3.7. SR 03-07-2011REQUEST FOR ACTION TO ITEM NUMBER Ma or and Ci Council 3.7. AGENDA SECTION MEETING DATE PREPARED BY Consent March 7, 2011 ustin Femrite, P.E. ITEM DESCRIPTION REVIEWED By Selection of Engineering Expert to Assist in the Completion of Lori ohnson, Ci Administrator the Beneficial Reuse of Wastewater Effluent Project REVIEWED BY ACTION REQUESTED Approval of $13,000 for professional services associated with Task 1 and 2 of the proposal submitted by BDM Consulting Engineers and Surveyors for the Beneficial Reuse of Wastewater Effluent project. BACKGROUND/DISCUSSION In late January we were notified by the Minnesota Pollution Control Agency (MPCA) that the City of Elk River was awarded a grant in the amount of $285,740 towards our Beneficial Reuse of Wastewater Effluent project. This project involves taking effluent water leaving our Wastewater Treatment Facility and pumping it to Great River Energy for reuse through a number of their plant processes. The first task in completing this project involves detailing a project scope and budget with the MPCA to formalize a contract. The second task involves completing the facility plan in order to layout the required improvements, associated costs, and project benefits. Beyond the initial tasks, if the improvements are determined to be beneficial, cost effective, and feasible the project would come back to the Council for approval to move forward. In order to finalize a contract with the MPCA we need to hire an engineering specialist in effluent reuse to detail the full financial impact and scope of the project. Understanding this is a specialized project that involves the need for an expert to study the effects of effluent reuse, we solicited proposals from four firms with demonstrated success in previously completing effluent reuse projects. Three of the firms returned detailed proposals for our consideration. We asked the proposers to itemize their proposals into separate tasks. This allowed us to consider the upfront costs in determining if the project is feasible, while having an understanding of the total engineering costs to full design and construct the project. Tasks 1 and 2 consist of getting the project through the facility plan stage. The proposals were detailed with not to exceed costs as follows: Task 1+2 Cost Full Project Cost BDM Consulting Engineers and Surveyors $13,000 $66,000 Foth Infrastructure and Environment $14,830 $75,000 Bolton & Menk, Inc. $18,450 $115,220 A committee consisting of Lori Johnson, Matt Stevens, Gary Leirmoe, Eric Silvola from Great River Energy, and myself reviewed the proposals and interviewed the three firms. Through the process all three firms demonstrated substantial knowledge on the subject of effluent reuse. After good discussions with all firms we recommend moving forward on this project with BDM Consulting Engineers and Surveyors. While we are only asking for authorization for Tasks 1 and 2 this request, we request N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\03-07-2011\RFA WWTP COnsultant.docx authorization to retain the same consultant through design and construction of this project if it proceeds to that stage. We feel this is important for consistency in information, communication, and relationships built with Great River Energy and the MPCA through the entire project. FINANCIAL IMPACT 'This action will have a total financial impact of $13,000. Upon finalizing our contract with the MPCA the grant will reimburse 50% of this amount. The City committed expenditures will come from the Sanitary Sewer Fund. ATTACHMENTS • BDM Proposal Action Motion by Second by Vote Follow Up N:\Public Bodies\City Council\Counal RCA\Agenda Packet\03-07-2011\RFA WWTP COnsultant.docx BDM CONSULTING ENGINEERS AND SURVEYORS, PLC February 10, 2011 Mr. Justin Femrite, P.E. City Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 Re: Proposal for Engineering Services Beneficial Use of Wastewater Dear Justin: BDM Consulting Engineers and Surveyors, PLC is pleased to submit this engineering service proposal for your consideration. BDM Brings Continuity to the Project The concept of using treated wastewater for various beneficial uses at the Great River Energy (GRE) was first introduced by BDM to the City of Elk River and GRE a few years ago. Last December, BDM assisted the City of Elk River in securing the $285,000 grant from the Minnesota Pollution Control Agency for the Beneficial Use of Wastewater. With our 20 years of experience in Elk River wastewater treatment plant, we have the knowledge required to develop a cost effective plan for both the City and the GRE, and provide continuity to the team in building synergy between parties. BDM OuaIification BDM recently completed a beneficial effluent reuse program at the Brainerd Wastewater Treatment plant where the treated effluent is used to operate heat pumps which heat the Service Center Building for the Brainerd Public Utilities. BDM is also assisting Brainerd in the development of additional effluent reuse programs for irrigation. BDM is currently assisting the City of Wadena in beneficial effluent reuse on multiple water uses, such as seal water and irrigation. The construction is scheduled to begin this summer and will be completed in 2012. BDM's water/wastewater team consists of four senior professional engineers with an average of 30 years of experience, three professional engineers with an average of 10 years of experience and one engineer in training. Three of them have advanced engineering degrees. Scone of Services Per your request on your 2/7/11 email, BDM proposes to provide the following scope of services: 1. Project work plan and budget preparation for the completion of the contract with the MPCA • Assist the City in completing the project work plan and budget in accordance with the MPCA's requirements. DRAKE BUILDlNO, 60 PLATO BOULEVARD EAST, SU1TF. 140, ST. PAUL, MN SS l07 2. Preparation of Facility Plan • Site Investigation • Project meetings, agency discussions, vendor discussions • Evaluate existing needs and opportunities • Develop options and probable costs • Develop environmental review • Complete the Facility Plan 3. Design of Improvements (to be reviewed after the Facility Plan is prepared to assure they are in accordance with the initial application) • Site survey • Assist the City in ordering a soil investigation • Project meetings • Plans and specifications • Permit application • Develop engineer's opinion of probably construction costs • Assist in agency review and preparing responses to review comments 4. Advertising, Bidding, Construction Management and Inspection Services • Advertising and bidding services • Construction staking • Construction observation • Construction administration Not-to-exceed En~ineerins Fees Tasks Descri tions Not-to-Ezceed Fees 1. Project work lan and bud et re aration $1,000 2. Pre aration of Facili Plan $12,000 3. Desi of Im rovements $29,000 4. Advertisin , Biddin ,Construction Mana ement and Ins ection $24,000 We look forward to working with you on this project. If you have any questions, please feel free to contact us. Thank you very much. Sincerely, BDM Consultin Engineers and~eyors, PLC ill Chang, P.E. Project Manager