3.5. SR 03-07-2011REQUEST FOR ACTION
To
ITEM NUMBER
City Council
3.5.
AGENDA SECTION
MEETING DATE
PREPARED BY
Consent
March 7, 2011
Rich Czech, Ice Arena Manager
ITEM DESCRIPTION
REVIEWED By
Ice Arena Condenser Replacement
Tim Simon, Finance Director
REVIEWED BY
Lori Johnson, City Administrator
ACTION REQUESTED
Approve the quote from Commercial Refrigeration for replacement of the existing condenser in the barn
and an additional $1,000.00 for the replacement of a privacy/security fence around the new condenser.
BACKGROUND /DISCUSSION
The existing condenser is about 30 years old and is subject to leaks in its cooling pipes that could lead to
the loss of refrigerant and loss of ice during the season.
Due to space constraints, the existing fence will need to be removed during replacement of the condenser
and will need to be replaced.
FINANCIAL IMPACT
$37,500.00 was budgeted in the 2011 Ice Arena budget capital outlay for the replacement of the
condenser. Staff received two quotes, the lowest being from Commercial Refrigeration for $33,790.00,
plus $1,000.00 for replacement of a privacy /security fence for a total project cost of $34,790.00.
ATTACHMENTS
• Quote from Commercial Refrigeration
• Quote from American Industrial Refrigeration Mechanical Contractors
Action Motion by Second by Vote
Follow Up
N: \Public Bodies \City Council \Council RCA \Agenda Packet \03 -07- 2011 \Action Requested Bam Condenser.docx
RECEIVED 02/28/2011 11:00
FEB -28 -2011 10:45 From:COPTIERIAL REFRIG 5Y 218 749 6810 To:17636351144 P,1 -14
.�..._ ... �.. 105 -..P VV ..
�t�MM�AIGIAL �161�R111�IRggTiC1N �iY�TIlM6
SALGO, 81:AVIC0. INSTAII -ATION a AePAIA
Mark Rudettoo • Jahn Redorlge 144 13e4t Chealnut 81tgp1 - R O. BOX 1004
PhOnO (2113) Vlrglnfo, Minnsaoi• 136748
PROPOSAL AND ACCEPTANCE
Proposal Submitted to: City of Elk River Date: February 28, 2011 Number: 2011.07
Attu: Rich Czech
Job Name: Evaporative Condenser
Job Location: Elk River Ice Arena
We purpose to remove and replace:
Existing Baltimore Aircoil Model #VC1 -80 and replace with a Baltimore Aircoil Model #VC1-
126 Evaporative Condenser (see enclosed spcitications). Base capacity increase to 380/a,
Price: $241850,00 (Freight allowed, Minnesota Sales Tax Included)
Structural Beams ADD: $500.00
Removed and Dispose of Existing Evaporative Condenser: $2,640.00
Installation (Labor, Materials, Travel & Subsistence): $3,500.00
VFD for Condenser Fan ADD: $2,500,00
Payment Terms:
We; Tills KOPOUI MY In witlXMM by in It not
WAp%d won ..All - - days
Net 30 Days
i o -i 3 3,
Authorized Signature
Acceptance of Proposal - The above prices, specifications and conditlona are s8tlsfactory and are hereby
aaceptad. You are authorized to do the work as speclfied. Payment will be made as outlined above.
Signature Tide
Date
PROPOSAL
Mon
American Industrial Refrigeration
Mechanical Contractors
14322 2181 Ave. No. • Plymouth, MN 955447 *Phone (952) 470 -9610 *Fax (952) 470.9617
omPPOW NSme
Elk River Arena
Phone I Fax
763 -635 -1141
Date
311111
street Address
1000 School Rd
4OU010 rwrneer
0311 -04 -GB
tate,ilP
Psoled eealton
Elk River, MN 55330
Arena — west end
llentforr
Rich Czech
Project oescrip on
Original rink condenser. upgrade
Dear Rich,
American Industrial Refrigeration (AIR) proposes to furnish and Install a new BAC evaporative
condenser model # VC1 -125 In place of the existing model# VC1 -90. The existing condenser would
be isolated, pumped down and evacuated. The refrigerant and water piping would be disconnected
and the condenser cut loose from its supports. The existing unit would be craned off and new support
steel Installed on the base. Once the new support steel is installed the new condenser would be set in
place. The refrigerant piping and water supply and water drain lines can be re- connected. A pressure
test, leak check and an evacuation will then be performed. After the electrical wiring is finalized, a
start up, test and adjustment of the condenser would complete the installation. The evaporative
condenser, VFD fan motor control, technical labor, permit, crane, pipe & fittings, electrical wiring,
support steel and removal /demo of a second unused condenser are Included.
Elk River Arena net price ................... ............................... ....................$52,397.00.
Any additional materials, repairs, overtime labor and structural supports are not included and would be
over & above the figure quoted.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard
practices. Any alteration or deviation from above specifications involving extra costs will become an extra charge over
and above the estimate. American Industrial Refrigeration will not be held liable for agreements contingent upon strikes,
accidents or delays beyond our control. Building owner will carry fire, property and other necessary insurance. Our
workers are covered by workmen's compensation insurance. American Industrial Refrigeration will not be responsible for,
nor will bid on this project, any work or cost of asbestos abatement. Building owner will provide safe work area with free
access to carry out above work. As part of this Proposal, if it is required by the Contract, American Industrial
Refrigeration will provide commercial general liability coverage for the scope of AIR's work on the project to the fullest
extent of its current insurance coverage. American Industrial Refrigeration will not assume any insurance obligations
beyond that included in its current insurance policy. Upgrading of existing systems to meet the most current codes is
limited to scope of work detailed above. All work to be performed during normal workday (lam to 3:30 pm, M -1) on
straight time unless otherwise noted. Drain dawn and refilling of piping systems by others unless noted above. Warranty
includes one (1) year on all parts or materials installed and 90 days on labor. On all accounts over 30 days, customer
agrees to pay all reasonable collection fees and / or attorney fees.
14322 21st Ave. N. • Plymouth, MN 55447 TEL: (800) 310 -9610 - FAX: (962) 470 -9617
216 Pleasant Ave. • PO Box 460 - Atwater, MN 56209 - TEL: (800) 279 -9031 - FAX: (320) 974 -8080
Page 2
Note: Proposal may be withdrawn by us if not accepted within 30 days.
If you have any questions, please feel free to contact me.
'�44 14--�
Gary R. Bye Phone (651) 357 -1274 Direct Fax 651- 605 -2824
Service Sales / Project Mgr
ACCEPTANCE OF PROPOSAL - The above prices, specifications and conditions are satisfactory and hereby accepted. You are authorized to do the
work as spedfied. Payment will be made as outlined above.
Dale of Acceptance
P.O. #
Authorized Signature
14322 21st Ave. N. • Plymouth, MN 55447 • TEL: (800) 310 -9610 • FAX: (952) 470 -9617
215 Pleasant Ave. • PO Box 460 • Atwater, MN 66209 • TEL: (800) 279 -9031 - FAX: (320) 874 -8080