Loading...
6.8. SR 08-18-1997City of MEMORANDUM TO: FROM: DATE: SUBJECT: Item # 6.8. Mayor and City Council Steve Ach, City Planner.~_~ August 18, 1997 Request by Phoenix Enterprises for Preliminary and Final Plat Approval (Hillside Crossing South Two), Public Hearing Case No. P 97-7 Phoenix Enterprises is requesting preliminary and final plat approval to subdivide approximately 7 acres into two commercial lots. Location The southeast corner of 193rd Avenue and Evans alignment. Zoning/Land Use C3 (Highway Commercial) / HB (Highway Business) Attachments · Memo from City Engineer dated July 17, 1997 · Letter from Scott Breuer · Location map · Proposed plat of Hillside Crossing South Two · Concept plan for the site · Plat of Oak Park Plaza and minutes from meeting · Plat of Hillside Crossing South and minutes from meetings Overview The application involves replatting Outlot A of Hillside Crossing South which is an outlot immediately east of SuperAmerica and the Hillside Crossing shopping center. This outlot has been discussed with two previous plat applications; the first being Oak Park Plaza, and the second Hillside 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to the Mayor and City CounciYP 97-7 August 18, 1997 Page 2 Crossing South. Attached to this report is a copy of Oak Park Plaza and Hillside Crossing plat along with minutes from each of those meetings to help the City Council piece together the history regarding this property. The primary issues in considering this plat and concept plan relate to: · Creating a development that respects the natural characteristics of the site (i.e., Protect ridge and buffer to residential). · Types of businesses (uses) expected to be developed on the site based on the current zoning of C3 Highway Commercial. · Traffic/access and assessing the current conditions along with long range forecasts based on future uses and ultimate build out in this area. Natural Characteristics The property has a varying topography and for the most part, is wooded with a large wetland complex to the south and two smaller wetlands on both the east and west side. As part of the staff review, Steve Rohlf has noted that the property is identified on the Minnesota Biological Survey as an oak forest/dry sub-type. One of the main features discussed in previous reports is the natural ridge line that basically parallels the south boundary of the former Oak Park Plaza plat. This ridge line was originally discussed in 1991 when the property was rezoned from PUD (Planned Unit Development) to C3 (Highway Commercial), residents in Deerfield Addition had requested the ridge line be protected to act as a natural buffer between the residential and commercial to the west. This same issue was presented to the Planning Commission and City Council during the applications of Oak Park Plaza in the early part of 1994 and with Hillside Crossing South in the latter part of 1994. Approval of Oak Park Plaza plat included maintaining a 30 foot drainage and utility easement along the ridge line in an attempt to protect this area from future development considerations. Subsequently, the replatting of this property as part of the Hillside Crossing South application included moving the plat limits further south closer to the wetland complex and the bottom of the ridge. Also, the easement was vacated leaving no protection of the ridge line. Concept Plan A concept plan illustrating how the property may be developed has been submitted by the developer. This was a condition of plat approval for Hillside Crossing South. The purpose for submitting this plan was to give the city an \\elkriver\sys\shrdoc\council\p97-7x.doc Memo to the Mayor and City Council/P 97-7 August 18, 1997 Page 3 opportunity to review how the proposed development would fit with the lay of the land. According to the concept plan submitted by the developer, two 18,000 square foot buildings (9,000 sq. ft. footprint, 36,000 sq. ft. total) are proposed along the ridge line paralleling the south portion of the plat. These buildings are proposed to be located approximately 50 feet from the wetland complex to the south and east of the plat. Although the developer indicates the buildings are intended to be office buildings, under the present zoning the buildings could be used for any retail use outlined in the C3 standards. The concept plan also illustrates a 15,600 square foot building at the corner of 193rd and Evans Street alignment. Again, there are no specific tenants identified for this building and under the present zoning of C-3, a wide variety of retail and/or office uses could occupy this space. Given the building orientation and its exposure to Highway 169, the uses which may occur here are of greater concern than the other buildings adjacent to the wetland. The plan also has two access points into the subject site. One off of 193rd Avenue and another off the private driveway (Evans Street) which extends south of 193rd Avenue. Without the benefit of a grading plan it is impossible to accurately assess the building's impact on the ridge line and other natural features of the site. However, based on previous concept grading plans for this site and other developments in sensitive areas, it will be difficult to save many trees given the grading for parking and building areas. Staff is not approving any specific component of the concept plan at this time. A complete set of development plans will need to be submitted for each prospective use. Either the plans will be reviewed by staff as a permitted use or forwarded to the Planning Commission and City Council as a conditional use. Use of Property The current zoning is C-3 (Highway Commercial). As mentioned above the C- 3 zoning district allows a broad range of commercial uses. Based on the current zoning any C-3 use listed in the Zoning Ordinance could occur on the property. \\elkriver\sys\shrdoc\council\p97-7x.doc Memo to the Mayor and City Council/P 97-7 August 18, 1997 Page 4 Traffic/Access As discussed by the Council at a recent meeting, the traffic in the area of 193rd and Evans is becoming a concern. Terry Maurer's office has recently completed a traffic count for the intersection of Evans and 193rd. This report was presented to the Council last month. As the concept plan illustrates, an access is proposed to connect with Evans Street leading to the 193rd and Evans Street intersection. The significance of additional traffic will depend on the uses ultimately developed on the property. Other issues to consider is whether the new access off 193ra should include a turn lane. Furthermore, the current alignment of 193~a and any necessary right of way should be included as part of this plat. Indirect Source Permit The Indirect Source Permit (ISP) is supposed to be issued August 13th. Therefore, the Council may take final action on the proposed plat. Fire Protection The Fire Chief has indicated additional hydrants will be needed within the development. The placement of these hydrants will depend on the actual layout of the site. The hydrants will need to be covered with easements; ideally, the hydrant locations should be identified and included on the plat. Issues Staffs concerns are not so much with the plat; rather, with the concept plan. However, the two are somewhat tied to one another. The specific issues are as follows: · Addressing traffic within the area. · Controlling the types of uses; particularly the building at the corner of 193ra and Evans. · Protecting the natural characteristics of the site since it acts as a buffer to the residential. Storm Drainage In order to develop either lot in the subdivision, storm water ponds for quality purposes will need to be developed. These ponds should be \\elkriver\sys\shrdoc\council\p97-7x.doc Memo to the Mayor and City CounciUP 97-7 August 18, 1997 Page 5 encumbered by drainage and utility easements. Therefore, storm water calculations shall be submitted for review by the City Engineer along with a grading plan illustrating the location of storm water quality ponds. Recommendation Staff has concerns with the concept plan and plat as it has been submitted. It is recommended the concept plan be redrawn to address the issues mentioned in this report. If the Council wishes to approve the preliminary plat, the following conditions should be considered: A DEVELOPER'S AGREEMENT BE PREPARED OUTLINING THE CONDITIONS OF PLAT APPROVAL AND PUBLIC IMPROVEMENTS. PAYMENT OF PARK DEDICATION IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE MADE PRIOR TO RELEASING THE PLAT FOR RECORDING. PAYMENT OF THE SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE TIME OF FINAL PLAT BE MADE PRIOR TO RECORDING THE PLAT WITH THE COUNTY. PAYMENT OF THE WATER AVAILABILITY CHARGE BE MADE TO ELK RIVER MUNICIPAL UTILITIES PRIOR TO RECORDING THE PLAT WITH THE COUNTY. THE APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT TO REFLECT THE DRAINAGE AND UTILITY NEEDS TO ACCOMPLISH FUTURE DEVELOPMENT OF THE SITE. THIS ALSO INCLUDES AN EASEMENT BASED ON THE ULTIMATE {POST DEVELOPMENT) ORDINARY HIGH WATER LEVEL OF THE WETLAND COMPLEX TO THE SOUTH AND EAST. STORM DRAINAGE CALCULATIONS BE PROVIDED TO THE CITY ENGINEER FOR REVIEW AND APPROVAL PRIOR TO FINAL PLAT BEING RECORDED WITH SHERBURNE COUNTY. A COMPLETE GRADING AND DRAINAGE PLAN BE SUBMITTED AND REVIEWED BY THE CITY ENGINEER PRIOR TO FINAL PLAT APPROVAL. o THE WATERMAIN BE EXTENDED THROUGH THE PLAT FROM EVANS TO 193Ro AVENUE. THIS IMPROVEMENT WILL BE A PUBLIC UTILITY; THEREFORE, PLANS MUST BE REVIEWED BY THE CITY ENGINEER. PRIOR TO COMMENCING GRADING ON SITE, A GRADING PLAN MUST BE APPROVED BY THE CITY ENGINEER AND ALL EROSION CONTROL AND TREE PORTECTION INI PLACE. 10. A SIX FOOT WIDE SIDEWALK BE INSTALLED ALONG THE EAST SIDE OF EVANS STREET ALIGNMENT FROM 193RD TO THE RESTAURANT IN HILLSIDE CROSSING SHOPPING CENTER. 11. A REVISED CONCEPT PLAN BE SUBMITTED FOR COUNCIL REVIEW AND APPROVAL TO BE INCORPORATED INTO THE DEVELOPER'S AGREEMENT. THE REVISED DEVELOPOMENT PLAN SHALL FOCUS ON THE RE-ORIENTATION OF THE BUILDING \\elkriver\sys\shrdoc\council\p97-7x.doc Memo to the Mayor and City CounciUP 97-7 August 18, 1997 Page 6 LOT 1 TOWARDS THE CENTER OF THE SITE, ADJUSTING THE OTHER BUILDINGS TO MAXIMIZE PRESERVING THE NATURAL FEATURES OF THE SITE, AND ILLUSTRATE A BUFFER AREA BETWEEN THE RESIDENTIAL HOMES TO THE EST AND PARKING AREA. \\elkriver\sys\shrdoc\council\p97-7x.doc Item #7.7 Howard R, Green Company CONSULTING ENGINEERS July 18, 1997 File: 800420J-0601 COBI:LTING tNGIXEI~ Formerly MSA' Consulting Engineers Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 RE: 193RD AVENUE AND EVANS STREET INTERSECTION ANALYSIS Dear Council Members: As directed by the City Council last month, we have done an analysis of the traffic situation at the intersection of 193rd Avenue and Evans Street. In order to perform this analysis, we first took traffic counts of the number of vehicles entering the intersection from each of the four legs. These 24-hour, one-directional traffic counts were taken on Monday, Tuesday, and Wednesday, June 30, July 1st, and July 2nd. This is after the recent opening of the Time Out Sports Bar and Restaurant. The results of the traffic counts are shown on the attached exhibit. As can be seen from the exhibit, the highest volume of traffic is on eastbound 193rd Avenue and southbound Evans Street. These two legs are in the 5,200 to 5,400 vehicles per day range. Evans Street northbound had an average of 3,266 vehicles per day over the three-day period. The lowest traffic count of the four legs, as might be predicted, was on westbound 193rd Avenue at 1,728 average vehicles per 24 hours over the three days. These traffic counts were compared against the warrants for a multi-way stop sign installation and the warrants for a traffic signal installation. The counts certainly meet the minimum traffic volume warrant for the multi-way stop sign installation, which requires an average of 500 vehicles entering the intersection from all approaches for any eight hours of the day, plus the minor street must have an average of 200 vehicles per hour for the same eight-hour period. The intersection does not appear to come close to meeting any of the warrants for a traffic signal intersection installation. However, this may change over time as Hillside Crossing and Hillside Crossing South continue to develop, and in the future as 193rd is extended to Tyler Street, providing a means of access from the eastern part of Elk River to TH 169 and the commercial opportunities located there via 193rd Avenue. Because of the relatively short distance this intersection is located away from TH 169, we would not recommend an all-way stop sign installation because of the potential to back traffic up to TH 169. However, we would recommend the installation of a stop sign on westbound 193rd Avenue. This would make the intersection operate essentially the same as the Elk Hills Drive/Dodge Avenue 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 NEW LIQUOR STORE 193RD AVENUE SUPER AMERICA 0 60 ER420EX 7/17/97 800-420-J APl=ROVED: JOB NO. cay d F4 HOUR ONE DIRECTIONAL TRAFFIC COUNT~ JUNE 50, JULY 1 & 2 Scott and Ann Marie Breuer 19282 Dodge Street NW Elk River, MN 55330 241-0791 August 14, 1997 Steven B. Ach, City Planner City of Elk River 13065 Orono Parkway PO Box 490 Elk River, MN 55330 Dear Mr. Ach and Members of the Council: We regret that we are not able to be at this meeting personally, but could not change a prior commitment that was made months ago. This letter is written with the intent to express our concern about the request for preliminary plat approval of Hillside Crossing South Two. Our first concern is that the preliminary plat was almost approved without notification to the nearby residents that are directly affected by this requested plat. We were contacted the Sunday before the last scheduled meeting by a neighbor that this preliminary plat was being proposed. We immediately called Steve Ach at the City the next day with our concerns. We appreciate the fact that this meeting was rescheduled and that the residents were notified so that we could voice our concerns. We had bought our lot from Mr. Foster. Before we bought the lot, we expressed our concern of what was going to become of the area behind our lot. He told us that he had plans to build two or three rambler-style office buildings that would blend in with the natural surroundings and that we would hardly see them. The conceptual drawing shows a very large parking lot that comes within 12' of the back of our property line. Our home would overlook this parking lot of approximately 130 spaces, in addition to the turnaround as shown. The way it is proposed right now, there would have to be an enormous amount of trees removed for the parking lot alone. And without those trees for a buffer, Highway 169 and the present area businesses, along with the proposed businesses would dramatically increase the noise level for area residents and would also ruin the natural appearance of the lot that we originally bought. We feel that the plat as currently proposed would significantly drop our property values because of a lack of a tree buffer between commercial and residential properties. The reason we feel that this would decrease our property value is because all that we would see is a huge parking lot and the concern of parking lot lights and the lights from traffic coming and going that would shine directly at our home. In addition to a detrimental decrease in property values, we may not even be able to sell our home if this plat is approved as proposed. Being business owners ourselves, we can appreciate what Mr. Foster is trying to accomplish. We would much rather have a nice rambler-style office building, as proposed, than to look at the back of a Menard's or a grocery store. A~er talking with Mr. Foster, it is our understanding that he plans to build rambler-style buildings similar to the one he built on Evans Street, which is very attractive. He also stated he would be willing to leave a tree line buffer between our property and the parking lot and to omit the turnaround, which comes directly behind our property line. At this time, we feel that we would like to see a more defined plan with these changes. Our hope is that the council members will consider our concerns as part of their decision and help protect the property values of the area residents and the natural setting that we moved here for. Enclosed is a copy of the conceptual drawing highlighting our lot and showing the tree line that exists behind our property. Please call us with any questions at 241-0791. Si.ncerely, Scott and Ann Breuer HILLSIDE CROSSING 2 ..... 330.92 .... t / I / / / I /