Loading...
4.3. SR 11-03-1997~.,~y of · lver MEMORANDUM Item #4.3. TO: FROM: DATE: Mayor & City Council Klaers, City Adn~rator Pat October 27, 1997 SUBJECT: Heritage Landing I and II Drainage Issues Per Council direction on October 27, 1997, a meeting was held between the developers (and their engineers) of Heritage Landing I and II, homeowners in this area, and city staff regarding drainage and easement issues where the Heritage Landing I and II subdivisions meet. At this meeting point of the two additions, there is a 20 foot drainage easement except for one lot where the easement document recorded by the developer was not valid. A potential drainage problem exists during the spring thaw runoff and during periods of heavy rains or flash floods. The problem is that water could back up from the drainage swale or ditch into some of the homes that are built in the Heritage Landing I subdivision. The engineers for the developer are going to look at possible solutions to the potential drainage problem. The options will be discussed at a follow up meeting on Tuesday, November 4, 1997, at 10 a.m. at City Hall. Everyone understands the importance of arriving upon an acceptable solution in the near future so that it can be implemented before winter. The city will assist the implementation of a solution, but has no plans to spend public funds on resolving this developer driven situation. To some degree the city has already spent public funds to help reduce possible drainage problems by not assessing any costs to the developers or homeowners on the east side of Joplin Street for the 1997 storm drainage and street improvement project. \\elkriver\sys\shrdoc\councilkheritage.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425