Loading...
5.8. SR 05-02-2011Ji `Elk REQUEST .FOR ACTION ...,.~. River TO ITEM NUMBER Mayor and City Council S - 8 - AGENDA SECTION MEETING DATE PREPARED BY Consent Ma 2, 2011 ustin Femrite, P.E. ITEM DESCRIPTION REVIEWED By Traffic Signal System Painting Lori ohnson, Ci Administrator REVIEWED BY ACTION REQUESTED Authorization to accept the low quote received from OLS Restoration, Inc. in the amount of $24,982.00 to complete the painting of selected traffic control systems in Elk River. BACKGROUND/DISCUSSION Over the past four (4) months Sherburne County completed a comprehensive traffic control signal system inspection for the City or Elk River. The inspection included the review of all 18 traffic control systems that exist within the Elk River city limits. The signal systems were fully inspected fox condition of paint, lights, equipment, and controls. In addition, the County staff provided us with a comprehensive list of all signal agreements and a tabulation of who is responsible for the maintenance of each signal system. As detailed in these signal agreements, the City of Elk River is responsible for the painting of most of the systems. Through our review of the paint rating contained in the inspection reports, we are recommending painting four (4) full systems in 2011. We have gathered quotes to have the following signal systems painted: ^ TH 169 and 197x'' Avenue ^ TH 169 and 193`d Avenue ^ TH 169 and School Street ^ School Street and Freeport Avenue The remaining signal systems with conditions that require painting will be completed in 2012 as scheduled in the Capital Improvement Plan. If this work is approved by the City Council, staff will work with the contractor and the Minnesota Department of Transportation (MNDOT) on a schedule for the work. We will assure the painting of the signal systems along TH 169 will not be completed during the same time period as the TH 169 bridge work planned for this summer. FINANCIAL IMPACT The two quotations received for the work are summarized as follows: Aerial Painting, Inc. $30,700.00 OLS Restoration, Inc. $24,982.00 N:\Public Bodies\City Council\Council RCA\Agenda Packet\05-02-2011\Signal Painting RFA.docx Staff recommends approval of the low quote submitted by OLS Restoration, Inc. in the amount of $24,982.00. This project was included in the Capital Improvement Plan to be completed during 2011 at a cost of $25,000. Funds for this project will come from the Street Improvement Reserve fund. ATTACHMENTS None Action Motion by Second by Vote Follow Up N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\05-02-2011\Signal Painting RFA.docx ~~~~ ~-z`/~r ~~(-~ Pi~ ~~ ~ ' 5/4 2011 fem.--~ ~~