple Grove, MN 55311 RE: Box Culverts for Elk River Pit Dear Pete: We appreciate the opportunity to quote on the above-referenced project. As we understand it, Barton is proposing 2 Precast Concrete Cox Culverts at the Elk River South Pit, each approximately 156 LF in length. The size requirements are 8'x6' (WxH) for current use, but 14' x 12' would allow for future use by pedestrians. We have priced both of these options as shown below for your review: Option 1: 5'x6' Mobilization 8' x6' Precast Concrete Box Culvert, Class 2 $134,160.00 8' x6' PC Box Culvert End Section, Type 1 Qtv UM Unit Price Total Price 1 LS $3,000.00 $ 3,000.00 i~~~,_ 312 LF $ 430.00 4 EA $6,000.00 $ 24.000.00 Total= $161,160.00 ~"i11i-t`- Option 2: 14'x12' Qtv UM Unit Price Total Price Mobilization 1 LS $ 5,000.00 $ 5,000.00 14'x12' Precast Concrete Box Culvert, Class 2 ~~~U~'312 LF $ 810.00 $252,720.00 14'x12' PC Box Culvert End Section, Type 1 4 EA $17,000.00 $ 68,000.00 Total = $325,720.00 t ~~ ,~~ !i These prices are firm for work performed in 2005. Please do not hesitate to call i f you have any questions or need more information. Sincerely, Eric Sellman C:\Documents and Settings\peteo.TILLERCORP\Loca] Settings\Temporary Internet Files\OLK857\Barton Elk River Box Culverts 6-1$-OS.doc Page 1 z 0 Q U O w U x 0 m J J Q ~' W O is ver MEMORANDUM TO: Parks and Recreation Commission FROM: Michele McPherson, Director of Planning DATE: August 2, 2005 SUBJECT: Primer on Trails This memo is written to provide information to the Commission regarding the use of easements versus land in fee title for public trails. Trail Easement A trail easement grants permission over a parcel of property for public access. This trail easement could be a specific corridor described along an alignment through a parcel of property, or it could be a large "blanket" easement, whereby a large portion of the parcel is encumbered by the trail easement and the City has wide latitude for constructing the trail. In an easement condition, the City does not own the underlying land; therefore, park dedication credit in the form of land is not required to be given. Fee Title In this condition, the City would be given land which it would own in fee title for construction of a trail. In this instance, park dedication credit would be given for land. An example of such a trail connection is Outlot A in Trott Brook Farms 8~' Addition. This is a City-owned 50' wide trail connection located between two homes which will connect Olson Street to Outlot K, Trott Brook Farms. Other Considerations It should be noted that when reviewing plats with wetlands, trail easements or trail corridors will need to be carefully sited to avoid wetland impacts. The Technical Evaluation Panel will require mitigation for any fill over and above the dem,,,~mus allowed by Statute. The mm;mum allowed is not a significant amount of area; therefore, wetland fill in favor of trail construction will need to be carefully evaluated on a case-by-case basis. Hopefully, this information will the assist the Commission in making its recommendations for trails and park dedication. S:\PARK & REC\OS 04 OS Packet\P.ttachment to direttots report OS 02 OS PR memo nail inFo.doc