Loading...
5.3. PCSR 07-12-2011REQUEST FOR ACTION TO ITEM NUMBER Plannin Commission 5.3 AGENDA SECTION MEETING DATE PREPARED BY Planning July 12, 2011 Jeremy Barnhart, Planning Manager ITEM DESCRIPTION REVIEWED By Request by Vanman Companies on behalf of The Crossing erem Barnhart, Plannin Mana er Church for a building expansion, 829 School Street, Public REVIEWED BY Hearing -Case No. CU 11-06 ACTION REQUESTED Staff recommends approval of the Conditional Use Permit for The Crossing Church, as shown on plans dated June 6, 2011, with the following conditions: 1. All comments of the City Planner letter dated June 28, 2011 shall be addressed. 2. As a Conditional Use Permit is not a Building Permit, the applicant shall obtain all required permits, including approvals from the Fire Chief, City Engineer and Building Official. 3. The development shall meet all applicable fire codes. The Fire Chief shall verify the location of all fire hydrants, and may require additional hydrants necessary to preserve the health and safety of the residents. 4. The standards for issuance of the Conditional Use Permit shall continue to be maintained. 5. Line of site drawings shall be prepared to illustrate the roof top units will be screened .from adjacent public areas, including Lions Park and School and Jackson. 6. A letter of credit in the amount of $50,000 shall be provided to ensure compliance with grading, erosion control, drainage, utility, hardsurface, and landscaping requirements prior to the releasing of the building permit. Applicant Vanman Architects and builders, on behalf ofThe Crossing Church Location/ Address 829 School Street 60 Day Rule The City must take action by August 1,2011 OVERVIEW The Crossing Church proposes an expansion of their current facility, located on the south side of School Street, south of the Elk River High School. Phasing. The expansion is proposed in two phases, the first phase will include the improvement of a 547 space parking lot to the east of the existing church, a 14,232 square foot expansion primarily for an auditorium, and a 11,406 square foot expansion on the south side of the building for a new lobby/ entrance area. Future phases will include the construction of 7,360 square foot addition for classrooms. After all additions, the total area of the building will be 54,512 square feet, will provide seating for 1,500 in the auditorium, include a number of offices and classrooms, and parking for 547 cars. Case File: CU 11-06 The Crossing Church Page 2 Conditional Use Permit Building improvements will be a mixture of glass, metal siding, and precast concrete panels. There are no design standards applicable to the R-4 zoning district. Photo images of the materials will be provided at the meeting. Rooftop units. The applicant has indicated that the roof top mechanical units would be screened from public view. Due in part to the highly visable location, Staff will review line of sight drawings once locations of the roof top units have been identified. Parking. Parking is often the biggest concern identified during the review of an institutional use. The proposed Crossing Church will provide seating for 1,500 people in the main auditorium, requiring 500 parking spaces. The church proposes 547 spaces, including 25 already existing. This meets the requirement. Access to the site will be via a new entrance east of the existing aparrn~ent building, and a new access off of Jackson Avenue. Eventually, the access of Jackson will line up with 8~' Street. This will occur when the property to the south develops. A third access is proposed, west of the building, and will serve fire/emergency needs, garbage collection, and other deliveries only, no parking is provided. Signage. This lot is permitted three freestanding signs; two area identification signs (8 feet high, 16 square feet) and one free standing sign (96 square feet, 20 feet in height). The plans propose two area identification signs, and one freestanding sign. These signs are consistent with the sign ordinance as written, however, it is suggested that some attention be paid to the sign regulations, particularly its definition of `development' as it appears to open up a loophole, allowing more signage than perhaps intended. All signage will require a permit. Approval of the Conditional use permit is not an approval of the sign package as shown. Landscaping. Additional landscaping is being proposed based on the requirements of the zoning ordinance. After review and minor modifications, it is staffs expectation that the landscaping plan will be consistent with the landscaping requirements. This property is adjacent to a primary corridor, as identified by staff and the Council. The Landscape plan has been reviewed accordingly. BACKGROUND/PRECEDENT Churches, classified as an Institutional Use, axe a conditional use in all residential, C-1, C-2,C-3, and DD zoning districts. With the exception of the Elk River Lutheran Church approved in 2010, all of the churches in Elk River are in Residential zoning districts. The Crossing Church bought the former home of Alliance Church in 2009. Since then, their congregation has grown, requiring an expansion. N:\Departments\Community Development\Planning\Case Files\CUP\CU 11-06 The Crossing\CU 11-06 The Crossing Church SR to PC 7-12- 11.docx Case File: CU 11-06 Page 3 GENERAL INFORMATION The Crossing Church Conditional Use Permit Location Existing Use Comprehensive Plan Designation Current Zoning Subject The Crossing Old Town R-4/ C-2 Property Church/ vacant North Elk River High Public/ Semi Public R-1c School South Lions Park Old Town PUD East Single Family Old Town R-2a Residential West Apartment building Old Town R-4 APPLICABLE REGULATIONS Conditional Use Permit The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 7. Dill not endanger, injure or detrimentally affect the use and enjoyment of otherproperty in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral aa~elfare of the neighborhood or the city. 2. Weill be consistent with the comprehensive plan. 3. Weill not impede the normal and orderly development and improvement of surrounding vacantproperty. 4. Weill be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and mill not, in particular, create tra~c congestion or interference avith tra~c on adjacent and neighboring public thoroughfares. 5. mill not involve uses, activities, processes, materials, equipment and conditions of operation that ~arill be detrimental to any persons orproperty because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. 6. Weill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. 7. LVill fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license orpermit to establish and operate the proposed use in the city. If denial of such a permit should occur, it shall accompany recommendations or determinations by findings or a report stating how the proposed use does not comply with the standards set forth in Section 30-654. In the review of the standards for CUP as outlined, it appears that the request is consistent with all of these standards. ANALYSIS Staff has completed the review of the plans, and incorporated them into a comment letter dated June 28, 2011. It is staff's suggestion that these comments be addressed as appropriate, either as revised drawings or noted conditions of approval. On July 6, 2011 a response was received, indicating acceptance of most of the comments. The remaining issues include: N:\Departments\Community Development\Planning\Case Files\CUP\CU 11-06 The Crossing\CU 11-06 The Crossing Church SR to PC 7-12- 11.ClOCX Case File: CU 11-06 Page 4 The Crossing Church Conditional Use Permit A. Water service connection. City Staff, including the Fire Marshall, have recommended that the water service connection and a fire hydrant be connected to the watermain along Jackson Avenue. The applicant objects, due to costs. The recommendation is being made because in the event of a fire, the 8' main along School Street may not be sufficient to serve School street developments and the building. Using the 16' main along Jackson helps spread the demand to two areas. B. Signs. In addition to the freestanding signs noted about, the building proposes a number of wall signs. The ordinance permits 1 wall sign, not to exceed 96 square feet. Any signage less than 4 square feet is not regulated, nor is signage located inside a window. The plans need to be adjusted to provide for an allowable number of wall signage. ATTACHMENTS ^ Location Map ^ City Planner Comment Letter dated June 28, 2011 ^ Response letter dated July 6, 2011 ^ Applicant's Narrative ^ Drawing packet date June 1, 2011, including ^ Site Plan ^ Architectural drawings Action Motion by .Second by Vote Follow Up N:\Deparhnents\Community Development\Planning\Case Files\CUP\CU 11-06 The Crossing\CU 11-06 The Crossing Church SR to PC 7-12- 11.docx Wd bS STZ TTOZ/T£/£'6nnp deW uoiTe~oy\6uissa~ ay190-TT fly\dfl~\sa~ly ase~\6uiuue~d\Tuawdo~anaa luunwwo~\s~uaw~edaa\:N Y Z A _~ ^m^ /` !! V/ Z tt~ v -- _c z r m° yt~n Z C') M al T 4 1 m m 0 00 ~ ~ c n m = O O fA N~ a ~ m m w 7~ ~ ~. s ~ 3 y O ~. a ~ ut N N ql N O V ~ a ~ S ~ W o c W(J~ N AI X W n, 7 O1 G1 S ~ ~ O ~ 3 W ,.a IV Q n j 0 A ~ ..j cam) ~I m N O -m'I U J D a m ~ ~~ ~~ o~ ~ ~ a ~ D o~ € g D A o ~ ~ ~~ ~ m p m !" m r- ~ g ~ D y N D m m o i -- c/ 'I o ~ ~ ~ ;~ m m ~ ~ n ~ -DI ~ L J m .; ~ ~m° Q € z ">~ €m (n .°m Z o ~€ ~ ~~~ ~ p~ >~~ ~ Z g>~ Z ~ w Aga m ~ ~~ ~ °~° ~ ~ ~_ °m _ p= ~ g~m ~ s° Z m C F~ ~ z b m m Z ,- -~ ~------ - m -; : ;. ~ LJ O Z ~ ~ 0 ~ C r~ ~ ~ ~---- - a ~ Z I ~ ~ I ~ ~ I ~ - I ~ I 4 O ~ Z ~ I ~ i ~ ~ I I ~ I ~----- - LJ my ~ R ~4 ~;a° m ~~ aR ~~~ ~ $~ ~m ~~~ b, , I ~ I g ~~ DO GGG m Dew q~~ ~f /~ f4~ ~~ ~ ~ ~ m ~ ~~ ~, ~ i i m ~ ~ m ~ ~ -DI ~ ~ z '' II .~ - - `T~ - ~ ~ i i ~---- - LJ n c m W n Q s.n• o Z m >~m =osA g~~ ~ ~oy~ Z ~g \IJ `r ° ~; Cm ~y~ oa ~=m ~, b ~ m ~ w wig ~o~ ~o gl mmm o~~ $g 0 aso mm zag egg 0 4~.0. ~~ a m ~~ ~ mmm ~w ~~ ~~ ~ ~~ ~ ~g.,o• zso r,R .~4 ~mv Ica O =~ w n~ 5° g» w 0 'm 4 s .s ~ ;T~~ § ~ ~ ~Nqg $~BS$33 ~~~Raa~m~ o~ ~~ ,8 i~°^m a Bw~^~~ gm~ ~~'a~ '~3~"~. ~' ~ g83° ~3 Yi " w ®s ~ -::=s ,x awm any 's-~~So °~P~~~"•=w m :~ ~a~> ~ "~4~" ~~~R~ ~aamz aAq°~m~ x~-a ~° x ~ ~" Y ~3mz ~tl'~ ~-5~ aE~ j6d: 3. a~ 3q gH• - s 3 s~~= ~~a~ ~~~$ ~;~ :ssa=„ •,3;~s~ AA rll " @. m°a ~ ~~~m 3~m" $m.§ ma~g'~ °zae;'s ~g i[1 :~PS° ~a sp /mmm 3 ° os »sp$ g~~~ gam- - $°°~ ~~~'v~ ii A 2 .~ "g:a_ pay g~: H8i8g3 F3a~°: ~ " C a =g ~ 3~mm~>i ~~~so0' - ° ~ em S 8 a 3a~o?~S oaf S a° $ 3 ~ »09 Z 'v - a ~ D Z n -I C7 D O C_ r m n 4 ro c ro a 0 in N O O a ro 3 3 7 N O w N N V 3 V 01 (W s fD fl1 U7 N -n 01 ?~ V W ttl N $zV Z d 3 3 m a n 0 3 n Q 'O ~_ Z w ~ (~, IV j T~ rn1 1~1 m u 0 n Z `^^~--/ ..1. Oo N ca (A 0 0 rt l~D N rr m ~' fp v 7 _~ ~, N O M G1 (If W W 0 A~ w N O f3l rn .D m 0 c -o .D m r m r r O O z O m -n D m TI Z m n m ~® a Z m A Z v c v z' n V V V NW CO fJl N N N x V W fD N S7~5V 2 Al 3 3 n~ m a' 0 a 0 (7 Z N (~, N 0 L- V ~ Z m n ~7 O z G) N (n c'~ O O m ~D m <' m u, 0 CJI CTI W W su K w N 0 47 m m m qIT $~ $I" g 4~~ 4'~ D -~ r z `~ ' ' ~~~ ~~~ II Ir I I II yp~ °Ri __ ~A; m~ °Om ~o ~~ O °IC ; m ~o~ ~~ 7y O °Q ~m _; ~_ ~ ~I mp oN ~ ~o ~~ ° Is ~~ m C N II 6g o ~ 4~; D o z ~m s= 9a -~ ~m p~ g ~~ ~~ D D cw3 II r 0 z g~ io i~ ° ° ~~ m ~ SH ~ 3a lA I I; ~ I o I; g C m II g C II y ~ I ~ I I I; ~ -r~ I I I I I I I I ~~ I I I I I I LI _ I~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II. I I I I I I I I I I II I I I I I I I I I I I I I I I I I I I I II II II I I I I I I I I I I ~- - ~~ 4 ~~ $ _ `I ~N m~ ~~ 00 .3° ~'g _m ~ ~ y ' F ~ 4~ kA m ~ to ~~ ~ A ~ N ~ _ II am ' r y O z m-- u I I I I I I I I I I I I I I II I I II go II z~ ~o~ ~_ I I I I I I I I I I I I I I I I ~ iL I I I I I I II II y~ II ~3 II o~ I I I I I I __ II _ II II II I I -::: __ ................ `C T ~~ ~. ~ o~ .g ~~ ~y 'm ~m $~$8~ € 3 o~ p` om N~ o~ $m ~A ao ~o I~ gm 5m J mp s g~ mo ~~ _m a ~T A o; ~; ~ gg R~ ~m ~_ ~, ~- ~~, I~ ~o m °° Sm ~m ~m € € € Am I ° =i ~o ~~ pm m _ D 8~ ° ~Ig v S Z ~ " ~, ~ w ~ ~ ~ r ~D m ~ u (7 ~ ~ D ~ ~' n m V -o a ~ z W C r ~''~ m ~/ ^~ •/ m m co K 11 m C fD Z ~ N ? ~ c n W ~ N 0 O O fD C V'„ m rn d ~ ~ ~. 3 ~ N Q ~. d ~ cn N ~ ~ a ~ S ~ W O1 W tD VI N N x y w cn V .~ 7 LN a ~ ~ O K W N 0 0 x 4Z (~, W = m p---- -- -- - - -- -- --- j m~ mom - - 6 a^E- I m V ~ I v I I o~ C ~~m I I I yj ~\ 4` _ , ti 1 Z fn ~ ~~ ~ ~ti r ~ : ~ ~ ~ m m p -1 ~ ~ ~: ~ ~ ~ ~ , ~ ..ti~ ~ ~ ~" X ~ A N I _ 5 1, ~ ..~i! u fns 3p W~1~. I T ~ ~ ~` T ~Y{ Z ~~ ~ „t ' v I I _ ~ a~~ ti~: I Z _._~ _ ~. _ ~ ti ~~i~~ !~ ~ '*~ : ~ ~`. L I ., ~ T ~1 n ~ r `yA ~` ~Sk »~'~ 1ZI A ~ . I 1 I S ~ j i ~ g~ ~ A gz i ~~ g 1 A:E ym I I (7 W I I ~ ~ T 'A v+ I Q° I i I I ~ O II I - ~ ~ O I A _ I ~ I WD~n ~ I -~ ~ C - p~~ ~z m ~ . ~. ~. m 11 -- I . Z m I N - y I ' I ; - N > ~' - ~ n n - I ~ N P C i _ ym ~p~ I I I BOO v ~ I I ~ o00 I D I ~ P N I D - I n I I ~ 1 I O II D _ I I r I I _ - 1 i 1 I 1 I i I 11 -- I 1 I I I ; I I _ -' I ~ ~ _ N n ~ I I I I aoa I I ~ m " 1 = 1 ~ cwa ~ i I I I I I 3 P C S I I I ------- - -- - - ~` %~ " . _~~ a ~, ' JACKSON AVENUE n m i ~ O N a ~ ~ ~ ~ o ~ o fA y y O r m m Z v NF pg ~Ng~ D o~ R= g~p~ Z o ~°, $ ~ <~ ~_ $ AAA ~ m~ o~y~ Z > o> ~• ~ $S ~~ ~~~ Z ~ ~~ o~'~ o - ^ ~y_ m~ ~~f1 ~ ~ x ~ n O n m D a3 .ems s 3~ 3 ~ x ~ w s ~ ~ , ~ ~ & . $~ ~ Y ~ ° - m _ ~ ~ ~ ~ o c ~ ~ ~ -z g ~$ ~° o z ~ o ' ` w~ .~ o ~ ~ $ o ~ a < m N~ ~ $ v Up 3 m 4a p r=' ~ er ~ ~ s ~ ~ c g 3 ~ ~ a g ~ ~ ~ x ~~. ~ 5e5 q°~ $ . 8 9; m ffi ~ ~ a z 3 m i a -~° A N ° ° ~ a ~ u ° ~ ~ T e ~ m ~ ~~z ~ ~ 4 S ~~~ g zqq g ~~ 3 m ~ z s ~s gds Q a ~ ~8~ ? ~ att~ Q `~ n&' San Sg-y 3 a~ g ,°-, S 8~ m° z .Y ~y 8 $na go;_ ~~B g«~ 3 z S ~ e. a~4 Q~& 8a= E_ 3 : g e m _~ II a o g ,$°~ g ~ ~ ~ $ y y $~ ~~ €€ AS ~ 7 Z m r r m m Z v ~ c~o cp ; $ ic~~~v ~mO l H 001iz ~~ r~io m o ~~oa~~ r-. D =~o p m '' 8~ y p ~m _~ Z o _ < om my Z G) ~ ~ ~ m -~ D ~ _~, m ~ ~ r; 1 ~~ ~~~ ~ m 4°0 8~y C yoym ~m m ~fm mw A a '~'^ MI A z v C r v rn ~c~n n 3 V W f0 W N Pf X v 6! W fL1 W Gi V tU 7 W 7 C1 a n O n O v -~ (~, N -~ N O V ~ 1 1~1 n ~l Z G7 C~ 2 C C7 I= N co N n O O_ rt ~D tD m <' m -. ~' m 0 w W W Q m w n n ll 7 D_ Z G m r O O D Z O W m v x D m 0 z m n m D ~J 91 W IV O s i fR -P m m i~ m Q D Z D Cam'? n Z V ~ Q C r... /"1 p ~J m can z n C M Z N a ;~ o 4 ~. m w 7C ~ ~. ~ ~. N y v ~ s ~ W W m O w ~_ in N d x v m w ~_ w N V flt 7 m ~ CT a ~ W N 0 n "C r^~^_ 4/ 4\3 "'~ /^ N V/ o fin) ~ m o ~ v -` (~ C7 C7 (~ C7 C7 (~ C7 C7 n n (n wn» CCCCCCCC = 'V ~ 'D "O "O "O ~ ~ m ~~~~~wN, m c~c~c~ -ic_nmc~~cn-~ ~ G«_ ~G~-XivDZm~ m r r Z Z CIA 2~:17~'1OD~= x Dr-m zm~~ zm o~v ~mrn~O~m -mi z~~ O~m~v~ r~ r~~ DZZ ~~~ZZZ DZ ~ Z D r n n c~ FA o ~ z ~ ~m i ~ A A O ~~ _ o ~ m p m W>Tyx o Ayio~> omz'D~ic~~> mNi 750 ~`°< n?~Or z Z)_(p ~'°z rT. 1Om n .~Z A D m P ~ 2 0~ 3 {~ p ~ Z 0~~ A n p ~Y'~mmA y~m~zg z~`O1„mziz mho m n~WNO~O, ~mNN~Zy ro~r7r ~H3mi> "'mi ~ A J ff~~11 ~ti mm ~mp N2mN oyA (°z > ~ ao `NCoo moz Noo i m2 ° Z m ~Am mOm ~Am ~'~ A 3° is ^~x is Z -Z m0 3 Z Nm 3 ~ mN o my n °n D °A 5 s -v -v m n m C7 0 m -~ ~? _ ~ ~ c ~ m ~ ~ ~ ~ _. ~ ~ ~ ~ ~ O ^' 7-V ~ ^ . ^'` J 0 O z ~ ~ I ~ ~~~ ~ ~~ a m g' ~ ~ ~ m ~ ~ ~ ~ y z z € o~ o A~~ m ~ g~ ~ 8 Z $ --I ~ m~ g m-_ ~ N _m m p p m y ~ ~ ~ $ ~ W C n ~ O ~ _ ~ ~ ~ r n ~ I~I ~ ~ ~` ~ ° ~ ~., ;~i g m m v'` ~ ~ 8 N~ A ~ o m m m ~~, g a y z z p_~ 9~ g a C ® ~ ~aog~~ o~ m ITI Nm~w-~ _~ ~ X Z = ~ m~ o~N (7 (") ~ a~~g r~"~~m" Z ~ _ om ~~~ ~ g _ O v ~ ~ m .. 9 s ~ o~ o ~ ~ ~ o ~ 'O N o € €_ a$ A ~ "- 3 "- ~ ~p ~o_om yc O 0 0o s ~ g ~~ m N ~ ~ m~ ~ ~ c n ~ ~ "'U~U~ n m ~ ~ ~ ~ ~ ~ T ~' ~ 0 ~ Z N 0 vm W Q O ~ ~ ~' o ro V Z a ~ N m d ~ ~ ~ ~a ~ N _ ~ ~p s~ s m ~a ~o ~. A Z ra O ~~ ~ .. sNT~ s~mgU" ~ ~ ce '~;m ~~~m ~~ v a ~ ~ ~ 3 ~ ~v s a W 88 x #' m 4 ~~ ~ ~ `~~' ~~ ~ x w $$ $ - cn >~ 2 g ro g s s x ~ v m w 'Ui o ~ ; m ~ ~P ~ = o D N gm Pz g ~~s- c~ 3 "~ m ~ Liz a ~ :~"" ~ V ' Z~~_ ~ dao~ ~v z 4~ ~ e` ~mf m ^ ~n m ~; o~ ~~ $ z.~ S~.~H~i ~ Y! < ~N o'a ~ 3'iV~ocsi '§ o °$~~~ P 7 ~ er ~ $$n a 4 aka .. w ~~,~ xa wN ~ ~: °' ~ ~w ~ ~ 3 ~~ ~ g s ~ K °s~ ~ a ;~ - s o Ca °° ~ a ~ D a - m O - ~ m a ~ ~ O v x fn ~~~ N m N m o ~ ~~ o= June 28, 2011 Vanxnan Architects and Builders Attn: Angie Knodel 669 Winnetka Avenue N. Golden Valley, MN 55427 VIA EMAIL angie@vanmanab.com Re: Conditional Use Permit, Staff Comments Dear Ms. Knodel, At the Site Plan Review Committee meeting on June 8`'', staff reviewed your application and has the following comments: Timetable 1) This project has been scheduled for review by the Planning Commission on July 12t'' and by the City Council on July 18r''. Public hearing notices have been distributed to the newspaper; as of today, no comments for or against the project have been received. Engineering 2) The following comments were generated by the City Engineer, Justin Femrite. a. C-1 Site Plan - No Comment b. C-2 Utility Plan 1) Identify existing forcemain along south property line. Assure adequate cover exists over the top of the forcemain. 2) Provide detail of all public utility connections. 3) Remove proposed water service from connecting to the main in School street and provide service connected to the existing watermain on Jackson Avenue. 4) Change "Note 4" to reflect the same conditions but now on Jackson Avenue. 5) Identify proposed disruption area on Jackson Avenue for water connection. 6) Provide Standard Elk River details for all proposed improvements. c. C-3 Grading Plan 1) Provide detail of connections with the City Street including pedestrian ramps, valley gutter, sidewalks, etc. 2) Show proposed pavement section. 3) No curb elevations are identified. 4) Proposed curb type is not identified. d. General Comments: Applicant shall provide a full SWPPP and erosion control plan for site. Applicant shall submit full hydrologic calculations including all infiltrating pipe systems and ponding areas. (The City Engineer is continuing to review those submitted) Applicant shall provide soil boxing report. Access/ parking 3) The currently proposed access off of Jackson Avenue is temporary. When the property to the south along Jackson is developed, access off of Jackson will be shared as it aligns with 8~' street. Please adjust the plans to illustrate the future alignment 4) The parking lot appears to be less than 10 feet from the property line, in particular the property lines shared with the apartment building NE of the church building. In fact, it appears that a portion of the proposed parking extended over the property line shared with the apartment building. Please adjust. Landscaping/Vegetation 5) Sheet 3 shows. a landscaped island in the main part of the parking lot, on the west side of the drive from School street; a storm sewer line runs through this island. A tree is proposed to be planted here, which is likely to cause conflicts. The number of trees is consistent with the requirements of Section 30-934 (b)(3). 6) Please either relocate or provide street trees along School Street. 7) Please provide additional shrubbery along School Street and Jackson avenue for headlight screening. Fire Chief 8) Please provide a fire hydrant at the new front of the building, the south east entrance. This hydrant supply shall come off of Jackson Ave because of placement of the west fire lane and the water supply to that lane. S This property is unique, in that a portion of the project is located within the R-4 zoning district (the building), and a portion of the project is located in the C-2 zoning district (the parking lot). Where separate rules exist based on zoning district, the rules applied to the district in which the principle structure is located is applied. The building is located on the western portion of the property, on the lot that is currently zoned R-4. Based on the sign ordinance, the development is permitted one area identification signs (per Section 30-866 (8) These area identification signs are permitted 16 square feet and up to 8 feet in height. Per Section 30-866 (10), permitted non-residential uses are allowed one freestanding and one wall business sign, not to exceed 96 square feet in total sign area. Because the lot has more than 1,000 linear feet of combined street frontage, the total area may be increased, not to exceed 192 square feet. The free standing sign may not be higher than 20 feet. To summarize: Type of sign Size Number Height (sgft) Area ID 1 8 16 Freestanding 1 _ 20 96 W a 11 1 96 9) I note that plans show three freestanding signs and 2 building wall signs. The detail on sheet 7 that shows the area identification sign is consistent with the ordinance, although it is unclear where this sign will be located. Sheet 2 identifies entry and monument signs. The detail on sheet 7 that shows the monument elevation is consistent with the ordinance with regard to size and height. Please adjust the plans to reflect the number of free standing signs allowed, and clarify where each type will be located. 10) Finally, please clarify "Sermon Series Signage". I understand this are to be changeable copy; if its electronic changeable copy, please provide a note on the plans. Building de_ 11) I reviewed the building height. Although portions of the building wall exceed 40 feet high, based.on the definition of height, the building height is permissible. 12) Please verify that all mechanical units, if mounted on the roof, will be screened from public view, including the streets and Lions Park. 13) The permissible amount of lot coverage is 25%. Because the language of the ordinance is unclear, we have interpreted that lot coverage calculation is applied to the building only, not the parking lot. This is consistent with the application in the past, and amount to a lot coverage area of approximately 14%. 14) Please provide color and material samples for review by the Planning Commission and City Council. Because of the lateness of these comments, it is not expected that changes occur prior distribution of the Planning Commission packet on July 8a' for the meeting on July 12~', 2011. However, to facilitate discussion at that meeting, a response letter provided to my office by July 6~' would be appreciated. It is recommended that these commented be incorporated into revised drawings provided by July 13r'', for inclusion in the City Council packet. The revised submittal should include five full size sets as well as four 11x17 reduced sets for the Planning Commission review. A .pdf copy of .all revised graphics are required to be submitted. If you have any questions at all regarding these comments, please let me know. Please do not hesitate to contact me should you have any questions, I can be reached at (763) 635-1034. Sincerely, Jeremy Barnhart Planning Manager, AICP .~r'~f~, ~~~~ ~~ f ,July 6, 2011 The City Qf Elk :River Attn: Jeremy Barnhart, A(CP 13{165 Orono Parkway Elk River, MN 5533fl Re: The Cross(ng - Canditiona( Use .Permit, Response Letter #o Staff Comments Dear Jer-emy, We ..have .received and reviewed your staff comments from the June 8t" Site Plan Review Committee :meeting, please. see the following comments. and clarifications. Timetable 1) This project has been scheduled for review by the Planning Commission on July 12t" and by the City Council on July 18#". Public hearing :notices have: been distributed #o the newspaper; as of#aday; no comments for ar against the: project have: been received. Vanman Architects .and Builders and ~ .representative from The Crossing Church wilt attend the Ju~y'12~" and July 48t"' meetings to answer any questions presented. Enciineerinq 2} The following. comments were generated by the City "Errgineer, Justin Femrite. a. C-1 S(te Plan - No Comment b. C-2 Utility Plan 1) identify existing forcemain along south property line: Assure adequa#e cover exists aver the top of fheforceman: -The existing forcemain; will be added to the plans (as-built information requested from the -City Engineer). Adequate cover over the forcernain will be verified. 2) 'Provide detail of ail public utility connections. Details for public utility connections wi11 be provided on the construction documents ,and submitted for review, 3) Remove ,proposed water service from ~onnect(ng to the main in School street and provide service connected to the existing watermain on Jackson.Avenue. The water main in School Street is a shorter run and due to . :budget concerns, th.e church would like to connect at School Street instead ofi Jackson Avenue. 4} Change "Note 4" to reflect the same conditions but now an Jackson Avenue,. "Note ~l" will be revised to reflect the approved relocated water service. connectionlocation. Page 1 of 5 5} identify proposed disruption area on Jackson Avenue for water connection. The disruption area #or the Jackson Avenue water service connection anvil! beshown on the corns#ruction documents :and submitted #or review. 8) .Provide Gtandard EIk River details for all proposed improvements. . :Standard Elk'River details for all proposed improvements will be included an fife construction documents and submitted #or review, c. G-3 Grading'Plan 1 } Provide detail of connections with the City Street including pedestrian :ramps, valley gutter, sidewalks, etc. Details #or connections -with the City Street will be' inclurlec3 on the construction documents and submitted #or review. 2} Show proposed pavement section. The proposed pavement sec#ion will be sped#ied in the -soils report. A typical .:section will be shown on the plans. 3} No curb elevations are identified. Proposed curb elevations wiN be included on the constructiondocumen#sand submitted#or review, 4} Proposed curb type is not identified. The proposed. curb type is B612. Details #or the curb will be ;included on the construction documents .and submitted for review. d. Genera! Comments: ' Applicant shall provide afiuli SWPPP and: erosion control plan for site, Applicant shall submit full hydrologic calculations including all infiltrating .pipe systems and ponding areas..{The City Engineer is continuing to review those submitted) ;Applicant shall provide soil boring-report. ,A SWPPP and erosion control plan ~nrill be iinclucled in the constriction documents and~submitted~or review. See comments below #or responses to hydrologic calculations. A soil boring .report shall be provided by,the Arch`tect. Additional Engineer review comments dated June 29, 211 (via a-mail) 1} Applicant shall provide soils testing and boring rifarmation aruhich identify the elevation of ground -water and support the .infiltration rate used irl the drainage: ca{culations. ~- soil boring report shat! be prcivided by the Architect.. Page,2 of 2) Being the pond is intended to be dry.,. the outlets into the ponding areas -shah be extended and installed to an elevation 1' above the bottom. Qutlets into the ponding areas shall be extended and installed to an elevation 1' above the. bottom. 3) Please include exis#ing and .:proposed drainage reports. for the 2 and 1 ~ year rain events. Existing and proposed drainage reports for the 2 and 14 year rain events will be submitted. Access( parkinci 3) The currently proposed access off of Jackson. Avenue is temporary. tNhen the property to the south along Jackson is developed, access off of Jackson v~iill be :shared as it aligns with 8th street. Please adjust the plans to illustrate the future alignment.:. Vanman Architects-and Builders will :provide a revised plan for the City Council Meeting by>July 13~". 4} The parking lot appears to be less than 1 Q feet from the property line, 'in particular the property :lines shared vuith the :apartment building NE of the church building. In fact, it appears that a portion of the proposed parking. extended over the property line shared with the apartment building. Please adjust. The parking spaces located adjacent to the apartment building NE ofthe church building are existing spaces to remain and are currently not. part of the project.. LandscapnnNe etq anon ~) Sheet 3 shows a landscaped island in the main part of the. parking lot, on the west side of the: drive from School street; a storm sewer tine runs through this island, A tree is proposed to be planted :here., which is likely to cause conflicts, The tree will be relocated on the revised site plan. The number oftrees is consistent w%th the requirements of Section 30-934 (b)(3). 6) `Please either relocate or provide :street trees along School Street. Vanman. Architects. and Builders will provide- ~ revised .plan relocating trees on the site to provide street tress along School Street, 7) Please provide additional shrubbery along School Street and .Jackson avenue for headlight screening. Vanman Architects and Builders will provide. a revised plan proviidirrg additional shrubbery -along School Street and Jackson Avenue for headlight screening... .Fire Ghiefi S) Please provide afire.-hydrant at the new front ofi the building, the south east entrance. This hydrant supply- shall come off of ,Jackson Ave because of placement of the. west fire lane and the water supply to that lane. A new fire hydrant shat{ be located near the south east entrance of the :building. Due to budget concerns, the church would prefer to connect to the water service off of School Street instead of Jackson .Avenue. Page':3 of 5 Signacte , This property is .unique; in that a portion of the project is .located within the R-~ zoning district the building}; and a portion of the project is located in the C-2 zoning district {the parking lof}, Where separate rules e~cist based on zoning district, the-rules applied to tfie district in which the :principle structure is located is applied. The 'building is iocateci on the western portion of the property, an the :lot that is currently zoned R-4. Based on the sign ordinance, the developmen# is permitted one area identification signs (per Section 30-868 {8} These area identification signs are permitted 16 square feet and up to 8 feet in height. -Per Section 30-866 ~'(0}, permitted non-residential uses are allowed one freestanding and one wall business sign, net to exceed 96 square feet in total-sign area.. Because the lot has more than 1OD0 linear fast of combined street fronfage, the total .area,may be increased, notto exceed X92 square feet. The free standing sign may nofi be higher than 2(J feet. To summarize; ~ ype of sign c ~A (`,umber Hei ht is~ ft) .Area 1D ~ ~ ~ i~ Frees`anding ~ ~9 2~ J6 1~1,~aI I _ " .2 96 9} 1 note that plansshc~w three freestanding signs and 2 building wall signs. The detail on sheet 7 that shows-the area identification sign is consistent vUith the .ordinance,.. although'it: is unclear where this sign will be .located. Sheet 2 iden#ifies-:entry and. monument .signs. The detail cn sheet 7 that shows the monument elevation is consistent with the ordinance with regard to size and :height. Please .adjust the plans to reflect the number df free standing signs" allowed, and clarify where each type will be located, Sheet 2>is locating (1}one Area tdertt%#ication Sign-at #he;entrance to the. parking lot off of School Street (east of the existing apartment buitding}. This is labeled-as "newentry sign".. 'There is (~i}one Area Identification Sign at the entrance to the parking Int off of Jackson Avenue and is i'abeed as "new-entry sign"-. These Area ldentflcation Signs are identical at the {2} two locations and are described in details SJCUP-7 and 6(CUP-7. Accord(ng to Cify Code Sscticn 30-866 ~'8) ":..However, if the neighborhood, subd(visron, -or devetopmenthas entrances an arterial and/or collector roads, then a s(ngle area identification sign ma~rbe allowed of each of these entrances. The Church is showing {2} two ~nrall signs. t)ne s%gn "is located an the north elevation identifying :the building to school Street. -The other sign Is located at the south :east-entry dentifytng-the main entrance of the b'uildiing. Page 4 0#5 10) Finally, please clarify "Sermon Series Signage". I understand this are to be changeable copy; if its electronic changeable copy, :please .provide a .note on the plans. The Crossing Church wit{ continue to post "Berman Series Sgnage" similar to what tfiey :post currently on the corner of`School Street and Jackson Ave. The signage wild not be electronic and will change every four weeks to a new sign describing the new "Berman Series". 1n the future, the church may desire to have electronic signage, but we are currently not proposing to do that at this time. Building design 11} 1 reviewed the building. height. Although porEions of the .building -wall exceed 4t? feet high, based on the defiiniton of height, the building height is perm:"sssible. 12) Please verify that all mechanical units,. ifi mounted on the roof, will be screened from. public view, including the streets and Lions Park. All mechanical units wit( be screened from ;public view. 13} The permissible amount of lot coverage is 25°l0. Because the language of the ordinance is unclear, we have interpretedthat lot coverage calculation is applied to the 'building only, not the parking lot.. This is consistent-with the application in the past, and :amount to a lot coverage area vfi approximately 14°1°. 14) Please provide color and material samples for review by the Planning Comrriission and City Council. Vanman Arcftitects and Builders will provide photo copies of materials for review by the Planning commission and City Council. Revised plans will be sent by July 1`3~' for distribution in the City Council Packet fior the July 18th meeting.. Please let me know if there are any other questions. Sincerely, Ang Knodel, AlA Vanman Architects anti Builders Page 5 of 5 ,~ Project Narrative for: The Crossing Church Conditional Use Permit May 31, 2011 The Crossing Church is a rapidly growing church in the Elk River Community. Not your typical church, The Crossing Church is "Church for People Who Don't Do Church". The Crossing Church has been doubling their attendance annually after moving into their new home at 829 School Street and currently holding five worship services on the weekend to serve their members. Their current worship space seats approximately 500 people and the need is huge to increase the number of seats in their worship space to reach more people. The existing building at 829 School Street is approximately 21,514 SF with a worship space/auditorium that seats 500 people. There is also youth space, youth classrooms, offices, restrooms, and a small lobby. The existing parking lot has spaces for 122 cars. Current hours of operation of The Crossing Church are Monday thru Friday, gam to 5pm. The Crossing Church is holding five weekend services; 5pm and 6:45pm on Saturdays, and 9:30am, 11:15am and 1 pm on Sundays. The peak use of the facility is obviously on the weekends with the weekdays being for general church operation where the church currently employees approximately 30 people. The Crossing Church has recently purchased the vacant property to the east which will be developed into additional parking, complete with concrete curb & gutter, bituminous paving, parking lot lighting, and landscaping to meet City of Elk River's zoning requirements. The new proposed design for the two combined properties will have a maximum 547 parking spaces and will meet the parking demands of the proposed project. The proposed addition and remodel project for The Crossing Church includes doubling the size of the worship space and adding much needed lobby space, youth spaces and classrooms. There is additionally significant work proposed to bring the building up to current code compliance with sprinkler systems, elevator, accessible restrooms, ramps, stairs, etc. The proposed additions total 25,638 sf of additional space with an area reserved for a future 2 story classroom addition of 7,360 sf. The new worship space/auditorium will seat 1500 people with room to expand to the maximum occupants allowed by parking count constraints. The exterior materials of the additions will be precast concrete panels, prefinished metal ribbed siding, glass and aluminum curtain walls. The proposed additions will have flat (low-slope) roof structures with fully adhered EPDM membrane roofs. The signage for the building will include two building signs, one freestanding sign and two area identification signs. The main building sign will be located on the north elevation along School Street to identify the building. An additional building sign is shown on the east elevation to indentify the main entrance to the building. The freestanding sign is located on the corner of School Street and Jackson Avenue. This sign will be constructed of materials to match the new building facade. It will identify the church and allow an opportunity for the church to display their sermon series which changes every four weeks. The area identification signs are located at the entrances to the parking lot off School Street and Jackson Avenue. These signs are sized to remain within the square footage requirements and shall be constructed of materials to match the new building fagade. Outdoor Storage consists of a trash enclosure suitably sized for two dumpsters, one for trash and one for recycling. The materials of the trash enclosure have been selected to match the proposed additions and will be constructed of precast concrete panels and prefinished metal ribbed siding. YANMAN ARCWITECTS ANd BUILDERS INC. 669 Wni~etka Avenue Narth • Suite 210 • Minneapolis, Minnesota 55427 888.327.2817 • 763,541.9552 • fax 763.541.9857 www.vanmanab.com