6.5. SR 11-17-1997,,-.,y of
iver
MEMORANDUM
Item # 6.5.
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Steve Ach, City Planner. S?2
November 17, 1997
Request by Royal Oaks Realty for
Preliminary Plat Approval
(Riverplace), Public Hearing Case
No. P 97-16
Request
Royal Oaks Realty is requesting a preliminary plat to subdivide 40 acres into
59 single family lots.
Location
North of U.S. Highway 10 along Queen Avenue alignment (immediately east
of Custom Motors).
Zoning/~and Use
Rlb (Single Family Residential) / MR (Medium Density Residential).
Attachments
· Proposed preliminary plat
· Report to the Planning Commission dated October 28, 1997
Overview
The proposed plat encompasses an area of approximately 40 acres which is
bordered on the south by U.S. Highway 10 and on the north by the Elk River.
Approximately 14 acres of the parcel extends into the Elk River and
consumes portions of the islands in the middle of the river. The remaining 26
acres lying south of the Elk River is the area which is considered developable
and is the subject of the proposed subdivision. The proposed plat includes 59
single family lots along with a 1.8 acre park as recommended by the Park &
Recreation Commission.
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to the Mayor and City Council/P 97-16
November 17, 1997
Page 2
The plat is bordered on the west by Custom Motors Salvage Yard and on the
east by a vacant piece of property which has similar characteristics as the
property proposed for the subdivision.
Streets
The subdivision is proposed to have two new roads accessing the parcel off of
the Highway 10 service road. The plat also provides for interior streets to be
extended both east and west to adjacent parcels for future connections as
those properties develop. The Highway 10 service road is currently a rural
section and will eventually need to be upgraded to an urban section to fit in
with the area as it continues to develop. Staff is recommending the developer
be responsible for upgrading that portion of the service road adjacent to the
proposed plat. The ultimate design of this service road would be a 32' wide
urban section with a pedestrian system along the north side and have the
appropriate storm drainage system included in the street design (i.e., catch
basins and storm sewer). The subject property is approximately a quarter
mile west of where the frontage road improvements have terminated which
are representative of the improvements that will eventually occur along the
frontage road. Staff is recommending the developer provide some security to
ensure the developer's cost for improving that road in the future is
maintained. The timing for improving this frontage road may be discussed
further along with the Guardian Angels proposal which will require looping
of the watermain in either an easterly and westerly direction along U.S.
Highway 10. If the watermain extends west, it may be an appropriate time
to upgrade the frontage road along with that watermain improvement.
Floodway and Floodfringe
Both of these designations apply to the property. Staff has asked that the
developer's surveyor identify and include on the proposed plat the edge of the
floodway. This is the actual channel of the water course and is the area
required to carry or store the regional flow (i.e. hundred year event). No
building activity can occur within the floodway. The plans appear to respect
the floodway, however, the boundary should be noted on the plans to verify
this.
The floodfringe is the area outside of the floodway. This area can be filled,
however, the lowest floor elevation must be 879.1 and a ground elevation of
878.1 must extend for a minimum of 15 feet around all structures. (Please
refer to Terry Maurer's memo containing the Planning Commission report for
more information regarding the floodfringe and the storm sewer design
s:\council\p97-16.doc
Memo to the Mayor and City Council/P 97-16
November 17, 1997
Page 3
proposed which will actually extend the flood fringe further into the property
and into rear yards of lots.
Landscaping Along Highway 10 and Custom Motors
The developers are proposing to install a 15 foot landscape buffer along the
west property line to provide additional screening between the residential
development and Custom Motors. Currently, there are existing trees along
this property line and every attempt will be made to save what is existing as
well as supplementing that landscaping with additional groupings of Russian
olive, evergreens and birch clumps.
Staff and the Planning Commission are also recommending extensive
landscaping be provided along the Highway 10 frontage road to buffer the
residential area from Highway 10, both visually and as much as possible to
deflect ambient noise from vehicles. The landscaping along the service road
shall consist of earth berming and extensive planting to accomplish the
appropriate buffer. A detailed plan will have to be submitted prior to final
plat approval for staff review and comment.
The existing trees located within the interior of the subject property will have
to be removed in order to accomplish the proposed grading plan.
Park and Recreation Commission Recommendation
The Park & Recreation Master Plan has identified a neighborhood park for
this area. The Park and Rec Commission recommended a two acre park be
dedicated as part of the plat in a location where an additional two acres on
the adjacent property to the east could be dedicated to accomplish a four acre
neighborhood park. Based on the 26 acres of developable area included in
this proposed plat, the Park & Rec Commission could ask for 2.6 acres.
However, in order to achieve the Park & Rec's goal of a 4 acre park, the
Commission has recommended two acres be dedicated with a future 2 acres
on the adjacent property being dedicated for a total of a 4 acre park. The
proposed plat includes a 1.8 acre park slightly less than the two acres
recommended by the Park & Rec Commission. In order to accomplish a 2
acre park, Lot 7 in Block I would have to be eliminated. By including Lot 7
into the park area, the park then has a total area of 2.16 acres. This would
satisfy 83% of the developer's park dedication requirements, with the
remaining 17 percent being paid in cash ($6,409.00). The developers have
also offered Outlot A to the City for additional park dedication credit. The
Park & Rec Commission did not want to give any credit to Outlot A, since it
is undevelopable property and its true recreational value may be limited.
Staff is recommending in order to accomplish the park dedication
f:\shrdoc\council\p97-16.doc
Memo to the Mayor and City Council/P 97-16
November 17, 1997
Page 4
requirements, Lot 7 be eliminated and included as part of the park land with
the remaining park dedication requirements being paid in cash.
Pedestrian System
The Comprehensive Pedestrian System identifies a trail along the north side
of the service road. This trail currently exists further to the east where the
new frontage road has been developed north of Highway 10. The trail also
extends south of Highway 10 along the east side of Joplin to County Road 30.
The developer shall be responsible for installing the 10 foot wide trail along
their portion of the property adjacent to the service road. Construction of the
trail at this time will not conflict with any reconstruction of the service road
at a later date. Consistent with city policy, the developer will be reimbursed
$10 a foot for the installation of the trail.
Lot Dimensions
The property is currently zoned Rlb which requires a minimum lot size of
12,000 square feet. Lots adjacent to the Elk River are required to have a
minimum lot size of 15,000 square feet measured above the ordinary high
water. The shoreland regulations which apply to this plat require that all
lots adjacent to the river have a minimum lot width of 80 feet, both at the
setback line and at the ordinary high water level. Lot 13 does not meet this
requirement, therefore, should be redesigned by eliminating the tail which
extends down to the Elk River.
Staff is also recommending that all of the lots adjacent to storm water
ponding areas have a rear yard area of 30 feet measured from the back of the
house to the edge of the ponding area. Some of the lots have an area between
15 and 20 feet. These lots will have to be modified in order to meet this
requirement.
Outlot A
As previously mentioned Outlot A is the area of the plat which extends into
the Elk River. The developers have indicated they may give as a charitable
contribution this property to some non-profit organization such as the
Minnesota Land Trust or Nature Conservancy.
Recommendation
It is recommended the City Council approve the preliminary plat with the
following conditions:
s:\council\p97-16.doc
Memo to the Mayor and City Council/P 97-16
November 17, 1997
Page 5
1. A DEVELOPER'S AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS
AND CONDITIONS OF ALL THE IMPROVEMENTS.
COMMENTS OUTLINED IN THE CITY ENGINEER'S MEMO DATED OCTOBER 24, 1997 BE
ADDRESSED AND INCORPORATED INTO THE PLANS.
DEVELOPER BE RESPONSIBLE TO CONSTRUCT A 10 FT. WIDE BITUMINOUS PATH
ALONG THE NORTH SIDE OF THE SERVICE ROAD. A CREDIT OF $10 PER LINEAL FOOT
FOR THE TRAIL WILL BE APPLIED TOWARDS THE DEVELOPER'S PARK DEDICATION.
WATER AVAILABILITY CHARGE IN THE AMOUNT OF $300 PER LOT BE PAID TO ELK
RIVER MUNICIPAL UTILITIES. DEVELOPER SHOULD ALSO CHECK WITH ELK RIVER
MUNICIPAL UTILITIES FOR ANY ADDITIONAL CHARGES RELATING TO WATER
CONNECTION OR ELECTRIC FEES.
A SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE
TIME OF FINAL PLAT BE PAID PRIOR TO RECORDING THE PLAT.
PARK LAND IN THE AMOUNT OF 2 ACRES BE DEDICATED WITH THE BALANCE OF THE
PARK DEDICATION REQUIREMENTS BE PAID IN CASH. THE 2 ACRES DEDICATED FOR
PARK SHALL NOT INCLUDE ANY PONDING AREA.
A LANDSCAPE PLAN BE PROVIDED ILLUSTRATING A BUFFER ALONG THE WEST
PROPERTY LINE AND ALONG THE SOUTH ADJACENT TO THE SERVICE ROAD. THE
BUFFER ALONG THE FRONTAGE ROAD SHALL CONSIST OF BERMING AND
LANDSCAPING. A DETAILED PLAN SHOULD BE SUBMII'rED ALONG WITH THE FINAL
PLAT.
8. AN NPDES PERMIT BE OBTAINED PRIOR TO ANY GRADING OF THE SITE.
A COMPLETE GRADING, DRAINAGE AND EROSION CONTROL PLAN BE APPROVED BY
THE CITY ENGINEER PRIOR TO COMMENCING GRADING ON SITE.
10. STREET LIGHTS BE INSTALLED AS RECOMMENDED BY ELK RIVER MUNICIPAL UTILITIES.
11.
APPROVAL FROM THE DNR SHALL BE OBTAINED ACKNOWLEDGING THE PLAT MEETS
THEIR REQUIREMENTS.
12. APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT.
13.
A DEVELOPMENT PLAN BE PROVIDED AND REVIEWED AND APPROVED BY THE CITY
ENGINEER PRIOR TO ISSUANCE OF ANY BUILDING PERMITS.
14.
THE PLAT SHALL BE REDESIGNED TO INCREASE THE REAR YARD AREA BEHIND LOTS 1
THROUGH 6, BLOCK 4 AND LOTS 13 THROUGH 22, BLOCK 5.
15.
THE FLOODWAY AND FLOOD FRINGE BE NOTED ON THE PLAT AND ALL
REQUIREMENTS OF THESE ORDINANCES BE MET.
16.
EROSION CONTROL SHALL BE PROVIDED ALONG THE BANK OF THE ELK RIVER. THIS
EROSION CONTROL SHALL BE DONE IN COORDINATION WITH THE DNR AND CITY.
s:\council\p97-16.doc
Memo to the Mayor and City Council/P 97-16
November 17, 1997
Page 6
17. THE DEVELOPER PROVIDE THE CITY SOME FORM OF SECURITY TO INSURE THE
FRONTAGE ROAD IS REBUILT TO AN URBAN STANDARD. THE CITY ENGINEER SHALL
DETERMINE THE APPROPRIATE AMOUNT TO COVER THE COST OF THE STREET.
18.
ALL LOTS ADJACENT TO THE ELK RIVER MUST HAVE THE ENTIRE YARD SODDED AT THE
TIME OF CERTIFICATE OF OCCUPANCY.
19.
LOT 13, BLOCK 5 SHALL BE MODIFIED TO REMOVE THE NARROW EXTENSION TO THE
RIVER.
s:Xcouncil\p97-16.doc
RIVERPLACE
PRELIMINARY PLAT AND LANDSCAPE
IN THE CITY
OF
ELK RIVER, MINNESOTA.
PLAN
PROPOSED STREET LIGHT
EXISTING UTILITT POlE
[X/STING MAIL BOX
EXISTING TELEPHONE BOX
DESCRIPTION:
16
THE EAST HALF OE TH[ WEST HALF' 0~'
THE NORTHEAST QUARTER 0+' SECTION 51.
TOWNSHIP 35, RANGE 26, SHERBURNE AREA: 40.8± ~cres
COUNTY. ~INNESOTA.
CURRENT ZOHINO:R-lB
ZONING OF
SURROUNDING PROpERTy:
PURCHASER AND ROYAL OaKS REALTY
SUBDIVIDER:4196 Lexington Avenue PROPOSED LOT'S:URBAN DISTRICT:
(612) 786-6909
411 ~
PARK
~65.9 [
MINIMUM LOTREQUIREMENTS
LANDSCAPE DETAILS
STREET
TYPICAL LOT DETAIL
VICINITY MAP
GI~PHIC SC~L£
=
1' = 100'
MIDWEST
;Land Surveyors & Civil Engineers, Inc
RIVERPLACE
PRELIMINARY UTILITY PLAN
IN THE CITY
OF
ELK RIVER, MINNESOTA.
PROPOSED S~REET LIGHT
EXISTING UTILITY POLl[
EXISTING MAIL BOX
EXISTING TELEPHONE BOX
EXISTING T.~
EXISTING TREE UNE
EX[STING 10 FOOT CONTOUR IHTERVAL
EXISTING 2 FOOT CONTOUR INTERVAL
---~: EXISTING CHAIN LINK FENCE
~ EXISTING SEPTIC TANK
~; EXISTING STORM MANHOLE
~) EXISTING SANITARY MANHOLE
[~ EXISTING WATERVALVE
~ EXISTING WELL
~ EXISTING UNDERGROUND GA~
"~ EXISTING HYDRANT
....... EXISTING WATERMAIN
SEWER AND MANHOLE
PROPOSED STORId
SEWER AND CATCH BASIN
RC APRON WITH RIP RAP
PROPOSED KORCEMAIN
<
\ to
=EC 22
7
PARK
PURCHASER AND
SUBDIVIDE R:
SU R V'EYOR AND
DESIGNER:
ROYAL OA~S REAL~f
4196 Lexington Avenue
Shorevlew. MN 55126
(612) 483-5518
(612) 786-6909
VICINITY MAP
MATERIALfi.
FORCE:MAIN ~" PVC {C RD0)
SANITARY SEWER -- 8' PVC (SDRS$). 0.4[ MIN. SLOPE
SANITARY SERVICE - 4" PVC (SDRSS)
WATERIdAIN .... 6' 6[ 8' DIP (CL 52)
WATERMAIN SERVICE - 1' COPPER
GRAPHIC SC,AL~
100'
MIDWEST
' 'Land Surveyors & Civil Engineers, lnc
RESTORATION SCBEDUI r
~ INSTALL SILT FENCE
2 BEG~N SIIE GRADING
O STRIP TOP SOIL
b GRADE S~TE
C, TO~DSOIL DISTURBED AREAS
5 SEED AND MULCH DISTURBED AREAS
(W~THIN 14 DAYS FROM COMPLETION OF GRADING)
4 UTIL[TY CONSTRUCTION
5 STREET CONSTRUCTION
6 SEED AND MULCH NEVCLY DISTURBED AREAS
(W~THIN 14 DAYS FROM COMPLETION OF GRADING)
7 INDIVIDUAL BUILDERS RESPONSIBLE FOR EROSION CON'V~OL
AND RESTORATION FOR HOME CONSTRUCTION.
PROPOSED STREET LIGHT
EXISTING UTILITY POLE
EXISTING
EXISTING WATER~AIN
RIVERPLACE
PRELIMINARY GRADING PLAN
IN THE CITY
OF
ELK RIVER, MINNESOTA.
ROCK ENTRANCE DETAIL
NOT TO SCALE
(612) 483-5518 ,-~;~ TYPICAL STREET SECTION
STOI~I BEWER ~If~TATIOfl CONTROL
VICINITY MAP
T~ICAL SILT FENCE I~STALLATIOfl
NOT TO SCALE
GRAPHIC SCALE
'F--- T'F
I" = 100'
MIDWEST
Land Surveyors & CivJl Engineers, Inc.
TYPICAL LOT DETAIL
y of
iver
TO:
FROM:
DATE:
Item # 6.4.
MEMORANDUM
Planning Commission
Steve Ach, City Planne~
October 28, 1997
SUBJECT:
Request by Royal Oaks Realty
for Preliminary Plat Approval,
(Riverplace), Public Hearing
Case No. P 97-16
Request
Royal Oaks Realty is requesting a preliminary plat to subdivide 40 acres into
59 single family lots.
Location
North of U.S. Highway 10 along the Queen Avenue alignment; the East Half
of the West Half of the Northeast Quarter of Section 31, Township 33, Range
26.
Zoning/Land Use
Rib (Single Family Residential) / MR (Medium Density Residential)
Attachments
· Memo from the City Engineer dated October 24, 1997
· Location/zoning map
· Letter from Sherburne County Highway Department
· Minutes from Park and Recreation meeting
· Development plans
Overview
The subject property is a 40 acre parcel of which approximately 14 acres in
either part of the Elk River or islands within the Elk River that experience
flooding. The remaining 26 acres lying south of the Elk River and north of
Highway 10 is proposed to be subdivided into 59 single family lots as well as
reserving 1.8 acres for park purposes. The proposed plat is immediately east
13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425
Memo to Planning Commission/P 97-16
October 28, 1997
Page 2
of Custom Motors Salvage Yard and west of a single family home which is
located on a similar sized parcel.
Roads
The subdivision will be accessed by two new roads off the Highway 10 service
road. The plat also provides for street extensions into the properties on
either side of the plat. The service road along Highway 10 will eventually
need to be upgraded to an urban standard. Staff is recommending the
developers be responsible for upgrading that segment of frontage road along
the front of their property. They may elect to improve the street at the same
time they install the new streets in the plat, or pay the City an amount equal
to having that street reconstructed at a later date along with a larger project.
The service road is currently under the County's jurisdiction, however, the
City has been maintaining this road for several years and is in the process of
having it turned back to the City. The streets extending to the adjacent
properties will be constructed along with this project to avoid any future
surprises for residents.
Existing Structures on Site
The property currently has a single family home, garage and a few accessory
buildings. These structures will be removed to make way for the proposed
development. All septic and wells must be appropriately abandoned and
capped prior to beginning construction on site.
Trees
The property does have existing mature pine trees within the south quarter
of the property primarily around the existing residence. There are also
existing trees along the east and west sides of the property that, for the most
part, fall on the adjacent properties. According to the grading plan the trees
around the existing residence will need to be removed to make way for road
construction and grading of the lots.
Buffer to Custom Motors
The developers are proposing to install a 15 foot landscaped buffer along the
west property line to provide additional screening between this residential
development and Custom Motors. Currently, there are existing trees along
this property line; however, in order to establish an appropriate buffer,
additional trees will need to supplement what is currently in place. The
plans include providing groupings of Russian olive, evergreens and birch
clumps.
fi\shrdoc\planning\pc\p97.16.doc
Memo to Planning CommissionfP 97-16
October 28, 1997
Page 3
Additional Landscaping
Staff has suggested additional landscaping be provided along the south side
of those lots which are adjacent to the service road. This landscaping could
consist of similar materials planted along the Custom Motors site and
provide for some buffering for the residences along this service road.
Park & Recreation Commission Recommendation
The Master Park Plan has identified a neighborhood park for this area. The
Park & Recreation Commission has therefore recommended two acres be
dedicated as part of this plat in a location where the adjacent property, when
it is developed, can add to the two acres to create a total of a 4 acre
neighborhood park. The park shown on the plan is 1.8 acres in size; slightly
less than the 2 acres recommended by the Park & Recreation Commission.
The plat should be adjusted to meet the 2 acre recommendation. The 2 acres
must be outside of the ponding area. The Park & Recreation Commission
also indicated a desire to have Outlot A for public recreational purposes.
However, given the fact that a portion of Outlot A is the river and the islands
do flood, the Park & Recreation Commission was not wilhng to give any park
credit for deeding Outlot A to the City.
Pedestrian System
The Comprehensive Pedestrian System identifies the need for a trail along
the north side of the service road. Therefore, it is recommended the
developer install a 10 foot trail along with this project along that portion of
the property which is adjacent to the service road. Construction of the trail
at this time will not conflict with reconstructing the service road at a later
date. Although the trail doesn't go anywhere at this time, installing the trail
now will avoid any opposition from the neighboring homes.
Lot Dimensions
The current zoning of Rlb requires minimum lot sizes of 12,000 square feet.
The lots adjacent to the Elk River are required to have a minimum lot size of
15,000 sq. ft. measured above the ordinary high water. The shoreland
regulations which apply to this plat require that all lots adjacent to the river
have a minimum lot width of 80 feet both at the setback line and at the
ordinary high water level. Lot 13 does not meet this requirement, therefore,
should be redesigned by eliminating the tail which extends down to the Elk
River. The developer has the option to request a variance to the lot
standards; however, staff doesn't believe the findings for granting a variance
could be met.
f:\shrdoc\planning\pc\p97-16.doc
Memo to Planning Commission/P 97-16
October 28, 1997
Page 4
Ail of the other lots in the plat meet the minimum lot size requirements;
however, according to the drainage plan, some lots have storm water ponds in
their rear yards. Ponds of this nature are typically provided in
developments, however, staff has recommended a reasonable flat and usable
area behind the homes be provided before sloping down into the pond. The
pond between Lots 1 - 6, Block 4 appears to have about 30 feet of flat area
prior to beginning the slope down into the pond. However, Lots 13, 14 and 15
has a distance of only about 20 feet from the high water level of 878.9. The
plat should be adjusted to redesign the pond to allow a little more area
behind the homes before getting to the ponding area.
The proposed design raises a few questions since the river could backflow into
the rear yards up to an elevation of 878 (100 year elevation). In some cases,
this may put the edge of water within 10'-15' of the back of a house, or walk-
out elevation. In addition, the water level could be about 3 feet higher than
the lowest floor elevation. This may present a problem if the water level
doesn't go down in a reasonable amount of time allowing lateral movement
through the soil towards the home's basement.
Floodway & Flood Fringe
Both of these designations apply to the property. The surveyor should
identify and include on the proposed plat edge of the floodway. This is the
actual channel of the watercourse and is the area required to carry or store
the regional flow (i.e., 100 year event). No activity can occur within the
floodway. The plans appear to respect the floodway; however, the boundary
should be noted.
The flood fringe is the area outside the floodway. This area can be filled;
however, the lowest floor elevation must be 879.1 and an elevation of 878.1
must extend for a minimum of 15' around all structures. This may not be a
problem; however, the engineer should denote this boundary on the plans.
The flood fringe on this plat is primarily on the northeast corner of the plat.
Redesign Considerations
Based on staffs concerns with back yard ponds and lowest floor elevations
adjacent to the river back flowing into these areas, modifications will need to
be made to the plat. There are several alternative designs that can be made.
The developers may have a plan at Tuesday's meeting.
fi\shrdoc\planning\pc\p97-16.doc
Memo to Planning CommissionfP 97-16
October 28, 1997
Page 5
Recommendation
It is recommended the Planning Commission review the proposed plat and
provide comments. However, based on the drainage issue staff is
recommending the plat be redesigned and presented to the Planning
Commission at the November meeting. If the Commission wishes to take
action, the following conditions are recommended:
o
o
10.
11.
12.
13.
14.
A DEVELOPER'S AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS
AND CONDITIONS OF ALL THE IMPROVEMENTS.
COMMENTS OUTLINED IN THE CITY ENGINEER'S MEMO DATED OCTOBER 24, 1997 BE
ADDRESSED AND INCORPORATED INTO THE PLANS.
DEVELOPER BE RESPONSIBLE TO CONSTRUCT A 10 FT. WIDE BITUMINOUS PATH
ALONG THE NORTH SIDE OF THE SERVICE ROAD. A CREDIT OF $10 PER LINEAL FOOT
FOR THE TRAIL WILL BE CREDITED TOWARDS THE DEVELOPER'S PARK DEDICATION.
WATER AVAILABILITY CHARGE IN THE AMOUNT OF $300 PER LOT BE PAID TO ELK
RIVER MUNICIPAL UTILITIES. DEVELOPER SHOULD ALSO CHECK WITH ELK RIVER
MUNICIPAL UTILITIES FOR ANY ADDITIONAL CHARGES RELATING TO WATER
CONNECTION OR ELECTRIC FEES.
A SURFACE WATER MANAGEMENT FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE
TIME OF FINAL PLAT BE PAID PRIOR TO RECORDING THE PLAT.
PARK LAND IN THE AMOUNT OF 2 ACRES BE DEDICATED WITH THE BALANCE OF THE
PARK DEDICATION REQUIREMENTS BE PAID IN CASH. THE 2 ACRES DEDICATED FOR
PARK SHALL NOT INCLUDE ANY PONDING AREA.
A LANDSCAPE PLAN BE PROVIDED ILLUSTRATING A BUFFER ALONG THE WEST
PROPERTY LINE AND ALONG THE SOUTH ADJACENT TO THE SERVICE ROAD.
AN NPDES PERMIT BE OBTAINED PRIOR TO ANY GRADING OF THE SITE.
A COMPLETE GRADING, DRAINAGE AND EROSION CONTROL PLAN BE APPROVED BY
THE CITY ENGINEER PRIOR TO COMMENCING GRADING ON SITE.
STREET LIGHTS BE INSTALLED AS RECOMMENDED BY ELK RIVER MUNICIPAL UTILITIES.
APPROVAL FROM THE DNR SHALL BE OBTAINED ACKNOWLEDGING THE PLAT MEETS
THEIR REQUIREMENTS.
APPROPRIATE DRAINAGE AND UTILITY EASEMENTS BE INCLUDED ON THE PLAT.
A DEVELOPMENT PLAN BE PROVIDED AND REVIEWED AND APPROVED BY THE CITY
ENGINEER PRIOR TO ISSUANCE OF ANY BUILDING PERMITS.
THE PLAT SHALL BE REDESIGNED TO INCREASE THE REAR YARD AREA BEHIND LOTS 1
THROUGH 6, BLOCK 4 AND LOTS 13 THROUGH 22, BLOCK 5.
f:\shrdoc\planning\pc\p97-16.doc
Memo to Planning Commission/P 97-16
October 28, 1997
Page 6
15. THE FLOODWAY AND FLOOD FRINGE BE NOTED ON THE PLAT AND ALL
REQUIREMENTS OF THESE ORDINANCES BE MET.
fi\shrdoc\planning\pc\p97-16.doc
Ell~'~R~ver
13065 Orono Parkway · P.O. Box 490
Elk River, MN 55330
LOCATION
ZONING
MAP
CAS~:P97-/~
]V
October 10, 1997
Sherburne County
Highway Department
P.o. BOX 338 · ELK RIVER, MN 55330 · PHONE (612)441-1722 · FAX (612)4.41-2264
Mr. Steven B. Ach
City Planner
Elk River City Hall, P.O. Box 490
13065 Orono Parkway
Elk River, MN 55330
RE: Riverplace Plat, comments
Dear Mr. Ach:
As requested, the following comments are provided regarding the above referenced plat:
The County is in the process of researching the ownership of the service road adjacent to this plat and
considering a possible turnback to the City of Elk River. We should discuss the need for right of way
along this plat, it is proposed at 37 feet, would 50 feet be needed for the future.
Access onto the Service Road will require a permit from this office. Stop signs for A and B Street at the
Service Road will also be required. The stop signs are to be paid for by the developer and installed by our
department. The developer is responsible for notifying the Highway Department when the access has been
installed and is usable by the general public.
Thank you for affording us the opportunity to review these plans. If you have any questions or require
any additional information, please contact me at the number listed above.
Sincerely,
Shelly Pederston, P.E.
Assistant County Engineer
~Meeting Min tes~
September 10, 19971 Page2 j
- - -.
~~tions from the Lafayette Woods 2nd and Cherrywood Hills. Signage will be
placed at 193rd and Proctor stating no motorized vehicle traffic is allowed.
Discussion followed regarding access fo the properties south of 193rd if
development were to occur.
COMMISSIONER WESTRUM MOVED TO RECOMMEND CONSTRUCTION OF A 10 FT.
WIDE BITUMINOUS TRAIL AS PART OF THE RESTORATION OF 193RD, AND A 12 FOOT
WIDE TRAIL ALONG THE ABANDONED RAILROAD RIGHT OF WAY CONNECTING WITH
WOODLAND TRAILS. COMMISSIONER MADSEN SECONDED THE MOTION. THE
MOTION CARRIED 5-0.
5.2. Phoenix Enterprises Request for Preliminary Plat (Hillside Crossinq Four)
Steve Ach indicated this request involves replatting Outlot A of Hillside Crossing (7
acres) into two commercial lots; one lot .8 acres and the remaining lot 6.2 acres.
The Park and Recreation Master Park Plan does not indicate any park land
needed for this area, and staff recommends a cash payment of park dedication
fees.
COMMISSIONER OLSON MOVED TO RECOMMEND CASH PAYMENT TO MEET PARK
DEDICATION FEES FOR THE HILLSIDE CROSSING FOUR PLAT. COMMISSIONER
MADSEN SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.3. Phoenix Enterprises Request for Preliminary Plat IHillside Crossinq Five)
Steve Ach indicated this 3.5 acre plat will create two commercial lots.
The Commissioners and staff discussed possible locations for a trail corridor. It was
the consensus of the Park Commissioners to extend a trail along the NSP
easement, over to the north side of the "no cut" property line up to Evans Street.
COMMISSIONER MADSEN MOVED TO REQUEST THE DEVELOPER OF THE HILLSIDE
CROSSING FIVE COMMERCIAL PLAT PROVIDE AN EASEMENT TO THE CITY COVERING
THE 50 FT. WIDE "NO CUT" STRIP ON THE NORTHERN PORTION OF THE HILLSIDE
CROSSING PLAT FOR TRAIL CONSTRUCTION, AND TO CREDIT THE DEVELOPER FOR
TRAIL CONSTRUCTION COSTS TOWARD PARK DEDICATION FEES. COMMISSIONER
WESTRUM SECONDED THE MOTION. THE MOTION CARRIED 5-0.
5.4. Discuss Park Issues in Hillside Estates
The Commissioners and staff discussed projected park needs in the Hillside Estates
development. The developer, Rick Foster, was present to provide suggestions for
location of some type of park area. It was the consensus to give further
consideration to a centrally located 2 acre park, preferably adjacent to NSP
powerline easement, with street and trail access for residents in the development.
5.5.
Discuss Concept Plan by Royal Oaks Realty
Steve Ach explained Royal Oaks Realty is considering development of a 40 acre
parcel lying north of Highway 10 and immediately east of Custom Motors Auto
Salvage. Steve indicated the northerly 15 acres is probably undevelopable
Howard R, Green Company
CONSULTING ENGINEERS
October 24, 1997
File: 801610j-0240
~ ~rmer/y MS, A
~?o~sulEng Engineers
Mr. Steve Ach
City Planner
City of Elk River
13065 Orono Parkway
P. O. Box 490
Elk River, MN 5530-0490
RE: RIVERPLACE ADDITION PLAT REVIEW
Dear Mr. Ach:
As you requested, we have reviewed the submittal package for the Riverp[ace Addition. This
proposed plat is located on the north side of TH 10 just east of Custom Motors. The submittal
package was prepared by Midwest Land Surveyors and Civil Engineers, Inc. and consis,ted of a
preliminary grading plan, preliminary utility plan, and a preliminary plat and landscape pian. All
three contained revision dates of October 20, 1997. Based upon our review, comments
received at the staff review meeting, and a meeting held with the developer, their surveyor, and
engineer, we would offer the following comments.
A. General
One issue that needs to be addressed with this plat is home lowest floor elevations
relative to the Elk River 100-year flood elevation. The City Floodplain Ordinance
requires the lowest floor be one foot above the 100-year flood elevation. According to
their plan, the 100-year flood is at 878.1. Because of their storm drainage system with
two ponds and pipe connecting them, the 100-year flood could actually get further onto
the property after development than before. We would suggest that all lots impacted by
the 100-year flood be identified and their lowest floor meet or exceed the one fool above
requii-ement. Currently, there are numerous lots impacted by the 100-year flood that
have lowest floors below this elevation.
B. Preliminary Grading Plan
The rear lots of Block 3 appear tO have a drainage swale that flows from south to
north, and is at less than 1% grade. 1% is the minimum grade acceptable for
any overland flow.
At the south end of Block 2, near the TH 10 service road, it is unclear how
drainage will get from the side yards to the street/storm drainage system. This
entire area appears to be fiat.
O:',~RO.P, g01610j\610-2306, oct. doc
S0/E0 ' d
October 23, 1997
Mr. Steve Ach
Page Two
It is unclear how the rear yards of Lots I - 4, Block 5, will drain. This entire area
appears to be treed and relatively fiat. Some type of positive drainage has to be
provided in this area.
The rear yards of Lot 8, 9, and 10, Block 3, have a relatively steep sic:e slope
shown. It appears that this side slope is almost 1:1. No grade greater than 3:1
should be allowed in this area.
The rear yard drainage across Lots 6 and 7, Block I appears to flow through the
middle of the rear yards and not along the drainage and utility eas¢~ments,
provided at the perimeter of the lot. if this is to continue, additional easement will
be needed on these lots. It would be advisable to actually move the drainage to
the rear lot drainage and utility easement. In cases where this (:trainage
easement is provided, across the middle of the back yard, there cc. uld be
problems with variances or easement vacations required if the homeowner wants
to put on a deck or expand the home.
Where the storm drainage pipe from the southerly pond flows across to the
northerly pond between Lot 1, Block 4 and between Lots 20 and 21, Block 5, the
emergency overflow elevation should be noted.
The northerly pond shows a high water elevation of 878.9. This would provide
for flooding of the rear yards of Lots 15 - 20, Block 5. Additional ea,'~ement
should be provided for this area as it would be inundated in the 100-year fi,sod.
Detailed drainage calculations have been provided. However, we have riot had
SUfficient time to adequately review them for this memo. I hope to have them
reviewed prior to the Planning Commission meeting.
The grading plan shows a temporary cul-de-sac at the east end of SI'met C
located partially in the park area. However, the grading plan does not indicate
any grading for this cul-de-sac. The grading plan should be revised to indicate
the grading necessary for this temporary turn around.
The grading plan indicates drainage from Block I flows across the park through a
swale, out to Street C. This does not appear to provide for a very usab'~e park
area with the drainage swale that is provided. Some other means of providing for
the drainage should be considered which would allow the park area to be
relatively fiat for park uses.
C. Preliminary Utility Plan
This plat will receive sanitary sewer and water service from the utilities th~lt were
jacked under TH 10, along the east line of the Sherbume County Government
Center property, with the Western Area Phase 2 improvements. Essentially,
water service will be provided through a long dead-end relying .on the c~ossing
under TH 10. An analysis of the water pressure and fire-fighting capability
indicates that it is not necessary to loop the water system on the north side of TH
10 for service to this development.
O:\PROJ~801610j\610-2306.oc~.do¢
Howard R. Green Company
CONSULTING ENGINEERS
October 23, 1997
Mr. Steve Ach
Page Three
When we met with the developer and his engineer we provided several
comments regarding minor modifications to the utility system. All these c'~anges
have been made with one exception; the hydrant shown between Lots 21 ;and 22,
Block 5, should be moved to the south east corner of Lot 22.
Based on a staff comment, the plat now provides for street and utility access to
the west for the Custom Motors site. The street access has been provided at the
mid point between Streets A and C. This puts three intersections in relatively
close proximity to each other. The closest of these intersectio,~s are
approximately 170 feet apart with the other two intersections over 200 feet apart.
We feel that this should be acceptable in this instance because of the limited
amount of property to develop to the west. Therefore, there is a limited amount
of traffic that will access these intersections. We felt that this access poirt to the
west was better then lining up with Street C which would provide for straight 'cut-
through" opportunities when the whole area is developed. The straight streets
tend to lead to complaints regarding the speed of traffic through neighborhoods.
The plan shows a 10-foot wide bituminous trail along the south plat boundary on
the north side of the service road.
One issue that has yet to be resolved is what should happen with the service
road relative to this development. Clearly, as this whole area develops, there will
be a need to rebuild this road. This road should, at some time, be rebuilt to a
City standard section, 32-foot wide with concrete curb and gutter. It may be
more appropriate at this time to require the developer to pay an amount of money
equal to his share of the rebuilding of the frontage road. At some poin'! in ',.he
future, probably when the watermain needs to be relooped, reconstruction of the
entire frontage road from Naples Street to the west connection with T~ 10 will
take place.
D. Preliminary Plat and Landscape Plan
The landscape detail shows boulevard trees being planted every 60 feet, 6 feet
into the lots. We would suggest that these trees be 10 feet into the lots, to keep
them out of the drainage and utility easement provided along the front of e~ch lot.
Along the rear lot lines of Lot 6, 7, and 8, Block 5, additional drainage ea.~sement
needs to be provided based on the grading plan.
The drainage and utility plan along the rear lot lines of Block 3 need.~ to be
clearly called out. In this area there is a 15-foot landscape buffer planned to be
planted, with the drainage and utility easement provided inside of this buff~;r. The
drainage and utility easement should be labeled in width and location.
Consideration should be given to whether or not the City is interested in having a
separate document that provides for a landscape easement. Where the
landscaping is planned along the south plat boundary and the rear lot lines of
Block 3. as it stands right now, a homeowner on any one of these Iot.~ would
have the right to remove the landscaping that is planned to be planted. If
Howard R. Green Company
CONSULTING ENGINEERS
O: \PROJ'~8016 I0j\6l 0-2306.oc[.d~c
S0/~0' d
SO'd qW±O±
October 23, 1997
Mr. Steve Ach
Page Four
separate landscape easement is provided, it would preclude the future home
owners from removing this vegetation.
Glen Sundeen from the Municipal Utilities has suggested that seven street lights
be provided with this plat. These should be located at the south end of S~:reet A,
at the corner by the park on Street A, at the south end of Street B at the
intersection of Streets A and B, at the intersection of Streets B and C, at the rear
of the cul-de-sac on Street B, and at the curve located by Lot 17 Block 5
If you have any questions regarding any of these comments, please call.
Sincerely,
Howard R. Green Company
TJM/ot
OAproj\801610~610-2306.oct
O:\PROJ\8016 lOj\610-2306.oct, do¢
S0/S0 ' ~
Howard R, Green Company
CONSULTING ENGINEERS
£66~-~-130