Loading...
4.4. ERMSR 06-14-2011Elk River .~ Municipal Utilities 13069 Orono Parkway • P.O. Box 430 Elk River, Mi~I 5 5 3 3 0-043 0 UTILITIES COMNIISSION MEETING Phone: 763.441.2020 Fax: 763.441.8099 TO: FROM: Elk River Municipal Utilities Commission Mazk Fuchs John Dietz, Chair Line Superintendent Daryl Thompson, Vice Chair AI Nadeau, Trustee MEETING DATE: AGENDA ITEM NUMBER: June 14, 2011 4.4 SUBJECT: U date on 2011 Purchase of Directional Bore Ri Discussion: We received the directional bore rig in May. Chad Grande and Tom Geiser have taken on the task of learning how to use it. Vermeer came to help train and assist with problems that come up. There aze three basic components. The first component is the bore rig puts ten foot rods together to turn, push, and steer the head to a location where we need to stop, then we hook the cable on the head and pull it in. The second component is a tank to mix the mud in and pump to the bore rig. This mud goes thru the center of the rods and out a nozzle on the head. The mud helps keep the hole open and keep the head coo]. The third component is the locator, with this you can see where the head is. The locator operator talks to the bore rig operator to let him know if he needs to go up or down and right or left depending on the upcoming terrain. We aze using the bore rig in cable replacement projects and new projects where it is not feasible to plow. This size of bore rig works good with most of the projects we have to do. '` '; ~~ 1v ~~. ry. E ~ ~y 4r ~~~ ~ 1 ~;.~~ ,: ,~ . }; .:, ,,k, s ~~ ~~ -` { ;. ka t;:„s