Loading...
4.7. SR 07-14-1997"-'ity of 'ver Item #4.7. MEMORANDUM TO: FROM: DATE: Mayor & City Council Pat Klaers, City a~?trator July 14, 1097 SUBJECT: Highland Road Project Update The Highland Road watermain construction project is moving forward on schedule. (Councilmember Farber can attest to the construction activity in his neighborhood.) During the Council CIP worksessions, discussion of the vertical curve in Highland Road near Jackson Road took place. It was estimated that about I foot of material would be removed which would lower the vertical curve and that the cost for this work would be about $22,000. The Council requested additional information about the horizontal curve and whether or not the road could slightly shift to the north. In brief, it does not appear that much can be done regarding the horizontal curve. Additionally, there is a concern that we won't get much in terms of results with a one foot decrease in the vertical curve for the $22,000 investment. City Engineer Terry Maurer will have some pictures and information to present to the Council at this 7/14/97 meeting. \\elkriverksys\shrdoc\offsite\street\highrdup.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425