7.1.A. PRSR 03-09-2011MEMORANDUM
.~.r-.
Elk
River
TO: Parks and Recreation Commission
FROM: Chris Leeseberg, Park Planner-Planner
DATE: March 9, 201 I
SUBJECT: Monitoring Well in Windsor Park
Item: 7. I .A.
Staff was contacted by Peex Engineering, on behalf of the Minnesota Pollution Control
Agency, about the possibility of placing a monitoring well in Windsor Park. They have
identified an area in the southwest corner of the park. A representative from Peer
Engineering will be in attendance to provide information on what is being proposed.
Staff is looking for direction on the proposal from the Parks and Recreation Commission.
Attachments
• Location Map
• Peer Engineering email
• Pact sheet prepared by the MPCA
• Site summary sheet
• Well diagram
• MPCA access agreement
CVDxumutte' and SaongsVdorcAhxnl Settings~Tcmpnrary Inmmcc Cilce'VComm~GUudnok\3n/GNII I'O~APR D1cnai 3-9-I Ldocs
•i
x
S,x, ~ \ *'' ~
o '`~
~
~,`~
P~ v
w /
~
..
c ~
o
r te` ~
M~ h ~
V *
T ~~
n 4 , ~
~
~' M`` ~ ~„
m T l'~., a ~d'1 ~7~.~'M hs ..
~
_ ~
~ °~ '.
~
lJ I 1
:~
O
f
~- p
~`
~
_
'
m `
T
~ ~ ~:
'
°°~. ~, ~
m -; - x . ..
Z ., ~
. ; ~
~ -°
~ w
?~
~1
a1 I
3 ~. d
,.~ ~ !1
, .
-~
n
',
~u;;;
D
` ~
.y.. ~ ~,
~ -
..
A
.~
1 S
} x
~ . ,r. <, ~ ,
~
Z ~ s z
~ ~
e
fie. ..' ~
~ ~ +FT ~
k„
G..
:w~.
i rol'
•i
•i
N:\Departments\Parks and Recreation\Parks\AdministrationWgenda Items\2011\Windsor Park Monitoring Well\Location Map.dwg, 3/3/2011 10:13:24 AM
C]
•
Ambient Groundwater Quality Monitoring
Minnesota Pollution Control Agency
Ms. Sharon Kroening
PROPOSED !~'GLL #62
COUNTY: Sherburne
LOCATION: Windsor Park
13444 212'x' Avenue
Elk River, MN
LATITUDE: -93.612114
LONGITUDE: 45.354592
DESIRED LAND USE:
Residential Un-Sewered Area
February 8, 201 1
Proposed We(I
Lncati~n ##(,2
Photograph looking NE at the proposed w•cll location in the
SW portion o(the park
Current Land Use:
The proposed well location is in the southwest corner of
Windsor Park. The park is a neighborhood park within
the Windsor Park subdivision. The park includes paved
hails, a swing set, a climbing rock and a gazebo. Anew
residential development is currently being built to the
west of the proposed well location along 212't' Avenue.
Several houses are constructed that are not shown in the
air photo. The land use within 500 meters of the well
location is approximately 70% residential un-severed, 10
undeveloped land.
Hydrogeolo;y:
• Surface Elevation: 990 ft
• Soil Type: Vety Fine to Medium Sand
• Glacial Setting: Grantsburg Sublobe
• Sediment Type: Calcareous
• Groundwater Elevation/Depth: 940 ft /50 fl
• Groundwater Flow: ' 'yx ~•.,,,.~-`
Southwest E • ~. ~ -
• Bedrock Formation: ~ 4''.-, ~` '~`+~'
.~
Eau Claire "r x "~' ''~• '~°~~ ~ ~
• Bedrock Elevation/Depth: rt~~ ~ •~~~
835 ft / 155 ft bgs `~ ~ ~ ~'t
Property Owner:
City of Elk River
Property Accessibility:
The proposed well location is
easily accessible off of Lander
Street NW.
Cotnments:
Access agreement pending
Prepared by: Peer Engineering; Inc.
~
t ~~ ~ ±„ 4
Photograph looking N at the proposed well location
t!' ~' ~~
•, ,
'S
t ` ^* }•
e /~, ~
Project # ?0607
}[i~, ~ r
Te^ ,
Proposed
Well.
Location
#62
b IIY(•li (.D. SCEs d.(I
STEEL S~UTER CASEEJts
4 FT ~;
i
I
OUT ~_
2 INCH 1.D. SCH 40
FLUSH THREADED
PVC WELL CASING
BENTONITE SEAL
(1 FT THICK) ~~
2
1 FT +1-
3 FT +l-
I __~
2 INCH I.D., NO. 10 SLOT,
FLUSH THREADED,
PVC VEE-WIRE SCREEN
(OR APPROVED EQUIVALENT)
#40 RED FLINT FILTER PACK
2 FT
/.- LOCKING COVER
i ~
4 IN. i}IA. S('.ti 40 --; -#
STEEL GUARD POSTS ~ "'
(31F REQUIRED) ~ ~ ',
i--COAICRETE -~ -•.,.`.
10
1 FT
I~
8 1/4 IFJ. DIA
BOREI~OLE
•
2
_,' ~ 'r
~ .~..
~~. ~,
2
~ +::
4. -
••} " 't
.. ~/'. ;,
.J _ " , r . "~ Y t .Y~,
_,
°'~''-`~
a`. 7 .fix
'~ , T~° ~,
.~'~' .~°
,..,.
,:' ~ .~;t
~~"~" :, r
--.
•
Wigni!onnp YdelLdv:g
En~~'~r
g
TYPICAL WELL CONS I RUCTION
AMBIEtJT GROUNDWATER QUALITY
tv10NITORING NETWORK
JAN 2011
r-ICUR~
7
Leeseberg, Chris
From: Becca Reason <breason@peerengineering.com>
Sent: Monday, February 28, 2011 1:14 PM
To: Leeseberg, Chris
Subject: Monitoring Well of MPCA
Attachments: MPCA Amb. Mtring Fact Sheet.pdt; Ambient GW Access Agreement (Jan 2010).docx; Figure
2 Monitoring Well.pdf; Proposed WeII #62.pdf; Monitoring WeII.JPG
Hi Chris,
Thanks for talking with me today about the possible installation of a monitoring well in Elk River as part of the
Minnesota Pollution Control Agency's Ambient Groundwater Quality Monitoring Networking program. I have attached a
fact sheet prepared by the MPCA describing the program. Peer Engineering is a consultant for the MPCA, and we have
been contracted to assist with identifying viable permanent monitoring well locations and obtaining access for
installation. The goal is to have access agreements in place by end of March and install the wells between late April and
early June of 2011. The MPCA/State are paying all well installation and future sampling costs.
Also attached is a site summary sheet for the possible well location in Windsor Park. The actual location of the
monitoring well can be moved based on the city's recommendation /future plans for the parks. As I discussed during
our conversation, the well is 6" in diameter and sticks out of the ground approximately 2 feet and will have a lock on
it. Please see the attached "Figure 2 Monitoring WeII" for the typical well construction as well as the "monitoring well"
photograph showing what a finished monitoring well will look like.
I've also attached the general MPCA access agreement for the groundwater quality monitoring program. This
agreement has been reviewed by the State Attorney General. Please use review it and use it in your discussions going
forward.
If you have any questions please don't hesitate to contact me. Thanks again for your help.
Becca Reason
Peer Engineering
7615 Golden Triangle Dr., Suite N
Eden Prairie, MN 55344
Oirect:952.697.0563 Ce11:952.237.9276
Main: 952.831.3341 Fax: 952.831.4552
breason@peerenaineerine.com
www.peeren~ineerina.com
N ,~
.~
Minnesota
Pollution
Control
Agency
For More Information
For additional information
about the MPCA's
ambient groundwater
quality monitoring
network, contact the
MPCA's Ambient
Groundwater Monitoring
Coordinator in the
Environmental Analysis
and Outcomes Division at
651-296-6300 or
800-657-3864.
Enhancing Ambient Groundwater
Quality Monitoring in Minnesota
For the Clean Water Land and Legacy Amendment
Water QualitylAmbient Monitoring #1.05 • December 2009
round water provides drinking water to
about 75 percent of Minnesotans and
contributes water to stream, rivers,
lakes, and wetlands. The Minnesota Pollution
Control Agency (MPCA) monitors the quality of
our groundwater and protects it from
contamination in cooperation with other state
and local agencies.
What Is Ambient Monitoring?
Ambient monitoring is one important
component of [he MPCA's groundwater
protection efforts. Data collected from ambient
monitoring activities provide information about
the general quality of Minnesota's groundwater
and helps identify whether the quality is getting
better, worse, or not changing. Ambient
monitoring involves the sampling of
groundwater across large geographic settings
and provides alarge-scale or "big picture" view
of groundwater quality conditions across the
state. Ambient monitoring is not conducted
where there is known contamination.
sand and gravel and Prairie du Chien-Jordan
aquifers. Both of these are heavily used for
drinking water. Assessments of agricultural
chemicals are performed by the Minnesota
Department of Agriculture.
A network of shallow wells tapping the water
[able is monitored by the MPCA as an early
warning network in the surficial sand and
gravel aquifers. Groundwater near the water
table typically is no[ used as a source of potable
water supplies and likely does not reflect the
quality of water people are consuming, but any
changes in groundwater quality will be detected
first in these wells. The early waming network
detects whether human activities may be
affecting groundwater quality.
The MPCA is enhancing its early waming
network to improve the assessment of
groundwater quality conditions and trends
across the state. The agency will be installing
additional monitoring wells and focuses on
typical urban land use settings. The newly-
constructed wells will be sampled annually for
non-agricultural chemicals.
How Is This Information Used?
Data collected from MPCA ground water
investigations is valuable to drinking water
protection efforts. This data informs the state's
drinking water supply protection efforts,
identifies threats to groundwater quality, and
guides the development of best management
practices to avoid future groundwater impacts.
These data are available on-line through the
MPCA's Environmental Data Access system.
MPCA's Ambient Groundwater
Monitoring Network
The MPCA's ambient monitoring network
focuses on determining the amount of non-
agricultural chemicals in the aquifers that are
most susceptible to pollution from human
activities. The network focuses on the swficial
Clean Water Land and Legacy
Amendment
Enhancements to the MPCA's ambient
groundwater quality monitoring network are
funded through the Clean Water, W ildlife,
Cultural Heritage and Natural Areas
Amendment .On November 4, 2008, Minnesota
voters approved this amendment which
increased the sales and use tax rate by three-
eighths of one percent on taxable sales through
2034. Part of these funds are used to protect,
enhance, and restore [he groundwater, with a[
least five percent of the funds targeted to
protect drinking water source.
Minnesota Pollution Control Agency 520 latayetle Rd. N., St. Paul, MN 55155-4194 www.pca.state.mn.us
651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 Available in alternative formats
MPCA PROPERTY ACCESS AGREEMENT WITH
(Property Owner)
L Purpose of Agreement. The Minnesota Pollution Control Agency (MPCA) is enhancing its ambient
groundwater monitoring network in Minnesota. The attached fact sheet describes this groundwater monitoring
network ("network"), which will help provide information about the quality of Minnesota's groundwater and
identify trends in water quality. The MPCA is assessing groundwater in this region. As part of the groundwater
assessment, the MPCA is installing wells to obtain water samples for analysis.
2. Parties. This agreement is between the MPCA and (the "Property Owner"), wlto owns
property located at (the "Property") where the
MPCA would like to install a monitoring well. The MPCA is authorized to enter any property, public and
private, for the purpose of conducting surveys under Minn. Stat. §§ 1 15.04, subd. 3.
3. Consent to access. The "Property Owner" hereby consents to participation in the network and authorizes the
MPCA, its employees and agents, [o enter [he Property for the purpose of
O installing a permanent groundwater monitoring well at the location shown on attachment I; and
2) collecting groundwater samples from the monitoring well according to the schedule set forth below.
4. Notice. The MPCA will notify the Property Owner of the name of the environmental consulting firm that will
be managing the monitoring well installation at least two weeks before the installation.
5. Location of well. The MPCA's consultant will coordinate the monitoring well installation with the Property
Owner to ensure that a mutually agreeable location on the Property is identified.
5. Permits, required actions. The MPCA will be responsible for obtaining all permits and providing notices [o
utilities related to [he installation. The MPCA's consultant will coordinate all contractors involved in
installation, including locating all utilities prior to well installation and completing all Minnesota Deparhnent of
Health perntits required to install the well.
6. Well installation. The Property Owner understands and agrees that the well installation will require three
separate site visits. All buried utilities will be located during the first site visit. Tltis will take approximately I-2
hours to complete and will be done prior to the well installation. The well will be drilled during second site visit,
which will take approximately one working day to complete. The well will be prepared for water sample
collection during the final site visit. These preparations involve pumping water from the well and monitoring its
quality. These activities will take one-half day to complete and will be performed tto sooner than 24 (tours after
well installation.
7. Sampling; notice of sampling. After installation, the MPCA will sample the monitoring well once a year.
Sampling will involve pumping water from the well, collecting field measurements of the water, and collecting
samples for later laboratory analysis. Sampling will take between I to 2 hours to complete. The MPCA or its
consultant will notify the Property Owner at least 48 hours before entering the Property for the purpose of well
installation or sampling.
8. Hours of work. All work under this access agreement will be conducted during regular business hours (8:00
AM to 5:00 PM) unless the MPCA or its consultant receives written permission by the owner or his/her agent to
conduct work during different (tours.
9. Disturbance of properly. The well installation and sampling will be performed by the MPCA in a manner
which minimizes interference with the Property Owner's use of the Property. If the MPCA's activities disturb
any portion of [he Property, the MPCA will restore the property to as close to its original condition as is
reasonably possible under the circwmstances.
10. Property Owner responsibilities. The Property Owner agrees to take reasonable precautions to insure that the
equipment of the MPCA or its agents that is located on the Property, and any monitoring wells that are located on
the Property, are no[ damaged and that the work being conducted by the MPCA, its employees and agents is not
disrupted.
(1. Sampling results. Upon request, the MPCA shall provide copies of the results of all sampling conducted on
the Property to the Property Owner after test validations. The data collected from the monitoring well on the
Property will be public information.
12. Liability. The MPCA will be liable for injury to or loss of property or personal injury or death caused by any
act or omission of any employee of the State of Minnesota in the performance of the work described above, under
circumstances where the State of Minnesota, if a private person, would be liable to the claimant, in accordance
with Minn. Stat. § 3.736.
13. Termination. This monitoring well is part of a network designed to provide long-term information about
Minnesota's groundwater quality. It is the MPCA's intention to maintain this monitoring well and to monitor it
indefinitely. This agreement, however, can be terminated by either party (MPCA or Property Owner) with 60 days
written notice to [he other party. The Property Owner understands that, should either party decide to terminate this
agreement, state law requires proper closure of the well. The MPCA will be responsible for all costs and
activities associated with closure of the monitoring well. The Property Owner agrees and understands that, to
close the well, it will be necessary to provide access to the MPCA for the purpose of well closure, and the
Property Owner hereby agrees to provide [hat access, conditioned only on 48 hours written notice.
14. Sale of Property. [f the Property Owner sells the Property, the Property Owner agrees that it shall notify the
buyer of this access agreement and provide the MPCA with notice and an opportunity to reach agreement with the
buyer under which continued access for sampling will be allowed.
MINNESOTA POLLUTION CONTROL AGENCY PROPERTY OWNER
Glenn Skuta Signature
Manager, Water Monitoring Section
Date: Date: