Loading...
6.13. SR 10-20-1997ity of iver MEMORANDUM Item # Mayor and City Council 6.13. FROM: Steve Ach, City Planner DATE: October 20, 1997 SUBJECT: Consider Comprehensive Plan Amendment to Adjust the Urban Service Boundary, Public Hearing Case No. OA 97-10 Issue The City of Elk River has initiated a Comprehensive Plan Amendment to consider adjusting the urban service boundary in the eastern part of Elk River. The specific area under consider is bordered by County Road No. 12 on the north, Tyler Street alignment on the west, 175ch Avenue on the south and Fillmore Street on the east. Attachments · Report to the Planning Commission dated September 30, 1997 Overview The area to be considered for inclusion into the urban service area currently lies outside of the boundary and is zoned Rla (Single Family Residential). Under the current zoning the property could be developed without city services into lots with a minimum lot size of 2-1/2 acres. With having the subject area located adjacent to the existing urban service boundary and consisting of a majority of large undeveloped tracts of land, staff has analyzed the possibility of having this area included as ultimately being developed with urban services. As the Council is aware, the platting of 2-1/2 acres subdivisions often creates a boundary or barrier to the feasible and practical extensions of city sewer and water. With the known and inevitable development interest in eastern Elk River, it is easy to assume given the opportunity, the proposed area to included in the urban service boundary would develop at some point in time under urban densities. 13065 Orono Parkway * P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to the Mayor and City Council/OA 97-10 October 20, 1997 Page 2 During the Planning Commission meetings, affected residents from this area spoke at the Planning Commission meeting with concerns ranging from future assessments, timing of having utilities to serve the area and feasibility to further subdivide some of the smaller tracts of land in the northwest corner if utilities were ever extended into this area. To try and address these concerns, staff has offered the following: Timing for extending utilities into this area - Given the amount of land that can develop north of County Road No. 12, it is unlikely utilities would have to be extended into the subject area any sooner than 10 years from today's date. Therefore, both staff and the Planning Commission are recommending if this area is included, a footnote be added that the new area not receive city sewer and water until the year 2007. The City Engineer has indicated that the area north of County Road No. 12 can develop with utility extensions virtually independent of the area south of County Road No. 12. Ultimately, the subject area could be served by a lift station which is most likely needed in the southeast corner of the area north of County Road No. 12. Future assessments - It is difficult to give the residents any guarantees on what the future assessment policy will be when utilities are ultimately extended into this area. However, if past practice is any indication of how future policies will be applied, the developer initiating the extension has typically paid a majority of the costs associated with extending utilities into a vacant area. The Council has also treated existing homes a little different to allow time to hook up to the utility. Who will initiate the request - The residents which spoke at the public hearing indicated they would like to see the area remain rural with larger tracts of land and preserving the farming opportunities which are there today. Staff is in complete agreement with the residents - there is not need to have this area develop given the developable land currently available. However, staff believes the area will ultimately develop with the influence of a developer and not require a city-initiated project. Therefore, if the landowners have no interest in selling their property, the area can remain rural in character for as long as the property owners desire. However, if in fact it is ever developed, it can be done efficiently at urban densities with city sewer and water and at the property owner's request Please refer to the attached Planning Commission reports and letter from the residents. f:\shrdoc\council\oa97-10x.doc Memo to the Mayor and City Council/OA 97-10 October 20, 1997 Page 3 Recommendation It is recommended the City Council approve the Comprehensive Plan amendment to adjust the urban service boundary by including the area described in this report within the urban service boundary. The approval shall include the following conditions as recommended by the Planning Commission: UTILITIES SHALL NOT BE EXTENDED INTO THIS AREA ANY SOONER THAN 10 YEARS FROM THE DATE OF COUNCIL APPROVAL. FUTURE CITY COUNCIL'S CONTINUE THE SAME POLICY FOR RELIEF FOR CURRENT RESIDENTS FROM POSSIBLE ASSESSMENTS ASSOCIATED WITH A UTILITY EXTENSION. If the City Council approves the urban service boundary adjustment a subsequent action will be necessary. Similar to other residential areas within the urban service boundary, a rezoning to Rle (Single Family Residential) which requires a 10 acre minimum lot size prior to sewer and water being available will need to be brought before the Planning Commission and City Council. f:\shrdoc\council\oa97- lOx.doc ity of vet FROM: DATE: SUBJECT: MEMORANDUM Item # 6°4° Planning Commission Steve Ach, City Planner_~t5~ September 30, 1997 Consider Comprehensive Plan Amendment to Adjust the Urban Service Boundary, Public Hearing Case No. OA 97-10 Issue The City of Elk River has initiated a Comprehensive Plan Amendment to consider adjusting the urban service boundary in the eastern part of Elk River. Location The area considered to be included in the urban service boundary is bordered by County Road No. 12 on the north, Tyler Street alignment on the west, 175th Avenue on the south, and Fillmore Street on the east. Background This item was presented to the Planning Commission on July 22nd where public testimony was received from concerned residents. One of the residents presented a letter from the concerned citizens within the proposed area to be included in the urban service area (see attached). At that previous public hearing meeting, one of the issues the residents raised related to the timing of the when utilities would actually be extended to serve this area. As staff pointed out at that meeting, a time schedule could be included as part of this amendment preventing any further extension of utilities into this area until a certain date. For example, based on the number of developable acres north of County Road No. 12 and the expected timetable to develop this area, the area proposed to be included would not have to be served for at least another 10 years. Therefore, if the area was included in the urban service boundary, a notation could be made that no utilities would be extended in this area until the year 2007. 13065 Orono Parkwav· P.O. Box 490 * Elk River. MN 55330 * TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Planning Commission]OA 97-10 September 10, 1997 Page 2 Even with an established date of when utilities could be extended into this area, chances are the development community will be one to propose the extension of utilities. Much like the Waddy Schulze development which is forcing the utilities in the eastern part of Elk River, a similar situation will most likely occur in this new area proposed to be included in the urban service boundary. If the request to extend utilities is prior to the established date, a comprehensive plan amendment would be required. As staff has pointed out in the past, managing the City's growth by controlling the extension of utilities and establishing the proper long range planning practices of a well-planned compact growth pattern, the City is able to provide for a much more efficient extension of public services while protecting the rural character of the community from the possibility of unnecessary urban sprawl. Please refer to the attached for additional information on this issue. Other Issues Many residents at the previous Planning Commission meeting on this issue were concerned with assessments. By including this area in the urban service boundary there would be no immediate assessments. Staff believes this area could stand on its own; therefore, would not be assessed until the utilities were actually extended to serve the area. Recommendation It is recommended the Planning Commission recommend approving the Comprehensive Plan amendment to adjust the urban service boundary including the area described in the report. Furthermore, if the Planning Commission would agree in deferring extension of utilities into this area for a certain time period, a date can also be established preventing the extension of utihties into this area prematurely. Lastly, if the urban service boundary is adjusted, a rezoning of the area to reflect a residential zoning district consistent with other residential areas within the urban service boundary will need to follow. \\elkriver\sys\shrdoc\planning\pc\oa97-10x.do¢ July 15, 1997 TO: City of Elk R/ver Planning Commission Department FROM: Concerned citizens in proposed Urban Service Area Petition City Urban Service Area (City Sewer & Water) Case: OA 97-10 Our neighborhood would like to provide input to the City of Elk River's proposal for bringing city sewer and water to the eastern urban area of Elk River roughly located between the proposed City park, County Road 12, Fillmore Street and 175th Ave NW (also known by locals as "Snake Trail"). Most res/dents within and directly stm'ounding this area are opposed to a system timt brags sewer and water i~,to fl:eir ncigl~bod~ood. Their needs are currently being mol b}.' '"' ~* ;.~ .~tct ,,~,,~ _-:,.~.,.~,. s} ...:,..~.,:s. Typically, those properties arc iarg,:r it] size than a development requiring sewer and water would be. For tl~e most prat these propcrties have been designed to take advantage of the Features and fidl land nrca upon which they are built. It is not feasible for most of these rcsidcnts to hook up to a city sewer and water system due to iris lay-out of' their property. TI~c l~igh linancial cost which goes paired with a water and sewer sys'~em, can not be deferred by selling off a portion of their land due to lbo loc:ilion of ilici;' ;~onies, cMve ways, access, ponds, etc... A number o£ those properties range fi'om hvo to five acre lots or more. A p~icul~ propeay el' six acres whhh~ tids proposal area which can not subdMde would be ,~=~.,~,. ai,p.:ox.,,,,.ac,y $,18,uu0 gr li~e axm,: line plt;s $38,000 to bring sewer 1/4 mile along ti:o drive way plus ti~c added expense of hook up and eliminating well m~d septic, witich could be a few thousm~d d, 71ars more. Tlfis is a hom~,ing prospect for any one to face. We don't believe it would be the intent of our CiW Council or m~y Developer, to impml this kind of Fm~ci~ b~den on the fmnilies in o~ City. Case: OA 97-10 Page 2 of 2 The total number of properties affected by this proposal would be relatively few. We would therefore, propose that they be exempted fi.om inclusion in the water and sewer project all together. In addition, roughly 80 acres of the proposed area is being actively fanned by a large family dairy operation. This "University of Minnesota Demonstration Farm" consists of about 140 milking cows and another herd of 100 "replacement" cattle. In order to support this business about 500 acres is needed of which this 80 acres is a part. In addition, the proposed area includes about 30 more acres which are being rented. With the loss of 110 acres, this final "American Da/fy Stronghold" in the City of Elk River will almost certainly come to an end. As a whole, the residents in the affected neighborhoods, feel that if a developer wants to build homes in an area within this section, they could do one of two things: · Absorb the total cost of the city water and sewer system that serves them, into their own project. · Develop the area in a similar fashion as "Hidden Creek" with minimum 2.5 acre lots with a well and septic system for each home. We appreciate this opportunity to provide you with our comments and we have faith in your leadership. We believe, that with your help, this growth phase can be brought to a positive conclusion for all concerned in the City of Elk River. 199TH 159T~ 187114 164'~14 : I ~ 9~9 'f glST ,/- 18~TH ---- 184TN 18.T~O 182ND --BIST 180TH 179TH "'~ 17811H 177114 176TH ,,' ~ 17§TH 174'I~ 172'10 18811't 167TH 164TH 161ST S60TH ~y of 'ver MEMORANDUM Item gS. 12. TO: FROM: DATE: SUBJECT: Planning Commission Steve Ach, City Planner..~~ July 22, 1997 Consider Comprehensive Plan Amendment to Adjust the Urban Service Boundary, Public Hearing Case No. OA 97-10 Issue The City of Elk River has initiated a Comprehensive Plan Amendment to adjust the urban service boundary in eastern Elk River. Location The area considered to be included in the urban service boundary is bounded by County Road No. 12 on the north, the Tyler Street alignment on the west, 175th Avenue on the south, and Fillmore Street on the east. Background One of the major components of the updated Comprehensive Plan was to consider expanding the urban service boundary for future urban development opportunities. This would include city water and sewer services and a variety of urban densities similar to the development pattern found within the city's current urban district. After reviewing several options of expanding the urban service boundary, the City Council approved the expansion of the urban service boundary as shown on the attached Exhibit A. The Planning Commission may recall within the past six months a preliminary plat was submitted for a site of approximately 80 acres within the area identified to be considered for expansion of the urban service boundary. The proposed plat was a 2-1/2 acre subdivision which basically included a half mile cul-de-sac to serve the property. During review of this preliminary plat, a few Commission members made a comment relative to the inappropriateness of this 2-1/2 acre development in an area which may be 13065 Orono Parkway * P.O. Box 490 * Elk River, MN 55330 · TDD & Phone: (612) 441-7420 * Fax: (612) 441-7425 considered for city utilities sometime in the future. However, based on the present zoning of Rla, the prehminary plat was allowed to proceed forward. The development was eventually withdrawn, due to some problems the developers experienced with the property owner. Overview The area to be included within the urban service boundary totals approximately 480 acres. This 480 acres can be broken down as follows: 80 acres is Hillside Park which is currently owned by the City · Approximately 50 acres in consumed by Clever's Marsh · Approximately 20 acres owned by Minnesota Department of Transportation · Approximately another 30 acres is identified wetlands according to the National Wetland Inventory Maps. Therefore, based on the ownership of the properties, wetlands, and other restricting factors, the area probably has approximately 280 - 300 acres for development potential. By including this area in the urban service boundary there would be no immediate or foreseeable impact for the property owners in terms of assessments for utilities. As presented to the Planning Commission in the past, typically, the costs associated with extension of utilities has been initiated by the development community and absorbed by those properties directly affected. It is anticipated that if this area is included in the urban service boundary, it would basically be reserving this area for possible development to an urban standard. If this area is included in the urban service boundary, it would be appropriate to consider rezoning the properties from the current Rla zoning district (2-1/2 acre minimum lot size) to a residential zoning district consistent with other areas within the urban service boundary. The area that has been selected to be considered for inclusion in the urban service boundary appears to be a logical extension of the existing boundary that has been adopted by the Council. The proposed area is bounded on the east by a large lot rural subdivision which is typically difficult to serve with public utilities because of the cost associated with such an improvement and also bounded on the south by Cargill. The extension of trunk utilities into east Elk River may improve the efficiencies of some of the utihty improvements necessary in the east Elk River project. It is not anticipated that this area would be served until a petition has been submitted by any of the affected property owners within this area. The subject area south of County Road 12 may possibly stand on its own and could be developed after the entire area between County Road 12 and 13 is built out. \\elkriver\sys\shrdoc\planning\pc\oa97-10.doc Recommendation It is recommended the Planning Commission approve the Comprehensive Plan amendment expanding the urban service boundary to include the area bounded by County Road 12, Fillmore Avenue, 175th Avenue and the Tyler Street alignment. Also, if the expansion is approved it is recommended the Planning Commission recommend to the City Council a rezoning of the affected properties occur to be consistent with other residential areas within the urban service area. \\elkriver\sys\shrdoc\planning\pc\oa97-10.doc I187'~1 1 1~4.'1'H 182~1D I~0'11-~ 17gTH 17831~ 177TH 176TH 175"n-I 17 173Ro 172ND 1715T 170TH RI& o~~ LOCATION Ell/ River MAP 13065 Orono Parkway · P.O. Box 490 CASE' O~1~ Elk River. MN 55330