3.8. SR 07-21-1997~ity of E **Item #3.8. a-f~* iver MEMORANDUM TO: FROM: DATE: Mayor & City Council Lori Johnson, Asst. City Administrator/ Finance Director June 16, 1997 SUBJECT: Pay Estimates Attached are copies of Pay Estimates for each of the following projects. The Pay Estimates have been approved by either the city engineer or architect and construction manager as applicable. CONTRACTOR Pay Estimate #4 - 171st. Avenue PAYMENT REQUEST RETAINAGE W. B. Miller $ 91,436.17 $18,781.36 Pay Estimate #5 - Highway 10 Frontage Road and Signal Bauerly Brothers, Inc. $235,954.05 $26,865.96 Pay Estimate #3 - Orono Lake Third, Joplin Street and Lowell Avenue $16,790.62 $15,064.00 $26,035.00 R.L. Larson Excavating, Inc. $164,113.08 Pay Estimate #16 - WWTP Expansion Gridor Construction, Inc. $ 89,295.00 Pay Estimate # 2 - Northbound Liquor Various (see attached detail) $171,112.00 Pay Estimate #12 - Ice Arena Expansion M.A. Mortenson $18,922.00 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 This Pay Estimate will be held pending architect approval. Pay Estimate #1 - Highland Road Trunh Watermain Richard Knutson, Inc. $ 78,279.93 $ 4,120.00 This is a water utility project. The water utility has requested that the City fund this pay estimate because, even though the water fund has adequate cash and investments to make the payment, there is not enough available cash without liquidating investments. Future pay estimates will be paid by the water utility. Action Requested The City Council is asked to approve the Pay Estimates as listed above. s:XcouncilXpayest.doc PARTIAL PAYMENT ESTIMATE NO. 4 FROM: NOVEMBER 13, 1997 TO: JUNE 27, 1~97 CONTRACTOR: ADDRESS: OWNER: PROJECT: W.B. MILLER, INC. 6701 NORRIS LAKE ROAD, ELK RIVER, MN 55330 CITY OF ELK RIVER. MINNESOTA 171ST AVE, ULYSSES ST & THI0 MEDIAN IMPROVEMENTS (230-313-30) COMPLETION DATE AMOUNT OF CONTRACT: ORIGINAL: JULY 25, 1997 ORIGINAL: $379,656.35 REVISED:. ~I): SCHEDULE 1.0 171ST AVENUE-TOTAL SCHEDULE 2.0 ULYSSES STREET-TOTAL SCHEDULE 3.0 TH 10 MEDIAN-TOTAL EXTRA WORK-TOTAL 80,106.45 312,532.84 10,915.02 56,252.30 3,727.13 3,727.13 1,500.00 3,115.00 MATERIAL ON SITE I $0.00 ! $0.00 P~vtous PAYMENTS ................................................... I..*.*..*..*..*.*..*..*.~.~.*..*.~.*..*..*..*.*..*..*_*.*..*..*.~.~:~! ....................... .S.~.~:.l.~.7.:~ .... PARTIAL PAYMENT ESTIMATE NO. S FROM: MAY 30, 1997 TO: JUNE 27, 1997 CONTRACTOR: ADDRESS: OWNER: PROJECT: BAUERLY BROTHERS, INC. 4787 SHADOWWOOD DRiVE, SAUK R~PIDS, MN 56379 CITY OF ELK RIVER, MINNESOTA 185TH AVENUE (230-277-30) COMPLETION DATE AMOUNT OF CONTRACT: ORIGINAL: JULY 15, 1997 ORIGINAL: $ 666,711.10 REVISED: REVISED: SCHEDULE 1.0 INTER. OF TH 10 AND 185TH AVE (ROW OF TH 10) - TOTAL SCHEDULE 2.0 185TH AVENUE (STAT 0+11 TO 7+00) - TOTAL SCHEDULE 3.0 185TH AVENUE (STAT 7+00 TO 15+50) - TOTAL SCHEDULE 4.0 STORM SEWER - TOTAL SCHEDULE 5.0 SIGNAL SYSTEM - TOTAL SCHEDULE 6.0 SANITARY SEWER - TOTAL SCHEDULE 7.0 WATER. MAIN - TOTAL 42,113.53 53,468.73 71,424.16 112,607.96 42,767.16 57,328.16 -340.00 126,211.95 113,037.30 113,037.30 0.00 27,327.25 0.00 47,337.85 FROM: TO: PARTIAL PAYME~'T Eb-'I'IMATE NO. 3 MAY 6, 1997 JUNE 27, 1997 CONTRACTOR: ADDRESS: OWNER: PROJECT: R.L. LARSON EXCAVATING, INC 2255 -12TH STREET SE, ST. CLOUD, MN 56304 CITY OF ELK RIVER ORONO LAKE 3RD ADDITION, $OPLIN ST., & LOWELL AVENUE (230-320-30) COMI%ETION DATE ORIGINAL: JULY 5, 1997 DESCRIPTION TOTAL THIS PERIOD SCHEDULE 1.0 - ORONO LAKE 3RD ADD. (STREETS)--TOTAL 64,114.30 SCHEDULE 2.0 - ORONO LAKE 3RD ADD. (SANITARY)--TOTAL 11,08'/.80 SCHEDULE 3.0 - ORONO LAKE 3RD ADD. (WATERMAIN)--TOTAL 28,810.70 SCHEDULE 4.0 - ORONO LAKE 3RD ADD. (STORM) TOTAL 19,748.80 SCHEDULE 5.0 - JOPLIN STREET (STRI~TOTAL 36,507.26 SCHEDUL~ 6.0 - JOPLXN STREET (STORM) TOTAL 0.00 SCHEDULE 7.0 - LOWELL AVENUE--TOTAL 12,481.75 ! ! $335,812.31 AMOUNT OF CONTRACT: ORIGINAL: $ 490,952.60 REVISED: TOTAL TO DATE 66,286.80 49,043.20 61,804.10 39,050.40 52,966.76 54,179.30 12,481.75 GRIDOR CONSTR., INC. 1886 BERKSHIRE LANE P.O. BOX 41246 PLYMOUTH, MN 55441 612-559-3734 Owner CITY OF ELK RIVER, MN Date For Period 6/2/97 TO 6/30/97 Request No. Engineer MSA CONSULTING ENGINEERS SUMMARY: 1 2 3 4 5 6 7 8 9 1o 11 ORIGINAL CONTRACT AMOUNT CHANGE ORDER - ADDITION CHANGE ORDER - DEDUCTION REVISED CONTRACT AMOUNT VALUE COMPLETED TO DATE INCLUDING CHANGE ORDERS MATERIAL STORED AMOUNT EARNED TO DATE LESS RETAINAGE - 5% SUB-TOTAL LESS AMOUNT PREVIOUSLY PAID AMOUNT DUE THIS REQUEST REQUEST FOR PAYMENT WWTF UPGRADE ELK RIVER, MN $ 51,801 $ (48,141) $ 3,292,900 $ 3,296,560 $ 3,159,560 $ 2,018 $ 3,161,578 $ 0 $ 3,161,578 $ 3,072,283 $ 89,295 Rccommended for Approval by: MSA C NSULTING INEERS Approved bv Contractor: GRIDOR CONSTR., ~~ ROBERT MEYER PROJ. MGR 6/30/97 Approved by Owner: CITY OF ELK RIVER, MN Specificd Contract Completion Date: 7/31/97 Date PAYXLS 6/30/97 EQUAL OPPORTUNITY EMPLOYER PROJECT APPLICATION AND PROJECT.CER, .,qCATE FOR PAYMENT AIA DOCUMENT G722/CMa (Instructioos on ~everse side) PAGE ONE OF P'AG'~S H- Z 0 bd Z 0 >- LU 0 b_ TO O\X/NEI{: Cily of Elk River 13065 Orono Parkway Elk River, MN Lori Johnson ATTENTION: PROJECT: Northbound Liquors 1(~348 Evans Slr~t NW Elk River, MN 55330 PROJECT APPLICATION FOR PAYMENT Application Ls made. (or Payment. as showo bdo~.; h, connection whh thc Projco. Project Application Summary, AIA Oocumem G7251C.Ma, i5 auachcd. I. TOTAL CONTRA~ SUMS (hem A To~Is) ~ 839. P61' 2. To~l net changes by Change O~em I 15,647 .(Item B Totals) 855,608 5. TOTAL CONTRA~ SUM 10 DATE (i~,m C Totals) ~ 4. TOTAL COMPLETED & STORED TO DATE I 301,[!04 ('Item F ~)tala) 5. RETAINAGE (hem H Totals) I 15,064 115,128 6. LESS PREVIOUS TOTAL PAYMENTS 1. (llem I Totals] 7. CURRENT PAYMENT DUE (Rcm J Totals) ] '1 1'71,1 12 The undersigned Con.,;Iruction Maoagel certific.,; Ih.at I0 Manager's know'ledge, infosmation and belie{ {h~ Project Application roi ~ymcnt is an a<cumle compilation of thc Con,melon' Appllcmion$ OeyMon¢ Con~Mon Comply CONSTRt}CTION MANAGER:~ ~ ' ~_A. ' 7/16/97 Bye _ . Date: 5~a~e of: Coumy off Sco~ Subscribed ~gd sworn lo belb~, me this day or m~y 1997 DeMa K. Qu~ell 1/3 Da000 Nolary Public: My C Dram L~sion APPLICATION NO.: I')is~ribulion LO: PERIOD TO: 0] O OWNER PROJECT NOS.: 06130/97 0 CONSTRUCTION MANAGER 3460 [] ARCIIITECT PROJECT CERTIFICATE FOR PAYMENT · In acco{dance with ihe Contract Do<umcms, based oh on-$il~' observations and the data comprising this Apptiotio[L the ConstTt~lion Manager and Arddteet certify ~o the Owner thai to thc he_si of their k~ov,'ledge, info[matioi~ and belief the Work has progressed as iJxdicated, the qu.ality of thc Wosk is iix accordance ~x'ilh the Coniract L~ocufltent$, and the Contractors are emitled ti) paymem Gl the AMOUNTS C£RTIFIED. 171,112 TOTAL OF AMOUNTS CERTIFIED ................ G mysl ono._C0nstmc tion Company CONSTRUCTION MANAGER.'~ 7/16;97 By: .' ~/~_' {~Ij ~ Date: Tushie-Montgomery & Associates. Inc. ARCHI'fEeT: . . Gary Tushie, Presidcnl By: Dme: This Cerlilicat¢ is not negoliabl¢. The AMOUNTS CERTIFIED ace payable only to the Contracto[s named in AIA Document G723/CMa, attached. I.¢,suar~e, paymcm and tahoe of payment are withou! pse[udice to any ~ights of the Owner or the Contractor.~ under their Contracts. ~,,~.~ AIA'DOCUMENT G722K:Ma * PlO)ECl' APPLIeAI'IO.'q ,~%q) PROJE~ CE~IFI(~ ~l PAYMENT · I~ EDISON · AIAe ~,1~2 · THE AM~(~N ~$TITL~E OF A~ItlTEC~. 1735 N~' ~ A~UL ~., ~&SHIN~N. D.C. ~92 WARNING: U~I~ ~~ v~ ~ ~t ~ ~ MIl ~ N ~ m ~ ~n. Gi7221CMa--199 2 Northbound Liquors Project Summary 19348 Evans Street NW Application No. ~0~,S, E?~ Elk River MN 55330 A,pplication Dale 7116/97 Pefied Ending ' A B C D E F G H I , ,J Bid Original Change Contract Work Stored Total Completed Currenl -Pkg Conb'ac? Orders Sum In Place M~tefials and Stored to Retainage Relainage Previous Payment --;'- Contractor's Name s.m To Date To Date To Date (Nol D or I) Date (D+E) Percentage Amount Payments ! MSCConcrete, tnc. 211,230 $ 755 $ 311,985 $ 1~1,857 $ " $ 111,857 5% $ 5,592 $ 62,272 $ 2 FiveSlarWeldin~&Fabricaling 79,500 $ $ 79,500 $ 67,500 $ $ 67,50O 5% $ 3,375 $ 13,965 $ 50,160 --"~"-JulianM.*JohnsonConsb'ucUon 94,800 $ 5,242 $ 100,042 $ 72,367 $ $ 72.367! 5% $ 3,618 $ 12,469 $ 56,280 4 Anderson Mechanical, Inc. 88,749 ~ - $ 86,749 $ $ $ 5% $ ,, $ $ - 5 Reliance Electric, Inc. 74,971 $' - $ 74,971 $ 12.800 $ $ 12.800 5% $ 640 $ 4,085 $ 8.075 6 B & B Sheet Metal & Roofing, In 55,782 $ $ 55,782 i $ $ $ - 5%! $ $ $ ' 7 Galeway ACG, Inc '44,080 ~ $ 44,080 IS 12.235 $ $ 12,235 5% $. 612 $ - $ 11,623 8 Gopher State Contraclels, Inc. 31,500 $ S 31,500 $ $ _ $ - 5% $... $ - $ .-. 9 R & H Dp/wall, Inc. 49,790 $ $ 49,790 $ . $ . $ - 5% $ $ 10 Skillmans Pain/lng, Inc. 13,275 $ $ 13,275 $ . $ . $ 5% $ $ - 11 Multiple Concept lnleflors, lnc. 9,162 ~ $ 9,162 $ $ _ $ 5% $ $ - 12 Gmzzini Brothers & Company 7,880 $ $ 7.88o I $ $ $ 5% $ $ 13 Door Se~vlce of St. Cloud '10,497 $ - $ 10,497 $ $ $ 5% $ - $ .. 14 HelmlnLandscaping 17,500 $ - $ 17,500 $ $ $ 5% $ - $ 15 SchlndlerElevalorCorporatlon 26,700 $ 9,650 $ 36,350 $ " $ $ 5% $ - $ $ 16 Molln Concrele Products Comp 24,545 $ - $ 24,545 $ 24,545' S $ 24.545 ! 5% $ 1,227 $ 22,337 $ . 981 I:: 0 $ - , 0 ' $ ' - 5%$ - $ TOTALS 839,g6!, $ t5.647 $ ~55.608 $ 301.304 $ "$ 301,304 $ 15,064 $ 115,128 $ 171,112 K L M _ Balance Balance To 'To Finish Ind Finish % (G/C) Retainage 100,128 52.8% 105,720 12,000 84.9% $ 15,375 27,675 72.3% $ 31,293 88,749 o.0% $ 88,749 62,171 17.1% $ 62,811 5§,782 0.0% $ 55,782~ 31,845 27.8%'$ 32,457 31,500 0.O% $ 31,500 49,790 0.0% $ 49,790. 13,275 0.0% $ 13,275 9,162 0.0,~ $ 9,!62 7,880 0.0% $ 7,880 10,497 0.0% $ 10,497 17,500. 0.0% $ 17,500-- 36,350 0.0% $ 36,350 100.0% $ 1,227 o 0.0% $ o 554,304 35.2% $ 569.368 APPLICATION AND CERTIFICATION FOR PAYMENT TO OWNER Ciiy of Elk Rivcr 13065 Orono Parkway Elk River, Minnesota 55330 PROJECT: Elk River Ice Arena Expansion Elk River, Minnesota FROM CONTRACTOR: VIA ARCHITECT: RSP Archilects, Ltd. M. A. Mortenson Company 120 Firsl Avemte Norlh 700 Meadow Lane North Minneapolis, MN 55401 Golden Valley, Minnesota 55422 CONTRACT FOR: C~nslmc6on Managemen! CONTRACTOR'S APPLICATION FOR PAYMENT Application is made lbr p~ymen~ as shown below, in eenneclion with the Conlract. Continuation Sheel, AIA Document G703, is eltachcd. ,4M DOCUMENT G702 APPLICATION NO: 12 PERIOD TO: 6/30/97 PAGE OI~E o~: 2 PAGES PROJECT NO: 951019 Distribution to: F-~OWNER F~ARCFIITECT FT~ CON T RA CTOR CONTRACT DATE May, 1996 The undersigned Conlraetor certifies IbM to the best of the Contractor's knowledge, information and belief the Work coveied by this Application for Paymen! has been completed in accordance with the Contracl Documents, that ali arno!mis have been paid by the Contractor tbr Work for which previous Certifi~tes for Pa!Then! ~r~ i.~nmd and paymenL~ received from ~e Owncr~ and thai cunent paymen! shoo, tn herein is now due. I. ORIGIIqAL CONTRACT SUM 2. Net change by Ch~ge O~dess 3. CONTRACT SUM TO DATE 0Ane 1 a- 2) 4. TOTAL COMPLETED & STORED TO DATE - (Column G on G703) 5. RETAINAGE: a. % of C0mpleted Work (Column D -~ E on G?03) I~. % of Stood MMerial (Column F on G703) ' Total Retainage (Line. s 5a ~- ab or Total in Coloron I of G?l)3) 6. TOTAL EARNED LESS RETAINAGE (Line 4 Less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from pdo~ Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Lin~ 3 less Line 6) $ 2,288~04.00 $ 190,4~2.U0 $ 2,478,606.00 $ 2,467,517.00 26,035.00 $ 26,035.00 $ 2,441,482.00 $ 2,422,560.013 $ 37,124.00 CON TRACTOR: M. A. Mt~enson Company Bt': Date: Jul)' 10, 1997 Slate of: Minnesota Counly of: Hennepin Subscribed and sworn ~o b~lbre me ~is 10th .da}, of . July 1997 Notary Public: My Commission expires: Janumy 31, 2000 . ARCHITECT"S CI=RTIFIGATI:'FOR PAYMI::NI In accordance with the Contract Documents, based on c~-sie: observations and the dnla comprising the application,, the A~c. hitcet certifies to !~ Owner thal !o thc best of e&e Anrhitect's knowlcdge~ information and belief the Work has progrezsvd as indic, a~ed, the qnali~y oflhe Work is in accordance wilh ~he Contra~ Docamen~s, and the Con~ractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED ........... $ ' CHANGE ORDER SUMM~RY ADDITIONS DEDUCTIONS Tolal Changes approved in previous months by O,wncr $181,063.1)~} Total approved this Month $9,339.00 TOTALS $190,402.00 $0.00 NET CHANGES by Chaag~ Order $190,402.00 A~ OOCIJ~ENT O'i~ - APPLICA'f ION AI~D CERllFlCAlION FC~ PAYMENT - t.092 E~n't(~l · AIR · ~1~2 IHE AMERICAI9 INS ! II UTE O~: ~C~ i ~:~i:a 17~5 NEW YORK A'qE., N.W.. WASHINGTON. DC 2(IOC~-5292 Users may obtain validation of this document-by requesting a completed AIA Document D401 - Certification of DocumenfsAuthenttcity from tho Licensee. (~4ttach explanation if amount certified differs from the amount applied Initial all figures on this Application and an!he Continuation Sheet thai are changed lo conform wilh the amount certified) ARCHITECT: By: Date: This Certificate is not negotiable. The AMOUNT CERTIFIED is pa)able only to L:ontra~or named harem. Issuance, payment and aoceptance ot payment afc w~thout prejudice to an)' rigbls of the Owner or Contractor under this Contract. CONTINUATION SHEET ALA Docnmenr c3702, APPLICATION ANDCERTIFICATION FOR PAYMENT', containing Contractor's sig~ed certification is attached. In tabulations below, amounts are s~aled to the neam~! dollar. Use Column I on Contracts where variabl= rctainage for line items may npply. /1l/t DOCUMENT G703 Page 2 o~ 2 P'~es APPLICATION NO: 12 APPLICATION DATE: 7/10/97 pERIoD TO: 6130197 ARCHITECT'S PROJECT NO: MAM INVOICE NO: 18538 & 18609 A B C D [ E F G - H I l'l'lgM DESCRJ]~i'I(~ OF WORK SC-HEDULEI~" WOILK COMPLETED MATERIALS TOTAL % BALANCE RETAR4AGE NO. VALUE FROM PREVIOUS THiS PERIOD PRESENTLY CO.MPLE i PJ~ {G + C) TO FINISH (IF VARI ABLE APPLIC^TION STORED AND STORED (C - G) RATE3 (D + E) {NOT IN TO DATE O OR E) I General Conditions ~6'6,234.00 550,739.00 54',406.00 $0,00 $55,145.00 $3.'~6% $11,099.00 2 Ice Equipment S465,120.00 $468,120.00 $0.00 $0.00 g46g, 120.00 100.00% $23,281.1)0 S~curities 3 :General Con.~tructkm $1,322,746.0~) SI,315,166.00 S7,58~X00 50.00 $1,322,746.00 IO0.E)0% Pledged 4 Bleachers $55,~70.00 $55,070~00 $~LO0 $0.00 $55,070.00 100.00% 5 Electrical $175,631.00 $173,872.00 $1..759.00 $O.00 $175,631.00 IO0.0~$ 50.00 6 biechanical $324,380.00 $324,380.00 $0.00 50.00 $324,380.0t1 100.0~ 999 Construction Manager Fee $62,325,00 $62,325.00 $0.00 50.00 $62~325.00 100.00% 50.00 Chain Link Fencing $4,101).00 S4,100.00 54,100.{)0 101XO0% SO.00 GRANO TOTALS $2,478,606.00 "$2~453,~72.0o 513,745.00 $0.00 ~2,467,517.00 99.55'/~ $11,089.00 $26,035.00. Al& OOCUMENT G76'~ - COHIlI~tI~,TION SHEE1 FOR G702 - 1992 EDIIION./*iA. ~1992 THFA~IERIC&IqlN$11TUrEOFARCH~lECT,S.~735NEWYORKAVENUE= N.W. ~'.'ASHiNGTON. D.C 20006~232 G703-1992 FROM: TO: CONTRACTOR: ADDRESS: OWNER: PROJECT: JUNE 16, 199'/ JULY 4, 199'7 PARTIAL PAYMENT ~ATE NO. 1 RICHARD KNUTSON, INC. 12585 RHODE ISLAND AVENUE SOUTH, SAVAGE, MN 55378 CITY OF ELK RIVER HIGHLAND ROAD TRUNK WATERMAIN COMPLETION DATE AMOUNT OF CONTRACT: ORIGIINAL: JULY 16, 199'7 ORIGINAL: $ 360,403.17 REVISED: REVISED: DESCRIPTION SCHEDULE 1.0 HIGHLAND ROAD TRUNK WATERMAIN-TOTAL ALTERNATE NO. 1-TOTAL TOTAL THIS PERIOD TOTAL TO DATE 82,399.93 82,399.93 0.00 0.00 6MOUNT EARNED I $82,399.93 ! $82,399.93