Loading...
4.7. SR 08-18-1997ITEM 4.7. Howard R, Green Company CONSULTING ENGINEERS August 13, 1997 File: 230321J-0020 CONSULTING ENG]NEE~ Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P. O. Box 490 Elk River, MN 55330-0490 RE: FEASIBILITY STUDY FOR SHERBURNE COUNTY GOVERNMENT CENTER Dear Council Members: Attached is a copy of the Feasibility Study for the extension of utilities and street to serve the Sherburne County Government Center. As you are aware, this project consists of the extension of Business Center Drive from its current terminus point to the west limits of the County Government Center property. The street improvement would also include street lighting and a sidewalk on one side. The utility improvements would consist of a trunk watermain along the same alignment as Business Center Drive with a lateral extension down the west side of the County Government Center to provide fire flow to the west side of the building. There is lateral sanitary sewer included in the feasibility study that extends east and west from the trunk line along the east side of the Government Center property. The extension to the east would provide lateral benefit to the Gagne property. The extension to the west would provide access to the Wilson family property located immediately adjacent to the Government Center. The final improvement discussed in the Feasibility Study is storm drainage necessary to provide service to the new road. This Feasibility Study was initiated by petition received from Sherburne County. Total cost of all the improvements is proposed to be assessed against the two benefiting properties with the exception of the watermain trunk oversizing which would be funded by the City, and the lateral sewer in front of the Government Center, which also would be funded by the City, anticipating that the cost would be recovered at a later date when development occurs on the Wilson family property. Attached is a resolution for the Council's consideration which receives the Feasibility Study and orders a public hearing on the improvements. We have tentatively scheduled the public hearing for October 6, 1997. If you have any questions regarding this issue, I will be in attendance at Monday evening's meeting. Terry J.'rvTaurer, P. E. TJM/et Enclosure O:~proj~30321\321-1302.aug 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 RESOLUTION 97- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING IN THE MATTER OF THE STREET AND UTILITY IMPROVEMENT OF 1997 TO SERVE THE SHERBURNE COUNTY ADMINISTRATOR BUILDING WHEREAS WHEREAS the Feasibility Report ordered by the Council in Resolution 97 - 62 has been prepared with reference to the Street and Utility improvement to serve the Sherburne County Administration Building and was received by the City on August 18, 1997; and the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The City Council will consider the Street and Utility improvement as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429 at an estimated total cost for the improvement of $550,565.00. A public hearing shall be held before the City Council on the proposed improvement on the 6th day of October, 1997, at 6:00 o'clock p.m. at the Elk River City Hall. The City Administrator shall provide ten days mailed notice and two weeks published notice on the hearing as required by law. Passed and adopted this 18th day of August, 1997. ATTEST: Henry A. Duitsman, Mayor Sandra D. Thackeray, City Clerk 0:~230321\321-1308. aug