Loading...
4.3. SR 11-17-1997~ty of iver MEMORANDUM Item #4.3. TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Ad~~~ il November 17, 1997~/~/~lf Building Official Updates Since I have requested Building Official Cliff Skogstad to be in attendance for agenda item 4.2., I thought it would be appropriate for Cliff to spend a few minutes with the Council to update everyone on some of the other projects happening throughout the city. R.~din~ House - Cliff has taken the lead in ensuring that the Ryding house north of the library is being demolished. The Police, FBI, and Fire Department conducted training in the house prior to the demolition which was completed by Veit Construction on Tuesday, November 11. As of the writing of this memo, fill material has not been placed in the hole on the site where the house once stood, but this is scheduled to take place any hour or day and should be completed by the time the Council meets on 11/17/97. The parking lot construction will not take place until next year. New Liquor Store - The new liquor store is essentially completed. A punch list of corrections is still outstanding and this is fairly standard business with any new facility. Cliff has issued the occupancy permit and the one year warranty is running on most of the building and site improvement items. Overall the project went as smooth as one could hope for and the project came in on time and under budget. The construction manager (Greystone) did an excellent job for the city on this project. City Hall Building Health - A consultant was hired to investigate the health condition of our City Hall building. A building construction error in the air intake system was identified and is being corrected. This intake air situation may have been a cause of some of the complaints about the building air quality causing headaches, a feeling of"sickness", and similar types of conditions. 13065 Orono Parkway · P.O. Box 490 ° Elk River, MN 55330 ° TDD & Phone: (612) 441-7420 ° Fax: (612) 441-7425 Ice Arena - This project is essentially completed, but there are still a couple of building issues that require our attention. These items include the roof, heating, and the dehumidifier situation. On the positive side, the seating has been corrected and now meets code and all of the seating is available for the public. The request to the city was for "four walls and a sheet of ice." We do have a very nice Olympic sheet of ice and we got a good project for our money. However, the bare bones project needs some additional expenditures in order for the arena to function properly and we are looking at these issues one at a time based on priorities. When anyone tries to do a $3 million project for $2.7 million, you will have some problems in the design and "value engineering" which will require additional expenditures after the project is completed. This appears to be the case with the dehumidifier situation in which the improper functioning of this system has some potential negative long term effects on the building and needs to be addressed. Options are being reviewed to resolve the situation, but none of the options for improving the air circulation in order for the dehumidifier to function correctly are cheap.