6.7. SR 08-18-1997£ity of
River
MEMORANDUM
Item # 6.7.
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Steve Ach, City Planner
August 18, 1997
Request by Phoenix Enterprises
for Preliminary and Final Plat
Approval (Hillside Crossing Three),
Public Hearing Case No. P 97-11
Issue
Phoenix Enterprises is requesting preliminary plat approval to subdivide
approximately 3.5 acres into I commercial lot and 1 outlot.
Location
Southeast corner of 197tn Avenue and Highway 169.
Zoning/Land Use
PUD (Planned Unit Development) / HB (Highway Business)
Attachments
Resolution No. 97-__
Memo from the City Engineer dated July 18, 1997
· Location map
Proposed plat of Hillside Crossing Three
· Proposed plans byAmoco Oil
· Approved development plans for the Hillside Crossing Planned Unit
Development
· Letter from Terry Humbert, MnDOT, dated July 14, 1997
Overview
The preliminary plat involves subdividing approximately 3.5 acres into one
commercial lot and one outlot. The new lot would be approximately 60,000
square feet (1.3 acres) with the outlot having an area of 87,952 square feet (2
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to the Mayor and City Council/P 97-11
July 21, 1997
Page 2
acres). The subject property was originally platted as an outlot along with
Hillside Crossing II planned unit development which included all of the
property north of Sax Foods up to 197th Avenue.
The concept plans for Hillside Crossing planned unit development were
approved with the subject site shown as one large parcel including one
commercial building, with an area of approximately 11,400 square feet. The
original concept plan also included extensive earth berming along 197th
Avenue and Evans Street to serve as a buffer to the residential areas
immediately to the north and northeast. The concept plan indicated much
larger setback areas along Highway 169 to provide the opportunity for
additional landscaping.
Traffic~Circulation
Reviewing the proposed plans submitted by Amoco Oil along with the
proposed subdivision and anticipated future projects in this area, staff has
taken a close look at the proposed driveway locations, turning movements,
potential conflicts and ultimate traffic demands in this area. Based on
previous projects and past experience, staff offers the following comments:
The right in only off of 197tn is approximately 145 feet from
Highway 169. This is 20 feet further from Highway 169 than the
SuperAmerica on 193rd. The 145 feet is closer to the highway than
some of the other gas stations recently approved in the city (both
Holiday locations). In a letter from Terry Humbert, MnDOT Traffic
Engineer, it is pointed out the need to keep the intersections along
Highway 169 as "free-flowing" as possible. Mr. Humbert suggests
the proposed location of the right-in should be discouraged at this
location.
The concept plan approved for this site showed no access onto
Evans along the east side of the property. Therefore, no comments
were made regarding potential access drives. Staff would
recommend any new access along Evans line up with 196th to the
east.
Only one additional driveway should be allowed onto Evans from
the remaining outlot. The location should be located to the south
end of Outlot A, similar to the driveway shown on the concept
plans.
\\elkriver\sys\shrdoc\council\p97-11.doc
Memo to the Mayor and City Council/P 97-11
July 21, 1997
Page 3
Driveway locations should take advantage of maximizing sight
distances. Relocating the driveway opposite 196th will improve this
issue.
Lastly, it is difficult to review this plat and pending development
without considering access to the property east of Evans. Once
again, an additional driveway opening onto Evans between 196th
and 197th will raise some concern. To preserve the integrity of
Evans as a frontage road and minimize turning movements, there
should be no additional driveways between 197th and 196th. This
issue can be discussed in full when the property is platted for
development.
Additional Right-of-Way
Recently staff has noticed some areas of concern when the ultimate right-of-
way is not dedicated. Therefore, in order to achieve enough room for
pedestrian system, utilities, snow storage, etc., a 15 foot boulevard is
required. It appears an additional 5 feet will be necessary along Evans
Street to accomplish the 15 foot boulevard.
Fire Protection
The Fire Chief has indicated a need to loop the watermain through this plat
for fire protection purposes. Currently, the watermain extends north on
Evans Street and stops approximately at the proposed entrance into the
Amoco site. Based on the Fire Chiefs recommendation, the watermain loop
would extend west from Evans along the new property line to Highway 169
and then south to Evans to complete the necessary loop. In addition, two on-
site hydrants will be required to provide fire protection to both the proposed
Amoco building and future commercial building on the outlot to the south.
The necessary easements to install the watermain and hydrants will need to
be included on the plat.
Park Dedication
The Park and Recreation Commission has reviewed the preliminary plat and
has recommended a payment of cash to meet the park dedication
requirements. The park dedication will apply to the proposed Lot I at this
time, with future dedications coming from the outlot when it is replatted.
\\elkriver\sys\shrdoc\council\p97-11.doc
Memo to the Mayor and City Council/P 97-11
July 21, 1997
Page 4
Indirect Source Permit
The Minnesota Pollution Control Agency (MPCA) has issued a draft Indirect
Source Permit (ISP). The final permit will be provided to the city on August
13, 1997.
Outlot A
Outlot A has a gross area of approximately two acres. This includes the
Menards sign and some ponding area. The usable area is approximately 1.5
acres. Staff recommends the usable area is not large enough for two
commercial lots consistent with the approved concept plan. Therefore, Outlot
A should not be platted into more than one commercial lot.
Pedestrian Circulation
Currently a sidewalk exists along the south side of 197th to Evans Street.
The sidewalk then continues south along the east side of Evans to 193fa.
With the development of Lot 1, Block 1, Hillside Crossing Three, a sidewalk
along the west side of Evans should be installed along with this plat. It is
recommended the sidewalk be extended to the new driveway from the Amoco
site onto Evans, with the ultimately continuing south to the southerly
driveway when Outlot A is developed.
Recommendation
Staff would recommend approval of the following:
ho
Preliminary Plat for Hillside Crossing Three with the following
conditions:
A DEVELOPER'S AGREEMENT BE PREPARED OUTLING THE TERMS AND
CONDITIONS FOR APPROVAL ALONG WITH NECESSARY IMPROVEMENTS.
THE PRELIMINARY AND FINAL PLAT SHALL BE ADJUSTED TO SATISFY THE
CONDITIONS APPROVED AS PART OF THE AMOCO OIL'S SITE PLAN REVIEW.
THIS INCLUDES ANY MODIFICATIONS TO THE LANDSCAPED AREAS ALONG
EVANS AND 197TM.
o
PARK DEDICATION SHALL BE PAID IN THE AMOUNT REQUIRED BY THE CITY AT
THE TIME OF FINAL PLAT.
SURFACE WATER MANAGEMENT SHALL BE PAID IN THE AMOUNT REQUIRED
BY THE CITY AT THE TIME OF FINAL PLAT.
WATER AVAILABILITY SHALL BE PAID TO ELK RIVER UTILITIES PRIOR TO
RECORDING THE PLAT WITH THE COUNTY. DEVELOPER SHOULD ALSO CHECK
\\elkriver\sys\shrdoc\council\p97-11.doc
Memo to the Mayor and City Council/P 97-11
July 21, 1997
Page 5
WITH ELK RIVER UTILITIES OR ANY ADDITIONAL WATER CHARGES ASSOCATED
WITH THE DEVELOPMENT OF THIS SITE.
THE WATERMAIN SHALL BE EXTENDED WEST OF EVANS TO HIGHWAY 169,
THEN SOUTH TO EVANS, PROVIDING THE NECESSARY LOOP FOR FIRE
PROTECTION PURPOSES. SINCE THIS WILL BE A PUBLIC UTILITY, THE PLANS
MUST BE REVIEWED AND APPROVED BY THE CITY ENGINEER PRIOR TO
INSTALLATION.
o
ADDITIONAL RIGHT OF WAY WILL BE REQUIRED ALONG EVANS IN ORDER TO
ACCOMPLISH A 15 FOOT BOULEVARD AREA.
o
DRIVEWAY LOCATIONS SERVING THE PLATTED AREA (LOT 1 AND OUTLOT A)
SHALL BE LIMITED TO THE FOLLOWING:
A RIGHT IN ONLY OFF OF 197TM AVENUE AND SUBJECT TO REVIEW AS
PART OF A SPECIFIC DEVELOPMENT PLAN. THE ACCESS MAY BE DENIED
BY THE CITY COUNCIL IF NOT DESIGNED OR LCOATED ACCORDINGLY.
· ONE DRIVEWAY ONTO EVANS AVENUE OPPOSITE 196TM AVENUE.
ONE DRIVEWAY AT THE SOUTH END OF OUTLOT A SIMILAR TO THE
LOCATION SHOWN ON THE APPROVED CONCEPT PLANS FOR HILLSIDE
CROSSING PUD.
o
THE SIDEWALK WHICH TERMINATES AT EVANS AND 197m SHOULD BE
CONTINUED SOUTH ALONG EVANS STREET TO THE NEW DRIVEWAY ONTO
EVANS FOR THE PROPOSED AMOCO SITE. THE SIDEWALK SHALL CONTINUE
SOUTH WHEN OUTLOT A IS DEVELOPED IN THE FUTURE.
10.
OUTLOT A SHALL NOT BE REPLATTED INTO MORE THAN ONE COMMERCIAL
LOT.
11.
DEVELOPER SHALL REIMBURSE THE CITY FOR COSTS ASSOCIATED WITH
REVIEWING THE PLAT PRIOR TO RELEASING THE PALT FOR RECORDING AT
SHERBURNE COUNTY.
Bo
Resolution No. 97- , granting final plat for Hillside Crossing Three
with the conditions outlined on Exhibit B of the resolution.
\\elkriver\sys\shrdoc\council\p97-11.doc
RESOLUTION NO. 97 -
CITY OF ELK RIVER
A RESOLUTION GRANTING FINAL PLAT APPROVAL FOR:
Hillside Crossing Three
Case No. 97-11
WHEREAS, application has been made for final plat approval, pursuant to
Section 1008.08 (1)(c) of the Elk River City Code of Ordinances, of the property
legally described on attached Exhibit A and hereinafter referred to as "the
Property"; and
WHEREAS, the application for preliminary plat approval has been referred
to the Planning Commission which has given its advice and recommendation to
the City Council; and
WHEREAS, a preliminary plat of the Property was approved by the City
Council on August 18, 1997; and
WHEREAS, the proposed final plat is consistent with the preliminary plat
as approved by the City Council; and
WHEREAS, the proposed final plat complies with each of the conditions
set forth by the City Council in its approval of the preliminary plat of the Property;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ELK RIVER, as follows:
It is hereby determined by the City Council for the City of Elk River as
follows:
Ao
The proposed subdivision is consistent with the Zoning Ordinance
and conforms with all of its requirements.
B°
The proposed subdivision is consistent with all applicable general
and specialized city, county, and regional plans including, but not
limited to, the City's Comprehensive Development Plan.
The physical characteristics of the site, including, but not limited
to, topography, soils, vegetation, susceptibility to erosion and
siltation, susceptibility to flooding, and drainage are suitable for the
type and density of development and uses contemplated.
The proposed subdivision makes adequate provision for water
supply, storm drainage, sewage transportation, erosion control and
all other services, facilities and improvements otherwise required
herein.
Eo
The proposed subdivision will not cause substantial environmental
damage.
Fo
The proposed subdivision will not conflict with easements of record
or with easements established by judgment of a court.
The proposed subdivision will not have an undue or adverse impact
on the reasonable development of neighboring land.
Final plat approval is hereby granted for the Property, subject to the
conditions set forth in attached Exhibit B.
The officers of the City are hereby authorized, once the conditions set
forth in Exhibit B are met and complied with, to sign the final plat for the
Property and to issue a certified copy of this Resolution giving final
approval of the plat.
°
The owner of the Property is authorized to record the final plat as required
by law and shall file proof of said recording with the City. No building
permits will be issued for the Property until the final plat is recorded.
This final plat approval shall expire one year from the date of this
resolution if the final plat is not recorded within that time.
The foregoing
resolution was introduced by Council Member
and duly seconded by Council Member
The following voted in favor of the Resolution.
The following voted against the Resolution:
The following were absent:
f:\shrdoc\document\resoluti\p97-11.doc
WHEREUPON the resolution is adopted.
Passed and adopted this __. day of
,1997.
Henry Duitsman, Mayor
CERTIFICATE
STATE OF MINNESOTA
COUNTY OF SHERBURNE
CITY OF ELK RIVER
I, the undersigned, being the duly qualified and acting Clerk of the City of
Elk River, Minnesota, hereby certify that the above resolution is a true and
correct copy of the resolution as adopted by the City Council of the City of Elk
River on ,1997.
WITNESS my hand officially as such Clerk and the corporate seal of the
City this ~ day of ,1997.
Sandra Thackeray, City Clerk
STATE OF MINNESOTA
SS.
COUNTY OF SHERBURNE
The foregoing instrument was acknowledged before me this __
, 1997, by Henry Duitsman, Mayor, City of
Minnesota.
Elk
day of
River,
Notary Public
f:\shrdoc\document\resoluti\p97-11.doc
STATE OF MINNESOTA
SS.
COUNTY OF SHERBURNE
The foregoing instrument was acknowledged before me this __ day of
, 1997, by Sandra Thackeray, City Clerk, City of Elk River,
Minnesota.
Notary Public
THIS INSTRUMENT WAS DRAFTED BY:
DOHERTY RUMBLE & BUTLER
3500 Fifth Street Towers
150 South Fifth Street
Minneapolis, MN 55402-4235
f:\shrdoc\document\resoluti\p97-11.doc
EXHIBIT A
Outlot C, Hillside Crossing Two, Sherburne County, Minnesota.
f:\shrdoc\document\resoluti\p97-11.doc
o
o
10.
11.
EXHIBIT B
A DEVELOPER'S AGREEMENT BE PREPARED OUTLING THE TERMS AND CONDITIONS
FOR APPROVAL ALONG WITH NECESSARY IMPROVEMENTS.
THE PRELIMINARY AND FINAL PLAT SHALL BE ADJUSTED TO SATISFY THE CONDITIONS
APPROVED AS PART OF THE AMOCO OIL'S SITE PLAN REVIEW. THIS INCLUDES ANY
MODIFICATIONS TO THE LANDSCAPED AREAS ALONG EVANS AND 197TM.
PARK DEDICATION SHALL BE PAID IN THE AMOUNT REQUIRED BY THE CITY AT THE
TIME OF FINAL PLAT.
SURFACE WATER MANAGEMENT SHALL BE PAID IN THE AMOUNT REQUIRED BY THE
CITY AT THE TIME OF FINAL PLAT.
WATER AVAILABILITY SHALL BE PAID TO ELK RIVER UTILITIES PRIOR TO RECORDING THE
PLAT WITH THE COUNTY. DEVELOPER SHOULD ALSO CHECK WITH ELK RIVER UTILITIES
OR ANY ADDITIONAL WATER CHARGES ASSOCATED WITH THE DEVELOPMENT OF THIS
SITE.
THE WATERMAIN SHALL BE EXTENDED WEST OF EVANS TO HIGHWAY 169, THEN SOUTH
TO EVANS, PROVIDING THE NECESSARY LOOP FOR FIRE PROTECTION PURPOSES.
SINCE THIS WILL BE A PUBLIC UTILITY, THE PLANS MUST BE REVIEWED AND APPROVED
BY THE CITY ENGINEER PRIOR TO INSTALLATION.
ADDITIONAL RIGHT OF WAY WILL BE REQUIRED ALONG EVANS IN ORDER TO
ACCOMPLISH A 15 FOOT BOULEVARD AREA.
DRIVEWAY LOCATIONS SERVING THE PLATTED AREA (LOT 1 AND OUTLOT A) SHALL BE
LIMITED TO THE FOLLOWING:
A RIGHT IN ONLY OFF OF 197TM AVENUE AND SUBJECT TO REVIEW AS PART OF A
SPECIFIC DEVELOPMENT PLAN. THE ACCESS MAY BE DENIED BY THE CITY
COUNCIL IF NOT DESIGNED OR LCOATED ACCORDINGLY.
· ONE DRIVEWAY ONTO EVANS AVENUE OPPOSITE 196TM AVENUE.
· ONE DRIVEWAY AT THE SOUTH END OF OUTLOT A SIMILAR TO THE LOCATION
SHOWN ON THE APPROVED CONCEPT PLANS FOR HILLSIDE CROSSING PUD.
THE SIDEWALK WHICH TERMINATES AT EVANS AND 197TM SHOULD BE CONTINUED
SOUTH ALONG EVANS STREET TO THE NEW DRIVEWAY ONTO EVANS FOR THE
PROPOSED AMOCO SITE. THE SIDEWALK SHALL CONTINUE SOUTH WHEN OUTLOT A IS
DEVELOPED IN THE FUTURE.
OUTLOT A SHALL NOT BE REPLATTED INTO MORE THAN ONE COMMERCIAL LOT.
DEVELOPER SHALL REIMBURSE THE CITY FOR COSTS ASSOCIATED WITH REVIEWING
THE PLAT PRIOR TO RELEASING THE PALT FOR RECORDING AT SHERBURNE COUNTY.
\Xelkriver\sys\shrdoc\document\resoluti\p97-11.doc
Howard R, Green Company
CONSULTING ENGINEERS
July 18, 1997
File: 800740J-0240
CO.~'LTL'~G L'NGIXE~
Formerly MSA
Consulting Engineers
Mr. Steve Ach
City planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE:
HILLSIDE CROSSING THREE
PRELIMINARY PLAT REVIEW
Dear Mr. Ach:
As requested, we have reviewed the preliminary plat of Hillside Crossing Three. Based on our
review and comments received at the staff review meeting, we would offer the following comments:
1. The preliminary plat consists of the subdivision of Outlot C from Hillside Crossing Two.
Outlot C is located near the intersection of 197th Avenue and Evans Street. The outlot
consists of a 3.4 acre parcel of land proposed to be divided into Lot 1 and Outlot A. Lot 1
is 1.38 acres and is on the north end of the parcel. Outlot A is just over two acres and is
the southern portion of the site.
2. The major issue with this plat is access. The Concept Plan for Hillside Crossing Two
showed two access points for Outlot C. The first was a right-in off of 197th Avenue. The
second was a full access onto Evans Street located at the southern portion of the outlot.
With the subdivision of this outlot into Hillside Crossing Three, the Developer will be looking
for a third access. The third access is proposed to be located approximately on the lot line
between Lot 1 and Outlot A, and would provide joint access to both parcels included in the
plat.
The obvious issue that comes to mind is whether this access should be located where the
Developer is proposing it on the lot line, or located directly across from 196th Avenue,
which' is about 150 feet further to the south. Obviously, from the Developer's point of view,
the lot line location provides the best access to Lot 1, Block 1, for the potential end user.
At this location, the ddveway will likely be located directly across from a future driveway in
the parcel to the east across Evans Street. At its current location, the driveway would be
approximately 200 feet from the intersection with 197th Avenue relative to a car turning at
the free right located at that intersection. As a comparison, the driveway for the Holiday
Station Store to be built at School Street and TH 169 is approximately the same distance
from School Street as this driveway would be from 197th Avenue.
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923
Mr. Steve Ach
July 16, 1997
Page Two
There are no engineering guidelines that would indicate the driveway would be better
located opposite 196th Avenue. However, with this being the first of multiple developments
near this intersection, the proposed location could easily provide for traffic congestion with
left turning vehicles during peak hours after full development.
Another issue with this subdivision is the size of Outlot A. At 2.02 acres, it is likely slightly
large for any one user, but it is slightly small to be further subdivided into two lots. The
most likely use of this outlot would be for two users located in the same building or multiple
buildings on one lot. Staff would recommend that Outlot A not be further subdivided in the
future because of the potential traffic conflicts and driveway issues associated with the
further subdivision into multiple lots.
Another issue that was discussed at the staff level is the slightly narrow boulevard width
near the north end of Evans Street along Lot 1. The right-of-way in this area is 80 feet
wide, as it is throughout Hillside Crossing Two. However, with the road section widening
slightly to facilitate the free right turn movement at 197th Avenue, this reduces the available
boulevard width. It would be staffs recommendation that Hillside Crossing Three grant
additional right-of-way of approximately five feet in this area to maintain the typical
boulevard width that is found throughout the remainder of Hillside Crossing Two. Along
with this issue of boulevard width, the issue of sidewalk must also be raised, should the
sidewalk which currently traverses the north lot line of Hillside Crossing Three be extended
along the east lot line (along Evans Street) to facilitate pedestrian movements from Lot 1
to Outlot A. It is difficult to answer this question completely without knowing the user for
Outlot A. We would recommend that the sidewalk be continued at least to the southern lot
line of Lot 1, Block 1, to have it available to Outlot A should it need to be extended further
south along the Evans Street frontage.
Drainage and utility easements should be provided along the southern lot line of Lot 1,
Block 1.
If you have any questions regarding these comments, please call.
Sincerely,
Howard R. Green Company
T~rry J. Ma/u/'~'rer, P.E.
TJM:tw
o:~proj\800740J\740-1608 .jul
Howard R. Green Company
CONSULTING ENGINEERS
LOCATION
~.lt- WORLO PARK
PARK
City ol
River
13065 Orono Parkway · P.O. Box 490
Elk River, MN 55330
ZONING
MAP
CARWASH
.!
\
\
SITE PLAN
NOTES:
SITE DATA ~ FROM:
I'
I
U.S
HIGHWAY
NO.
16g
CONCRETE CURB
, !
'-18"RCP 0 2.22
o
4~'--.1.5..".RCP
\
!
I
%
/21
1.5
(N
HIGH
NO. 169
BOUND LAND
EAST EDGE OF NORTH BOUND LANE
-----'--~'-'~_~ TURN
LANE
_ ~ ouz.Loz.
Minnesota Department of Transportation
District 3
3725 12th St. N.
P.O. Box 370
St. Cloud, MN 56302
Tel: 612/255-4181
Fax: 612/255-3257
Toll Free: 1/800/657-3961
July 14, 1997
Steve Ach
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
Re.'
Guardian Angels Development Near Joplin Street
Avenue NW
food Shop Near 197th
Dear Steve:
During our tour of Elk giver on July 2nd you had requested Mn/DOT input on transportation
issues related to the abo~{,e referenced proposed developments. Following is our input on the
plans developed to date i~or the developments.
- The plan as currently drawn shows an access to
as well access to J6plin Street. In the corridor plan developed for TH 10,
placed on an expressway design, where access to and from TH 10
signalized ctions. 'This plan was developed to ensure that traffic
would do so at provided the greatest amount
have been used to Joplin Street into one of those s~
occur at
exiting TH 10
resources
In addition to proposing a
closing access locations
will be necessary to efficiently
Although the plan recog~zed that n~
to existing uses of the accesses, the
the use of the unsignalized access
in the corridor study on page
of signalized corridor plan also recommended
not be si .g 0funsignalized access locations
move on TH 10 as the traffic volumes grow.
accesses could be closed immediately, due
recommend that future land use decisions minimize
access at Hudson Street was specifically addressed
"East of Jo access openings will
Closure of~ points may be
alternate access to the north
should We made with the intent o:
eventually closin~'.'them when possible."
at Hudson Street and Gary Street.
: near future because it would be
)fTH 10. Future land use decisions,
use of these accesses and
An equal opportunity employer
The plan by Guardian Angels for access to TH 10 at Hudson Street should not be allowed for
several reasons. The first is the inability to develop a reasonable spacing between the access into
the retail area and the through lanes on TH 10. Such spacing would be necessary for stacking of
traffic and to provide sufficient time to make decisions. The second is that additional traffic at
Hudson Street would not be compatible with the objectives of the long range corridor plans which
were developed to not only safely and efficiently move traffic along the TH 10 corridor, but also
to provide safe and efficient access points along TH 10. Given that the Joplin Street intersection
is less than a quarter of a mile away, all traffic to and fi.om the Guardian Angels development
should use the signalized intersection at Joplin Street. If the Hudson Street access to the
Guardian Angels site is allowed, MniDOT may have to consider removing the median crossover
at Hudson Street to improve the safety and efficiency of the corridor.
During the District review of the Guardian Angel's plan, an alternate was suggested which would
eliminate the access at Hudson Avenue to the properties located north of TH 10. The proposal
was to have a publ Lake Circle to the access at Hudson Street, thus
providi access to TH 10 via the Street. If this
was platted, the Hudson Street access to the north side e :d.
this would have an impact to the current site plans, it would be a pro-active
consolidating the unsignalized access on TH 10.
Amoco Food Shop - The corridor plan developed for TH 169 indicated a full access at 197th
Avenue NW. Traffic volumes on TH 169 near 197th Avenue are projected to be 47,000 in the
year 2015 which is at capacity for 'the expressway design of TH 169. Given the level of
development occurring near 197th, traffic flow could also be heavy on 197th Avenue.
The plans for the Amoco Food Shop as drawn show a right-in slip from 197th Avenue NW into
the Amoco Food Shop. This slip begins approximately 110 feet from the edge of TH 169. Given
the congestion which is likely to occur in the future, there is a need to keep 197th Avenue as free-
flowing as possible near its junction with TH 169. Since the right-in slip could cause conflicts
between motorists wishing to slow down to use the slip and those wishing to accelerate as they
come through the intersection, its inclusion in the plan should be discouraged. Elimination of the
right-in slip would help ensure that traffic on 197th Avenue remains as free flowing as possible.
If you have any questions regarding the above thoughts regarding the proposed develo
please call.
Sincerely,
cc:
G.P. Dirlam - Bratnerd
K.U. Busch- St. Cloud
Terrence J. Humbert
Planning Engineer
Item #7.7
Howard R, Green Qompany
QQNSULTING ENGINEERS
July 18, 1997
File: 800420J-0601
~O~[LTING E~GI~I~
Formerly MSA
Consulting Engineers
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: 193RD AVENUE AND EVANS STREET INTERSECTION ANALYSIS
Dear Council Members:
As directed by the City Council last month, we have done an analysis of the traffic situation at the
intersection of 193rd Avenue and Evans Street. In order to perform this analysis, we first took
traffic counts of the number of vehicles entering the intersection from each of the four legs. These
24-hour, one-directional traffic counts were taken on Monday, Tuesday, and Wednesday, June 30,
July 1st, and July 2nd. This is after the recent opening of the Time Out Sports Bar and Restaurant.
The results of the traffic counts are shown on the attached exhibit.
As can be seen from the exhibit, the highest volume of traffic is on eastbound 193rd Avenue and
southbound Evans Street. These two legs are in the 5,200 to 5,400 vehicles per day range. Evans
Street northbound had an average of 3,266 vehicles per day over the three-day period. The lowest
traffic count of the four legs, as might be predicted, was on westbound 193rd Avenue at 1,728
average vehicles per 24 hours over the three days.
These traffic counts were compared against the warrants for a multi-way stop sign installation and
the warrants for a traffic signal installation. The counts certainly meet the minimum traffic volume
warrant for the multi-way stop sign installation, which requires an average of 500 vehicles entering
the intersection from all approaches for any eight hours of the day, plus the minor street must have
an average of 200 vehicles per hour for the same eight-hour period. The intersection does not
appear to come close to meeting any of the warrants for a traffic signal intersection installation.
However, this may change over time as Hillside Crossing and Hillside Crossing South continue to
develop, and in the future as 193rd is extended to Tyler Street, providing a means of access from
the eastern part of Elk River to TH 169 and the commercial opportunities located there via 193rd
Avenue.
Because of the relatively short distance this intersection is located away from TH 169, we would
not recommend an all-way stop sign installation because of the potential to back traffic up to TH
169. However, we would recommend the installation of a stop sign on westbound 193rd Avenue.
This would make the intersection operate essentially the same as the Elk Hills Drive/Dodge Avenue
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax612/644-9446 toll free 800/888-2923
Honorable Mayor and City Council
July 18, 1997
Page Two
intersection. By installing the third stop sign, eastbound traffic on 193rd Avenue, most of which
turns north onto Evans Street, will be able to make this move freely, therefore clearing out the
intersection quicker, allowing more opportunities for left turns from northbound Evans Street.
Because this type of installation of stop signs is somewhat unusual, it is imperative that the signs
are accompanied by a placard which would indicate that the traffic coming from TH 169 does not
stop. I have discussed this type of installation with Phil Halls, Street Superintendent. He concurs
with this recommendation; however, due to the additional signs necessary with the stop sign
placement, it may be a couple of weeks before the stop sign on 193rd could be put into place.
If you have any questions regarding this issue, I will be in attendance at your City Council meeting
on Monday, July 21, 1997.
Sincerely,
Howard R. Green Company
Terry Jr. Maurer, P.E.
TJM:tw
Attachment
O:~proj\800420J~420-1801 .jul
Howard R, Green Company
CONSULTING ENGINEERS
NEW
LIQUOR
STORE
193RD AVENUE
SUPER
AMERICA
0 60
ER420EX
LK 7/17/97
TM 800-420-J
ab d JZ4 HOUR ONE DIRECTIONAL TRAFFIC COUNTE
J JUNE 30, JULY 1 & 2
Scott and Ann Marie Breuer
19282 Dodge Street NW
Elk River, MN 55330
241-0791
August 14, 1997
Steven B. Ach, City Planner
City of Elk River
13065 Orono Parkway
PO Box 490
Elk River, MN 55330
Dear Mr. Ach and Members of the Council:
We regret that we are not able to be at this meeting personally, but could not
change a prior commitment that was made months ago. This letter is written with the
intent to express our concern about the request for preliminary plat approval of Hillside
Crossing South Two.
Our first concern is that the preliminary plat was almost approved without
notification to the nearby residents that are directly affected by this requested plat. We
were contacted the Sunday before the last scheduled meeting by a neighbor that this
preliminary plat was being proposed. We immediately called Steve Ach at the City the
next day with our concerns. We appreciate the fact that this meeting was rescheduled and
that the residents were notified so that we could voice our concerns.
We had bought our lot from Mr. Foster. Before we bought the lot, we expressed
our concern of what was going to become of the area behind our lot. He told us that he
had plans to build two or three rambler-style office buildings that would blend in with the
natural surroundings and that we would hardly see them.
The conceptual drawing shows a very large parking lot that comes within 12' of
the back of our property line. Our home would overlook this parking lot of approximately
130 spaces, in addition to the turnaround as shown. The way it is proposed right now,
there would have to be an enormous amount of trees removed for the parking lot alone.
And without those trees for a buffer, Highway 169 and the present area businesses, along
with the proposed businesses would dramatically increase the noise level for area residents
and would also ruin the natural appearance of the lot that we originally bought.
We feel that the plat as currently proposed would significantly drop our property
values because of a lack of a tree buffer between commercial and residential properties.
The reason we feel that this would decrease our property value is because all that we
would see is a huge parking lot and the concern of parking lot lights and the lights from
traffic coming and going that would shine directly at our home. In addition to a
detrimental decrease in property values, we may not even be able to sell our home if this
plat is approved as proposed.
Being business owners ourselves, we can appreciate what Mr. Foster is trying to
accomplish. We would much rather have a nice rambler-style office buildin$, as proposed,
than to look at the back ofa Menard's or a grocery store. After talking with Mr. Foster, it
is our understanding that he plans to build rambler-style buildings similar to the one he
built on Evans Street, which is very attractive. He also stated he would be willing to
leave a tree line buffer between our property and the parking lot and to omit the
turnaround, which comes directly behind our property line. At this time, we feel that we
would like to see a more defined plan with these changes.
Our hope is that the council members will consider our concerns as part of their
decision and help protect the property values of the area residents and the natural setting
that we moved here for.
Enclosed is a copy of the conceptual drawing highlighting our lot and showing the
tree line that exists behind our property. Please call us with any questions at 241-0791.
Si.ncerely,
Scott and Ann Breuer
.... 396.75 ..... ~
2
..... 330.g2 ....
/
i
/
In~
I
I --'-'
,,.',
?."-- 1
~ty of
iver xo:
MEMORANDUM
Item # 7.8
Mayor and City Council
FROM:
Steve Ach, City Planner_~~
DATE:
July 21, 1997
SUBJECT:
Request by Phoenix Enterprises for
Preliminary Plat Approval (Hillside
Crossing South Two), Public
Hearing Case No. P 97-7
Is$/~e
Phoenix Enterprises is requesting preliminary plat approval to subdivide
approximately 7 acres into two commercial lots.
Location
The southeast corner of 193rd Avenue and Evans alignment.
Zoning/Land Use
C3 (Highway Commercial) / HB (Highway Business)
Attachments
Memo from City Engineer dated July 17, 1997
· Location map
· Proposed plat of Hillside Crossing South Two
· Concept plan for the site
· Plat of Oak Park Plaza and minutes from meeting
· Plat of Hillside Crossing South and minutes from meetings
Overview
The application involves replatting Outlot A of Hillside Crossing South which
is an outlot immediately east of SuperAmerica and the Hillside Crossing
shopping center. This outlot has been discussed with two previous plat
applications; the first being Oak Park Plaza, and the second Hillside
Crossing South. Attached to this report is a copy of Oak Park Plaza and the
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425
Memo to the Mayor and City Councfl/P 97-7
July 21, 1997
Page 2
Hillside Crossing plat along with minutes from each of those meetings to help
the City Council piece together the history regarding this property.
The primary issues in considering this plat and concept plan relate to:
Creating a development that respects the natural characteristics of the
site (i.e., Protect ridge and buffer to residential).
Types of businesses (uses) expected to be developed on the site based on
the current zoning of C3 Highway Commercial.
· Traffic/access and assessing the current conditions along with long range
forecasts based on future uses and ultimate build out in this area.
Natural Characteristics
The property has a varying topography and for the most part, is wooded with
a large wetland complex to the south and two smaller wetlands on both the
east and west side. As part of the staff review, Steve Rohlf has noted that the
property is identified on the Minnesota Biological Survey as an oak forest/dry
sub-type.
One of the main features discussed in previous reports is the natural ridge
line that basically parallels the south boundary of the plat. This ridge line
was originally discussed in 1991 when the property was rezoned from PUD
(Planned Unit Development) to C3 (Highway Commercial), residents in
Deerfield Addition had requested the ridge line be protected to act as a
natural buffer between the residential and commercial to the west. This
same issue was presented to the Planning Commission and City Council
during the applications of Oak Park Plaza in the early part of 1994 and with
Hillside Crossing South in the latter part of 1994. Approval of Oak Park
Plaza plat included maintaining a 30 foot drainage and utility easement
along the ridge line in an attempt to protect this area from future
development considerations. Subsequently, the replatting of this property as
part of the Hillside Crossing South application included moving the plat
limits further south closer to the wetland complex and the bottom of the
ridge. Also, the easement was vacated leaving no protection of the ridge line.
Concept Plan
A concept plan illustrating how the property may be developed has been
submitted by the developer. This was a condition of plat approval for Hillside
Crossing South. The purpose for submitting this plan was to give the city an
s:\council\p97-7x.doc
Memo to the Mayor and City CouncilfP 97-7
July 21, 1997
Page 3
opportunity to review the impacts there may be to the ridgeline along the
south along with other natural features of the site.
According to the concept plan submitted by the developer, two 18,000 square
foot buildings (9,000 sq. ft. footprint, 36,000 sq. ft. total) are proposed along
the ridge line paralleling the south portion of the plat. These buildings are
proposed to be located approximately 50 feet from the wetland complex to the
south and east of the plat. Although the developer indicates the buildings
are intended to be office buildings, under the present zoning the buildings
could be used for any retail use outlined in the C3 standards.
The concept plan also illustrates a 15,600 square foot building at the corner
of 193ra and Evans Street alignment. Again, there are no specific tenants
identified for this building and under the present zoning of C-3, a wide
variety of retail and/or office uses could occupy this space. Given the building
orientation and its exposure to Highway 169, the uses which may occur here
are of greater concern than the other buildings adjacent to the wetland.
The plan also has two access points into the subject site. One off of 193ra
Avenue and another off the private driveway (Evans Street) which extends
south of 193ra Avenue.
Without the benefit of a grading plan it is impossible to accurately assess the
building's impact on the ridge line and other natural features of the site.
However, based on previous concept grading plans for this site and other
developments in sensitive areas, it will be difficult to save many trees given
the grading for parking and building areas.
Staff is not approving any specific component of the concept plan at this time.
A complete set of development plans will need to be submitted for each
prospective use. Either the plans will be reviewed by staff as a permitted use
or forwarded to the Planning Commission and City Council as a conditional
use.
Use of Property
The current zoning is C-3 (Highway Commercial). As mentioned above the C-
3 zoning district allows a broad range of commercial uses. Based on the
current zoning any C-3 use listed in the Zoning Ordinance could occur on the
property.
s:\council\p97-7x.doc
Memo to the Mayor and City CouncilfP 97-7
July 21, 1997
Page 4
Traffic/Access
As discussed by the Council at a recent meeting, the traffic in the area of
193rd and Evans is becoming a concern. Terry Maurer's office has recently
completed a traffic count for the intersection of Evans and 193rd. Please refer
to Terry's memo for an explanation of the finding from this study. As the
concept plan illustrates, an access is proposed to connect with Evans Street
leading to the 193r~ and Evans Street intersection. The significance of
additional traffic will depend on the uses ultimately developed on the
property.
Other issues to consider is whether the new access off 193ra should include a
turn lane. Furthermore, the current alignment of 193r~ and any necessary
right of way should be included as part of this plat.
Indirect Source Permit
The applicant is in the process of completing an Indirect Source Permit (ISP)
for the entire Hillside Estates and Hillside Crossing development. No final
action can be taken until that permit has been issued. The preliminary plat
can be acted on with a condition regarding the ISP; however, the final plat
cannot be acted on until the ISP is completed.
Fire Protection
The Fire Chief has indicated additional hydrants will be needed within the
development. The placement of these hydrants will depend on the actual
layout of the site. The hydrants will need to be covered with easements;
ideally, the hydrant locations should be identified and included on the plat.
Staffs concerns are not so much with the plat; rather, with the concept plan.
However, the two are somewhat tied to one another. The specific issues are
as follows:
Addressing traffic within the area.
Controlling the types of uses; particularly the building at the corner of
193ra and Evans.
° Protecting the natural characteristics of the site since it acts as a buffer to
the residential.
s:\council\p97-7x.doc
Memo to the Mayor and City CounciUP 97-7
July 21, 1997
Page 5
Recommendation
Staff has concerns with the concept plan and plat as it has been submitted.
It is recommended the concept plan be redrawn to address the issues
mentioned in this report. If the Council wishes to approve the preliminary
plat, the following conditions should be considered:
PAYMENT OF PARK DEDICATION IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME
OF FINAL PLAT BE MADE PRIOR TO RELEASING THE PLAT FOR RECORDING.
PAYMENT OF THE SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY
THE CITY AT THE TIME OF FINAL PLAT BE MADE PRIOR TO RECORDING THE PLAT WITH
THE COUNTY.
PAYMENT OF THE WATER AVAILABILITY CHARGE BE MADE TO ELK RIVER MUNICIPAL
UTILITIES PRIOR TO RECORDING THE PLAT WITH THE COUNTY.
THE APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT TO
REFLECT THE DRAINAGE AND UTILITY NEEDS TO ACCOMPLISH FUTURE DEVELOPMENT
OF THE SITE. THIS ALSO INCLUDES AN EASEMENT BASED ON THE ULTIMATE (POST
DEVELOPMENT) ORDINARY HIGH WATER LEVEL OF THE WETLAND COMPLEX TO THE
SOUTH AND EAST.
STORM DRAINAGE CALCULATIONS BE PROVIDED TO THE CITY ENGINEER FOR REVIEW
AND APPROVAL PRIOR TO FINAL PLAT APPROVAL.
o
PRELIMINARY PLAT APPROVAL BE CONDITIONED ON THE INDIRECT SOURCE PERMIT
BEING GRANTED BY MINNESOTA POLLUTION CONTROL AGENCY. THIS PERMIT MUST
BE OBTAINED PRIOR TO RECEIVING FINAL PLAT APPROVAL.
A COMPLETE GRADING AND DRAINAGE PLAN BE SUBMITTED AND REVIEWED BY THE
CITY ENGINEER PRIOR TO FINAL PLAT APPROVAL.
A TREE PROTECTION PLAN BE SUBMITTED PRIOR TO FINAL PLAT BEING PRESENTED TO
THE CITY COUNCIL, IDENTIFYING THOSE AREAS OF TREES TO BE SAVED DURING
CONSTRUCTION.
9. THE WATERMAIN BE EXTENDED THROUGH THE PLAT FROM EVANS TO 193RD AVENUE.
s:\council\p97-7x.doc
Howard R, Green Company
CONSULTING ENGINEERS
July 18, 1997
File: 800730J-0240
Formerly MSA
Consulting Engineers
Mr. Steve Ach
City Planner
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330
RE: HILLSIDE CROSSING SOUTH TVVO
Dear Mr. Ach:
As you requested, we have reviewed the Site Plan for the proposed Hillside Crossing South Two.
The Site Plan was prepared by Lot Surveys, Inc., and was dated June 4, 1997. Based on our
review, comments received at the staff review meeting, and a meeting held with the Developer, we
would offer the following comments:
A. TRAFFIC
The proposed development consists of three office buildings. Two of them are 2-story,
18,000 square feet each, and one is a 1-story, 15,600 square-foot building. In total, there
will be 51,600 square feet of office space. It is difficult to predict the number of trips
generated without knowing the makeup of the tenants. To get an idea of the number of
trips generated, we used the Institute of Transportation Engineer's Trip Generation Manual
dated January 1991, and used the Office Park designation. This is generally 'used for plan
unit developments containing general office buildings and support services such as banks,
savings and loan institutions, and sit-down restaurants. Any different makeup such as a
drive-through fast food restaurant or a retail tenant would increase the traffic. Based on the
Office Park classification, the predicted week day total traffic trips generated would be
approximately 600. The a.m. peak hour traffic would be approximately 95 trips and the p.m.
peak hour traffic would be approximately 78 trips. As you are aware, there is already a
concern about the traffic congestion at the intersection of Evans Street and 193rd Avenue
at certain p.m. peak hours. This development has the potential to make this situation
somewhat worse. However, with the proposed change at that intersection by adding a stop
sign, the intersection is certainly capable of handling the additional trips. Although the p.m.
peak hour may be perceived to be a worse situation, it is still well within the capacity of the
roadway system.
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923
Mr. Steve Ach
July 18, 1997
Page Two
The development proposes two outlets, one to Evans Street and a second one to 193rd
Avenue further to the east. In meetings with the Developer, he has suggested posting the
Evans Street exit as no right turn in an effort to encourage outbound traffic to use the 193rd
Avenue exit. We support this suggestion; however, it is worth noting that it will be virtually
impossible to enforce.
B. STORM DRAINAGE
There is an existing trunk storm sewer line which crosses 193rd Avenue from the large
retention pond on the north side and traverses approximately the location of the proposed
access, through the parking lot area, and outlets into the existing wetland south of this
proposed development. The Site Plan shows two proposed retention ponds on either side
of the proposed 193rd Avenue outlet. Storm drainage calculations will be needed at some
point in the future to ensure that storm sewer facilities are adequate sized and that Best
Management Practices are met relative to quality control prior to discharging into the
wetland to the south.
Them currently is a minor storm drainage problem on 193rd Avenue in that the catch basins
at the Iow point just north of this proposed development cannot accept the volume of water
in large rainfall events. This causes overtopping of the mad and some erosion in this ama.
This problem will likely be solved by this development in that the water can now find its way
down the proposed access to 193rd Avenue. The Developer is aware of this and has
indicated that he will provide catch basins along this access road to pick up any additional
water generated from 193rd in large rainfall events.
C. UTILITIES
There is an existing trunk sanitary sewer line which runs north and south along Evans
Street on the west side of this development; therefore, adequate sanitary sewer facilities
exist to serve this development. There is also a watermain in Evans Street which has a
stub toward this development. Watermain along 193rd Avenue is also stubbed out. It will
be relatively easy to loop this watermain through the development to strategically placed
hydrants where the Fire Chief determines for fire protection. Each building should have a
sanitary sewer and water service. If any portions of the building are to be sold at a later
date to individual owners, each segment to be individually owned would need a separate
service.
D. GRADING
No Grading Plan was submitted with the Site Plan. At some point in the future, a Grading
Plan will need to be submitted, reviewed, and approved. The elevation of the two buildings
adjacent to the large wetland to the south will need to be carefully reviewed. The current
Mr. Steve Ach
July 18, 1997
Page Three
office building at the south end of Evans Street is set at an elevation of 937.0. The two
proposed buildings should be no lower than that building, so that adequate separation
between the high water level expected in the wetland to the south and the lowest floor in
the office building is maintained.
If you have any questions regarding these comments, please call.
Sincerely,
Howard R. Green Company
TJM:tw
O:~oroj\800730J\730-1802.jul
' I
ZONING
~ll~"~-River M~P
13065 Orono P~kway. P.O. Box 490 CASE"
Elk ~ver, MN 53330
P97-7
./
N
LOT
LAND
'.()
~CALE IN ~
lO0 0 lO0 200
$CAI..[ 1 NCH ~ 100 FE:L~'T
DENOTE~ 1/2 ~ BY 14 INCH IRON ~ SET
~ A PLA~'IC CAP ~ ~ ~ 674'~
FOI~ TI~: ~ OF ~ PLAT,TI'~
E. AST~]~.Y LI~ OF' OUTLOT A, OAK PARC
Pt. AZA IS ASSt.M~ TO BE.A~ NO~TH 1°45. 4~' WE:ST
SURVEYS COMPANY, INC.
SURVEYORS
HILLSIDE CROSSING
SOUTH TWO
I
uJ
SHEET 2 OF 2 SHEETS
EASEMENT . ¢:, ..
/ /
L~J
~-. 142.11
.,.',",~,-'T ~ . . -~ ~ j /
'-' ~~-C~ - ~ ~G_
'/ j
/ / ~
/ / ~
/ / ......................
//
~ / /
I ~/ /
// :/
..... I i ~ 1 I
I / ~ ~% I
I I _
~_~ ......
L,-;
/
/
/
/
/
HILLSIDg
CROSSING
SOUTH
TWO
LOT ~ ~, ~
0
40°00°
.... 396.75 .....
2
142.11
I
I
I
I
I
65.00
150
\ ?. \
-"N \
/-
/ \ \
\
\
\
Z:, ×~ ";,
/
/
..... 330.92 ....
r~'
/
/
/
/
/ :
/
/
/ -
LOT SURVEYS COt4~ANY, INC.
LAND SURVEYORS
HILLSIDE CROSSING SOUTH TWO
CiTY OF ~ RJVER, ~ COUNTY
OWNER ~ [~'VELOPER:
19250 E'VAt~ STRf~r , [i..K liIVTR. ~ 55530
PHOI((~12) 24t-I~01
l
.......... ;'- -'
I ~ ~'' ~'[ ~ ~ R . w ' ~- /', ', ' I ~x -'
,, . ,o ~ c,',' -- ~// ~-~- ~ ' - ' -'-'"
~' ~,V,~ ;:o ~,. ~,_ , ~ ...,
i ~g,... m i/ ~ , --'~' 17" E-~ ~.4~ A~ ~ x] ),,,,
~ ~ x~ 7x ~ ~ ~)' ~ ' ~ ~ -~ ~ ~ ~ r'
( .... r ..... ;-C-S, .... 331.56
' - Ii' _
gl~~,~, ~ ', I',l'
~ ~ b~, ~ .... ~ "~ .~.~ -.~,, ,
uti ~'d'. ~
~ '-' ~l ~._~', ~ ~ , ., ~ S 87'18' 28" W 330.92
, ~_, ~',~5;~ ~.. < { , , /
~ ~-' ~'Z~', . ;'., ~ I' ,u / ~ _,~
' -~'.~-P, w~ --2, / // --~------~ I u~.
~'~"~' ~ 9 ~ ", ~ ~ ~;~,, ~ ,~o.oo ..... < ,~-~ :, ~ ~ ~,,,
Y,73,, /
- r~ ' ,~ , (~ , ,
~ ""~'" 142.11
_.";. - '; '264.( ~-: ......
_.;..---.:' . ~6f.6i - - - .-'
-'' N 87'15' 55" E o~
[~ 38. 13 /" .~,,'~n" e >
116.17
- ~ D- 00'48' 54" _.__ ~-:..-- i
~'~ ~--. o7..¥ 2." c1~.,,
' , ~'l-~ T..
C koo 0.. o6:.'~-. <:
~ S 87'18 8" W
x...' '
'~'""-~. TFt~ SOUTIi LI'~: OF OUTLOT 'A CHERRYFLL BLUFFS
AK : P Rc PLAZA
Planning Commission Representative Louise Kuester indicated that the
Planning Commission recommended approval.
Vice Mayor Farber opened the public hearing. There being no one for or
against the matter, Vice Mayor Farber closed the public hearing.
COUNCILMEMBER DIETZ MOVED TO ~PPROVE A TWO-YEAR RENEWAL OF THE SOLID
WASTE FACILITY LICENSE AND CONDITIONAL USE PERMIT (CU-87-02) FOR UNITED
POWER ASSOCIATION WITH THE STIPULATION THAT MORE RESTRICTIVE STATE OR
FEDERAL EMISSION STANDARDS ARE AUTOMATICALLY INCORPORATED INTO THE
CITY'S PERMITS. COUNCILM~MBER HOLMGREN SECONDED THE MOTION. THE
MOTION CARRIED 4-0.
8.1. Consider Zoning Ordinance Amendment Establishing a Business Park (B-P)
Zoning District by the City of Elk River/Public Hearing
City Planner Steven Ach explained that in 1990, a Focus Area Study was
completed which provided an in-depth study of future land use
opportunities. A land use that was discussed was the creation of a
business park. An ordinance must be established in order to implement
the concept of a business park. He further indicated that the proposed
"Business Park" Zoning Ordinance has been reviewed by the Planning
Commission and Business Park Task Force.
Vice Mayor Farber opened the public hearing.
Louise Kuester indicated that the Planning Commission recommended
approval. She also relayed a concern that the Planning Commission had
regarding certain items being accomplished "at the discretion of the
Zoning Administrator." This issue was discussed and it was the
consensus that no change be made to the ordinance.
COUNCILM~MBER DIETZ MOVED TO ADOPT ORDINANCE 94-2 AN ORDINANCE AMENDING
SECTION 900.12 OF THE CITY OF ELK RIVER CODE OF ORDINANCES ESTABLISHING
A BUSINESS PARK ZONING ORDINANCE. COUNCILMEMBER .HOLMGREN SECONDED THE
MOTION. THE MOTION CARRIED 4-0.
consider Preliminary Plat to divide approximately ten acres into one
ommercial lot and one outlot along with a conditional use permit to
operate a motor vehicle st~~ convenience store by
SuDerAmerica/Public Nearin~/Case~o. P-92-7 ~ CU-92-16
Steven Ach indicated that SuperAmerica is requesting a preliminary plat
to subdivide approximately 12 acres into 1 commercial lot and 1 outlot
at the southeast corner of Highway 169 and 193rd Avenue. The division
would create one lot approximately one acre in size for SuperAmerica
with the balance of the property retained as an outlot for future
development. SuperAmerica is planning to install temporary utility
lines with the intention of hooking up to the trunk sanitary sewer when
it is extended from School Street and Freeport. If the trunk line is
installed prior to the construction of SuperAmerica, they would then
hook directly to the trunk line.
Elk River City Counci1~ting
January 18, 1994
Steven Ach indicated that SuperAmerica is also requesting a conditional
use permit to operate a motor vehicle station and convenience store.
Representatives of SuperAmerica were present.
distributed of the proposed sign for the site.
A handout was
Vice Mayor Farber opened the public hearing. There being no one for or
against the matter, Vice Mayor Farber closed the public hearing.
Louise Kuester indicated that all Planning Commission concerns have
been addressed. She stated that the Planning Commission voted to
recommend approval of both requests.
COUNCILMEMBER DIETZ MOVED TO RECOMMEND APPROVAL OF TPIE PRELIMINARY PLAT
FOR SUPERA}iERICA TO SUBDIVIDE A 12 ACRE PARCEL INTO ONE COMMERCIAL LOT
'AND ONE OUTLOT LOCATED AT INTERSECTION OF HIGHWAY 169 AND 193RD AVENUE
WITH THE FOLLOWING CONDITIONS:
ISSUES OUTLINED IN TERRY MAURER'S MEMO DATED DECEMBER 16, 1993, BE
ADDRESSED AND/OR INCORPORATED INTO THE PRELIMINARY PLAT.
A DRAINAGE AND UTILITY EASEMENT BE ESTABLISHED ALONG THE SOUTHEAST
PROPERTY LINE PROTECTING THE RIDGE AND EXISTING TREES. THIS
EASEMENT SH~?.?. BE A MINIMUM OF 30 FEET IN WIDTH AND FOLLOW THE
SOUTHEAST PROPERTY LINE.
ELK RIVER UTILITIES, BE CONTACTED TO ARRANGE THE EXTENSION OF
ELECTRICAL SERVICES TO THE PROPERTY.
A STREET LIGHT BE INSTALLED AT THE SOUTHWEST CORNER OF 193 AVENUE
AND THE EASTERLY ENTRANCE DRIVE.
5o
CASH PAYMENT OF PARK DEDICATION IN THE AMOUNT OF $1,500 PER ACRE
BE PAID PRIOR TO RELEASING THE FINAL PLAT FOR RECORDING.
PAYMENT OF '$7,500 TO THE CITY OF ELK RIVER FOR THE PROPERTY'S FAIR
SHARE COST FOR SIGNALIZATION IMPROVEMENTS AT 193 AVENUE AND
HIGHWAY 169.
PAYMENT OF A TRUNK SANITARY SEWER AND WATER MAIN ASSESSMBNT IN THE
AMOUNT OF $3,800 PER ACRE BE PAID PRIOR TO RELEASING FINAL PLAT
FOR RECORDING.
8. COMPLETING A DEVELOPERS AGREEMENT FOR OAK PARC PLAZA PLAT.
PROVIDE TO THE CITY FOR REVIEW AND APPROVAL A DEVELOPMENT PLAN
ILLUSTRATING THE GENERAL GRADING, STORM/SEDIMENTATION PONDING
NEEDS AND FINISHED FLOOR ELEVATIONS OF BUILDINGS.
COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 4-0.
COUNCI~ER HOLMGREN MOVED TO APPROVE THE CONDITIONAL USE PERMIT TO
OPERATE A MOTOR VEHICLE STATION AND CONVENIENCE STORE AT THE
PaCe 8
LITERAL ENFORCEMENT OF THE ORDINANCE WOULD CAUSE
UNNECESSARY HARDSHIP BY NOT ALLOWING THE APPLICANT TO
CONSTRUCT A DECK IN A REASONABLE LOCATION ON THE PARCEL.
THE VARIANCE IS NOT A CONSEQUENCE OF THE PETITIONERS ACTION BUT
DUE TO THE PLATTING OF THE PROPERTY PRIOR TO THE SHORELAND
ORDINANCE.
GRANTING THE VARIANCE WILL NOT BE INJURIOUS OR ADVERSELY AFFECT
THE HEALTH SAFETY AND WELFARE OF THE RESIDENTS OF THE CITY OF ELK
RIVER OR THE NEIGHBORHOOD WHERE THE PROPERTY IS LOCATED.
ONLY ONE OF THE ENCLOSED STRUCTURES BE ALLOWED TO LIMIT THE
VISUAL IMPACTS FROM PINTAIL POND.
COMMISSIONER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 6-
0.
Staff reports presented by Steve Ach. Riverside Development requested a
comprehensive land use plan amendment changing the land use from MR
(Medium Density Residential) fo HB (Highway Business), rezoning from R lc
(Single Family Residential) and PUD (Planned Unit Development) to C3
(Highway Commercial), and a request fo plat approximately seventeen 17)
acres into one commercial lot and two outlofs.
Jeff Oongoll, Riverside Development addressed the Planning Commission
regarding the three (3) requests.
Chairman Tveite opened the public hearing for the land use plan amendment
request and the rezoning request. There being no comments from the public,
Chairman Tveit-- closed the public hearing.
Planning Commission discussion included: zoning; plat boundaries; ridge;
easement.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE LAND USE
PLAN AMENDMENT REQUEST BY RIVERSIDE DEVELOPMENT COMPANY, PUBLIC
HEARING, CASE NO. LUA 94-7, CITING STAFF'S MEMO AS FINDING OF FACT.
APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITIONS:
EXTENDING THE COMMERCIAL LAND USE ALONG HIGHWAY 169 FURTHER
SOUTH TO INCLUDE THE REMAINING UPLAND AREA IS A LOGICAL
EXTENSION.
THE LAND USE PLAN AMENDMENT WILL NOT HAVE A DETRIMENTAL AFFECT
ON SURROUNDING PROPERTIES.
Planning Commission Minutes
September 27, 1994
Page 9
CONDITIONS HAVE CHANGED WITH RESPECT TO SEWER AND WATER
EXTENSIONS, COMMERCIAL DEVELOPMENT ACTIVITY, AND THE PLA1TING
OF PROPERTY AROUND THIS AREA TO WARRANT A CHANGE IN THE LAND
USE.
THE LAND USE PLAN AMENDMENT WILL BE CONSISTENT WITH THE CURRENT
ZONING DESIGNATION OF C3 (HIGHWAY COMMERCIAL).
LAND USE PLAN AMENDMENT REQUEST BE CONTINGENT UPON APPROVAL
OF THE PRELIMINARY PLAT
COMMISSIONER THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-
1, Commissioner Kreger voted against the request.
COMMISSIONER KREGER MOVED TO RECOMMEND APPROVAL OF THE ZONE
CHANGE REQUEST BY RIVERSIDE DEVELOPMENT COMPANY, PUBLIC HEARING,
CASE NO. ZC 74-11, CITING STAFF'S MEMO AS FINDING OF FACT. APPROVAL IS
RECOMMENDED WITH THE FOLLOWING CONDITIONS:
THE REZONING WILL BE CONSISTENT WITH THE AMENDED COMPREHENSIVE
LAND USE PLAN.
THE REZONING WILL NOT HAVE A DETRIMENTAL IMPACT ON THE HEALTH,
SAFETY, OR WELFARE OF THE SURROUNDING PROPERTIES.
REZONING IS A LOGICAL EXTENSION OF THE COMMERCIAL AREA GIVEN
THE PHYSICAL AND NATURAL SURROUNDING FEATURES.
REZONING TO C3 (HIGHWAY COMMERCIAL) IS CONSISTENT WITH THE
ZONING DESIGNATION IMMEDIATELY TO THE NORTH AND WOULD BE A
MINOR EXTENSION.
REZONING REQUEST IS CONTINGENT UPON PRELIMINARY PLAT APPROVAL.
THE CURRENT EASEMEN~ BE MAINTAINED AND NOT VACATED UNTIL THE
PLANNING COMMISSlOnl AND CITY COUNCIL HAVE REVIEWED PLANS
FOR THE PLAT.
COMMISSIONER MINTON SECONDED THE MOTION. THE MOTION CARRIED 6-0.
Chairman Tveite opened the public hearing regarding the preliminary plat
request. There being no comments from the public, Chairman Tveite closed
the public hearing.
Planning Commission discussion included: sign at the location; private road
(Evans); natural plat boundaries.
COMMISSIONER MINTON MOVED TO RECOMMEND APPROVAL OF THE
PRELIMINARY PLAT REQUEST BY RIVERSIDE DEVELOPMENT COMPANY, PUBLIC
HEARING, CASE NO. P 94-11, CITING STAFF'S MEMO AS FINDING OF FACT.
APPROVAL IS RECOMMENDED WITH THE FOLLOWING CONDITIONS:
Planning Commission Minutes
September 27, 1994
Page 10
THE PLANNING COMMISSION AND CITY couNcIL APPROVE THE LAND
USE PLAN AMENDMENT AND REZONING REQUEST ADJUSTING THE
COMMERCIAL BOUNDARY IN A SOUTHEASTERLY DIRECTION TO COINCIDE
WITH THE PROPOSED PLAT.
OUTLOT A BE DEEDED TO THE CITY UPON FILING THE PLAT WITH SHERBURNE
COUNTY.
PAYMENT OF PARK DEDICATION IN THE AMOUNT AS REQUIRED BY CITY
ORDINANCE AT THE TIME OF FINAL PLAT APPROVAL.
NO GRADING IS TO OCCUR WITHIN THE WOODED AREA OF OUTLOT B,
UNLESS DIRECTLY ASSOCIATED WITH THE DEVELOPMENT OF LOT 1, BLOCK
1, HILLSIDE CROSSING SOUTH, UNLESS MODIFIED BY THE PARK AND
RECREATION COMMISSION.
APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE
PLAT AS REQUESTED BY ELK RIVER UTILITIES.
THE PLAT BE CORRECTED TO ELIMINATE THE NAME EVANS STREET AND
REDUCE THE DRAINAGE AND UTILITY EASEMENTS FROM SIXTY (60) TO FIFTY
(50) FEET IN WIDTH.
AT THE TIME OF REPLA171NG OUTLOT B, A CONCEPT PLAN ILLUSTRATING
THE LOCATION OF OFFICE BUILDINGS SHALL BE SUBMIT[ED AND USED TO
DETERMINE THE APPROPRIATE AREA OF THE NATURAL BUFFER TO BE
PROTECTED. A CONSERVATION EASEMENT OR OTHER INSTRUMENT
SHOULD THEN BE APPLIED TO ASSURE PROTECTION OF THIS AREA.
A CROSS ACCESS/CROSS PARKING AGREEMENT BE PREPARED AND
EXECUTED PROVIDING ACCESS TO LOT 1, BLOCK 1, AND OTHER PORTIONS
OF THE PLATTED AREA.
10.
11.
12.
13.
14.
COMMENTS FROM TERRY MAURER'S MEMO DATED SEPTEMBER 22, 1994, BE
INCORPORATED INTO THE FINAL PLAT.
DEVELOPERS SHALL IMPLEMENT IMMEDIATELY TREE PROTECTION
MEASURES FOR THOSE AREAS THAT WERE DISTURBED WITH EARLIER
GRADING OF THE SITE.
APPROPRIATE STREET LIGHTING SHALL BE PROVIDED ALONG THE ACCESS
DRIVE TO LOT 1, BLOCK 1.
IF IT IS DETERMINED THAT A DEVELOPERS AGREEMENT NEEDS TO BE
PREPARED, THIS DOCUMENT SHALL BE SIGNED AND RECORDED ALONG ~.~
WITH THE PLAT.
STORM DRAINAGE FEE IN THE AMOUNT OF $600 BE PAID PRIOR TO
RECORDING THE FINAL PLAT.
WATER AVAILABILITY CHARGE OF $300 BE PAID PRIOR TO RECORDING THE
FINAL PLAT.
Plarming Commission Minutes
September 27, 1994
Page 11
15. PRIOR TO CONNECTING LOT 1, BLOCK 1 TO CITY SEWER AND WATER, THE
APPLICANT OBTAIN A PERMIT FROM MPCA.
1~ 16. EASEMENT TO MAINTAIN THE RIDGE.
RETAIN
THE
DRAINAGE
AND
UTILITY
COMMISSIONER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 6-0.
Staff report presented by Troy Langer. Consider a request by the City of Elk
River to amend Section 900.30 of the Elk River City code related to regulations
on screening, landscaping, lighting, storage, and outdoor displays.
Chairman Tveite opened the public hearing. There being no comments from
the public, Chairman Tveite closed the public headng.
Commissioner Kreger stated he would like to table this request for further
review, however, he would be happy to discuss some of the proposed
changes with staff at this meeting. Staff decided input from the Planning
Commission at this time would be very helpful.
Planning Commission discussion included: screening regarding double-
frontage lots; 3:1 slopes versus 4:1 slopes; in ground and underground irrigation:
credit for existing trees; enforcement; clear cutting of woodland areas.
Commissioner Kuester requested staff consider giving the Planning Commission
more time to review this type (or other major types) of amendment. One
suggestion was the Planning Commission could review major amendments at
their workshops; another suggestion was staff would give the Planning
Commission a copy of the proposed amendments one month prior to the
public hearing meeting.
COMMISSIONER KREGER MOVED TO TABLE THIS ITEM TO THE ~CTOBER 25, 1794,
PLANNING COMMISSION MEETING TO ALLOW TIME FOR FURTHER REVIEW.
COMMISSIONER TACHENY SECONDED THE MOTION. THE MOTION CARRIED 6-0.
Staff report presented by Gary Schmitz. The City of Elk River requested to
amend various sections of the Floodplain Management Ordinance.
Chairman Tveite opened the public hearing.
Earl Hohlen, 39 Main Street, Elk River, reminded the Planning Commission that
whenever the Commission is discussing something of this nature, the public did
not have a copy of the ordinance and therefore, did not know what changes
were being proposed and made it difficult to receive public opinion. Mr.
7.2. Consider an Administrative Subdivision
Headnq, Case No. AS 94-17
Page 8
Request by Jake Jacobson, Public
City Planner Steve Ach indicated that Jake Jacobson has requested an
administrative subdivision to divide a 10 acre parcel into a 4.7 acre parcel, a 2.8
acre parcel and a 2.5 acre parcel. The property is located on Lot 4, Block 4, Oak
Meadows Addition. Steve Ach indicated that although this subdivision is within
the subdivision moratorium zone, the applicant has recently gone through an
ordinance amendment exempting this property from the subdivision moratorium.
Mayor Duitsman opened the public hearing.
Mike Miller questioned how the sale of Mr. Jacobson's property would affect his
property value. Councilmember Holmgren indicated that the sale should have
very little, if any, effect on his property.
There being no further comments, Mayor Duitsman closed the public hearing.
COUNCILMEMBER DIETZ MOVED TO APPROVE THE ADMINISTRATIVE SUBDIVISION
REQUEST BY JAKE JACOBSON TO DIVIDE A 10 ACRE PARCEL INTO ONE 4.8 ACRE
PARCEL - PARCEL A, A 2.8 ACRE PARCEL - PARCEL B, AND A 2.5 ACRE PARCEL -
PARCEL C, WITH THE FOLLOWING CONDITIONS:
PARK DEDICATION IN THE AMOUNT OF $900 BE PAID PRIOR TO RECORDING
THE ADMINISTRATIVE SUBDIVISION.
STORM WATER IMPACT FEE IN THE AMOUNT OF $120 BE PAID PRIOR TO
RECORDING THE ADMINISTRATIVE SUBDIVISION.
A TREE PRESERVATION PLAN BE SUBMITi'ED FOR PARCEL B IF A HOME IS
CONSTRUCTED WITHIN THE WOODED AREA.
THE LOCATION OF A DRIVEWAY FOR PARCEL B MUST BE LOCATED ON AN
UPLAND AREA AWAY FROM THE WETLAND.
A CULVERT BE REQUIRED UNDER THE DRIVEWAY FOR PARCEL B AND PARCEL
C TO KEEP THE EXISTING DRAINAGE PATI'ERNS FUNCTIONING PROPERLY.
COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0.
7.3.
Consider an Easement Vacation Request by Riverside Development, Public
Hearinq, Case No. EV 94-2
Request to vacate a 30 foot drainage and utility easement along the southeast
property line of Oak park Plaza. Staff recommends approval of vacating a
portion of the 30' easement.
7.4.
Consider an Easement Vacation Request by Riverside Development, Public
Hearinq, Case No. EV 94-4
Request to vacate a drainage and utility easement on a portion of Outlot A,
Cherry'hill Bluffs Addition. Staff recommends denial because the easement
·
City Council Minutes
October 17, 1994
Page 9
., p.m,~nflv r)rot¢cts a rid~/e line fro.m dev, elopment qctivity, and, the easement is
n~eeded for storm water ponding, storm sewe~i~"'pr~)vements and mitigation area.
7.5.
Consider a Land Use Amendment Request by Riverside Development, Public
Hearinq, Case No. LUA 94-7
Request for a comprehensive land use plan amendment changing the land use
from MR IMedium Density Residential) to HB (Highway Business) for a strip of
property approximately one hundred feet in width along the southeast border of
Oak Parc Plaza. The Planning Commission and Staff recommend approval of the
request.
7.6.
Consider a Zone Chanqe Request by Riverside Development, Public hearinq,
Case No. 94-11
Request for a zone change from Rlc (Single Family Residential) and PUD (Planned
Unit Development) to C3 (Highway Commercial) for a stdp of property
approximately one hundred feet in width along the southeast border of Oak Parc
Plaza. Planning Commission and Staff recommend approval of the request.
7.7.
Consider Preliminary Plat Request by Riverside Development, Public Hearinq, Case
No. P 94-11
Request for a preliminary plat to plat approximately seventeen (17) acres into
one commercial lot and two outlots. Planning Commission and Staff recommend
approval of the request.
Council discussion and action on Items 7.3 - 7.7
City Planner Steve Ach presented the staff reports on each of the above items 7.3
- 7.7.
Mayor Duitsman opened the public hearings for items 7.3. through 7.7.
Jeff Gongoll representing Riverside Development reviewed aerial photos of the
site. He indicated that it is the developer's intention to make the area
environmentally pleasing and to follow the business park zoning guidelines. Mr.
Gongoll spoke specifically to the developer's request to vacate the drainage
and utility easement on Outlot A of Cherryhill Bluff's Addition. He stated that
delaying the vacation of the easements would be burdensome as far as
developing legal descriptions.
Planning commission Representative Dan Tveite indicated that the Planning
Commission recommended that the easements not be vacated at this time
because the ridge line creates a natural barrier between the commercial and
residential property.
There being no further comments from the public, Mayor Duitsman closed the
public hearing.
City Council Minutes
October 17, 1994
Page 10
7.3.
COUNCILMEMBER HOLMGREN MOVED TO ADOPT RESOLUTION 94-107, A
RESOLUTION FOR VACATING DRAINAGE AND UTILITY EASEMENT. COUNCILMEMBER
SCHEEL SECONDED THE MOTION. THE MOTION CARRIED 5-0.
7.4.
COUNCILMEMBER DIETZ MOVED TO DENY THE REQUEST TO VACATE THE DRAINAGE
AND UTILITY EASEMENT ON OUTLOT A, CHERRYHILL BLUFFS ADDITION.
COUNCILMEMBER SCHEEL SECONDED THE MOTION. THE MOTION CARRIED 5-0.
7.5.
COUNCILMEMBER FARBER MOVED TO ADOPT RESOLUTION 94-108, A RESOLUTION
AMENDING THE COMPREHENSIVE PLAN TO CHANGE THE LAND USE FROM MR
(MEDIUM DENSITY RESIDENTIAL) TO HB (HIGHWAY BUSINESS) LUA 94-7.
COUNCILMEMBER HOLMGREN SECONDED THE MOTION. THE MOTION CARRIED 5-0.
7.6.
COUNCILMEMBER HOLMGREN MOVED TO ADOPT ORDINANCE 94-15, AN
ORDINANCE AMENDING THE CITY OF ELK RIVER ZONING MAP TO ZONE CERTAIN
PROPERTY FROM R1C (SINGLE FAMILY RESIDENTIAL) AND PUD (PLANNED UNIT
DEVELOPMENT) TO C3 (HIGHWAY COMMERCIAL) ZC 94-11. COUNCILMEMBER
FARBER SECONDED THE MOTION. THE MOTION CARRIED 5-0.
7.7.
COUNCILMEMBER FARBER MOVED TO APPROVE THE PRELIMINARY PLAT REQUEST BY
RIVERSIDE DEVELOPMENT TO SUBDIVIDE 17 ACRES INTO ONE COMMERCIAL LOT AND
TWO OUTLOTS WITH THE CONDITIONS AS SET FORTH IN THE STAFF REPORT, WITH THE
FOLLOWING RECOMMENDATIONS:
THE PLANNING COMMISSION AND CITY COUNCIL APPROVE THE LAND USE
PLAN AMENDMENT AND REZONING REQUEST ADJUSTING THE COMMERCIAL
BOUNDARY IN A SOUTHEASTERLY DIRECTION TO COINCIDE WITH THE
PROPOSED PLAT.
OUTLOT A BE DEEDED TO THE CITY UPON FILING THE PLAT WITH SHERBURNE
COUNTY, WITH THE CITY HOLDING THE DEED UNTIL THE MITIGATION IS
COMPLETED.
PAYMENT OF PARK DEDICATION IN THE AMOUNT AS REQUIRED BY CITY
ORDINANCE AT THE TIME OF FINAL PLAT APPROVAL.
NO GRADING IS TO OCCUR WITHIN THE WOODED AREA OF OUTLOT B,
UNLESS DIRECTLY ASSOCIATED WITH THE DEVELOPMENT OF LOT 1, BLOCK 1,
HILLSIDE CROSSING SOUTH.
APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT
AS REQUESTED BY ELK RIVER UTILITIES.
THE PLAT BE CORRECTED TO ELIMINATE THE NAME EVANS STREET AND
REDUCE THE DRAINAGE AND UTILITY EASEMENTS FROM SIXTY (60) TO FIFTY
(50) FEET IN WIDTH.
AT THE TIME OF REPLATTING OUTLOT B, A CONCEPT PLAN ILLUSTRATING THE
LOCATION OF OFFICE BUILDINGS SHALL BE SUBMITTED AND USED TO
DETERMINE THE APPROPRIATE AREA OF THE NATURAL BUFFER TO BE
PROTECTED. A CONSERVATION EASEMENT OR OTHER INSTRUMENT SHOULD
THEN BE APPLIED TO ASSURE PROTECTION OF THIS AREA.
Cify Council Minutes
October 17, 1994
Page 11
7.9.
11.
12.
13.
14.
A CROSS ACCESS/CROSS PARKING AGREEMENT BE PREPARED AND
EXECUTED PROVIDING ACCESS TO LOT 1, BLOCK 1, AND OTHER PORTIONS
OF THE PLAI'rED AREA.
15.
COMMENTS FROM TERRY MAURER'S MEMO DATED SEPTEMBER 22, 1994, BE
INCORPORATED INTO THE FINAL PLAT.
DEVELOPERS SHALL IMPLEMENT IMMEDIATELY TREE PROTECTION MEASURES
FOR THOSE AREAS THAT WERE DISTURBED WITH EARLIER GRADING OF THE
SITE.
APPROPRIATE STREET LIGHTING SHALL BE PROVIDED ALONG THE ACCESS
DRIVE TO LOT 1, BLOCK 1.
IF IT IS DETERMINED THAT A DEVELOPERS AGREEMENT NEEDS TO BE
PREPARED, THIS DOCUMENT SHALL BE SIGNED AND RECORDED ALONG WITH
THE PLAT
STORM DRAINAGE FEE IN THE AMOUNT OF $720 PER ACRE BE PAID PRIOR TO
RECORDING THE FINAL PLAT.
WATER AVAILABILITY CHARGE OF $300 BE PAID PRIOR TO RECORDING THE
FINAL PLAT.
PRIOR TO CONNECTING LOT 1, BLOCK 1 TO CITY SEWER AND WATER, THE
APPLICANT OBTAIN A PERMIT FROM MPCA.
EASEMENTS ALONG THE RIDGE LINE BE
THE
DRAINAGE
AND
UTILITY
MAINTAINED.
COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0.
Consider a Rezoninq Request by the City of Elk River, Public Hearinq, Case No. ZC
94-10
City Planner Steve Ach indicated that the City is requesting to rezone
approximately 150 acres from PUD (Planned Unit Development) and C2 (Office
District) to BP (Business Park). He explained that on September 19, the City
Council continued discussion of this item to allow Country Ridge Partnership an
opportunity to submit a plan to the City illustrating how they would like their
property developed. He indicated that their property is included in the City'S
proposed rezoning to BP. Mr. Ach indicated that Country Ridge Partnership has
submitted a plan showing their preference in zoning the property with 13 acres
along Highway 10 zoned as C-3 (Highway Commercial) and the remaining 15
acres zoned as Business Park. Steve Ach indicated that following review of the
plan, staff is recommending that the entire area be rezoned to business park.
Mayor Duitsman opened the public hearing.
Jay Johnson of Country Ridge Partnership, indicated that Country Ridge
Partnership prefers that a portion of their property be zoned C-3. He indicated