Loading...
5.3. SR 03-21-2011REQUEST FOR ACTION TO ITEM NUMBER Ci Council 5.3. AGENDA SECTION MEETING DATE PREPARED BY Administration March 21, 2011 Chris Leeseber ,Park Planner-Planner ITEM DESCRIPTION REVIEWED B~/ Monitoring Well Placement in Windsor Park Steve Benoit, Recreation Mana er REVIEWED BY ACTION REQUESTED Staff and the Parks and Recreation Commission are recommending the City Council approve the placement of a monitoring well in Windsor Park as requested by the Minnesota Pollution Control Agency (MPCA). BACKGROUND/DISCUSSION Staff was contacted by Peer Engineering, on behalf of the Minnesota Pollution Control Agency, about the possibility of placing a monitoring well in Windsor Park. They have identified an area in the southwest corner of the park. A representative from Peer Engineering was in attendance at the Parks and Recreation Commission on March 9, 2011 to provide information on what is being proposed. The well will be approximately 20 feet deep and will have to rise above grade at least one foot. The time frame for the need for the well was assumed to be indefinite, pending state funding. Peer Engineering identified the south west corner due to the easy accessibility. They indicated that the well could be in any location within the park. The Commission was in favor of the request but asked the engineers to work with staff and a commission member in siting the well in a location that was not in one of the main access points of the park. FINANCIAL IMPACT All cost associated with the installation, restoration, and monitoring of the well will be by the MPCA. ATTACHMENTS ^ Location Map ^ Peer Engineering email ^ Fact sheet prepared by the MPCA ^ Site summary sheet ^ Well diagram ^ MPCA access agreement N:\PubGc Bodies\City Council\Council RCA\Agenda Packet\03-21-2011\Monitoring Well at Windsor Park.docx Action Motion by Second by Vote Follow Up N:\Public Bodies\City Council\Council RCA\Agenda Packet\03-21-2011\Monitoring Well at Windsor Pazk.docx Leeseberg, Chris From: Becca Reason <breason@peerengineering.com> Sent: Monday, February 28, 2011 1:14 PM To: Leeseberg, Chris Subject: Monitoring Well of MPCA Attachments: MPCA Amb. Mtring Fact Sheet.pdf; Ambient GW Access Agreement (Jan 2010j.docx; Figure 2 Monitoring Well.pdf; Proposed Well #62.pdf; Monitoring WeII.JPG Hi Chris, Thanks for talking with me today about the possible installation of a monitoring well in Elk River as part of the Minnesota Pollution Control Agency's Ambient Groundwater Quality Monitoring Networking program. I have attached a fact sheet prepared by the MPCA describing the program. Peer Engineering is a consultant for the MPCA, and we have been contracted to assist with identifying viable permanent monitoring well locations and obtaining access for installation. The goal is to have access agreements in place by end of March and install the wells between late April and early June of 2011. The MPCA/State are paying all well installation and future sampling costs. Also attached is a site summary sheet for the possible well location in Windsor Park. The actual location of the monitoring well can be moved based on the city's recommendation /future plans for the parks. As I discussed during our conversation, the well is 6" in diameter and sticks out of the ground approximately 2 feet and will have a lock on it. Please see the attached "Figure 2 Monitoring Well" for the typical well construction as well as the "monitoring well" photograph showing what a finished monitoring well will look like. I've also attached the general MPCA access agreement for the groundwater quality monitoring program. This agreement has been reviewed by the State Attorney General. Please use review it and use it in your discussions going forward. If you have any questions please don't hesitate to contact me. Thanks again for your help. eecca Reason Peer Engineering 7615 Golden Triangle Dr., Suite N Eden Prairie, MN 55344 Direct: 952.697.0563 Cel1:952.237.9276 Main: 952.831.3341 Fax: 952.831.4552 breason@peeren~ineerin~.com www.peerengineerine.com WV 4Z~ET~OT TTOZ/£/£ '6mp•dey~ uo!ae~o~\paM 6uuo3!uoW ~!~ed ~ospu!M\iTOZ\swa~~ epua6y\uoile~lsiuiwpy\s~!~ed\uo!leanaa pue sped\sauaw~eda4\:N ~ ` °` ,, ~ k ~ •~ ~ ~ ti j ~ ,.. '~ " U ~~ ++ e ~ , ~ ~ 'k LL R SR ~~.„ ryr ~ A • f w ~ , ~. f ~ + ~..y r• Z ~/ LT ~. t • ~n . ~` ~ Z E a ~, ~? ~ < , ,y ,. ~ ~, , } IF,~ , e t ~-~ ~ G O-I' ~ W ~~ ~ ~ ~ ~ ~,~'~ 1 • ~ } y , ~~, .__ ~Oj t 4= ' o* ~ , , ~ x ~ ~~ ~.. ~ ti Y ~ ,. ~ J ' V .~ "~, ~ \, ~,~ r." • W ~ . "~' o ~'d' a ~9 C o , .~:~ ` Y ~ " ~ ~ ~ ~~ r ' ~ M ~ / i-+ ~ r f O ~ t 14~h ~ ~ M M ` Q Pe ~ L.L Q a ~ ` ~l~ ~ ~E ~ .. u • aJ {• ~ ~ °_ E .. ¢ ~ f ~ ~ ! ~ ~ J ,. s , Cy ~ ~, "` t., Z . o~ ~ ~ , 1 ~ ~ cn ' N0~ bW Z z, a~ ,S ~~ ~-_, w Q ~ b ti ~ ~~ , s.. .. ~ _~ 5 S oo cn Q -- o a NPR ~ ~ W N ~ a--+ .t ~. F4 8[~7 Ambient Groundwater Quality h~onitoring Minnesota Pollution Control Agency Ms. Sharon Kroening PROPOSED 1'1'ELL #62 COUNTY: Sherburne LOCATION: Windsor Park 13444 212°i Avenue Elk River, MN LATITUDE: -93.612114 LONGITUDE: 45.354592 DES112ED LAND USE: Residential Un-Sewered Area February 8, 201 1 Proposed Well I.ncatirm #(,2 Photograph looking NE at the proposed well location in the S«' portion of the park Current Land Use: The proposed well location is in the southwest corner of Windsor Park. The park is a neighborhood park within the Windsor Park subdivision. The park includes paved trails, a swing set, a climbing rock and a gazebo. Anew residential development is currently being built to the west of the proposed well location along 212i1' Avenue. Several houses are constructed that are not shown in the air photo. The land use within 500 meters of the well location is approximately 70% residential un-severed, 10 undeveloped land. Hydro;eolo;y: • Surface Elevation: 990 ft • Soil Type: Very Fine to Medium Sand • Glacial Setting: Grantsburg Sublobe • Sediment Type: Calcareous • Groundwater Elevation/Depth: 9_=30 ft /50 ft bgs • Groundwater Flow: ' s e~~~_r,,X- Southwest t ~F ~ R • Bedrock Formation: ~ ~:, • ~~,~ .`- Eau Claire '" ~ ~` ~j '~'": ,~ • Bedrock Elevation/Depth: ~°,~ 835 ft / 155 ft bgs ~ Property Owner: City of Elk River Property Accessibility: The proposed well location is easily accessible off of Lander Street NW. Comments: Access agreement pending r N ~~ t F %tb~ ~~i .F ~ - 4 ,~~x Photograph looking N at the proposed well location ~. Prepared by: Peer Engineering, Inc. Project # 20607 Proposed Well Location #62 b INCH 1.0. SCH 40 STEEL OUTER CASING 2 FT ~1 .;.~ -1 4 FT NEAT CEA4ENT GROUT ~` 2 INCH LD. SCH 40 FLUSH THREADED PVC WELL CASING BENTONITE SEAL (1 FT THICK) ~~ ~~ 2 FT /- LOCKtPlG (;OVER ~~ STEEL. GUARD ('OSTS :- .. r--:~ (3 IF REQUIRED) . ~ ~ ` 2 1 1 FT +/- 2 INCH I.D., NO. 10 SLOT, FLUSH THREADED, PVC VEE-WIRE SCREEN (OR APPROVED EQUIVALENT) #40 RED FLINT FILTER PACK h5arilor!ng VdclLC~rg 3 FTl +/- i0 1 FT I~ 8 114 IN. DIA BOREI~OLE '~ ~~'~r ~~~~~ Engineering -. {'....~. +'• TYPICAL WELL COPISTRUCTION AMBIENT GROUNDWATER QUALITY MONITORING NETWORK 2 _', } .~_. .~'~ 2 ~` ;~_ . :- ~_ .,. , ~ ~ ' ~ ~ ~~~ r ,. K . ° y gyp! y ' ~. , .~~.'.. ~,~ ' :~~~ ~_i '.°: .I r. YJ~-.. ~~ • ~w /^~~ ,/ ~, ~F /. .. ~ r ~t•. ,,,.,.,i ~ . ' ` `.1 a. ~ r s~' f • 4 ~ ~ ~ r _. JAN 2011 FIGUP.E 7 MPCA PROPERTY ACCESS AGREEMENT WITH (Property Owner) 1. Purpose of Agreement. The Minnesota Pollution Control Agency (MPCA) is enhancing its ambient groundwater monitoring network i-i Minnesota. The attached fact sheet describes this groundwater monitoring network ("network"), which will Help provide information about the quality of Minnesota's groundwater and identify trends in water quality. The MPCA is assessing groundwater in this region. As part of the groundwater assessment, the MPCA is installing wells to obtain water samples for analysis. 2. Parties. This agreement is between the MPCA and (the "Property Owner"), who owns property located at (the "Property") where the MPCA would like to install a monitoring well. The MPCA is authorized to enter any property, public and private, for the purpose of conducting surveys under Minn. Stat. §§ 115.04, subd. 3. 3. Consent_to access. The "Property Owner" hereby consents to participation in the network and authorizes the MPCA, its employees and agents, to enter the Property for the purpose of: 1) installing a permanent groundwater monitoring well at the location shown on attachment 1; and 2) collecting groundwater samples from the monitoring well according to the schedule set forth below. 4. Notice. The MPCA will notify the Property Owner of the name of the environmental consulting firm that will be managing the monitoring well installation at least two weeks before the installation. 5. Location of well. The MPCA's consultant will coordinate the monitoring well installation with the Property Owner to ensure that a mutually agreeable location on the Property is identified. 5. Permits, required actions. The MPCA will be responsible for obtaining all permits and providing notices to utilities related to the installation. The MPCA's consultant will coordinate all contractors involved in installation, including locating all utilities prior to well installation and completing all Minnesota Depa--tment of Health pern~its required to install tl~e well. 6. Well installation. The Property Owner understands and agrees that the well installation will require three separate site visits. All buried utilities will be located during the first site visit. Tliis will take approximately I-2 hours to complete and will be done prior to the well installation. The well will be drilled during second site visit, which will take approximately one working day to complete. The well will be prepared for water sample collection during the final site visit. These preparations involve pumping water from the well and monitoring its quality. These activities will take one-half day to complete and will be performed no sooner than 24 hours after well installation. 7. Sampling; notice of sampling. After installation, the MPCA will sample the monitoring well once a year. Sampling will involve pumping water from the well, collecting field measurements of the water, and collecting samples for later laboratory analysis. Sampling will take between I to 2 hours to complete. The MPCA or its consultant will notify the Property Owner at least 48 how's before entering the Property for the purpose of well installation or sampling. 8. Hours of work. All work under this access agreement will be conducted during regular business hours (8:00 AM to 5:00 PM) unless the MPCA or its consultant receives written permission by the owner or his/her agent to conduct work during different hours. 9. Disturbance of property. The well installation and sampling will be performed by the MPCA in a manner which minimizes interference with the Property Owner's use of the Property. If the MPCA's activities disturb any portion of the Property, the MPCA will restore the property to as close to its original condition as is reasonably possible under the circumstances. 10. Property Owner responsibilities. The Property Owner agrees to take reasonable precautions to insure that the equipment of the MPCA or its agents that is located on the Property, and any monitoring wells that are located on the Property, are not damaged and that the work being conducted by the MPCA, its employees and agents is not disrupted. 1 1. Sampling results. Upon request, the MPCA shall provide copies of the results of all sampling conducted on the Property to the Property Owner atter test validations. The data collected from the monitoring well on the Property will be public information. 12. Liability. The MPCA will be liable for injury to or loss of property or personal injury or death caused by any act or omission of any employee of the State of Minnesota in the performance of the work described above, under circumstances where the State of Minnesota, if a private pe--son, would be liable to the claimant, in accordance with Minn. Stat. § 3.736. 13. Termination. This monitoring well is part of a network designed to provide long-term information about Minnesota's groundwater quality. It is the MPCA's intention to maintain this monitoring well and to monitor it indefinitely. This agreement, however, can be terminated by either party (MPCA or Property Owner) with 60 days written notice to the other party. The Property Owner understands that, should either party decide to terminate this agreement, state law requires proper closure of tl~e well. The MPCA will be responsible for all costs and activities associated with closure of the monitoring well. The Property Owner agrees and understands that, to close the well, it will be necessary to provide access to the MPCA for the purpose of well closure, and the Property Owner hereby agrees to provide that access, conditioned only on 48 hours written notice. 14. Sale of Property. If the Property Owner sells the Property, the Property Owner agrees that it shall notify the buyer of this access agreement and provide the MPCA with notice and an opportunity to reach agreement with the buyer under which continued access for sampling will be allowed. MINNESOTA POLLUTION CONTROL AGENCY PROPERTY OWNER Glenn Skuta Signature Manager, Water Monitoring Section Date: Date: