Loading...
INFORMATION 07-05-2011Information ~'~.'~' .~_ ver MEMORANDUM TO: City Council FROM: Tina Allard, City Clerk DATE: July 5, 201 I SUBJECT: Tobacco Compliance Checks On Friday, June 24, 2011 Sherburne County Public Health along with the Elk River Police Department conducted compliance checks on tobacco licensees. Attached is the report from Sherburne County Public Health. Of the 19 licensee's there was one failure by BP Amoco of Elk River. A letter will be sent to the licensee explaining that: (1) they may request a hearing before the City Council, or (2) they need to submit the administrative penalty of $75 for afirst-time violation within a 24 month rolling period. This item will be placed on a future agenda if BP Amoco requests a hearing. N:\Public Bodies\City Council\Council RCA\Licensing\Tobacco\Compliance Checks.doc /BORNE Cp\ ~,.~ JUN 2 8 2111 .~-~ - . Public Health Prevent. Promote. Protect. June 28, 2011 City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 Dear Elk River City Council: Rl/NNE50jP This letter is to inform you of the results for the Tobacco Compliance Checks for the City of Elk River. The checks were conducted on Friday, June 24, 2011 during the hours. of 10:00 AM to 1:00 PM. Eric Balabon, Police Officer Elk River Police Department, Mark Lees, Community Health Coordinator Sherburne County Health & Human Services Department and one under aged youth checked nineteen businesses that are licensed through the City of Elk River. BP Amoco of Elk River sold to our under aged youth. Feel free to contact me if you have any questions or concerns on this matter. Thank you for your time on this matter. Sincerely, ~~~~ ~- Mark Lees, Community Health Coordinator Slerburne County Health ~ Human Services 13880 Business Center Drive Elk River, Minnesota 55330-4601 763-241-2750 ^ 1-800-433-5237 ^ Fax: 763-241-2976 http://www.co.sherburne.mn, us/pubhealth E-mail: publichea/th @ co. sherburne. mn. us Public Health Prevent. Promote. Protect. City of Elk River Tobacco Compliance .Results June 24, 2011 Al's Smoke Shop Pass Beaudry Express Pass Broadway Bar & Pizza Pass JT's BP of Elk River-Hwy 10 Pass BP Amoco of Elk River-Evans Fail Charlie Brown's Pass Coborn's Pass Cub Foods Pass Eagles Pass Holiday Store-Business Center Pass Holiday Store-Freeport Pass Northbound Liquors Pass Super America-Main Pass Super America-193rd Pass Super America-Yale Court Pass Walgreen's Pass. ~T~'a1TMart Pass Wash-N-Fill Pass Westbound Liquors Pass Compliance Rate in June 2011 for the City of Elk River is 95% ~BURNE ~QU T~ ~~Y ~ nr~ :,~~1~`R- i ~MIMNESa~~I' 13880 Business Center Drive Elk River, Minnesota 55330-4601 763-241-2750 ^ 1-800-433-52371] Fax: 763-241-2976 http://www. co, sherburne, mn. us/pubhea/th E-mail: publichealth@co.sherburne.mn.us INFORMATION MEMORANDUM TO: Mayor and City Council FROM: Justin Femrite, P.E. DATE: July 5, 201 I SUBJECT: Letter of Support to the City of Rogers -Interchange Project on TH I O I at CR 144 At the request of the Rogers City Council, their staff came to City Hall last week to meet with Tim Simon and myself to ask for consideration of a Letter of Support and financial contribution of $100,000 for an interchange project on TH 101 at CR 144. This intersection is the last remaining intersection on TH 101 between I94 and Elk River that has a stop light for north bound traffic. I have attached a memo prepared by Roger's City Engineer regarding their request and the estimated benefit to the City of Elk River residents who commute along this route. Rogers has received partial funding for the project through a State Safety and Mobility (SAM) grant. They are currently putting together an application for additional funding through the MNDOT Metro and MetCouncil process. Through this application process, the City of Rogers feels their ability to show regional benefit and cooperation for the project will be very much enhanced with neighboring communities letters of support and financial contribution. In our meeting we posed the question "If Elk River were to make the same request of Rogers in the future would they make a contribution towards a project here?". Roger's City Administrator, Steve Stahmer, responded by saying any improvement project on the Trunk Highway system in Elk River would likely have limited benefit to their residents because the general direction people commute to work is to the southeast toward the metro. That said, Steve identified if we could show direct benefit to Rogers residents, similar to the benefit they estimated for Elk River residents in the attached memo, they would consider our request. We left the meeting by saying we would check with our Mayor and Council to gauge any interest in supporting the project. 1) Does the City Council have interest in supporting the Rogers financial request to allow their staff to make a presentation on the project at an upcoming Council Meeting? 2) Do you have interest in approving a Letter of Support? If so, it will be included as a consent item on an upcoming meeting. wsB && assoc~ Engineering Memorandum Planning Environmental Construction To: Steve Stahmer City of Rogers City Administrator From: Bret A. Weiss PE, President City of Rogers City Engineer Date: June 2, 2011 Re: Calculation of annual benefit for the City of Elk River related to the removal of the CSAH l44/TH lOl at grade intersection 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 This memorandum provides additional detailed information related to the benefit that could be realized by City of Elk River residents by constructing an interchange at TH 101 and CSAH 144 in the City of Rogers. The City of Rogers is requesting funding participation and a letter of support from Elk River for this important regional project. We have estimated a $1.5 million local share of the estimated $22 million project cost that must be paid by the City of Rogers and our partners. We identified benefits including the reduction of crashes, reduced delay and increased economic development due to improved access to the City of Elk River. The CSAH 144 intersection is on the City of Rogers northern border and has limited impact to our residents and businesses from a delay and crash standpoint. The Rogers City Council is most interested in the improved safety and access to the school facilities but recognizes the regional benefit and is supportive of this project. It is difficult to quantify economic benefits associated with better access, so we are not trying to justify that number with this memo. A calculation of benefit related to crashes and delay is a much more recognized method. This memo only addresses the reduction in delay and crash costs that can be attributed to the volume of traffic passing through the intersection from the City of Elk River residents. Additionally, we only used Elk River residents using TH 101 for their work commute. We could have attempted to increase the number of trips using non-work related trips, but we wanted our analysis to be as defendable as possible for the City Council. Using only crash and delay savings for work related trips on TH 101, we have calculated an estimated annual savings to Elk River residents of approximately $221,600 /year. June 2, 2011 Page 2 The remainder of this memo will address how we arrived at those annual savings and provide our methodology for the calculation. It should be noted that the savings we have identified are realized by the residents and businesses and not directly to the City of Elk River. Those residents and businesses will realize additional time and fuel savings, along with increased safety through crash reduction. It can be assumed that providing Elk River residents with additional time could result in increased volunteer and charitable work or could provide them more time at work or with their families. We have requested and have received preliminary approval of $100,000 contribution from the City of Otsego. Due to the number of residents using TH 101, their annual savings was $160,000 per year or approximately $60,000 per year less than Elk River. We are requesting a letter of support and a contribution of $100,000 from Elk River as well. The City of Rogers would be willing to establish an agreement with the City of Elk River to make the contribution subject to the completion of the project and payable in 2014. Please do not hesitate to contact me at 763-287-7190 with any questions. June 2, 2011 Page 3 Delays & Crash Savings Analysis for the TH 101/CSAH 144 Interchange City of Elk River Residents Using TH 101 for Their Work Commute: The first part of the analysis involves determining how many residents leave the city limits and pass through this intersection on a daily basis on their travels to and from work. As was stated previously, we did not include the Elk River residents who pass through this intersection on non- work related trips. We utilized information from the U.S. Census Bureau as shown on the figures below to establish the percentage of working residents who travel south and southeast daily for their jobs. This information was from 2009. We are sure that there is some margin error in the information that was provide by the U.S. Census Bureau, however, we are confident that the information is reasonable for this calculation. We utilized an occupancy rate of 1.35 persons per vehicle to reduce the resident working population of 4,309 to 3,192 vehicles. One way ADT on TH 101 is 20,250 which amounts to 15.8% of the ADT on TH 101 is from Elk River residents traveling to and from work. Where Elk River Residents Jobs are Located 3.6X ~~ "' ,.,. ~ Elk River ~~ 3'~' s. r ~ ; . r ~* N 40 3.856 .< 32'Y. • Y 4 ~ ~ '~ 6.155 ELK RIVER 43% ~ 5,211 ~ 1X o, S 43 23.051 _ ~ r :~ 5.651 ,~- W 6.1% ~ t+nM 52 4.9% °E" . x~~- w TOTAL 10,617 6 • . ~.~~p'~! ~F . ••• ' o~t e; Swot: U.S. Ceinus Bvaau • OnTleMap. En~ptopnent 200D 5 6% $x `{ ~ ~ : . 46.156 F = 7,648 workers SE < 10 647 056 0 10096 FI4vY 10 SE 10 - 24 rtates 50% 1143 54196 HVYY 10' SE -50 n 193 60% 1316 4096 FFWY 10" ~ 50 rtes 86 60% 52 4(196 HWY 10" S {c 1 ~Ies) 71 056 71 9091 reach work prior b 144 S 10 m08s 1727 10096 1727 100% h Oie (SAFI 144 Total T 646 NOTES: • R 500 was asswned teased an 0~ 91 lar brxions i~nP) .. A sowo spit was assrur~d tamed on zaa6lnmoT Hors at Ek Rfver (H+M' lot and MlVY io) Home to Work 4,,309 Rate 1.35 MJvehicfe Total 3,192 vehicles One W Pro' Area ADT 20,250 vehicles E& River of ADT 15 89G vehicles June 2, 2011 Page 4 Savings Related to Reducing Crashes The table below identifies the number of crashes that occurred at this intersection for the years 2007 through 2009. The cost of each crash is categorized using the following criteria: K =Crash involving a fatality A =Incapacitating injury or one that is likely to require ambulance service B =Non incapacitated injury that may or may not require ambulance service C =Possible injury and property change N =Property damage only Crash costs are generated by Mn/DOT and the US Department of Transportation and are average across the system. As is shown on the table, we converted the three year crash information into a one year average and used the crash cost to arrive at a total crash cost for the intersection. At this location, we assumed that HWY 101 would experience a crash reduction of 80% resulting in an annual crash savings of $74,239/year related to Elk River travelers. It should be noted that in the application Mn/DOT prepared for the SaM (Safety and Mobility) funding, Mn/DOT added crashes to this intersection that previously occurred at South Diamond Lake Road. These crashes were eliminated with the flyover project, but Mn/DOT has assumed that they will resurface at this intersection. We did not assume the cost of these crashes in this calculation in an effort to be conservative in our analysis. Elk River Percentage i 5.895 Eqc River Crash CosUyr $92,799 Proposed Crash Reductior- 8095 _, June 2, 2011 Page 5 Savings Related to Reducing Delay This calculation is related to the total amount of delay for the roadway network associated with this intersection. Currently there is an existing pm peak hour intersection delay of 203 hours, which would be reduced to three hours after the proposed interchange is constructed. This will result in a total time savings of 200 hours. There are many different ways to calculate the value of time delay with the most common method incorporating a dollar per hour per person for their time which includes operation and maintenance of the vehicle. This is calculated to be $13.80 per hour per person, or using the 1.35 occupancy rate, arriving at an $18.63 value per vehicle. The $13.80 value was provided from the U.S. DOT Guidance of Travel Time in Economic Analysis, 2003. The annual delay savings as calculated below amounts to $147,414/year. PM Peak Hour