Loading...
4.2. SR 06-30-1997IT~f 4.2. Howard R, Green Qompany QONSULTING ENGINEERS June 23. 1997 File: 230-306-20 CO~d~l LTI~G ENGINEEI~ Formerly MSA Consulting Engineers Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: TRUNK HIGHWAY 169/197TH AVENUE SIGNAL IMPROVEMENTS Dear Council Members: As requested at the last City Council meeting, I have prepared the attached resolution which rejects all of the bids for the installation of the traffic signal at the intersection of Trunk Highway 169/197th Avenue. I have also attached, at the request of Council Member Holmgren, the signal justification reports for this signal and the recently installed signal at Trunk Highway 10 and Joplin Street. If you take the time to review these signal justification reports, you will find that both signals were somewhat similar. Neither was justified by the existing traffic at the intersection. The Trunk Highway 169/197th Avenue signal was justified by the construction of the Menards facility, and the Trunk Highway 10 and Joplin signal was justified by the strip mall and single family developments which were underway at the time the report was prepared. Some commercial type developments that are anticipated within the next two years were also used to justify the signal. If you have any questions regarding this resolution or the signal justification reports, I will be in attendance June 30, 1997, at the City Council meeting. Sincerely, Howard R. Green Company TJM/jl 306-2316.jun 1326 Energy Park Drive · St. Paul, MN 55108 ° 612/644-4389 fax 612/644-9446 toll free 800/888-2923 RESOLUTION 97 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION REJECTING ALL BIDS IN THE MATTER OF THE TH 169/197TH AVENUE IMPROVEMENT OF 1997 pursuant to Resolution 97-42, competitive bids were solicited and received for the TH 169/197 Avenue improvement as set forth in the bid tabulation attached hereto and incorporated herein by this reference; and the City Council has considered the amount of the bids and the need for the improvement at this time; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. All bids for the TH 169/197th Avenue signal improvemems are hereby rejected; and The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids. Passed and adopted this 30th day of June, 1997. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk 230/306-2316.jun il · · SIGNAL JUSTIFICATION REPORT June 1996 SRF NO. 0962401 -' '.~ Transportation. CIvil . Structural Envlronment~l~P,.l~g', .Traffic .. Landscape Architecture :' Parking - - , . :- . ' ::'":.:a~'~;¢R.:~-~?:?-~?</.:.*'o-~,:~-~-: r~-;-'''. -- '~.,.':-:,-~:- ' :-...,~ :'?:':<x', "-::_'. MINNESOTA DEPARTMENT OF TRANSPORTATION SIGNAL JUSTIFICATION REPORT FOR TH 169 AT 197TH AVENUE NW IN ELK RIVER, MINNESOTA June 1996 Program: Letting Date: Funding Category: Work Identification: Traffic Signal Installation and Roadway Improvements I hereby certify that this report was prepared by me or under my direct supervision and that ! am a duly Registered Professional Engineer under the laws of the State of Minnesota. Name ~ Reg. No. Date APPROVED: City of Elk Riv~{ Date Assistant Division Engineer - Traffic Date I CONCUR with your determination that a traffic signal is jUstified at this loCation based on this signal JustifiCati°n Data (Sections VII and VIII). ~,'-.i- State Traffic Engineer ' Date - :' ~'.;.-:-".~. -..: : -:-:;'.-:.-~.. o~.co'~sb~t~{o~ c~[ c~ [~*.,e o~o~:~-'.~ .W;~} .~-~-'.' {~,~ ~-'~'~n~'.~-, --" ~'-'~... "--':: ~J~;,."', '~. ~mY';'~. ,'~*'~'~'-'='"~'.'~.~"~ · ~:~"-:~-~-~Z .";~;-'. -:---~.;= ~,;.;J ?"~. ~. ' . ', '...' .-;~ ?:,J,-r-'V~, .-"..~ .5.'~ ":~..'~.'.'.? '~ -". Z.'~ ,~, ~:;' '. ".:r, · -. ~. ,~-~;-.-Z,':~.~ ~';:;' Date: June 1996 TH 169 at 197th Avenue NW in Elk River, Sherburne County PROJECT DESCRIPTION Existing Conditions The TH 169 and 197th Avenue NW intersection is located in the City of Elk River, Minnesota (see Figure 1, Project Location). TH 169 is a north-south, four-lane divided principal arterial roadway with a posted speed limit of 55 miles per hour in this area. 197th Avenue NW is an east-west, two-lane roadway with a posted speed limit of 30 miles per hour in the area. Unsignalized side-street stop traffic control is currently provided at the subject intersection. Surrounding land uses in this area are primarily retail and commercial and residential type land uses, however, much of the land in this area is undeveloped. Proposed Conditions Proposed roadway geometric improvements to the 197th Avenue westbound approach to TH 169 would include widening to provide one left turn only lane, one through lane, and one right turn only lane. The proposed Evans Street will form a T-intersection with 197th Avenue approximately 400 feet east of TH 169. The proposed Evans Street will provide access to the proposed development south of 197th Avenue. Roadway improvements planned for 197th Avenue west of TH 169 include providing an exclusive left turn lane, and a combined through/right (see Figure 2, Proposed Development Plan). The proposed traffic control signal system at the TH 169 and 197th Avenue intersection will be a full traffic actuated signal system with eight phase operation. Protected left tum phasing will be provided on each approach to the subject intersection. · : .! -_ ' . ~-~ .. .:. -:: : ' :;; '-::" ............... ..-"::"~-, ', :i:'''':::;'~:' ~:-~he ~nstruct~on ,cost of~.the ro ose., .;.~: ¢ .~.~,.. ........... ,~__ .~, .p p ~, proje~ wdl be funde¢ 50 percent b Mn/DOT. and 50 per~nt by the C~N of Elk ~er ': ./'":':. ?-:':::':. ':-' .... .' "':'*:~';~c:~%?;;?:C?; PoP. JECT LOCA3qON P,ROPOSED SIGNAL ELK '~ '**~':' *~'" ~' 169 AND 197TH AVENUE REPORT ./ .:' :..,' :. / CITY OF ELK RIVER PROPOSED DEVELOPMENT PLAN TH 169 AND 19?TH AVENUE SIGNAL JUSTIFICATION REPORT 2 The controller and cabinet will be provided by Mn/DOT with reimbursement by the City. The City will be responsible for power costs for the signal, hardware maintenance, street lights and painting, cleaning and relamping the system. · Mn/DOT will be responsible for controller maintenance and controller operation. The estimated cost o¢ this proposed traffic signal installation is $120,000. III. SCHEDULE AND PROJECT MANAGER Project Manager: Terry Maurer, P.E. MSA Consulting Engineers 1326 Energy Park Ddve St. Paul, Minnesota 55108 Telephone Number: (612) 644-4389 Estimated Letting Date: Estimated Construction Completion Date: IV. NEED FOR PROJECT/PROJECT DISCUSSION The proposed traffic signal work described in this report is needed as part of the roadway reconstruction at the TH 169 and 197th Avenue intersection and to accommodate proposed future development that is expected to take place in this area. A proposed commercial/retail development is planned for the southwest quadrant of the TH 169 and 197th Avenue intersection. The first phase of the proposed development would include a 161,160 square foot Menard's retail facility. Other specific tenants for the proposed development have not yet been identified. Based on ITE trip generation estimates, it is expected that the proposed Menard's development would generate over 500 additional trips during the afternoon peak hour and over 4,900 vehicles daily. The proposed traffic signal control at the TH 169 and '197th Avenue NW. : intersection is needed in order,_to _alleviate the excessive'delays.that exist for I '~ vehicles entering T,H 169 ..from .:197th ;Avenue NW. :-.The~,197th' Avenue~NW'. ~'~i:,~.~. roadway .; improvements are ~,necessary · in: order, to~ accommodate ~ ro osed ~.., . development, .. s,t,e.'., generated .traffic as_well,as; future .background ,traffic. iin;~this PUBLIC AND AGENCY INVOLVEMENT t The City of Elk River and Mn/DOT will be required to coordinate funding. VI. DESIGN CRITERIA AND EXCEPTIONS No design exceptions to Mn/DOT or AASHTO standards are required. VII. JUSTIFICATION Traffic signal justification will be based on applying the applicable warrant(s) for signal installation as outlined in the Minnesota Man~81 on Uniform Traffic Control Devices (MMUTCD) and reconciling the roadway geometrics, proposed lane usage, existing traffic volumes and planned changes in the area roadway network with the requirements of the MMUTCD and sound traffic engineering practice. The signal warrants analysis is based on the assumptions shown below: Geometry: Warrant Analysis Assumptions Northbound Mainline Southbound Mainline Minor Street 2 approach lanes 2 approach lanes 2 approach lanes Approach Speeds: Mainline 55 mph Minor Street 30 mph Based on April 1996 traffic counts for 197th Avenue, and previous data collected by Mn/DOT for TH 169, the TH 169 and .197th AvenUe intersection does not meet minimum/warrant requirements for traffic signal control. In order to determine if the proposed Menard's development forecast volumes would meet signal warrant requirements, hourly approach forecast volumes were developed and a 16-hour warrants analysis completed. The proposed roadway. geometdcs .with the posted speed .limits on both roadways were assumed Based on this warrants analysis it is expected that the Subiect intersection WoUld meet Mn/MUTCD Warrants 2, 8,~ 9and .11 With prOpOsed Menard,s'develol3ment' traffic included (see'Appendix for ~a...'~ts*~naly~is'sfimma~es);:.:,,Tfie'~dditi~jfial the ~eed .fo~ ~affic s~gnal cont[01 at th~s ~nteme~on. It is concluded that on the basis of: (1) meeting Warrants 2, 8, 9 and 11; (2) expected future increases in both site generated and through traffic, (3) to accommodate the planned roadway improvements in this area, installation of traffic signal control is justified at the TH 169 and 197th Avenue intersection in the City of Elk River. It is recommended that the proposed traffic signal system be installed concurrent with the proposed 197th Avenue reconstruction so that the traffic signal will be in place when the proposed Menard's development opens. ] ] VIii. APPENDIX WARRANT SUMMARIES MINNESOTA Location :~Y, Nl~c~ ..... gat e : 04-10-'~6 PDPULATIDN LESS YHAN }0,000: ~O SEVENTY PERCENT F~CTOR USED: YES DEPARTMENT OF TRANSPORTATION U)AFFIC ENBINEERIXB SISNAL WARRANI ANALYSIS ~EED APPROACH L..co~"r~ 55 Major App. I :l~ 169 ~B S OF 197TN AVENUE 2 55 Major App, 3 :TH 169 SB ~ OF 197TH AVENUE 2 ~0 Minor App. 2 :I~TTH AVENUE EB W OF TH ~69 2 ~0 ~}nor App. 4:197TH AVENUE NB E OF T~ 169 2 4201630 140/70 1.10~0 1/2 MAJOR WARRANT MINOR ~]N~R WAR~ANT WARRANT MET SA~E HDUR APP.I MET .PP.~ APP.~ )ET APP,2 ~ET APP.( ~D~RS 6-7 A.~. 237 )0 / / / 7-B A.~. 437 76 / / X / X 8-9 A.~. ~25 61 / J / / I 9-10 ~.~. 472 43 / J / / 10-1! A.H. 497 ~9 / / / 11-12 P.M. 4/9' 29 .I I / 12-I PoM. 4~0 51 / / / 1-2 P.~. ,..u, 22 / / 2-~ P.M. 554 2B / / / ,1-4 P.M. B41 ,13 / / / 4-5 P.)I. il07 ~i / / / 5-6 P.M. 10~ ~ / / / 6-7 P.I~. 7-B B-9 P.M. 27u MAJDR .... APP.3 1+5 1~ t509 11~1 1828 754 1179 614 1086 6u~ 1149 505 984 616 517 JO19 616 1170 609 1716 576 1616 547 1220 ~56 817 21& ~,:. 491 IIX IIX 23 ](IX 13 ](/2 14 X/X 11 XI! 9 IIX 11 Il]( Ill Iii J2 X/X 15 11 $1 / / / 27 MINNESOTA Location :ELK RIYER Date Factor POPULATION LESS THAN lO,O00: NO SEVENTY PERCENT FACTOR USED: YES DEPARTMENT OF TRANSPORTATION TRAFFIC ENBINEERIXB SIGNAL WARRANT AWALYSIS PccD APPROACH LANES 55 Major App. I :TH 169 NB S OF 197TH ....... 55 ~ajor App. 3 :TX 169 SB N OF 197TH AVENUE 2 30 ~nor App. 2 :I97TH AVENUE EB W OF TH 169 2 30 M~oor App. 4 :I97TN AVENUE WB E DF TH 169 2 140/70 1~0/70 HOUR 6-7 A.X. 7-8 A.X. ~AJOR APP. I ~PP.3 TOTAL WARRANT ~ET 310 1308 1618 518 1272 ~790 8-9 A.M. 4~ 812 9-10 A.M, 5~ 668 10-11 A.M. 11-12 P.M. 527 481 551 915 12-1 P,M. 1-2 P.M. 2-,] P.M. ~-4 P.M. 7O8 553 1295 1197 AP?.2 ~ X /X 2~ 2O 4-5 P.M. 1190 8-7 P,M. 7~ 10~ X / .X I7 667 1H8 X / X 19 i284 1666 751 X/X 17 22 X /X 24 655 607 APP.4 150 212 109 111 104 i57 X / X X / X 29 168 X / X 21 l,lO WARRANT XET APP.2 WARRANT )ET APP,4 X/X /I MET SAME HOURS IIX X/X X/X /X /X /I /X /X /X /X IX /I /l / X/X III / XtX IIX / IiX MINNESOTA DEPARTMENT OF TRANSPORTATION SIGNAL JUSTIFICATION REPORT for S.P. 7102-87 T.H. 10 at Joplin Street/185th Avenue In Elk River, Sherbume County Program: Management and Operation Letting Date: April, 1996 Funding Category: State Funds Work Identification: Traffic Signal I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Reg. No. Date APPROVED: District Traffic Engineer Date I CONCUR with your determination that a traffic signal is justified at this location based on the Signal Justification Date (Sections VII and VIII). State Traffic Engineer Date 230/277-2201 .sep I. PROJECT DESCRIPTION This report documents the warrant analysis and justification for signalization at the intersection of T.H. 10 and Joplin Street/185th Avenue in Elk River, Minnesota. Exhibit 1 identifies the intersection location on a local area map. T.H. 10 is a principal arterial that runs east/west thru the City of Elk River. At this intersection, it will have four lanes in each direction: one left turn lane, two thru lanes and one right turn lane. Joplin Street is a collector road that intersects T.H. 10 in a T-intersection from the south. On the northbound approach, it has one left turn lane, one thru lane and one free right turn lane. As part of the proposed construction project, 185th Avenue will be extended north to form the fourth leg of this intersection. It will continue to the west, servicing as a north frontage road for T.H. 10 and providing land access to adjacent commercial and residential properties. Its southbound approach lane configuration will consist of one left turn/thru lane and one thru/right mm lane. Exhibit 2 shows the proposed intersection layout with the fourth leg, 185th Avenue, in place. Parking is not permitted on the three existing legs, and will not be allowed on 185th Avenue. The T.H. 10 speed limit is 55 miles per hour in this area, and Joplin Street has a 30 mile per hour speed limit. The three existing legs have center medians, as will 185th Avenue. The proposed work includes installation of a permanent six phase traffic actuated traffic control signal system with an advance warning flasher for eastbound approach traffic, wiring for future emergency vehicle pre-emption, and conduit stub-outs from the equipment pad for possible future hard-wire interconnect and phone line connection. As mentioned earlier, this work is proposed in conjunction with the construction of 185th Avenue, which will form the fourth leg of the intersection. II. COST, FUNDING, AND MAINTENANCE Latest Estimate: $100,000 The cost participation for the proposed signal work is 50 percent MnDOT and 50 percent City of Elk River, as outlined in Traffic Control Agreement//7102-87. Power is to be supplied by the City of Elk River. Maintenance of the traffic signal will be the responsibility of MnDOT. 230/277-2201 .sep TABLE 1 SUMMARY OF VEHICLE TURNING MOVEMENT COUNTS Observer:. Joe Lock Dale: 8/31/95 Day: Thursday City: Elk River INTERSECTION OF T.H.10 AND JOPLIN ST. TIME NORTHBOUND SOUTHBOUND iii::!ii~OTA~i~i~iiEASTBOUND WESTBOUND !iii!ii3'OTAL~ il PERIOD APPROACH APPROACH iiiiiiiiiii'N ~i~: i i iilii~ APPROACH APPROACH i i iii i!iE ~:~t iii iii!:::: i LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL !!:'i!ili!ii:~:::i:'!il:' LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL iiiilW~{:.!ii!?i!~iii!iii:::.A~i , ........~........,.::;;:::~:::~:~:~:¥ ::::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::: 4:15~:30PM 2 6 8~ 0 ~?:~[?.~?:?~;~?~:8 168 4 172 2 219 221 ~::~::~::;~:.~ ;~=::393 4:30~:45PM 2 6 8 165 5 170 8 237 ' 4:45~:00PM 4 5 9 0 ~;~;~9~ 189 5 194 8 236 244 ~?~;~8 5:00~:t5PM 4 4 8 0 ~::~;~8 159 3~ 162 5 26~ 266 ~;~?~28 S:IS~:30PM 3 7 ~0 0 ~:;~;~:.~'0 168 0 168 9 227 236 :::~?~04; 5:30-5:45PM 4 6 10 0 :::::::::::::::::::::::::::::::::::::::::::: 146 4 150 3 230 233 ~????~?::7383 5:45~:00PM 2 5 7 0 ~??:~?:~[?:?:~:~ 138 8 146 6 224 230 ~?~?:~::~?;::~76 LAKE ORONO PROJECT :)N LAKE COUNTY COURT SOr~L HOUSE ORONO ER277-~ ~ CITY OF ELK RIVER T.H. 10 AT JOPUN ST./185TH AVE. SIGNAL JUSTIFICATION REPORT LOCAL AREA MAP CITY H,~LL "R277-EX = NO PARKING CITY OF ELK RIVER T.H. 10 AT JOPUN ST./185TH AVE. SIGNAL JUSTIFICATION REPORT INTERSECTION LAYOUT III. SCI-IEDULE AND PROJECT MANAGER Project Manager: Mr. Terry Maurer Elk River Consultant City Engineer 1326 Energy Park Drive St. Paul, MN 55108 Telephone number: 612/644-4389 Estimated letting date: Estimated construction completion date: January, 1996 August, 1996 IV. NEED FOR PROJECT/PROJECT DISCUSSION The construction of a traffic signal at the intersection of T.H. 10 and Joplin Street/185th Avenue is part of a roadway construction project that will add a fourth leg to an existing T-intersection. The new fourth leg, 185th Avenue, will intersect from the north. Beyond its intersection with T.H. 10, it will curve to the west and join the north T.H. 10 frontage road. Joplin Street was extended to intersect with T.H. 10 in the past year. The purpose was to provide an outlet to T.H. 10 for a new south frontage road and for residential areas further to the south. A traffic signal is needed at this location primarily because of commercial development that is underway, proposed, and anticipated along the T.H. 10 frontage roads. Developments presently being constructed include a strip commercial center with a gas station/convenience store, a fast food restaurant, and specialty retail, and a 30,000 square foot office building. To the south, construction is underway on single family detached residential units and townhomes. DevelOPment proposed or anticipated within the next two years includes two additional office buildings and a fast food restaurant south of T.H. 10, and a senior housing facility and two commercial lots north of T.H. 10. '~ 230/27%2201 .sep V. PUBLIC AND AGENCY INVOLVEMENT The City of Elk River and Mn/DOT will be required to coordinate funding through their cooperative agreement. VI. DESIGN CRITERIA AND EXCEPTIONS No design exceptions to Mn/DOT or AASHTO standards are required. VII. JUSTIFICATION The subject intersection was studied with respect to the signal warrants outlined in the 1991 Minnesota Manual on Uniform Traffic Control Devices (MMUTCD). A signal warrant analysis was done using projections of traffic volumes upon completion of developments currently under construction. A second warrant analysis was done using volumes representing projected traffic with development anticipated within the next two years. Both analyses concentrated on Warrant Number 11, the Peak Hour Volume Warrant. Exhibit 3 shows the results of both analyses in graphical form. As indicated in the exhibit, the combination of T.H. 10 and cross-street high volume approach projected volumes plots above the line for two intersecting roads each with two or more approach lanes. This is true for both analyses. Further analysis was done with regard to 8-hour and 4-hour volumes. This was done by taking the peak 8 hours of existing traffic and projecting the additional traffic due to the current and anticipated development as a percentage of the peak hour volumes that were developed for the analysis of Warrant 11. This analysis showed that the intersection would meet Warrant Number 2, the Interruption of Continuous Traffic Warrant, and Warrant 9, the Four-Hour Volume Warrant, at the time the developments that are currently under construction are completed. In addition, Warrant Number 230,r277-2201 .sep PEAK HOUR VOLUME WARRANT (ABOVE 40 MPH ON MAJOR STREET) I 400 La ~0 300 ~ <~ 200 O~ 100 I 300 GO 5~ 600 7~ 800 900 1000 1100 1200 1300 - ~H MAJOR STREET- TOTAL OF BOTH APPROACHES 2 1 1. PROJECTED PEAK HOUR VOLUMES UPON COMPLETION OF DEVELOPMENTS CURRENTLY UNDER CONSTRUCTION (1926,109). PROJECTED PEAK HOUR VOLUMES INCLUDING DEVELOPMENT ANTICIPATED WITHIN TWO YEARS (2007,153). (a)PROJECTIONS DO NOT INCLUDE BACKGROUND TRAFFIC GROWTH. (b) NORTHBOUND RIGHT TURNS ARE NOT INCLUDED IN MINOR STREET APPROACH VOLUMES, SINCE THEY HAVE A FREE TURNING MOVEMENT. '(c)VOLUME PROJECTIONS DO NOT REFLECT CLOSING OF THE T.H. 10 MEDIAN AT THE SHERBURNE CEXJN~ COURTHOUSE. [R277-EX ~ CITY OF ELK RIVER T.H. 10 AT JOPUN ST./185TH AVE. SIGNAL JUSTIFICATION REPORT PEAK HOUR VOLUME WARRANT 8, the Combination of Warrants, would be met with the development anticipated within two years. Table 2 is a summary of this analysis. Additional issues that strengthen the justification of signalization of this intersection are discussed below. An accident problem does not currently exist; however, potential for accidents is likely to increase as traffic volumes through the intersection increase. This is particularly true with the high-speed (55 miles per hour speed limit) nature of traffic on T.H. 10. Although the analyses in this report project traffic to be generated by development anticipated within the next two years, additional development is expected beyond that two year window, especially along the south T.H. 10 frontage road. The construction of 185th Avenue will change the existing T-intersection to a four-legged intersection. This will increase the number of conflicting traffic movements in the intersection, thereby increasing complexity and potential for safety concerns. Installation of a traffic signal at this location could provide assistance to MnDOT in its efforts to close other access points along T.H. 10. This could provide safety benefits that extend well beyond the immediate vicinity of the T.H. 10/Joplin Streeff185th Avenue intersection. Based on recent traffic counts and traffic projections for developments currently under construction, signalization of the intersection of T.H. 10 with Joplin Street/185th Avenue is warranted on the basis of meeting Warrant Number 2, the Interruption of Continuous Traffic Warrant; Warrant Number 8, the Combination of Warrants; Warrant Number 9, the Four-Hour Volume Warrant; and Warrant Number 11, the Peak Hour Volume Warrant. Furthermore, signalization is justified based on the operational considerations outlined above. 230/277-2201 .$ep TABLE 2: Traffic Signal Warrant Analysis - TH 10 and Joplin Street, Elk River, Minnesota Traffic Counts Taken: Wednesday, November 29, 1995, 5:00 a.m. to 1:00 p.m. (Table 3) Thursday, November 30, 1995, 1:00 p.m. to 9:00 p.m. (Table 4) Current Volume (A) Additional From Development Time (TH 10 - 2-way) % of Total Total VPH Hour Period (Joplin - NB & Lt. Turn) (TH 10) Current (B) Two Years (C) (A+B+C) 1 4 to 5 p.m. 1,394, 16 100 241, 96 81, 44 1,716, 156 2 5 to6p.m. 1,374, 15 99 239, 95 80, 44 !,693, 154 3 3 to 4 p.m. 1,259, 9 90 217, 86 73, 40 1,549, 135 4 7 to 8 a.m. 1,163, 10 83 200, 80 67, 37 1,430, 127 5 6to7 p.m. 1,011, 10 73 176, 70 59, 32 1,346, 112 6 6to 7 a.m. 983, 7 71 171, 68 58, 31 1,212, 106 7 2to3 p.m. 961, 4 69 166, 66 56, 30 1,183, 100 8 8 to 9 a.m. 920, 8 66 159, 63 53, 29 1,132, 100 Warrant 1: Requires (8 hr.) 420 VPH Major Street (2 dir.), 140 VPH Minor Street (I dir.) - Not Met Warrant 2: Requires (8 hr.) 630 VPH Major Street (2 dir.), 70 VPH Minor Street (1 dir.) - Met Warrant 8: Requires (8 hr.) 720 VPH Major Street (2 dir.), 100 VPH Minor Street (1 dir.) - Met Warrant 9: Requires (4 hr.) 80 VPH Minor Street when Major Street Over 900 VPH - Met Warrant 11: Requires (1 hr.) 100 VPH Minor Street When Major Street Over 1,200 VPH - Met All Use Above 40 MPH on Major Street 230/277-I 112.dec TABLE 3 SUMMARY OF VEHICLE TURNING MOVEMENT COUNTS Observer(s): Joe Lock/Ralph Bader Date: 29-Nov-95 INTERSECTION OF T.H. 10 ^NO JOPLIN STREET TIME PERIOD NORTHBOUND APPROACH Day: Wed Cily: Elk River SOUTHBOUND APPROACH EASTBOUND APPROACH WESTBOUND APPROACH 230277TC.W~4 1 12/21195 TABLE 4 SUMMARY OF VEHICLE TURNING MOVEMENT COUNTS Observer(s): Joe LocldSusan Fussell Date: 30-Nov-95 INTERSECTION OF T.H. 10 AND JOPLIN STREET NORTHBOUND TIME APPROACH PERIOD Day: Thur City: Elk River SOUTHBOUND APPROACH EASTBOUND APPROACH WESTBOUND APPROACH 230277 TC ~NI,(4 1 1212 II95 VIII. APPENDIX 230/277-2201 .sep rlK~l I.TP, li PROJECT CLIENT PROJECT NUMBER BY 6"/~ CHECKED PAGE / OF C,& )(.10~7) +- (.18 )(.1~2) = c/2_._ Vusa. ?~/~ NB't-bm ~¢-ro.~ 77-t Yeh..,-, r~o, ki~? NLS--> ~ d~,/,rf- nm orrb -n-/I0; "~._ SUBJECT PROJECT CLIENT PROJECT NUMBER .~....~--~,~r-~--.~_~ DATE ~>',~:~'/'~"" BY (~'M ~' CHECKED PAGE 2 OF SUBJECT .-'/-r-f~ PROJE~ CUENT PROJECT NUMBER DATE BY "~'~ CHECKED PAGE ~:::L~I;;' OF SUBJECT PROJECT CLIENT PROJECT NUMBER BY ~' J~_"~ CHECKED DATE F/~,/~/F- PAGE ..~ OF I SUBJECT PROJECT CLIENT PROJECT NUMBER I ~ ~--~ 7 BY C~"/~ CHECKED DATE PA~E ,., '--~ OF. 153