Loading...
3.3. SR 08-25-2003TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and Council Lori Johnson, Finance Director August 25, 2003 Pay Estimates Item # 3.3. Attached are pay estimates for the Public Safety and City Hall building projects and public improvement projects. These pay estimates have been reviewed and approved respectively by Kraus-Anderson and Tushie Montgomery and the City Engineer. Pay Est. Project No. Contractor Amount Boston & Concord 1 W.B. Miller $171,248.28 Street Rehabilitation 1 Barbarossa & Sons 147,343.58 Public Safety Facility 12 City Hall Expansion · 12 Various 152,718.41 Various 74,516.24 As you can see from the attached Pubhc Safety and City Hall pay estimates, retainage of $295,081.60 and $109,262.02 respectively is being withheld from contractors on these projects. Included in these amounts is $25,122.00 of retainage on Kxaus Anderson's contracts. Retainage is being held on all contracts for which payment has been requested. Retainage will continue to be held on each contract until the contractor has satisfactorily completed all of the required work. Even though retainage is being held, the Council may choose to hold or reduce certain payments until satisfactory progress has been made on outstanding issues. Also based on the Council discussion at the last Council meeting, approval of the Public Safety and City Hall pay estimates will be contingent upon Council consensus that adequate progress is being made based on the update from Don Stutesman of Kraus Anderson. Action Requested The City Council is asked to approve the Boston/Concord and Street Rehabiltation improvement projects pay estimates as listed above and to approve the Public Safety and City Hall building projects pay estimates contingent upon Council consensus that adequate progress is being made on outstanding issues. If, based the update from I~caus Anderson, the Council chooses to withhold or reduce payments, a motion should be made to that effect following the update. If no such action is taken following the update, the payments will be released as indicated in the attached pay estimates. PARTIAL PAYMENT ESTIMATE NO, I FROM: July 7, 2003 TO: August 5, 2003 CONTRACTOR: W.5. MILLER ADDRESS: 5701 NORRIS LAKE ROAD, NW. ELK RIVER. MN 55330 OWNER: CITY OF ELK RIVER, MINNESOTA PROJECT: CONCORD STREET AND BOSTON STREET, STREET AND UTILITY IMPROVEMENTS COMPLETION DATE ORIGINAL: REUSED: June 25, 2004 AMOUNT OF CONTRACT: ORIGINAL: $353,615.90 RE%qSED: BID SUMMARY SCHEDULE 1.0 - STREET CONSTRUCTION - TOTAL SCHEDULE 2.0 - STORM SEWER - TOTAL SCHEDULE 3.0 - WATERMAIN - TOTAL SCHEDULE 4.0 - SANITARY SEWER - TOTAL TOTAL THIS PERIOD $E0,317.35 $43,278.70 $34,132.50 $52,532.80 TOTAL TO DATE $50,317.35 $43,275.70 $34,132.50 $52,532.80 TOTAI~ $180,261.35 $180,261 35 $180,261.35 TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE o:~proj~ayest #1 818860J PAGE 2 FROM: TO: May 28, 2003 August 0,2003 PARTIAL PAYMENT ESTIMATE NO. I CONTRACTOR: ADDRESS: OWNER: PROJECT: BARBAROSSA & SONS INC 11000 93RD AVE. N, P O. BOX 367, OSSEO, MN 55359 CITY OF ELK RIVER, MINNESOTA 2003 STREET AND UTILITY IMPROVEMENTS COMPLETION DATE ORIGINAL.: REV1SED: AMOUNT OF CONTRACT: ORIGINAL: $1,093,243.20 REVISED: BID SUMMARY - TOTAL SCHEDULE1.0 - 4TH STREET - TOTAL SCHEDULE 2.0 - RUSH AVENUE - TOTAL SCHEDULE 3.0 - QUINN AVENUE - TOTAL SCHEDULE 4.0 - OXFORD AVENUE - TOTAL SCHEDULE 5.0 - NORFOLK AVENUE - TOTAL SCHEDULE 6.0 - MORTON AVENUE - TOTAL SCHEDULE 7.0 - 4TH STREET - WATERMAIN - TOTAL SCHEDULE 8.0 - RUSH AVENUE - WATERMAIN - TOTAL SCHEDULE 9.0 - QUINN AVENUE - WATERMAIN - TOTAL SCHEDULE 10.0 - OXFORD AVENUE - WATERMAIN - TOTAL SCHEDULE 11.0 - NORFOLK AVENUE - WATERMAIN - TOTAL TOTAL TOTAL BID SUMMARY THIS PERIOD TOTAL BID SUMMARY TO DATE AMOUNT EARNED :::::::::::::::::::::::::::::::::::::::::::::::::::::::::: AMOUNT RETAINED MATERIAL ON SITE MATERIAL DEDUCT. =REVIOUS PAYMENTS ~'.M OUNT DUE $50,602.80 $5,958.70 $5,495.00 $0.00 $0.00 $0.00 $43,184.00 $Z7,107.00 $22,751.00 $0.00 $0.00 $155,098,50 $50,802.80 $5,g58.70 $5,495.00 $0.00 $0.00 $0.00 $43,184.00 $27,t07.00 $22,751.00 $0.00 $0.00 $155,099.50 $155,090.50 $155.098.50 $155.098,50 $7.754.93 $7.754.g3 $0.00 $0.00 $0.00 50.00 $0.00 $147.343.58 $147343,59 $155,098.50 o:~oro~\Payest #1-818980J 816400J PAGE APPLICATION AND CERTIFICATE FOR PAYMENT Page 1 of 2 TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public City Hall APPLICATION #: 12 CONSTRUCTION MANAGER: Kraus-Anderson Construction 200 Grand Avenue Saint Paul, MN 55102 ARCHITECT: Tushie Montgomery PERIOD FROM: 7/1/03 PERIOD TO: 7/31/03 CONTRACTOR'S PROJECT #7751 CONTRACT DATE SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 1 George F. Cook Construction Co. 31,390.07 3 RHC Construction, Inc. 7 Minnetonka Iron Works 1,662.50 22 Steinbrecher Painting, Inc. 23 Marsden Building Maintenance, L.L.C. 2,671.02. 36 Weidner's Plumbing & Heating 3,790.50 37 Direct Digital Controls, Inc. 4,805.00 38 Reliance Electric 15,252.00 39 Systems Management & Balancing 2,804.40' Kraus-Anderson 3,286.00 TOTAL: 'A'~CHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above situation, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work is in accordance with the Contract Documents, and the Contractors are entitled to payment of the AMOUNT INDICATED. Amount Certff, ie~/~ ._'~_~_l__~/,/(__~_,,Z_~d~_ B~_~~~~-~-_'_~~D a t e :___ -~-/-_~_~ ~ ~hie~ome. An Associates Construction Manager: Kraus-Anderson Construction Co. Project: Elk River City Hall Address: 200 Grand Avenue St. Paul, MN 55102 Application Number: 12 Application Date: August 1, 2003 Period to; July 31, ZO03 Owner: City of Elk River - Pat Klaers Project Number: 775t Total Value Total Value Total of Net Due 3alance To Revised of Work oi~ Work Previous This Complete Percent Bid Pkg# Description of Work Contractor Contract Adjustments Contract Completed Retainage Earned Applications Request Plus Retainage Complete, General Field Conditions ~raus-Anderson 188,360.OO O.OO 188,360.OO 58,000.00 2,900.OO 55,1 OO.OO 53,01 O.OO 2,O90.OO 133,260.00 31 I Selective BId~l Demo George F Cook 144,ooo.oo 5,448.OO 149,448.o0 46,431.65 2,321.58 44,110.07 12,720.oo 31,390.o7 105,337.93 :31 2 Earthwork/Found Drainage D~den Excavath 26,450.OO O.OO 26,450.OO 26,450.00 1,323.OO 25,127.00 2S,127.00 0.00 1,323.00 1 O0 3 Concrete-Formwk,reinforc RHCConstructn 149,506.oo 894.50 150,40b.50 " h49,3oo.50 '7,465.OO, 141,835.50 134,501.o0 7,334.50 8,565.00 99! 0.00 40,555.00 40,555.00 2,027.75 I 38,527.25 38,527.25 0.00 2,027.75 1 O0 4 ~recast Concrete Plank Molin Concrete 40,555.00 5 Concrete&Masonr~ Oakwood/U5 Fid 208,600.00 ! 0.00 208,600.00 184,052.00 9,202.60 174,849.40 174,849.40 0.00 33,750.60 88 7 ~Structural Steel,Joist,Deck Minnetonka iron 76,074.00 0.00 76,074 O0 68,150.00 3,407.50 64,742.50 63,080.00 1,662.50 ' 11,331.50 90 8 Erection of Structural Steel Western Steel 78,275.00 2,188.00 80,463.00 74,1 88.00 3,709.00 70,479.00 70,479.00 0.00 9,984.00 92 9 ~'-~/psum Dr'/~vall Re,Iai Contract 266,812.00 630.00 267,442.00- t32,300.00 6,6t5.00 125,685.00 125,685.00 0.00 141,757.00 49 10 Rou~jh&Finish Carpent~ Geor~le F Cook 304,700.00 4,586.00 309,286.00 146,214.40 7,310.72 138,903.68 138,903.68 0.00 170,382.32 47 11 Waterproofinc, I Kremer&Davis 12,750.00 SO0.O0 13,250.00 13,250.00 663.00 12,587.00 12,587.00 0.00 663.00 100 12 Ext Insul&Finish System O~/mpic Wall 48,650.00 0.00 48,650.00 39,630.00 1,982.00 37,648.00 37,648.00 0.00 11,002.00 81 13 Membrane Root&Sheetmetal Roof Tech 180,600.00 988.92 1 81,588.92 51,225.00 2,561.25 48,663.75 48,663.75 0.00 132,925.17 ;)8 14 Metal Roof&Prefab Specialty Systm." 59,372.00 0.00 59,372.00 59,372.00 2,968.60 S6,403.40 56,403.40 0.00 2,968.60 100 15' Caulking £arciofini Caulk 12,080.00 0.00 12,080.00 11,574.00 578.70 10,995.30 7,670.30 3,325.00 1,084.70 96 16 Hollow Metal&Wood Doors Glewwe Doors 43,400.00 0.00 43,400.00 43,378.69 2,168.93 41,209.76 41,209.76 0.00 2,190.24 100 17 Coiling Doors&Secur Grille Garage Dr Store 12,555.00 0.00 12,555.00 3,000.00 1So.o0 2,850.00 2,850.00 0.00 9,705.00 24 18 Alum Entrances&Windows Empirehouse 1 t 1,905.00 0.00 111,905.00 96,154.00 4,807.70 91,346.30 91,346.30 0.00 20,55&70 86 19 Ceramic Tile Twin City Tile 98,860.00 0.00 98,860.00 71,785.00 3,589.25 68,195.75 68,195.75 0.00 30,664.25 73 20 Acoustical Treatments Ceilings&Floors 48,485.00 0.00 48,485.00 39,140.1S 1,957.01 37,183.14 37,183.14 0.00 11,301.86 81 21 Resil Floor&Carpeting Spectra Contracl 74,600.00 1,795.00 76,395.00 0.00 0.00 0.00 0.00 0.00 76,395.00 0 22 Wallcovering&Painting Steinbrecher Pai~ 76,800.00 0.00 76,800.00 16,025.00 801.25: 15,223.75 10,568.75 4,655.00 61,576.25 21 23 Final Cteaning Marsden Maint 8,685.00 0.00 8,685.00 2,811.60 140.58 2,671.02 0.00 2,671.02 6,013.98 3;) 24 Exterior Bldg Signa~e Bartley Sales 4,541.00 0.00 4,541.00 60.00 3.00 57.00 57.00 0.00 4,484.00 1 28 Loading Dock Equipment V Anderson 5,300.00 0.00 5,300.00 5,300.00 265.00 5,035.00 5,035.00 0.00 ;)65.00 100 33 Hydraulic Elevators Schindler Elev 44,760.00 0.00 44,760.00 44,760.00 2,238.00 42,522.00 42,522.00 0.00 2,238.00; 100 34 Plumbing&Hydr&Piping Albers Mechan 287,045.00 0.00 287,045.00 201,342.00 10,067.10 191,274.90 191,274.90 0.00 95,770.10 70 35 Fire Protection Systems rtl-State Fire 27,200.00 0.00 27,200.00 13,600.00 680.00 12,920.00 12,920.00 0.00 14,280.00 50 36 HVAC&Ductwork Systems ~/eidner Plumb 224,000.00 0.00 ZZ4,000.O0 149,598.00 7,479.90 142,118.10 138,327.60 3,790.50 81,881.90 67 37 HVAC Control Systems Direct Digital 102,793.00 0.00 102,793.00 48,614.00 2,432.00 46,182.00 41,377.00 4,805.00 56,611.00 47 38 Electrical Reliance Electr 384,672.00 1,950.00 386,622.00 306,315.00 ! 15,316.00 290,999.00 275,747.00 15,252.00 95,623.00 79 39 Test&Adjust&Balancing Systems Mgmt 14,700.00 0.00 14,700.00 2,952.00 147.60 2,804.40 0.00 2,804.40 11,895.60 20 Constr ~4anagement Fee Kraus-Anderson 62,956.00 0.00 62,956.00 39,662.00 1,983.00 37,679.00 36,483.00, 1,196.00 25,277.00 63 574 TOTAL 3~430,041.0¢ 18~980.42 3~449~021.42 2,185~189.99 109,262.02 2~075,927.97 1,994,951.98 80,975.99 1,373,093.45 63 Page 2 of 2 APPLICATION AND CERTIFICATE FOR PAYMENT Page 1 of 2 TO (OWNER): City of Elk River - Pat Klaers PROJECT: Elk River Public Safety Facility APPLICATION #: 1Z CONSTRUCTION MANAGER: Kraus-Anderson Construction 200 Grand Avenue Saint Paul, MN 55102 ARCHITECT: Tushie Montgomery PERIOD FROM: 7/1/03 PERIOD TO: 7/31/03 CONTRACTOR'S PROJECT #7713 CONTRACT DATE SECTION CONTRACTOR/SUPPLIER CURRENT PAYMENT DUE 1 Dryden Excavating, Inc. 475.00 4 Duncan Concrete, Inc. 4,664.50 7 North Metro Landscaping, Inc. 47,796.06 8 Kelleher Construction 399.00 14 George F. Cook Construction Co. ~~,O~~ 23 St. Cloud Acoustics, Inc. 1,353.75 25 MCI Inc. 46,521.00 35: Nielsen's Equipment & Design, Inc. 3,016.63 39 Schindler Elevator Corporation 667.00 44 Direct Digital Controls, Inc. 9,368.00 45 Collins Electrical Contruction Co. ~ 46 Systems Management & Balancing 1,850.40 Kraus-Anderson 11,672.00 TOTAL: l_.6A,.Z2--9-:O~ ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-site observations and the data comprising the above situation, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work is in accordance with the Contract Documents, and the Contractors are entitled to payment of the AMOUNT INDICATED. Amount Certifiecl, _~~/~~_ _ D a t e: _~_/~/~_ _ Tushie Mbntgomery And Associates Construction Manager: Kraus-Anderson Construction Co. Project: Elk River Public Safety Facilit' Address: 200 Grand Avenue st. Paul, MN 55102 Application Number: 12 Application Date: August 1, 2003 Owner: City of Elk River - Pat Klaers Period to: July 31, 2003 Project Number: 7713 Total Value Total Value Total of Net Due Balance To Revised of Work of Work Previous This Complete Percent Bid Pkg# Description of Work Contractor Contract AdJustments ~.ontract Completed Retainage Earned Applications Request Plus Retainage3omplete General Field Conditions Kraus-Anderson 295,680.00! 0.00 295,680.00 295,000.00 14,750.0(] 280,250.00 270,750.00 9,500.00 15,430.00 100 1 Site demo/Earthwork D~den Excavat118,399.001 7,797.00 126,196.00 126,196.00 6,310.00 119,886.00 119,411.00 475.00 6,310.00 100 3 Bituminous Pavin~ Omann Bros 130,896.001 440.00 131,336.00 35,850.00 1,792.5(] 34,057.50 34,057.50 0.00 97,278.50 27 4 Concrete curb&~utter Duncan Concret~ 176,000.00: 13,632.00 189,632.00 184,182.00 9,209.1(] 174,972.90 170,308.40 4,664.50 14,659.10 97 5 Site Utilities Dryden Excavat 54,741.15i 10,650.00 65,391.15 65,391.15 3,270.00 62,121.15 62,121.15 0.00 3,270.00 100 7 Sod,Seeding, Native Vegetat North Metro Lan 69,840.481 0.00 69,840.48 50,311.64 2,515.58 47,796.06 0.00 47,796.06 22,044.42 72 8 Concrete-Formwk~reinforc Kelleher Constr 3431647.O0 11060.oo 344~707.OO 3441707.oo 17~235.35 327~471.65 3271072.65 399.00 17~235.35 100 9 Precast Concrete PlankMolin Concrete 53,581.0(3 O.OO 53,581 .OO 53,581 .O0 2,679.00 50,902.00 50,902.00 O.00 2,679.OO 100 10 £oncrete&Masonr¥ Serice Construc~ 1~o17~500.O(3 -21030.O0 11015~470.OO 1~O16~870.OO 50~844.O0 966~o26.00 966~O26.OO O.OO 49~444.OO 1OO 11 Structural Steel,Joist,Deck Daka Corp 164,500.00 479.00 164,979.00 164,287.O0 8,214.35 156,O72.65 156,072.651 0.00 8,906.35 100 12 Erection of Structural Steel Western Steel109~370.O0 3,130.00 112,500.00 1121500.O(3 51625.OO 106~875.O0 106~875.O(3 0.00 5~625.OO 100 13 Gypsum Drywall Regal Contract 263,452.00 2,074.00 265,526.00 265,526.O(3 13,276.30 252,249.70 252,249.70 O.00 13,276.30 100 14 Rou~lh&Finish Carpentry George F Cook390~9oo.00 $O~182.OO 421~o82.O0 4191659.o0 20~982.95 398~676.05 363~655.3C 35~o20.75 22~405.95 1oo 15 ~/aterproofing Kremer&Davis 21 ,OOO.OO Z,1 OO.OO 23,1 OO.OO 23,1 OO.O0 1,155.OO 21,945.00 21,945.O0 O.00 1,155.00 tO0 16 Exterior Insul&Finish Systm Custom Dr,/wall 109~9OO.O0 2~464.o0 112~36,~,OO 112~364.O0 5~618.OO 106~746.0<3 106~746.O0 0.00 5~618.OO 1OO 17 ~4embrane Roof&Sheetmetal WeatherProof 118,637.O0 370.00 .119,007.O0 108,937.O0 5,446.85 103,490.15 103,490.15 0.00 15,516.85 92 18 :Caulkin~l Carciofini Caulk 17~126.O0 O.OO 171126.00 161270.O0 813.50 151456.50 151456.50 O.OO 11669.50 95 19 Hollow Metal&Wood Doors Glewwe Doors 54,925.oo 506.00 55,431.OO 55,431 .O0 2,771.55 52,659.45 52,659.45 O.00 2,771.551 1oo 20 Overhead Doors Gara~]e Dr Store 251750.00 O.00 25~750.00 22~OOO.OO 11100.OO 2019OO.00 2019OO.OO O.00 41850.OO 85 21 Aium Entrances&WindowsEmpirehouse 154,781.OO O.O0 154,781.OO 147,068.OO 7,353.40 139,714.60 139,714.60 0.00 15,066.40 95 22 Ceramic Tile Twin City Tile & 111~6OO.OO -1~205.80 110~394.20 110~394.20 5~519.71 104~874.49 104~874.49 0.00 5~519.71 100 23 Acoustical Treatments St Cloud Acoust 30,950.00 10,OOO.OO 40,950.00 40,950.00 2,O47.51 38,902.49 37,548.74 1,353.75 2,047.51 100 24 Concr Floor Coatin~l Concrete Special 17,500.00 O.OO 17,5OO.O0 O.00 0.00 O.O0 O.O0 0.00 17,500.OO 0 25 ResiL Flooring, Carpeting Multiple Concept 51,070.O0 O.OO 51,O70.O0 48,970.00 2,449.00 46,521.00 O.OO 46,521.00 4,549.00 96 26 Wallcoverincj&PaintingSteinbrecher 100,800.00 -80.OO 100,720.OO 92,950.OO 4,647.50 88,302.50 88,302.50 0.00 12,417.50 92 27 Final Cleanin~ Marsden Maint11,080.O0 O.OO 11 ,O80.O0 O.OO O.OO O.O0 O.OO O.OO 11,080.OO O 28 Ext Bldg Sicjnage Bartley Sales7,7OO.OO O.OO 7,700.00 89.00 4.00 85.o0 85.00 O.OO 7,615.OO 1 29 Lockers Bartle¥ Sales65,280.OO 2,827.OO 68,107.oo 67,737.00 3,387.00 64,350.00 64,350.OO O.OO 3,757.oo 99 31 Storable Shetvin~l Systems Haldeman-Homm10,326.O0 O.OO 10,326.OO 10,326.00 516.31 9,809.69 9,809.69 O.00 516.31 100 35 Fabricated Stainless Steel La Nielsen's EcJuipm 17,764.00 1,325.40 19,O89.40 19,089.40 954.47 18,134.93 15,118.30 3,O16.63 954.47 1OO 36 Window Treatments Custom Expressl 4,225.OO O.O0 4,225.00 4,225.OO 211.25 4,O1,3.75 4,013.75 O.00 21 t .25 1OO 37 Automated Filin~l S~'stems Haldeman-Homm20,236.00 O.OO 20,236.OO 701 .OO 35.05 665.95 665.95 O.00 19,570.O5 3 38 ktovable File Systems Haldeman-Homm19,622.OO O.OO 19,622.OO 19,622.oo 981.11 18,640.89 18,640.89 0.00 981.11 1 O0 39 H~/draulic Elevators Schindler Eiev 71,360.oo Z,3OO.OO 73,680.OO 73,680.oo 3,684.00 69,996.00 69,329.00 667.00 3,684.OO 100 40 Plumbin~&Hydr&Piping Northern Air 299,500.00 16,378.21 315,878.21 315,878.21 15,793.91 3OO,O84.30 300,084.30 0.00 15,793.91 100 41 Fire Protection S~/stems Tri-State Fire 53,200.00 O.OO 53,200.O0 51,5oo.oo 2,575.00 48,925.00 48,925.00 O.00 4,275.00 97 42 Geothermal Loop Northern Air 290,OO0.OO -1,O48.OO 288,952.OO 288,952.OO 14,447.60 274,504.40 274,504.40 O.OO 14,447.60 1OO 43 HVAC&Ductwork Systems Sentra-Sofa 245,6OO.OO -4,187.00 ~41,413.00 241,413.OO 12,o70.65 229,342.35 229,342.35 O O0 12,070.65 1 CO 44 HVAC Control Systems Direct Di~tital 38,385.OO 3,177.o0 41,562.O0 38,385.OO 1,919.oo 36,466.o0 27,098.OO 9,368.00 5,096.00 92 45 Electrical Collins Electric 741,350.OO 17,O99.97 758,449.97 739,949.97 36,997.50 702,952.47 701,527.47 1,425.00 55,497.50 98 46 Test&Adjust&Balancing Systems M~lmt9,740.OO 340.OO 10,O80.OO 7,792.00 389.60 7,402.40 5,552.OO 1,850.40 2,677.60 77 Constr Management Fee Kraus-Anderson 114~346.OO O.OO 114~346.OO 109~772.OO 5~489.00 104,283.O0 102~111 .OO 2fl 72.00 10~063.OO 96 944 TOTAL 6~022~279.6=- 119~780.78 6~142~060.41 5~901~606.57 295~081.6C 5~606,524.97 5~442~295.8~ 164,229.09 535~535.44 96 Page 2 of 2