Loading...
4.2. SR 02-14-2011~~j City of Elk -~-, River REQUEST FOR ACTION TO ITEM NUMBER Ma or and Ci Council 4.2. AGENDA SECTION MEETING DATE PREPARED BY Administration Febru 14, 2011 Tim Simon, Finance Director ITEM DESCRIPTION REVIEWED By Architect for Public Works/Parks/Fleet Maintenance Project Lori ohnson, Ci Administrator REVIEWED BY ACTION REQUESTED Approval to contract for architectural services with 292 Design Group for the public works/parks/fleet maintenance facility project pending city attorney review of the contract. BACKGROUND/DISCUSSION C-ver the past several months, a committee of several city staff members and Councilmember Westgaaxd has worked on the master planning study for the public works campus. From that point, the Council authorized the committee to perform a request for proposal (RFP) for the architectural services for the project. The RFT' was separated into two phases (I and II). Phase I includes conceptual design, schematic design, design development, and construction documents. Phase II includes bidding and negotiation and construction administration. The Council discussed phase I which may include some improvements like fuel islands, ball park lighting, grading, etc. All of which will be determined once phase I commences and detailed project budgets are developed. We will work with the architects to figure out the best approach based on the funding available for phase I. The Council will consider phase II once phase I is complete. Seven architectural firms submitted proposals for the project, of which the committee chose three of the firms to be interviewed. The base fees ranged from ($337,500 - $745,750). SEH, 292 Design Group, and TKDA were each given one hour for a presentation and questions from the interview panel. Based on the interviews, relevant experience, references, and fees, the interview panel is recommending 292 Design Group. The committee had many good discussions about the project and would like to consider some optional services that were proposed by many of the firms. They include commissioning, energy modeling, daylight modeling, and fixtures, furniture and equipment design. FINANCIAL IMPACT Breakdown of basic services (3.75% of $9,000,000 construction cost): Phase I - $236,250 Phase II - 10$ 1,250 Total $337,500 (plus up to $5,000 each phase for reimbursables) N:\Public Bodies\City Council\Council RCA\Agenda Packet\02-142011\PWazchitects.docx Estimated optional services: Commissioning ($27,000-$45,000) Energy Modeling ($4,400-$8,800) Daylight Modeling ($2,200-$4,400) Fixtures, Furniture and Equipment ($15,000) If these optional services are chosen, the total on the high range would be $420,700, including reimbursable expenses. The funding for phase I will be out of the government building fund with a transfer from the municipal liquor enterprise fund once the complete scope of phase I is determined. ATTACHMENTS ^ 292 Design Group Project Approach and Fee Schedule Action Motion by Second by Vote Follow Up N:\Public Bodies\City Council\Council RCA\Agenda Packet\02-142011\PWarchitects.docx Y ~.c d L ' . E I ,~'f , ~ } r ~ ~~` H r' -.. f 1, ~ ' V ~ ~' .. M ..: ~. 1 j ,. ,. ~ ~ , ~i. _ N~ i } ~'. . i ~ ~/ ? ` ~ r. ! ~ t Tw ~. ~ ~ .. _ r' , "~ X S _ T ~~ i ~~ nc~ .~~.~.yea, e f ` ~ 3 k~' .. . - - ~~ _ ,.~ / ~ k Y ~" ~ Public Works and Fleet Maintenance Facility A ~ropos~l for Archi~ecturc~i n ineerin S rvices 292 Design Group 9100 49th Avenue North New Hope, MN 55428 Contact, Pamela Bakken Anderson, AIA panderson@292designgroup.com 763.533:3813 r- J - - R~~jecf ~~p~oae~ Project Unc~erstandin~ & ~1/orkplan i~f~~°<< rtr~i~rsn~ Working closely with Elk River staff and leadership, 292 Design Group and our consultants will engage the team in meaningful analysis, assist the city in developing a detailed plan for the city's public works storage and maintenance requirements and design a facility that meets the needs of current operations while allowing for future development and changes. We understand that it is our job to provide professional planning advice to City staff so they will be able to make the critical decisions required for the future of the City of Elk River. Our team does this through a thoughtful and rigorous planning process starting with a work plan and defined work products. ~~r r~~ri~ i~r~~t~ Project dick-af Public Works representatives and City staff meet with the design team to discuss the work plan and to identify the decision-makers who will be involved in the design work. We then prepare a statement of goals and objectives for the vehicle storage, maintenance, and office building, the fuel storage/dispensing area, salt storage, compost storage and adjacent area design and confirm a schedule that identifies key milestone dates and agendas for meetings and presentations. Work Proclc~cts.- Written work plan and goals/objectives, project schedule, major milestone dates, directory of project participants, and meeting schedules and agendas City{Staff Input and Planning l~evie~d All project stakeholders will be brought together into a comprehensive planning and design team working directly with the consultant team. The first critical phase is to review and discuss the work undertaken to-date. Concurrently, we will collect input from the various users who will be involved in the project including public works staff, city leadership, and all regulating agencies. Our team believes in and feels strongly that the greater the input at this phase, the greater the potential for a successful project. Work Products: Written meeting minutes, notes and analysis, program and site planning updates (as needed) Cencept~al Design ®eveiopment As one of the most informative parts of the design process, the 292 design group team will lead the City through a design charrette to prepare multiple diverse options for participants to discuss. Conceptual image sketches suggest the form and image of the building and its fit within the existing natural context. At this time, initial budgets are confimed based upon the conceptual design and site information. Work Products: Conceptual plans, site plans, exterior image sketches and and _. preliminary budget confirmation • Vehicle Storage • Fleet Maintenance • Wash Bays • Office Area • Break Room • Support Spaces • Fuel Storage and Dispensing • Salt Storage Building • On-site Compost Storage Area '-,f ~ ~'~ ~.~ x '. ~,. ~; t s~% ~i~ ~= : 7 l ~ ~*~~ ~~• .i- Elk River Public Works and Fleet Maintenance Facility ' r-e r* ~ Pre~~~c~ A~~~~~~h Project Understanding & V~~orkpfan With the recommendation to proceed by the City, a schematic design is prepared. This phase will define the public works and fleet maintenance facility including materials and construction methods and the yard, drive, parking and site development. A comprehensive schematic cost estimate ensures the project remains on-budget and sustainable design goals are documented. `~!crk .~rcc`uc4s.F A comprehensive schematic design package. Deliverables are based upon our defined project process guidelines and include: • Updated project schedule • Site plan, floor plans, roof plan, exterior elevations, building/wall sections • Additional drawings /renderings as needed to present the concept • Schematic civil layout including site plan, grading plan and utility plan • Schematic structural layout including foundation plans and framing plans • Schematic mechanical layout including equipment and distribution • Schematic electrical layout including lighting and power distribution • Architect's and consultants' description of systems • Building code study and preliminary zoning ordinance analysis • Outline specification by CSI division • Estimate of probable construction costs and value engineering as developed in conjunction with the Owner In addition to the deliverables outlined above the 292 team will make presentations to staff and other review bodies as required by the City. D~Sfgrl ~e~~~iJ~3,'"tleC-lt This phase will define the major building systems -including architectural, structural, civil, mechanical and electrical -including materials and construction methods. An updated cost estimate ensures the project remains on-budget and sustainable design goals are reviewed. l-Mork °roducts: A comprehensive design development package. Deliverables are based upon our defined project process guidelines and include: • Updated project schedule • Final code review including code and zoning review drawings and text • Drawings including site plan, floor plans, roof plan, all exterior elevations, building and wall sections, interior elevations and schedules • Additional drawings to present the design and defined in the contract. • Developed civil layout including site plan/details, grading plan/details and utility plan/details • Developed structural layout including building sub-grade foundation work, footings and foundation plans, floor and roof framing plans and written description of structural systems • Developed mechanical layout including underground waste and supply lines, mechanical equipment, distribution and systems description • Developed electrical layout including distribution, equipment, site and floor plan - layout, distribution and site lighting and systems description • Preliminary specification by CSI Division • Estimate of probable construction costs and value engineering as developed in conjunction with the Owner In addition to the deliverables outlined above, the 292 team will make any required presentations as directed by County's project representative. ., 4 _ ~~ =r ~~~ r ~-.r , .-f~v . .,~~ ~ ~j , =~ _ s _ ~ r --„. _ _ _ =2' .. .,. _.~... , 1 , 1 ~;~~ _~ ~~ Elk River Public Works and Fleet Maintenance Facility ~` rc~~~t ~~~ra~~~ Project Understanding & Warkplan Prepare the documents that will provide the detailed drawings and specifications for the construction of the project that will become the basis for a contract between the City of Elk River and the contractor for the project. ~`ifvr%C rc~u~ ~: A comprehensive construction document package. Deliverables are based upon our defined project process guidelines and include: • Updated project and construction schedule • Final code review including code drawing, completed code review text and zoning review drawings • Construction Document drawings including site plan, floor plans, reflected ceiling plans, roof plan, all exterior elevations, building and wall sections, large scale plan drawings -final layout, interior elevations -final layout, schedules and details • Final civil layout including site plan/details, grading plan/details and utility plan/details • Final structural layout including building sub-grade foundation work, footings and foundation plans, floor and roof framing plans and structural details • Final mechanical layout including underground waste and supply lines, mechanical equipment, distribution systems, floor plan layouts, mechanical schedules and details • Final electrical layout including distribution, equipment, floor plan layouts, electrical services distribution and site light lighting electrical schedules and details • Layout of specialty systems • Final specification by CSI division • Assist in preparation of a final estimate of probable construction costs Poe E i Bidding and ~egotiotion Assist the City of Elk River in obtaining bids for the project. Interpret the documents and provide clarification to the bidders on the project. Prepare contracts for the construction of the project. Construction ~dministratian Observe the construction work for conformance to drawings and specifications, process shop drawings, evaluate contractor request for payment, prepare final punch list, Certificate of Substantial Completion, and project closeout. ° `'~ ~ b~ ~ o: ~~ ~-~ . - "~ "~^ ~- i i i ~ _ i i \~ . _ Elk River Public Works and Fleet Maintenance Facility • ~: ~; I`~j~~~ ~~3~~`C3C~~1 5faff [doles 8c A~ailat/ility - ~ ,r ,' t ~ ~- ... r.. ...~ _ € i F .u - d t".~ t~ ~ ` i ~ ~ z Project review and. ~ ~.,~ J a ~~ .~, *, , decision-making team ~~~ ~~ . L a H ~ ~ cr~fri Eng.neer€rrg ~ Jason Raverty, PE Stevens Engineering Will provide technical site design & engineering Structural Engineering Joe Pearce, PE Nelson-Rudie & Assoc. Will lead structural design services Project ~~anager/Architect Pamela Bakken Anderson, AIA, CID LEED AP 292 Design Group Will be the key contact person and oversee all phases of the work Project C~esignerfArchitect Mark Wentzell, AIA 292 Design Group Will provide overall design leadership for the facility lecl°€arrical EngineeriEE Scott Rudie, PE Nelson-Rudie & Assoc. Will lead plumbing & HVAC design Electrical Engi€~eerin Andy Erdmann, PE Nelson-Rudie & Assoc. Will lead power & lighting systems design AvaNabikity and Capak~ility Each of the staff members listed above are currently available to begin work with the City of Elk River and will remain with the project throughout planning, design and construction. Additional design, drafting and support staff will be assigned to the project as required by the schedule and project requirements. Gapies of individual staff resumes are provided under section E of this proposal. Elk River Public Works and Fleet Maintenance Facility d Fees Fees by Phase irf ~t O ibr~I Project costs and fees were based upon the information provided in the Request for Proposal and and calculated based upon the following assumptions. A final fee amount can be negotiated based upon the final scope of the project. Assumed Total Project Cost - $10,000,000 Assume Total Construction Cost - 90% $9,000,000 Fee Percentage - A/E - 3.75% -Both Phases $337,500 Breakdown of Basic Services Phase I Schematic Design - 15% $50,625 Design Development - 20% $67,500 Construction Documents - 35% $118.125 Phase ITotal - $236,250 Phase II Bidding - 5% $16,875 Construction Administration - 25% $84,375 Phase I I Total - $101,250 PC~S6= j Fee for Architectural Services $160,650 Fee for Engineering Services (civil, structural, mechanical, electrical) $75,600 Other Fees -Reimbursable Expenses (Estimated Allowance) $5,000 ~OSe ~j Fee for Architectural/Engineering Services (aid & construction) $101,250 Other Fees -Reimbursable Expenses (Estimated Allowance) $5,000 Reimbursable expenses include but are not limited to: Transportation cost at current rates Reproductions, plots, standard form documents, photocopies Project photography, postage, and delivery Materials required to assemble reports. Renderings, models and mock-ups requested by the owner Other similar direct project-related expenditures Fees for this project, including program/conceptual design. confirmation, basic services, and project administration, have been determined based upon experience with projects of similar type and scope and upon calculation of actual project schedule and staffing requirements for each phase of work. The 292 team strives to tailor the fee structure to the client's expectations and requirements. We would appreciate the opportunity to discuss our fees and their development and if desired, the amount of service for a particular task or phase can be modified to keep the fee in balance with the City's budgetary requirements. Elk River Public Works and Fleet Maintenance Facility