8.4.A. PRSR 11 10 2004ITEM # 8.4.A. Orono Park 5tormwater Project 8.4.A From: Basiletti, Mark - Elk River, MN [Mark.Basiletti@mn.nacdnet.net] Sent: Monday, November O1, 2004 11:35 AM To: bmaertz@ci.elk-river.mn.us Subject: Orono Park 5tormwater Project Bill, I wanted to update you on our progress. 1 discussed the project with staff here and we agreed that the best option would be to install a Swale that would begin at the top of the boat ramp and extend north east toward the low area along the shoreline (see attached jpg file). The Swale would have gradual side slopes and the first 60 to 70 feet could be mowed so that recreational use would not be impacted in the area near the dock and boat ramp. The remaining part would be unmowed and consist of dense vegetation to provide filtering. A curb cut and x low diversion across the boat ramp would be used to direct runoff into the Swale. A shoreline buffer where the Swale outlets to the lake could also be installed for wildlife and erosion control benefits. Let me know if the location of these BMPS is workable. Last Thursday at the peak of the rainfall event, we made some runoff measurements at the boat landing which we can use to compare with predicted values from tables and equations in our technical guide. It was a good opportunity since the total storm was close to a "one year" 24 hour event. This Friday (Nov. 5th) at 1 p.m. I will be meeting with Craig Peterson, an engineer with MRCS, and we will visit the site. He will comment on our proposal and give us some recommendations for designing BMPS. The drainage area is fairly large at 11.5 acres and most of the 4.3 acres of impervious area has curb and gutter. subsequently, the peak discharge is relatively high and we want to make sure our BMPS will work as intended. Mark Page 1