6.1. SR 08-18-1997ITEM 6.1. City of River TO: FROM: DATE: SUBJECT: MEMORANDUM MAYOR AND CITY COUNCIL STEPHEN ROHLF, BUILDING AND ZONING ADMINISTRATOR AUGUST 18, 1997 ~-- CONDITIONAL USE PERMIT FOR MINERAL EXCAVATION AND HOT-MIX ASPHALT PLANT BY TILLER CORPORATION CU 97-19 REQUEST: Tiller Corporation is seeking a conditional use permit for mineral excavation (gravel mining) on a 133 acre site. The proposed site is Zoned ME- "Mineral Excavation Overlay District" and was studied as part of the City's Environmental Impact Statement (EIS) on Mineral Excavation. In addition, Tiller is proposing to relocate their hot-mix asphalt plant to this site. This plant is currently located in the southwest corner of the intersection of Co. Rd. #33 and Highway 169. The hot-mix plant is considered a related facility to the gravel mining and may be reviewed under the same conditional use permit process. ATTACHMENTS: Mineral excavation application by Tiller corporation, dated June 24, 1997. This document contains a description of the proposed operation including reclamation plans. The legal description and a vicinity map of the subject property is also included in Tiller's application. A letter dated, July 14, 1997 from John Lichter of B. A. Liesch and Associates, City Environmental Consultant. A letter dated, July 16, 1997 form Terry Maurer, City Engineer. Draft conditional use permit. The draft conditional use permit attached contains staffs recommended conditions of operation for this request. f:\shrdoc\b&z\stever\tilrcup.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 REVIEW: Wetlands, ground water and surface run-off: Review of aerial photos and the wetland inventory map have not indicated the presence of any wetlands on the subject property. Some intermittent wetlands are difficult to identify without field research. Staff has no reason to believe there are any wetlands on site, but if one is discovered appropriate actions will be taken according to the Wetland Conservation Act. Tiller is proposing to have a 5 foot separation between ground water and mining activities. If mining was proposed to take place into the ground water additional stipulations would have been placed on the operation. The attached conditional use permit states that an amendment is required to mine into ground water. Wash operations are not being requested at this time. Staff is concerned with the effect a wash operation at this site would have on the lateral migration of ground water contamination associated with the Elk River Landfill. To allow gravel washing in the future it will take an amendment to this permit and in depth analysis. Staff is not recommending periodic well sampling as a condition on this operation. The landfill samples wells within 2,000 feet of their property yearly, which will most likely include the potable water supply at this site. The lack of wash operations at this site and a five foot buffer between mining activities and ground water further reduces concerns. Above ground fuel tanks and a septic system are proposed at the site. Tiller has added these details as well as a proposed building for their staff to their site plan for hot-mix asphalt plant. The operation is required to have a NPDES permit from the Minnesota Pollution Control Agency (MPCA). This permit regulates storm water run- off. As part of the NPDES permit a "Storm Water Pollution Prevention Plan" is required. The City Engineer also reviewed storm drainage on the site. Tiller's plan will necessitate a storm water retention pond without an outlet in the northwest corner of the intersection of 221st Ave. and Highway 169. This is not necessarily a problem, but rather is it is Tiller's decision. f:\shrdoc\b&z\stever\tilrcup.doc Roads and traffic: At a minimum, Tiller is proposing to pave 221st Ave. from their pit entrance to Highway 169. Two other mining companies, Midwest Asphalt Corporation and C. S. McCrossan Const., Inc., own the land west of Tiller to the city's railroad hiking trail. Tiller has indicated that they may try to get these companies to cooperate in a project that would pave 221st from the hiking trail to the highway. The specifications for doing this must be approved by the city engineer. Tiller's alternative reclamation plan also shows 221st Ave. being lowered. This will have to be reviewed and approved at a later date with the ultimate end use of the property in mind. There are currently south bound and north bound turn lanes on Highway 169 at the intersection 221st Ave. Tiller is proposing to add an acceleration and deceleration lane, such as those at intersections on Highway 169 with similar traffic. The City Engineer has made initial contact with MNDOT regarding these lanes. MNDOT is willing to construct these lanes as part of a 1998 construction project at a cost of $25,000 per lane or $50,000 total. Tiller should be required to financially participate. The subject property is located both north and south of 221~t Ave.. Tiller is seeking permission to transport product from the south side of 221st Ave. to the north side via a culvert and conveyor under the road. This is similar to what they are doing under Proctor Ave. now and eliminates a good deal of traffic crossing 221st. Staff is recommending berms that are a minimum of 4 foot high along the roadways adjacent to the project for safety and also screening. These berms will be constructed as overburden material from adjacent phases is generated. However, the berms adjacent to the hot-mix asphalt plant will be constructed by the end of the 1998 construction season. Guardrail may be used in lieu of berms at locations such as the proposed culvert under 221st Ave. Tiller is currently mining product at the Elk River Landfill site adjacent to the northern boundary of this proposed pit. An internal roadway from the Landfill to this site is proposed. This roadway will eliminate the need for trucks to go onto Highway 169 to gain access to the scales on the proposed site. Staff is not opposed to this road, but is recommending it is not located in the 200 foot buffer area required of the landfill or on Tiller's property within the 200 feet adjacent to the railroad hiking trail. f:\shrdoc\b&z\stever\tilrcup.doc Trees and screening: "The Natural Communities and Rare Species of Sherburne County Map" identifies an oak forest, mesic subtype, on the subject property. The removal of these trees was identified and reviewed in the City of Elk River's Environmental Impact Statement on Mineral Excavation. Staff is recommending a 200 foot strip of trees is left in the northwest corner of the site to act as a buffer for the city's railroad hiking trail. The other areas it would be logical to leave trees where they would not interfere with mining activities are adjacent to 221st Ave. and Highway 169. Regrettably, very few trees exist in these areas. Staff is recommending trees be planted within the required 50 foot setback adjacent to these roadways. Further, staff is recommending spruce be planted on the berms as they are constructed. The draft CUP reflects these recommendations. Hours of operation: Staff is recommending that mining activities take place during the normal hours allowed, 7:00 a.m. to 7:00 p.m. However, in addition to these hours staff is recommending the asphalt plant be allowed extra hours to operate on special occasions. An example of a special case was the recent paving of Highway 101, which had to take place at night because of traffic concerns. Noise, vibration and lighting: The conditions in the draft CUP regarding these issues are typical language for a gravel mining permit and have worked well in the past. Fencing: Tiller is proposing to fence their entire site with a four foot high woven wire fence. Warning signs should also accompany this fence. Odor: The conditions regarding odor in Tiller's current asphalt plant permit have been added to their new permit. These conditions include a review process by the city and ultimately revocation of the permit, if necessary to resolve odor problems. f:\shrdoc\b&z\stever\tilrcup.doc Si~na~e: Although the subject property is zoned agricultural, the use is industrial in nature. Staff feels it is legitimate to allow the same signage as allowed in an industrial zone, except for billboards. This is consistent with similar requests. Air emissions: Besides the normal concerns with gravel mining regarding air quality, mostly dust, there are an entire host of additional concerns with the asphalt plant. The recommended conditions in the draft CUP adequately address these concerns. Reclamation: Tiller indicated in their application that the projected life of the operation is 20 to 25 years and the site will be mined in phases. There is no reason for this site to wait until all of the property is mined before reclamation begins. Tiller's phasing plan appears adequate. Tiller's application actually contains two reclamation plans. There is sheet 2 of 2, which acts as an interim reclamation plan until the properties adjacent to the subject property are mined, and the alternate reclamation plan (Figure 4) which reflects the true proposed final contours. Tiller's reclamation plan is somewhat inconsistent with the final contours shown in the city's EIS on mineral excavation. Both plans show Highway 169 at its current elevation. Both plans also have about the same elevation proposed on the west side of the subject property. But, the plan in the EIS shows this loss of elevation a lot more gradual. Further, the Tiller plan for their property north of 221st Ave., unlike the EIS plan, shows a loss of elevation from west to east. This will necessitate the retention pond previously discussed. However, staff is okay with Tiller's plan. The main purpose of the elevations in the EIS are to ensure consistency from one pit to the next. Tiller's elevations on the west side of their property are close enough to tie into the adjacent parcel and needing a retention pond on their site is their decision. Tiller's plans appropriately reflect the berms and trees being left after reclamation in the 50 feet adjacent to 221st Ave. and Highway 169 as well as in the 200 foot buffer adjacent to the city's railroad hiking trail. f:\shrdoc\b&z\stever\tilrcup.doc RECOMMENDATION: Staff feels the application submitted by Tiller Corporation for mineral excavation and a hot-mix asphalt plant, under the conditions stipulated in the attached conditional use permit, is in compliance with the City of Elk River's Mineral Excavation, Zoning, and other applicable ordinances and the City's Environmental Impact Statement on Mineral Excavation. Therefore, staff and the Planning Commission are recommending approval of Tiller's request. f:\shrdoc\b&z\stever\tilrcup.doc LI= CH B.A. LIESCH ASSOCIATES, INC. July 14, 1997 13400 15TH AVE. N. MINNEAPOLIS, MN 55441 612/559-1423 FAX: 612/559-2202 Mr. Steve Rohlf Building and Zoning Administrator City of Elk River 13065 Orono Parkway Elk River, MN 55330 Tiller Corporation, Application for Mineral Extraction and Hot-Mix Asphalt Plant License Dear Steve: I am writing to recap items we discussed today concerning this application dated June 24, 1997. Plan Review A mineral extraction phasing plan was not included in the application. plan was not included in the application. The hot mix plant site Utilities Tiller proposes one well and a septic tank to provide water supply and sanitary facilities. No washing operation is proposed. If any truck maintenance or garage floor drains are proposed Liesch suggests the use of an oil water separator or holding tank be considered. Wetlands I reviewed the wetland maps included in the EIS and concluded no apparent wetlands are located on the property included in the application. Environmental Compliance Based on the facilities described in the application, Liesch suggests the City request the following documents as part of the licensing process. Air pollution permit applications. Stormwater pollution prevention plan required in the Stormwater NPDES permit. Spill Prevention Control and Countermeasure Plan required if aboveground storage tanks exceed regulated volumes. Page 2 July 14, 1997 Steve, please call if you have any questions. Sincerely, B.A. LIESCH ASSOCIATES, INC. John Lichter, P.E. Thanks. maw:lt970714a.wp/GO B.A. LIESCH ASSOCIATES, INC. 13400 15TH AVENUE NORTH MINNEAPOLIS, MINNESOTA 55441 Howard R, Green Company CONSULTING ENGINEERS July 16, 1997 File: 800720J-0240 CONS[tTINIi £iliINEEII~ Mr. Steve Rohlf Building & Zoning Administrator City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: TILLER CORPORATION MINERAL EXTRACTION AND HOT-MIX ASPHALT PLANT PERMIT APPLICATION Dear Mr. Rohlf: As you requested, we have reviewed the package of information submitted by Tiller Corporation concerning their request for a mineral extraction and hot-mix asphalt plant permit. As you are aware, the property in question is approximately 130 acres of land located in the northwest quadrant of 221st Avenue and TH 169. There is a small portion of the property in question that is south of 221st Avenue. Much like the plant along Proctor Avenue, the proposal is to operate both sides of the road utilizing a culvert conveyor system under 221 st Avenue. The application indicates that it will take approximately 20 to 25 years to complete mining the entire site. We have reviewed this permit application from two standpoints, one being drainage and the other being transportation considerations. With regard to these two issues, we would offer the following comments: 1. DRAINAGE The permit indicates that during the mining operation, surface water drainage will be directed to Iow areas within the property. No surface water drainage is expected to be directed off-site. Sedimentation would occur in these temporary ponding areas. The permit application indicates the ponds could be readily cleaned by on-site equipment. Erosion will be minimized by seeding and mulching side slopes as appropriate. The reclamation plan for the site indicates a lowest finished elevation of approximately 956 in the northeast quadrant of 221st and TH 169. The Highway 169 intersection elevation is approximately 1,010. This would indicate that the finished mine elevation will be approximately 50 feet below TH 169. It appears that the only reasonable long-term drainage scenario for this site would be an on-site retention basin preceded by appropriately sized sedimentation basins for quality control. 'This type of drainage pond with no outlet would have to be appropriately sized for the worst storm event that might be 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 Mr. Steve Rohlf July 16, 1997 Page Two envisioned in the future, depending upon the end land use of the property. This type of drainage facility is not uncommon in the City of Elk River. Many of the rural areas that are currently developed utilize on-site retention basins with no permanent outlet. TRANSPORTATION The permit application indicates that dust will be controlled by bituminous paving of 221 st Avenue from the entrance of the proposed pit to TH 169. From the drawing submitted, it appears that this distance would be between 700 and 1,000 feet. It also indicates that exit roads to the plant area will also be paved. We would suggest that the paving of 221st Avenue be to a MnDOT 10-ton design to limit City maintenance expenditures because of the anticipated heavy truck traffic. As you are aware, 221 st Avenue was recently upgraded. Therefore, the existing gravel base should be reasonably good for paving operations, although it may take some fine tuning prior to paving. The permit application indicates that the site is expected to handle an average of 100 trucks per day. This would result in 200 trips per day into and out of the plant. As the permit application indicates, there currently are turn lanes in place on TH 169 to 221st Avenue. During the City's recent meeting with MnDOT personnel, we made them aware of this pending application and the desire for northbound and southbound acceleration lanes. We would suggest that as part of this application, the applicant pursue the construction of these acceleration lanes with MnDOT. If you have any questions regarding these comments or would like further analysis of other issues, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. tJM:tw o:~proj\800720J\720-1606.jul Howard R. Green Company CONSULTING ENGINEERS CITY OF ELK RIVER AGREEMENT FOR ISSUANCE OF CONDITIONAL USE PERMIT FOR MINERAL EXCAVATION THIS AGREEMENT, made and entered into this __ day of , 1997, by and between the CITY OF ELK RIVER, a municipal corporation organized under the laws of the State of Minnesota (City), and TILLER CORPORATION, a Minnesota corporation, hereinafter referred to as (operator); WITNESSETH: WHEREAS, Operator has made application to City for approval of a conditional use permit to operate a gravel mining operation within the City on property legally described as follows: The Northeast Quarter of the Southeast Quarter of Section 4, Township 33, Range 26, lying east of railroad right-of-way, except the North 525 feet thereof; and The East Half of the Southwest Quarter of Section 3, Township 33, Range 26 lying west of US Highway 169, except the North 525 feet thereof; and The West Half of the Southwest Quarter of Section 3, Township 33, Range 26, except the North 525 feet thereof; and That part of the North 1121.92 feet of the Northwest Quarter of Section 10, Township 33, Range 26 lying east of a line which begins at a point on the north line of said Northwest Quarter distant 965.801 feet east, as measured along the north line from the northwest corner thereof; thence south at a right angle 1121.92 feet; and lying west of the westerly right of way line of US highway 169 as laid out and traveled in 1963; All in Sherburne County, Minnesota. (the Property); and Page 2 WHEREAS, the City of Elk River Planning Commission and City Council have held hearings on Operator's request for a conditional use permit, at which hearings all citizens of the City of Elk River and other interested parties have had the opportunity to be heard on the application; and WHEREAS, the City Council by motion adopted August 18, 1997, approved a conditional use permit for the operation of a gravel mining operation and hot-mix asphalt plant (the Operation) on the Property, subject to certain conditions, including that Operator enter into a License Agreement and Conditional Use Permit Agreement with City so as to fully comply with the City's Mineral Excavation, Zoning, and other applicable Ordinances; and WHEREAS, the City's Zoning Ordinance requires that a Conditional Use Permit be issued and that a Conditional Use Permit Agreement for mineral excavation be entered into. NOW, THEREFORE, in consideration of the premises and the mutual promises and conditions hereinafter contained, it is hereby agreed as follows: 1.) Entire Agreement- Except as otherwise provided herein, this Agreement shall constitute the Conditional Use Permit for the Property and, together with the License Agreement to be executed by City and Operator, shall govern the parties rights, responsibilities, and obligations with respect to the Operation, subject to the compliance by all parties with applicable city ordinances and state and federal laws. 2.) Warranty of Operator- Operator hereby warrants and represents to the City , as inducement to the City's entering into this agreement, that the Operator is the fee owner of the subject property. 3.) Conditions- The following general conditions shall apply to the Operation: (01) This Conditional Use Permit authorizes Mineral Excavation (gravel) from the Property and the operation of a hot-mix asphalt plant. (02) All mineral excavation and processing operations on the property shall comply with the City's mineral excavation, zoning and other applicable ordinances; with the terms of this Conditional Use Permit agreement and the license agreement to be executed by the City and operator; with the City of Elk River's Environmental Impact Statement on mineral excavation; and with the application materials and plans submitted by the f:\shrdoc\b&z\stever\gravcup.doc (03) (O4) (O5) (06) (07) (08) (09) Page 3 Operator, which plans and materials are the basis for the City's approval of the Conditional Use Permit. The Operator shall orally notify the City of any violations of this permit within 24 hours and follow this with notification in writing within 4 working days of the violation. The operator shall notify the City annually in writing of the total area and amount of material mined and projected estimates of area and amount of material to be mined in the following year. This is to be done at time of license renewal. The license must be renewed annually and shall run from January 1st through December 31st. The annual license fee is that which is specified by City Code at time of renewal. This license fee is not in lieu of gravel tax collected by the County and a portion of which the City receives. Violations of this Conditional Use Permit may result in suspension or revocation. The City Building and Zoning Administrator and/or his/her agents shall be permitted to inspect the operation for compliance with the conditions of this permit during normal hours of operation. The City's approval of this Conditional Use Permit is subject to the approval of appropriate permits by other governmental agencies. No explosives shall be allowed for this operation. Reclamation Reclamation shall be implemented on an annual basis pursuant to the reclamation plans submitted by the Operator. bo Each year a plan for that year's reclamation shall be approved by the Building and Zoning Administrator prior to issuance of the annual mineral excavation license. Co The reclamation shall include top soil from the site being preserved and put back into place after mining. The vegetation established for the reclamation must be maintained until it is self sufficient. f:\shrdoc\b&z\stever\gravcup.doc Page 4 (10) (11) eo Contours, finished grades, details of erosion control methods, and settling ponds, shall comply with the plans submitted and the City ordinance at the time of reclamation. Mixed species of trees shall be planted in a dense pattern within the required fifty (50) foot setback adjacent to US Trunk Highway 169 and 221~t Ave. Traffic ao Except for localized jobs, traffic through Elk River associated with this operation shall be limited to U.S. Highway 10 and 169. bo 221~t Ave. from the pit entrance to US Highway 169 shall be prepared and paved by the Operator according to City specifications which shall include a ten (10) ton design. This work shall be completed by the end of the 1998 construction season. Co Minimum four (4) foot high berms shall be installed along US Trunk Highway 169 and 221~t Ave. These berms shall be constructed as overburden from adjacent phases is generated, except that the berms adjacent to the hot-mix asphalt plant shall be constructed by the end of the 1998 construction season. Guardrails may be used in lieu of these berms. Interim slopes from the berms to the pit bottom shall be maintained at no greater than 3 to 1 and stabilized. Final slopes shall be no greater than 4 to 1. do The operator shall cooperate with the Minnesota Department of Transportation, including easements if necessary, regarding the construction of an acceleration lane and deceleration lane on US Highway 169 at its intersection with 221st Ave. eo The internal road between the Property and the Elk River Landfill site shall not be located within the 200 foot buffer strip on the west side of either property. Dust Control ao All equipment shall be located as to reduce dust to adjacent properties. f:\shrdoc\b&z\stever\gravcup.doc Page 5 bo Water, but no chemical agents, shall be used to control dust as necessary. Co The City reserves the right to require additional measures to be taken, if warranted by dust problems, including but not limited to reducing stock pile heights. do 221st Ave. from the entrance to the pit to US Trunk Highway 169 as well as the parking and drive for the hot- mix asphalt plant shall be paved. (12) Hours of Operation All mineral excavation, processing, and sales activities shall be conducted between the normal hours of 7:00 a.m. and 7:00 p.m., Monday through Saturday, except the hours for the hot-mix asphalt plant can be extended by the Building and Zoning Administrator for special cases. (13) Noise ao The noise from screening and crushing associated with this operation shall be controlled by equipment location on site, the placement of stock piles, and the type of equipment used. bo Noise levels associated with this operation, shall at no time exceed State standards. Co The City reserves the right to require additional measures be taken, if warranted by noise. (14) Air Emissions ao The MPCA air emission permits for all equipment associated with the mining and hot-mix asphalt operations shall remain current. bo A maximum of 20 % opacity is allowed for emissions from the hot-mix asphalt plant. Co Baghouse fines are allowed to be used in the hot-mix asphalt. d° That the baghouse is inspected for leaks once per month during the construction season with the results copied to f:\shrdoc\b&z\stever\gravcup.doc Page 6 (15) (16) (17) (18) the City. eo Particulate emission standards shall be met by the plant operation (maximum of .04 GR/DSCF for the hot- mix asphalt plant. That all correspondence between the operator and MPCA be copied to the city. Lighting Lighting from the operation shall be directed away from adjacent residential property. Glare, whether directed or reflected as different from general illumination, shall not be visible beyond the limits of the immediate site. All sources of artificial light shall be so fixed, directed, designed, or sized that the minimum subtotal of their illumination shall not increase the level of the illumination on nearby residential property by more than .1 foot candles in or within 25 feet of a dwelling, or more than .5 foot candles on any part of the adjacent property. The piling, storing, or keeping of old machinery, junk, debris, or abandoned motor vehicles, shall be prohibited on this site, with the exception that reusable parts may be stored on the mineral excavation site provided that it is in a location that cannot be viewed from adjacent properties or is totally screened. Mining activities shall not cause excessive vibration off site. If excessive vibration becomes an issue, the City reserves the right to take appropriate measures to alleviate the problem. Groundwater protection measures shall include: ao The Operator shall file with the City an emergency spill response plan. The operator shall adhere to this plan in the event there is a spill. The Operator shall provide the Fire Department with a copy of their flammable or hazardous materials. Fuel tanks shall be above ground, properly diked (if required by law), and registered with MPCA. do All incidences that have the potential to adversely affect groundwater, including but not limited to spills, shall be verbally reported to the City within 24 hours. This verbal f:\shrdoc\b&z\stever\gravcup.doc (19) (2O) Page 7 notification shall be followed up in writing within 4 working days. eo The appropriate storm water permits shall be obtained by the Operator from MPCA. Stockpiles of recyclable asphalt not be placed in surface water and run-off from these stockpiles shall be directed away from surface waters. Further, the size of the stock piles is limited to the amount of material that can be used in one year, but need not necessarily be used in one year and can be stored over winter. That the mining and hot-mix asphalt operations take place a minimum of five (5) feet above the water table. Any deviation to this requirement will require an amendment to this permit. ho Gravel washing operations are prohibited at this site and will require an amendment to this permit to be allowed in the future. The Operator shall have an approved hazardous waste license for this facility and properly dispose of or recycle all waste. j° Floor drains from maintenance facilities shall not be allowed to discharge untreated to a septic system. Si~na~e Signage for the gravel and asphalt hot-mix plant shall be allowed as per the I-2 zone. Further, no bill boards are allowed on the subject property. Odor Odor from the hot-mix operation must be controlled. If weather conditions make odor noticeable, the percentage of recycled asphalt must be reduced. If odor problems can not be resolved by the Operator, the Planning Commission for the City shall review the situation with a public hearing and make a recommendation to the City Council on whether or not the operation of the hot-mix asphalt plant shall be allowed to continue. f:\shrdoc\b&z\stever\gravcup.doc Page 8 (21) Oakwilt Cutting of trees between April 15 and July 15 is prohibited. The Operator shall take other measures deemed appropriate by the Sherburne County Forester to control or eradicate oakwilt. (22) Fencing and Screening So The perimeter of the entire site shall be fenced with a four foot high woven wire fence with warning signs placed where appropriate. bo A minimum four foot high berm with 3 rows of spruce at a 10 foot spacing shall be constructed adjacent to US Highway 169 and 221st Ave. A 200 foot wide buffer strip adjacent to the City's railroad hiking trail shall have the natural vegetation retained on it. (23) Other Permits The Operator shall obtain all state and federal permits appropriate to their operation and file copies of said permits with the City. 4.) General Provisions- (01) Permits- Operator agrees to comply with all of the provisions hereof and agrees to save and hold the City harmless from any and all claims or actions arising from the operations of the Operator on the Property. (02) Binding Effect- The terms and provisions hereof shall be binding upon, and inure to the benefit of the heirs, representatives, successors, and assigns of the parties hereto and shall be binding upon all future owners of all or any part of the Operation and shall be deemed covenants running with the land. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers and encumbrances of all or any part of the Property, and all recording fees, if any, shall be paid by the Operator. (03) Severable- In the event that any portion of this Agreement shall be held invalid for any reason, the same shall not affect in any respect whatsoever the validity of the remainder of this Agreement. f:\shrdoc\b&z\stever\gravcup.doc Page 9 (04) Waiver- Any waiver, whether express or implied, by any party of a breach of any provision of this Agreement will not operate as or be construed to be a waiver of any subsequent breach of this Agreement. (05) Notices- All notices and demands specified herein shall be deemed appropriately and timely given when delivered personally or deposited in the United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). The addresses of the parties hereto are as follows until changed by written notice given as above: If to the City at: City of Elk River ATTN: Building and Zoning Administrator 13065 Orono Parkway ,P.O. Box 490 Elk River, Minnesota 55330-0490 If to the Operator at: Tiller Corporation Attn: Brent Schlueter PO Box 1480 Maple Grove, Minnesota 55311-6480 (06) Incorporation by Reference- All plans, special provisions, proposals and specifications, submitted pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as fully as if set forth herein in full. IN WITNESS WHEREOF, the City and Operator have caused this Agreement to be duly executed on the day and year first above written. CITY OF ELK RIVER By: Its: Mayor By: Its: City Administrator OPERATOR: TILLER CORPORATION By: By: f:\shrdoc\b&z\stever\gravcup.doc Page 10 STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this ~ day of , 1997, by Henry A. Duitsman, the Mayor of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ day of , 1997, by Patrick D. Klaers, the City Administrator of THE CITY OF ELK RIVER, a Minnesota municipal corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA SS. COUNTY OF The foregoing instrument was acknowledged before me this __ ,1997, by , the Corporation, a Minnesota corporation, on behalf of the corporation. day of of Tiller f:\shrdoc\b&z\stever\gravcup.doc Notary Public Page 11 STATE OF MINNESOTA SS. COUNTY OF SHERBURNE The foregoing instrument was acknowledged before me this __ ., 1997, by , the Corporation, a Minnesota corporation, on behalf of the corporation. day of of Tiller Notary Public This instrument was drafted by: City of Elk River Building and Zoning Department 13065 Orono Parkway PO Box 490 Elk River, MN 55330 f:\shrdoc\b&z\stever\gravcup.doc JUNE 24, 1997 TILLER CORPORATION APPLICATION FOR MINERAL EXTRACTION LICENSE AND HOT-MIX ASPHALT PLANT PERMIT ELK RIVER, MINNESOTA SUNDE ENGINEERING, INC. 4200 West Old Shakopee Road, Suite 230 Bloomington, MN 55437-2967 ..................................................................................................... (612) 881-3344 ..................................................................................................... TILLER CORPORATION APPLICATION FOR MINERAL EXTRACTION LICENSE AND HOT-MIX ASPHALT PLANT PERMIT ELK RIVER, MINNESOTA I. INTRODUCTION Tiller Corporation is seeking a mineral extraction license for approximately 133 acres of land located in the northern portion of Elk River. The operation will include mining, processing and stockpiling of aggregate, and the relocation of the hot-mix asphalt plant from it's current location in Elk River, (County Road 33 and U.S. Highway 169), just over two miles south of the new site. 1.) And And And II. SITE INFORMATION Legal Description of Site The Northeast Quarter of the Southeast Quarter of Section 4, Township 33 Range 26, lying east of railroad right-of-way except the northern 525 feet. The East ~ of the Southwest N of Section 3, Township 33, Range 26 lying West of US 169, Except the northerly 525' The W ~ of the SW N of Section 3, Township 33, Range 26, Except the north 525 feet thereof That part of the North 1121.92 feet of the Northwest Quarter of Section 10, Township 33, Range 26, Sherburne County, Minnesota lying east of a line which begins at a point on the north line of said Northwest quarter distant 965.801 feet east, as measured along the north line from the northwest corner thereof; thence south at a right angle 1121.92 feet; and lying west of the westerly right-of-way line of U.S. Highway No. 169 as laid out and traveled in 1963. The location of the site is indicated on Figure 1. LIVONIA TWP. SIT 221st AVE. NW BIO LAKE TWP Io ELK RIVER MISSISSIPPI RIVER OSTEGO WRIG :ouNTh' )UN'Ih' LOCATION MAP FIGURE 1 2.) 3.) 4.) Name and Address of Operator and Land Owner: Tiller Corporation 10633 89th Avenue N. P.O. Box 1480 Maple Grove, MN 55311-6480 (612) 425-4191 Names and addresses of all adjacent land owners within 350 feet of site See attached Exhibit 1. Purpose of Proposed Extraction: The purpose of the proposed extraction is to remove an existing deposit of sand and gravel and process it into construction aggregate and hot mix asphalt. The site will serve the growing needs of Elk River and the surrounding area. 5.) 6.) Estimated Time Required to Complete the proposed Extraction: The site will be operated in phases. It is estimated that it will take 20- 25 years to complete mining over the entire site to the grades shown on the accompanying plans. The duration of mining activities is approximate only and is dependent upon market demand. Transportation Routes: The site is accessed off of 221 st Ave., which is a gravel road. Tiller Corporation proposes to pave 221st from U.S. 169 to the site's entrance and exit roads. Essentially all truck traffic from the site will be east on 221st Ave. approximately 1,000 feet to U.S. Highway 169. The site is expected to handle an average of 100 trucks per day. Dependent on receiving approval from MnDOT, an acceleration lane heading north and south on 169 are proposed to be constructed during the initial phase of operation. Turn lanes are currently in place from 169 to 221'"t Ave. 7.) a. Physical relationship of site with respect to the community. The site is located near the northern boundary of Elk River. The site is immediately west of U.S. Highway 169. The site is approximately 3 miles north of the developed area of Elk River. Site analysis: The southern portion of the site is located south of 221 st Ave. This parcel is approximately 24 acres in size. Past mining activity has occurred on this site by previous owners. The terrain is irregular with little topsoil, overburden or trees. The northern parcel of land is approximately 108 acres in size and lies north of 221 st Ave. The southeast portion of this parcel, adjacent to Highway 169 has also been mined in the past by previous owners. The area of past mining activity has brush for ground cover and little overburden. This area will be partially excavated and leveled out in preparation of plant relocation. A berm will be constructed along 169 and a portion of 221 st Ave. for screening. The asphalt plant will be moved from it's current location to this area. The remaining portion of the property is wooded, with varying amounts of topsoil. There are no buildings on the property. The site lies immediately south of the existing Elk River Landfill. Other surrounding land uses are primarily agricultural. This property, as well as property to the north, east and south is included in the gravel mining district studied in the Environmental Impact Statement (ELS) approved by the City of Elk River in June 1994. A small parcel of land located immediately south of the 24 acre southern parcel was not included in the ElS study. The elevation of the site varies from about 1070 to about 960. Mining will occur to an elevation ranging from 952 to 963. A prominent ridge runs in a north south direction through the property. The slopes on the property range from 20-60%. Slopes west of the site are relatively flat at around 6%. Slopes east of the site are more irregular and range from around 8- 20%. 4 Tibbits Brook, Rice Lake and a large wetland complex lie about 1,000 feet northwest of the site on the west side of the abandoned railroad track. Figure 2 is a U.S.G.S. Quad map excerpt that illustrates the site setting. c. Estimate of Quantity of Material to be Mined: The estimated quantity of material to mined is around 7,000,000 cy. This includes topsoil and overburden. The number is based on U.S.G.S. Quadrangle 10 foot contours and the proposed excavation grades. Depending upon the consistency of material with depth and the occurrence of unsuitable material, the actual amount to be mined may be less. d. Depth of Water Table: The depth of the water table was identified during the ElS process. The water table ranges from about 957 in the northern portion of the site to about 945 in the southeast corner of the site. A ground water divide, running approximately northeast- southwest runs through the site. Figure 3 illustrates the depth of the ground water and ground water flow directions beneath the site. Mining under this permit will occur to the grades illustrated on the Excavation Plan, Sheet 1 of 2. These grades have been developed to stay a minimum of five feet above the water table. Mining into the ground water may be requested in the future. e. Average thickness of overburden The average thickness of overburden is estimated to range between 0 and 5 feet. The overburden is a sandy loam. 8.) Plan of Operation: The plan of operation is to extract and process sand and gravel on the site. Processing will consist of crushing, screening, stockpiling, and production of hot mix asphalt. During the initial stages of operation, 5 SITE / 9 / 1059 '084 Little T.";,, 1'3_ U.S.G.S. Quad Map Excerpt Elk River and Lake Fremont Quadrangles FICUFRE 2 957 (INTERPOLATED --1000--,~ \ DENOTES DIRECTION OF GROUNDWATER FLOW 010 NOTE: GROUNDWATER CONTOURS TAKEN FROM ElS FOR CITY OF ELK RIVER PROPOSED GRAVEL MINING DISTRICT. GROUNDWATER CONTOUR MAP FLOW/ FIGURE ,_3 21st AVE. NW the asphalt plant will be set up in the southeast corner of the parcel north of 221st Ave. Approximately 10 acres will be prepared for the plant site. Preparation will include some mining and leveling of the area, and construction of a screening berm along the east/southeast boundary of this parcel. Aggregate stockpiles and accessory equipment will be located in the plant operations area. Crushing and screening will take place throughout the mining operation. The location of crushers will vary throughout the life of the operation. Their locations will depend upon the location of the active face. Conveyors will also be used throughout the site to convey material from the active face to the processing equipment. A water supply well a septic system will be constructed at the plant area. The site will be accessed off of 221 st Ave. Both an entrance road and an exit road are proposed to be constructed. Areas to be mined will be cleared and grubbed and then stripped as needed. Topsoil will be stockpiled on site. Overburden will be stockpiled or used as backfill to reclaim completed portions of the mine. Sand and gravel will be excavated from the active mining area and brought to the processing area. The site will be mined in phases. Initially the southern 24 acre parcel will be mined. A culvert is proposed to be installed beneath 221st Ave. to allow a conveyor to transfer material from the south side of 221st to the north side of 221st. This would eliminate the majority of truck traffic moving between the two sites. Mining will also begin in the northern portion of the property, adjacent to the Ell( River Landfill and progress to the south towards the processing plant. No explosives will be used at the site. 9.) Drainage, Erosion Control, Sedimentation, Dust, Access Control and Security: Surface water drainage is directed to a Iow area within the excavation. Collected surface water infiltrates into the underlying soils and/or evaporates. Surface water drainage will not be directed off site. 8 Sedimentation may occur in the temporary ponding areas. These ponds can readily be cleaned out by on-site equipment. Erosion of finished slopes is minimized by backfilling to a minimum slope of 4:1 and seeding and mulching. The berm will be constructed to a minimum of 3:1 slopes and seeded and mulched. Dust will be controlled by paving 221 st Ave. from the exit to Highway 169. The main entrance and exit roads to the plant area will also be paved. Conveyors will be used within the site minimizing truck traffic on internal haul roads. Access control will be established by locking gates at the site entrance and exit. The entire site will be fenced. 10.) Restoration Plan Restoration will be an ongoing process. As an area of mining is completed, and mining advances to a subsequent phase, reclamation will begin on the completed phase. Reclamation activities at the site will consist of backfilling, grading, and seeding. Work will be concentrated on the sideslopes around the perimeter of the site. The base of the site may remain open to accommodate mining activities, various haul roads, stockpile areas, etc. Final grades will range from 1% to 25%. Final restoration grades are shown on the Reclamation Plan, Sheet 2 of 2. Topsoil shall be placed on graded areas to be reclaimed. The area shall be seeded within 6 months of completing the backfilling. Topsoil will come from on-site sources, and be placed in a layer that is a minimum of 3" thick in accordance with the city ordinance. After placement of topsoil is complete, it shall be seeded and mulched according to Minnesota Department of Transportation (MnDOT) Standard Specification No 3876 and 3882. The seed used shall be MnDOT seed mixture 50A. The mulch shall be Type I. It should be recognized that portions of a given phase, for example, along borders of subsequent phases, within the processing and operations area and along haul roads, may be left at an intermediate stage of reclamation until completion is practical. 9 III STANDARDS 1 .) Boundary: Extraction operations shall be conducted within the confines of the boundaries indicated within this application. 2,) Setbacks: Site setbacks will be fifty feet from property lines and right-of-ways that are not adjacent to other areas where mining is allowed. The fifty foot setback is applicable along 1 69, 221st' the southern boundary of the southern parcel, and the western boundary that borders the abandoned railroad track. The remaining property lines are adjacent to properties which can be mined and the setback is 30'. Mining shall not be conducted within 5 feet of a right-of-way of an existing public utility. 221st Ave. runs through a portion of the property. It is anticipated that this road will be lowered in the future as mining progresses to the southern portion of the site. The setbacks from the right-of way would be mined in conjunction with the lowering of the road. Figure 4 illustrates alternative reclamation grades for this area if the road is lowered. The grades assume mining activity to the west of the site. 3.) Fencing: The site will be fenced and will meet the ordinance requirements of 4 feet in height with a minimum support post placement of 10'. 4.) Appearance and Screening: All equipment will be kept operational. Abandoned equipment and rubbish will be periodically removed from the site. Within 3 months after termination of mining, or within 3 months after termination of the extraction license, all buildings and structures incidental to extraction operations will be removed. The site will be graded in accordance with the reclamation plan. The perimeter of the site will be screened along 169, north of 221st Ave. A berm will be constructed, seeded, and maintained. 10 I I ! I ! ! ! ! ! ~'-101( I / ! ! ! ! ALTERNATE RECLAMATION PLAN WITH 221ST AVE. LOWERED AND ADdACENT PROPERTY TO WEST MINED. FIGURE 4 5.) Operating Standards: a. Noise: The mining operation and asphalt plant will be operated in compliance with all State noise standards. b. Hours: Mining and crushing will be conducted between 7 a.m. to 7 p.m. Monday - Saturday. The asphalt plant will operate Sunday- Saturday in accordance with its current permit. The asphalt plant may need to operate extended hours to provide material for nighttime paving operations. c. Explosives: There will be no explosives used at this site. d. Fugitive Dust: Fugitive dust will be minimized by paved access road and use of conveyors. Internal haul roads will be watered as needed. Asphalt plant operation and fugitive dust will not exceed air pollution standards established by the Minnesota Pollution Control Agency. e. Water Pollution: The site will be operated in compliance with all applicable Minnesota Pollution Control Agency and Department of Natural Resources standards. The asphalt plant will not discharge wastewater. A National Pollution Discharge Elimination Permit (NPDES) will be obtained for the site. Fuel storage will be in above ground tanks. Secondary containment will be provided for all fuel tanks. 12 f. Topsoil: All topsoil will be retained on the site until the completion of restoration. Topsoil will be used to create screening berms and these berms will subsequently be removed as part of the reclamation process. g. Slopes: The active mining face will be sloped at approximately 1:1. Reclaimed slopes will be backfilled to a maximum slope of 4:1 6.) Reclamation Standards a. Schedule: Reclamation will be an ongoing process. Once mining has been completed in a phase restoration will begin as quickly as possible. Some areas on the base of the floor may be used for stockpiling or operations and will be reclaimed as operations permit. b. Slopes: Slopes will be reclaimed in accordance with the reclamation plan. Finished slopes will not exceed 4:1. c. Cover and Planting: A minimum of 3" of topsoil will be placed over reclaimed slopes. The slopes will be seeded in accordance with the reclamation plan. The vegetation will be periodically inspected to insure that it has become self sustaining. d. Slopes to Water Bodies: There are no water bodies existing on site. Mining below the water table to create a water body is not contemplated under this permit, although a permit revision may be requested at 13 some time in the future. If this occurs, slopes to water bodies will be in compliance with the City Ordinance. e. Water Bodies: All water bodies resulting from extraction - for example temporary storm water ponding areas, will either be filled at the end of each construction season or preserved to continue to operate as a holding pond at the discretion of the City. 14 PLANS NOTES: 1. EXISTING TOPOGRAPHY FROM U.S.G.S. QUADRANGLE 2. BOUNDARY INFORMATION FOR NORTHERN PARCEL IS FROM BOUNDARY SuRVe~ ~ LOT SURVEYS COMPA~rr, ~NC. NO DATE. BOUNDARY INFOR- MATION FOR SOUTHERN PARCEL FROM A SURV['Y BY TAYLOR L~aD SUaveroRs. ~NC. DATED 221 ST AVE TO BE LOWERED IN FUTURE AND AREA SOUTH OF ROAD TO BE MINED. ~ 990 9B0 ENTRANCE AND EXIT ROAD TO PLANT AREa us ~ 69 '1070 LANESNEW ACCELERATION G;C ..... GENERAL LOCATION OF SCREENING BERM] ~'~~ TILLER CORPORATION ~asz~ ~ma,..~a~.a~.~ ELK RIVER, MN EXCAVATION PLAN NOTES: 1. EXISTING TOPOGRAPHY FROM U.S.G.S. QUADRANGLE. 2. BOUNDARY iNFORMATION FOR NORTHERN PARCEL IS FROM BOUNDARY SURVEY BY LOT SURVEYS COMPANY, INC. NO DATE. BOUNDARY INFOR- MATION FOR SOUTHERN PARCEL FROM A SURVEY BY TAYLOR LAND SURVEYORS, INC. DATED 9/~ 8/89. 5. RESTORATION SHALL INCLUDE BACKFILLING TO GRADES SHOWN ON PLAN, PLACEMENT OF A MINIMUM OF 5" OF TOPSOIL FROM ON-SITE SOURCE, AND SEEDING AND MULCHING. / 09o 1040 1 O2( -- 990 98O 4:1 SLOPES 98( \\ \\~ \ \ \ \ '1 )2O / / ~ ~s,~ TILLER CORPORATION ELK RIVER, MN RECLAMATION PLAN 2 EXHIBIT 1 PROPERTY OWNERS LIST 06/19/97 1.4:56:51 ........ P_~c~l._Nbr___. Na~e ...................... Ac!ch'ems Line. 1 ....... .C!,d. e S ................ :-' ?.5.-~o3-i~P_o_ ~.I.,[ aXVER .I,jtl~__le[~-l~, P0-~---~-ff2~§ ..... 'F-/Ji'f i~0'R'~-~-. ........ '~/~2i ~ i':2- O~ ~ ).-,! w ~-~ PJ) & N ~'5-ir'f-'(>-~ ~g ...... · ...................................................................... i2-2. 0i~'-~'~ 1-4. * ............. "--75-103o4200 ']~2~i~-_-~_ & ])0~ 2~191 ~tl(~i.~}.~-~'--':~-~-'~I'~-l~*'_l~l~'..' ..................... ;~'~"l[i3ii-~2-'-'~'~'-I~r''i:'4-~'~iEf~-l[-Ol~-U~-']t'~' ..... ..................................... 169 & ~ ~ 225~59~ . ~ ..................................................... .'._.." ~ sos~ OF ~ 1-4 ~I~ 12t37~_2.~RD ........................... AVE SLX RIV]~ ~ -- :_:j_'_._--_:'j:-_.:-'-'S'~3~0--g~-i-4 01~ Sli 1--:4 W ON RR -- ......... f)~a43 ~ 1-4 oTs"~-~-4-ri-llK-ti~- R OV ~ ~.~_2: ~..~ 258 ~K]~.~ ', ...................... ~~ B ~ ~-~._. -'~y~-~' ...... ~'~ '~2o ~ ~-~ o~ ~ ~-2 o~Z ~-4 ..................................... ~53-~-~231 ~ ~ 1-4 ov'~ ~-~ ~x~ 7.~-110-2101 i? ': 0 ~/:1.9/9"/ 14:56:51 ..... ~a,l:~m:L_lsTb_g,_ Ba~A ......... ........................................................ ?5-1~e,-oooo c~'Y ot~ - ...................... B~ IR~'-~LK-*ilIVE~*/*O*-*PICTlq C~'I'O ~ ' 1,4 :I/,EAG~'*~ .... - , _~INAL I'OTALS 'ei gall