Loading...
9.C.3. PRSR 01-14-2004Item # 9.C.3. MEMORANDUM TO: Park and Recreation Commission (~~^ , FROM: Michele McPhersoH;'Director of Planning DATE: January 14, 2004 SUBJECT: 2004 CIP Budget Attachments • Pet Waste Bag Dispenser Information • True Ride Illustration of Skate Park Equipment • Engineer's Construction Estimate -Lions Park Parking Lot Expansion • Lions Park Parking Lot Expansion Plan As 2004 will be a transitional year with the mid-year hiring of the Park and Recreation Director, staff is suggested ascaled-down 2004 Capital Improvements Budget, with fewer projects, all of which would be contracted out. We are proposing the following budget: PROJECT BUDGET AMOUNT Youth Athletic Complex Concession Stand Completion $20,000 Trott Brook Barn Interior Completion $15,000 Lions Park Parking Lot Expansion $35,000 Lions Park Trail Overlay $75,000 Skate Park Equipment Purchase $50,000 Purchase 5 Sets of Doggie Bag Pet Waste Bag Dispensers $ 500 Undeveloped park improvements $10,000 Prairie Seed $ 2,000 Miscellaneous Supplies $10,000 Tota12004 Budget $217,500 Park maintenance staff would oversee the various contractors and focus on maintenance and completion of minor park improvements such as benches, tables, and identification signs. Recommendation Staff recommends that the Commission recommend the Ciry Council approve the above 2004 CIP budget. S:\PLP,NNING\Michele McPherson\PARffiVREC\Financial\1 14 04 CIP memo.doc Bag Dispensers t~~~~r,A41-~r~ ~~~ _ "'F~ca{~dn,~}'r~aa erafrr~~ ~=la~rt}~~rr~ like ts> dam„ Page 1 of 3 waste bag dispenser holds up to 400 . built-in lock in the lid room for 2 rolls of pet waste bags (200 bags per roll) available in gray & black premium aluminum hinge ;,,~, Advantages of this model are: .Easy to refill. Simply set a roll of bags into an empty bag slot in the dispenser box. Great looks. This elegant bag dispenser fits nicely under signs, on posts and on fences. Infrequent service required because the dispenser holds up to 400 bags. No risk of loose bags because the bags are attached each other on a compact roll. Price:_$57.00 n waste bag dispenser holds up to 600 - built-in lock in the lid room for 3 rolls of pet waste bags (200 - w ~ , bags per roll) a _ i ~'f .. available in gray & black ~. Advanta es of this model are: .. ~..~t _ _ ,~~.. 9 http://www.leisuremore.com/DogPazkSolutions/bagdispensers.htm 12/2/2003 t %Pet Waste Bags Receptacles Page 2 of 3 .Easy to refill. Simply set a roll of bags into an empty bag slot in the dispenser box. ..Infrequent service required because the dispenser holds up to 600 bags No risk of loose bags because the bags are attached each other on a compact roll. Price: $59.00 waste bag dispenser holds up to 600 built-in latch for pad locks room for 3 rolls of pet waste bags (200 bags per roll) available in gray & black of this model are: ..Easy to refill. Simply set a roll of bags into an empty bag slot in the dispenser box. ..Jnfrequent service required because the dispenser holds up to 600 bags No risk of loose bags because the bags are attached each other on a compact roll. Easy to replace damage to locks caused by severe environments (e.g., salty ocean air). dispenser holds up to 600 bags. Individual compartments for each roll ..Simple operation with no mechanical parts to break Easy to load. Just set a roll in an empty compartment and start the bag feed. Constant supply of bags for extended periods reduces maintenance costs. Three bag feeds ensure bags continue to http://www.leisuremore.com/DogParkSolutions/bagdispensers.htm 12/2/2003 Bag Dispensers Page 3 0l 3 Three bag feeds ensure bags continue to be available after 2 rolls have been dispensed. -Box is designed to mount to 2" poles, fences, walls, and 4" x 4" wood posts. Mounting kit is available for a minimal charge iew sam~s of Custom.~ns. http://www.leisuremore.com/DogParkSolutions/bagdispensers.htm 12/2/2003 ENGINEERS ESTIMATE PROJECT: LIONS PARK CENTER PARKING LOT OWNER: CITY OF ELK RIVER ENGINEER: HOWARD R. GREEN COMPANY ITEM ITEM DESCRIPTION NO. UNIT QTY UNIT PRICE TOTAL PRICE CONCEPT A SCHEDULE 1.0 -PARKING LOT 1 MOBILIZATION 2 CLEARING 3 GRUBBING 4 AGGREGATE BASE CLASS 5 5 TYPE MV 4 WEARING COURSE MIXTURE fi TYPE MV3 NON WEARING COURSE MIXTURE 7 BITUMINOUS MATERIAL FOR TACK COAT 8 4" SOLID LINE W HITE, EPOXY 9 CONCRETE MEDIAN SCHEDULE 1.0-PARK AND RIDE PARKING LOT--TOTAL SCHEDULE 2.0-ALTERNATE 1 MOVE ELECTRICAL BOX 2 AGGREGATE BASE CLASS 5 3 TYPE MV 4 WEARING COURSE MIXTURE 4 TYPE MV3 NON WEARING COURSE MIXTURE 5 BITUMINOUS MATERIAL FOR TACK COAT SCHEDULE 2.0-ALTERNATE--TOTAL CONSTRUCTION SUBTOTAL LS 1 53,000.00 $3,000.00 TREE 1.00 5500.00 $500.00 TREE 1.00 $500.00 $500.00 TON 430 $10.00 $4,300.00 TON 120 540.00 $4,800.00 TON 120 $40.00 $4,800.00 GAL 50 $2.00 $100.00 LF 820 $0.50 $410.00 SF 862 $4.00 $3,448.00 $21,858.00 LS 1 $2,000.00 $2,000.00 TON 95 $10.00 $950.00 TON 27 $40.00 $1,080.00 TON 27 $40.00 $1,080.00 GAL 11 $2.00 $22.00 $5,132.00 $26,990.00 D m X rTl ~~'a ~\ m ~ ~ /~~ /~i!~ f I o rn ~ ~ ~ ~ i ~ ~ j ! ~1 ~ ; „„ ~ ~ \~... ~ 148.-~ 5/8" ~\ ~ \ >-~ " r~ ~ ~ >~ )-C ~_~ ~ a ~ ~ D o ~ _ O ~ ~ X N r- 1 v'-o" o ~ ' ~~ ~~ , ~~d' ~,~ z~ _ 0 i 0 it ~ ` d ~~ ~~ _ I -\ \\ N a ~ /~ t- ~ ; 24~_~,~ - 108'-O'. 12,-p„ i o z om ~~ m~ r m~ OD m~~ O Z - x ]J m ~X O m A O fOTI N rn ~ X O _ Z ~ O A W f`t OX -i Z ~ m0 XN ~~ m ~A OG) A~ ? A~ ~. yO n~ ~ D r^ ~ ~m Zm ~ ~ mx z O in xti N ~ Z ~ o 126'-0" 18'-0" a o ~\ i i ~Y ~\ _ ~~~ '~~ i I C o ~ u o ~~~` ~ -\ ~ ~ C ~ ~ i i ~ ~ I / ~\" i i J ~ l a /; ~ LION PARK S CENTER DATE: 9/2/2003 SHEET DROWN BY: °` PROPOSED PARKING PLAN cM~ 1 ti SCALE: River 1104 LIONS PARK DRIVE i " = 20'