Loading...
6.3. SR 11-24-1997ITEM 6.3. ~,ty of iver MEMORANDUM TO: FROM: DATE: Mayor and City Council Sandra Thackeray, City Clerk November 24, 1997 SUBJECT: Review of 1998 fees The City reviews its fees for services on a yearly basis to ensure that fees charged are sufficient to cover services rendered. The 1997 fees have been reviewed by the City Staff. Attached is the 1997 fee schedule. The proposed changes for 1998 appear in red and blue, (red indicates additions) (blue indicates deletions). Staff is proposing minimal changes to the schedule in 1998. Please note that the Surface Water Management Impact Fee is explained in an attached memo from the City Administrator. This issue is presented to the council for discussion. The schedule itself will be adopted on the annual council meeting by resolution. \\elkriver\sys\shrdoc\council\feememo.doc 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 ° TDD & Phone: (612) 441-7420 ° Fax: (612) 441-7425 _,ty of River MEMORANDUM TO: FROM: DATE: Mayor and City Council Pat Klaers, City Admini November 24, 1997 SUBJECT: Surface Water Management Impact Fee Ever since the City established the Surface Water Management Impact Fee with the adoption of Resolution 94-110 on October 24, 1994, staff has expressed concerns over this fee being too low. When a subdivision is approved, a SWM Impact Fee is collected from the developers, but this is a very small amount of money compared to the total cost of trunk SWM improvements that are typically necessary and compared to the benefit the development receives. The SWM tax levy pays the balance of the improvement expenses and this is acceptable as there are city-wide benefits for trunk improvements that are located in development projects. One concern expressed by staff relates to how low the City SWM Impact Fee is as compared to other developing communities. The balance between city- wide benefits and expenses and developer benefits and expenses is the concern. The attached material from the City Engineer in 1994, the City of Ramsey from 1997, and the City of Otsego from 1995 all show that the Elk River impact fee is significantly less than what other communities collect. It is understood that our City fee could be somewhat less based on additional funds being available through the city-wide SWM levy, but the current level is still believed to be too low. Another concern relates to having sufficient funds available to construct the necessary trunk SWM projects that are dictated by developments. As the Council knows, the SWM fund started off approximately 2 million dollars in the hole due to the major projects that were approved in the early 1990s. These projects included the Highway 10/101/169 interceptor, Deerfield III, Westwood, County Road 12/13, Western Area Phase II, and the Main and Evans area (Ditch 10). Financially, the SWM fund in 1997 has just completed repayment of all the internal loans due to other City funds, however, the fund still has only a very small amount of money available annually for new projects due to the annual debt payments on past projects. All but approximately $55,000 of the SWM levy annually goes toward the 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 debt from past projects. One repayment plan runs through the year 2009 and another repayment plan is completed in the year 2002. In this regard, there will not be monies of any significance available for additional projects until at least 2002. In 2002, an extra approximately $150,000 per year will be available provided the Council continues the tax levy. One thing that has helped our current financial status is the fact that no major projects were necessary in 1997. However, surprises in surface water management can happen at any time which require expenditures of City funds. Known projects on the horizon include Ditch 28, Business Center Drive extension and Waco Avenue, the Core Village area including the 4th and Norfolk area, County Road 12 project in 1998, and the east Elk River project including Ditch 10 and the connection between 171~t and County Road 12. If any of these proiects move forward before 2002 and significant SWM trunk work is necessary, then the current amount of levy annually available will have to go towards a long term bond which will leave nearly zero funds available until around the year 2002. Overall, this is a very difficult public improvement and financial situation, but we are starting to make progress. Additionally, it is difficult to add more expenses onto development projects, but any additional expense is clearly justified and directly related to the benefit the developer receives. When looking at the Ramsey, Otsego, Burnsville, Lakeville, and Lino Lakes information from a few years ago, a large increase on our SWM impact fee is not out of line. s:\council\swmfee.doc A RESOLUTION OF THE CITY OF ELK RIVER A RESOLUTION ESTABLISHING THE SURFACE WATER MANAGEMENT IMPACT FEE RATES WHEREAS, WHEREAS, WHEREAS, WHEREAS, the City of Elk River has a need for surface water management throughout the community; and the City of Elk River has completed a surface water management study; and the surface water management study has assisted the City in determining which drainage improvements are necessary to help eliminate the most urgent surface water management problems; and the City has determined to fund the surface water management improvements through a variety of funding sources including a Surface Water Management Impact Fee; and WHEREAS, the City has determined that this Surface Water Management Impact Fee should be collected from the property owner at the time of platting, or in the case of existing lots, at the time of issuance of a building permit. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Elk River Minnesota: o The Surface Water Management Impact Fee for all rural (non-city sewer and water) single-family residential lots shall be $60.00 in 1994. On January I of each succeeding year, the rate shall increase three percent (3%). The Surface Water Management Impact Fee for all urban (city sewer and water) single-family residential lots shall be $120 in 1994. On January 1 of each succeeding year, the rate shall increase by three percent (3%). The Surface Water Management Impact Fee for all non- single-family residential property shall be $720 per acre in 1994. On January 1 of each succeeding year, the rate shall increase by three percent (3%). Passed and adopted by the City Council of the City of Elk River this 24th day of October, 1994. // Februm'7 25, 1994 1326 EnerD' Fo;k Drive D. l~oul, ~q 5.5106 61 ~r.x: 612.6~Z.?~6 Mr. Pat K]zers City Administrator City of Elk River 13065 Orono Parkweay Elk River, MN 55330 RE: STORM SEWER IMPACT FEE Dear Mr. Klaers: This is a follow-up' io my February. 24,..!994, memo ~n which ! summarized our findings from a survey of seve/al metrb-Iiolitan communities. In that particular memo, I neglected.to include specifics or~ the impact fees charged by some of the metropolitan communities. As you will recall, the memo indicated that four of the communities we contacted in the metro area do have impact fees. We were able to recontact three of them and get the specifics on - those. The following table lists the costs i~er square fo__.ot charged by the Cities of Burnsville, Lakeville, and Lino Lakes. ~ I ~keville I,inn T ~lre~ Single Family $0.11 $0.105 $0.10 Multi-Family 0.15 0.116 --- Churches 0.15 --- -'- Commercial/Industrial 0.17 0.147 0.14 As you can' see. from these three communities, a typical single family lot of 10,000 toL. xd 15,000 Square feet would pay $1,000 to $1,500. On the other end, commercialJindustrial /v'-~x property would pay on the orde; of $6,000 to $7,500 per aCre. These rates are roughly~ ten times higher than those being contemplated by the City of Elk River. t/ It is our understanding that these communities s_.~l!_require the developer to build lateral facilities within the developments and the'impact fees are used for tru~lities and/or any oversizing of the internal lateral hciiifies. 2 The Ramsey City Council met on Tuesday, June 24, 1997, and heard comments from residents on 149th Avenue ab, he large amount of traffic in the area. The Road and Bridge Committee, which consists of three members of Council, will place this issue on a subsequent agenda for discussion. Council was presented with a petition proposing a Charter amendment stating development standards to mitigate the impact high density residential development may have on existing lower density neighborhoods. Council conducted a public hearing to levy assessments for utility and street improvements to Azurite Street. One hundred percent of the landowners on the unpaved portion of this street requested the improvement. No negative input was heard and Council adopted the assessment. Council heard a request for final plat approval of Nordvik Addition which is a split of one lot into two equal lots in HY-10 Ramsey Addition. Council tabled action pending further review by the City Attorney. Council approved the preliminary plat of Apple Ridge contingent upon an environmental review determination. Council authorized the purchase of an 83-acre park parcel contingent upon receipt of park dedication funds fro he Apple Ridge subdivision. This parcel is north of the ,~anty ditch adjacent to T.H. #47. The property has access off 163rd Lane to the west and the T.H. #47 frontage road off 160th Lane to the south. An ordinance was adopted in November 1996, requiring that the exterior finish on all residential, commercial, and institutional structures and accessory buildings be completed within one year of the start of the xvork. All permi'ttees ~vere notified of this action in January. There were 30 parcels subject to the ordinance requirements. In April, a second notice was given and as of June 16, there are 13 properties not in compliance. Council granted an extension to compliance with the siding ordinance to October 31, 1997. Council adopted an ordinance to amend Chapter 9 of'the City Code to identify permitted and accessory uses in multi-tenant buildings or business incubators located in the Business Warehouse and Industrial districts. Council awarded the contract for engineering services for the development of Alpine Park. The initial phase of the development will be the construction of five ball fields and an off-street parking area to service those fields. Council accepted the 1996 Comprehensive Annual Fi~. iai Report and authorized the Finance Officer to submit the report to the required agencies and to also submit it with application for the Certificate to the Government WHAT'S HAPPENING Government Finance Officers Association of the United States and Canada. Council scheduled Finance Committee Work Sessions for the 1998- 1999 General Fund Operating Budget. Council received a recommendation from the City Attorney to repeal the ordinance establishing a development assessment fee on all new subdivisions. Council did repeal such ordinance. Council amended the 1997 Schedule of Rates and Charges adding a park trail development f~e of $100 per unit on residential subdivisions and a storm water trunk ._char. ge of $350_per unit on residential subdivisions and ._$3.500 per acre on commercial and industrial subdivisions. Council also amended the rates and charges to reflect a yearly antenna lease rate of $12,000. Council was presented with a map showing a landlocked parcel which the City owns along Front Street, which is now known as Riverdale Drive. Council granted an ingress and egress driveway permanent easement across the parcel on the south side of the Econ Marketing property to Econ Marketing. Council donated one of the City's used computers to the Fish Pond, which is a youth center in Anoka. Council met on Tuesday, July 8, 1997, and received a petition to consider a cul-de-sac on 149th Avenue. Council discussed the fact that the extension of County Road #116 would aide in alleviating some of the traff~c problem in this area. Citizens were urged to contact their County Commissioner to let him know how important this extension is to the City of Ramsey. Anoka County SheriffLarry Podany gave a brief presentation of the workings of his department and the teamwork between them and the Ramsey Police Department. Council received a report relating to an EAW for Apple Ridge and voted to not take action due to the absence of two Councilmembers. Council discussed a park in the proposed Apple Ridge subdivision and directed that this issue be discussed by the Park and Recreation Commission. Council authorized entering into an agreement with a consulting firm to conduct the Comprehensive Plan Update. Council reviewed a draft of a right-of-way ordinance as it pertains to utility companies. They directed that the City Attorney review this ordinance and bring back a recommendation at a subsequent meeting. Council conducted a public hearing with regard to a grant from the Minnesota Investment Fund for the Northstar Die Casting facility. This grant is based upon the retention of jobs and creation of new jobs. The program is funded by the Department of Trade and Economic Continued on Page 9 The strQngest human ep, otion is neither love aor hate but the unquenchable urg. e t.o share a secret~.~.._.,.. CITY NEWSLETTER Back Row: Ryan Schroeder - Ramsey C#y Admin Economic Development Commission; Tom Gamec - Douglas Jones, Elliott Ostertag, and Duane Jones Ken Wagner- Ramsey Pat Walker, ~Cent Home & Kitchen Center; Scott Quering and Jim Winkels - AMCON. Lydia Scheiber Ramsey Economic Development Commission, Central Minnesota Development Corporation, Nancy Jones - AcCent Home & '~en Center, Dan Bartho - Americana National Finance, and Colin Evenson - Ad WELCOME TO ACCENT HOME & KITCHEN CENTER The City of Ramsey is proud to announce the new 48,000 square foot facility for AcCent Home & The building will be located in the Ramsey Business along McKinley Street N.W. The project is the result of the joint cooperati~ & Kitchen Center, AMCON Construction Development Company, and the City of Ram: ,. example of how the City, through the developed Home Minnesota "This is another partnerships, can provide for the growth of the industrial base of the community and the growth ora local company," stated ayor Tom Gamec. He also noted that the City of Ramsey now has 2 ,000 square feet of industrial projects currently under construction, makes 1997 the second most active year ever, with more than onths remaining in the year. Duane Jones, ~itchen Center president, started the company as D & E Cabinet Millwork, Inc. in his garage in 1966. By 1969, the business grown the garage, basement, and an addition, and a separate building was constructed. In 1978, to better serve customers, sales was separated from manufacturing and AcCent Home & Kitchen Center, Inc. was introduced. AcCent was located in Anoka and primarily operated as a retail sales location for products produced by D & E Cabinets and Millwork, Continued on Page 3 IT 1997, , rME 12, NO. 7 ARE INVITED TO DISCUSS IDEAS FOR RAMS//EY'S COMPREHENSIEE P~AN~ The City is pmnning several opportunities for citizen mt during the process of developing Comprehensive Plan. The first an infomaational meeting at City Hall on' September 4 at 7 p.m. The secon, pportunity is a "visioning" Ramsey Elementary School on September 18 from 7 p.m. to 10 p.m. Members of the public are welcome at and there is no charge. In order ensure adequate seating, materials and refreshments, you are encouraged to pre-register for the September 18 meeting by calling 427-1410 and giving your name. Your name tag will be waiting for you when you arrive at the meeting and you won't need to wait in line to register. Municipalities in the seven-county .h~tr. opolitan area are required to adopt and imi~ment Comprehensive Plans to ensure though~ul, long-term planning to deal with land use, trarl~ortation needs, and environmental protection. X~oning ordinances and development policies are bexhicles cities commonly use to make certain t'l~re is conformance to the comprehensive pla~. With the conhoxued high rate of growth during the past decad'ox, Ramsey's existing comprehensive plan has'xb~come outdated. R~ly the City Council co'nl,(acted with the consulting firm of Hoisington Keogler Group, Inc. to facilitate the updating process, which is expected to take 12 to 18 months. The tentative schedule of activities involved in updating the plan include data collection and review during July, August and Continued on Page 3 Page 4. Mayor Freske asked tbout the Stop Sign situation in Island View. Mr. into this. will check CM Black motioned to table this City Attorney is not at this Meeting. Motion carried. until thc City Council Meeting since the by CM Fournier. All in favor. Mayor Freske noted this was sub-committee is in corn Freske said yes. roved by the City agreement with th/s contract. t. CM Fournier asked if the CM Black and Mayor CM Black motion to authorize Mayor Freske to enter into the with Bonestroo for sewer study with the City of Dayton and Frankfort Township. Seconded by Heidner. All in favor. Motion carried. Elaine B~ noted there will be a sub-committee meeting on October 12 at 7 PM. She will know where. 7.3 Resolution Re: VanTatenhov~ I~ Mayor Freske asked Mr. VanTatenhove if heX'-is ax~ar~ussions regarding the $1,000. per acre for impact fees and if he has any questions. Mr. VanTatenhove'said he feels like all of this is over-kill on his project. This is a sandy area, the impact fees will kill his project. He had this project pre-sold to Ziegler Construction but doesn't think it is feasible compared to other projects in the area. His p~chase agreem~ent with t_he property owners, if it doesn't work out feasibly, will be null 'ax,.d void. Mr. VanTatenhove asked if he would have to have the black topping done in order to get Building Permits next Spring, he would like to do only the first lift this Fall. Another problem is getting the utilities in. He could get the grading done this Fall. The Council discussed the issuing of building permits, road escrow and pointed out to Mr. VanTatenhove he will start running into storm water impact tees with other communities. The Council suggested that Mr. VanTatenhove discuss these issues with the City Engineer, who should be available in a week, and with Elaine Beatty. CM Black motioned the approval of adoption of the Resolution. Seconded CM Fournier. All in favor. Motion carried. 1 Otsego City Council Meeting of September 25, 1995, cont'd. Page 3. CM Fournier stated the concern of the size of the original plat submitted. The Church addressed the size issue concern and have also responded to other issues of removin,2 the ball fields and submitted the septic information. CM Fournier commented also on th~ concern of future expanding which he doesn't see as a problem. He feels that when a Church reaches a certain point, they split. If the building was to be left empty, and if this area is truly a commercial one, there would be no problem. CM Fournier recoenized the lost in tax base but felt you can't compare that to what a Church can do for a C~ommunitv in terms of their special programs, se,wes as a place of gathering which contributes sociailv and spiritually to the lite of the community. CM Fournier stated, having a Church in the Community gives a positive effect on moral attitude which affects the quality of life. CM Fournier supports Christ Lutheran Churches requests. CM Black opposes this motion based on his previous statement. Mayor Freske motioned to send the Request for Preliminary and Final Plat Approval back to the Planning Commission. Seconded by CM Fournier. CM Fournier withdrew his second. Mayor Freske withdrew his motion. Discussion: CM Black opposes this motion for the reason of not delaying this any further. Bob Kirmis stated that if the rezoning would have been denied, then it should have gone back to the Planning Commission. CM Black motioned to approve the adoption of the Preliminary and Final Plat of MRD Commercial Park. Seconded by CM Heidner. All in favor. Motion carried 5 to O. 6.2. I--Iilary Barry. and Wilfred Lindenfelser PID #118-500-284300. in Sec. 28. Twp 121. R23. located on CO Rd 37 and Odean Ave NE, Request for Final Plat approval_ Mr. Kirmis stated that the applicants are requesting Final Plat Approval of Lin Bar Estates. The City Council approved the rezoning at their August 28, 1995 Meeting. Mr. Kirmis recommends approval subject to the conditions in his attached report. Kevin Kielb recommends approval of the Final Plat subject to the incorpor&tion of the items listed in his September 21, 1995 Report. Mr. Kielb noted he has discussed these issues with the applicants. Action CM Fournier motioned to approve the Final Plat for Lin Bar Estates subject to the conditions outlined by the City Engineer and City Planner. Seconded by CM Ackerman. All in favor. Motion carried. CITY OF ELK RIVER 1997 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION: ANIMAL LICENSES Cat Dog Duplicate Cat or Dog License Residential Kennel Commercial Kennel AUDIO/VISUAL Dubbing Audio Tapes Dubbing Video Tapes Video Operator $15/each $5/2 yrs $10/2 yrs $2.oo $50/year $75/year $5 per tape (must provide own tape) $10 per tape (must provide own tape $75 first two hours then $25 per hour ($75 minimum) BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, multifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMITS - regular Special Residential Special to Clear Land Special Daytime $50/10 lanes $5/each additional lane State permit fee, UBC Table lA, plus 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee Schedule Exhibit C plus State Surcharge City permit fee Schedule Exhibit B City permit fee ScheduleSc-hedc-de Exhibit A $24/year City permit fee Schedule D $0 $1o $25 $25 City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 CIGARETTE: COMMUNITY PROFILE: COPIES CUPS (ELK RIVER) DOCUMENTS: Audit Budget City Code Copies Growth Management Plan Housing Maintenance Ordinance Meetin.q Packets Microfilm Sign Ordinance So!id Waste Ordinance Subdivision Ordinance Zoning Ordinance FALSE ALARMS Fire Other FLAG - (City) GARBAGE HAULER LICENSE: GRADING PERMIT: LIQUOR LICENSE: Club Intoxicating On Sale Intoxicating Sunday On Sale Investigation Fee Corporation Single Non-Intoxicating Off Sale Non-intoxicating On Sale Set Up Wine Temporary Non-Intoxicating Temporary Intoxicating MAPS: Aerial Photos Page 23 $25/year $.20/ea. $. 15/ea. .50 $0 $75 $.25/page $25 $5 $7/packet $1/Der pa.cle $5 $10 $25 $150 for 4th alarm $50 for each successive alarm after the 4th $50 for 5th alarm $32 each $60 1st truck pluls $15/each additional truck $25 plus City Consultant fees if required to process application $300/year $4,000/year $200/year $250 $150 $75/year $225/year $75/year $650/year $20/day $20/day $6/sheet City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 Aerial Topography Maps Large Base, Zoning or Land Use Map Medium Base or Zoning Map Medium Base Ward Map MARKETING BROCHURE: MASSAGE ESTABLISHMENT: Initial Fee (Includes Investigation Fee) Single Corporation Partnership Renewal Fee MASSAGE THERAPIST: Initial Fee (includes Investigation Fee) Renewal Fee MECHANICAL AMUSEMENT: Mechanical Rides Pin Ball Games Pool Tables (Coin Operated) Video Games MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95~89) Residential Commercial Industrial PARK RESERVATION FEE DEPOSIT: Residents Arts Council Community Education School District Large Community Events Page 3g $15/per acre $3 $2 $2 $3/ea. $20O $3oo $3oo $150 $150 $100 $35/ride $35/machine $35/table $35/game $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined ~ ~n/,~1 .... I1~ ..... H' 1/!/96 ¢:4nn/,..,I,,,~llJn~ ~ ~ni.I- 1/1/07 $650/dwelling unit - 1/1/98 $!,750/per acre I/1/96 $2,000/per acre - !/!/97 N/A $50 $100 $100 $100 $500 (Deposit refundable if picnic area is cleaned following event. City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 PARKING FINES (see Resolution 97-30) Overtime Parkinq Prohibited/Improper Parking No Parkinq 2 a.m. to 6 a.m. Winter Parking Ordinance Other Fire Lane/Hydrant Handicap Parkinq Only PARKING STICKERS: (Railroad Parking Lot) Commuter Parking PAWN SHOPS: Investigation Fee PINS: (Plastic-Elk River) (Metal-Elk River) RENTAL DWELLING LICENSE SEPTIC INSTALLATION: SEPTIC REPAIR: SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure -(Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATER MANAGEMENT IMPACT FEE: (3% annual increase) (see resolution 94-110) Page $5 $10 $10 $1o $1o $15 $2oo $12/space 3 stickers/space maximum $12/space 1 sticker per space $12,000/year $1,500 $.35 each $2.50 each $12/dwelling unit $6O $3O $1,300 $30 $90 $15o $10 $2000 plus cost to review license. Amount of annual cost incurred by city to monitor and inspect the facility plus the license. $25 $68.8366.83 per residential lot(rural) $137.69 ! 33.68 per residential lot (urban) $826.10~ per acre multifamily, commercial and industrial) City of Elk River Fee Schedule Resolution 97-2 Effective January 1, 1997 TRANSIENT MERCHANT LICENSE: WATER ACCESS CHARGE: (Contact Municipal Utilities-441-2020) WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) WETLAND DRAINING OR FILLING PERMIT: ZONING/PLANNING APPLICATIONS: Administrative Subdivision Conditional Use Permit Commercial/Industrial Residential Amendments and Renewals Requiring Public Hearings Easement Vacation General Zoning Requests Multiple Principal Buildings Nonconforming Sign Alteration Ordinance Amendment Plats Permitted Home Occupations Planned Unit Development (PUD) Site Plan Review Variance Zone Change s:document/fees.doc $50/year $3oo $7001,050 $75 plus City Consultant fees if required to process application Page 5g $150 plus Park Dedication if applicable $300 $100 $75 $150 $5O $200 plus Park Dedication if applicable $110 $300 $500 + $5 per lot over 50. $15 Charge for planning applications that are necessary for PUD, i.e. CUP, Rezoning etc. $250 $15o $25o Exhibit A City of Elk River Fuel-Gas Piping Permit Fees The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the apphcant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each appliance so provided for shall, except as herinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. (B) Where any such permit is issued for roughing in of fuel-gas lines for future appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines. (c) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. ORD-fuelfoz EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION, ARq) AIR CONDITIONINC PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING. %rENTILiTION, AND AIR CORrDITIONING APPLLiNCE ITEMS, CONNECTIONS OR APPENDAGES For any permit for the installation, alteration, or repair of the above- referenced items, the fee shall be one percent (1%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. ordin-da/bz EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Dechs $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.00 plus state surcharge Fireplaces and Wood Stoves $20.00 plus state surcharge $15.00 plus state surcharge for a burning appliance installed into an existing chimney Garages and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-Roof Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.00 plus state surcharge 3 Season Porches $40.00 (x) square footage = valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures Moving structures in - $150.00 plus state surcharge Moving structures out - $35.00 permit fee s:\b&z\fees.doc EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing an), permit for the installation of any plumbing work, fixture, or device, shall require the payment by the apphcant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00) BASIC FEES (A) The fees for all plumbing permits shall be computed on the basis of the number of fixture openings, plumbing fixtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fixture so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fixture installed or replaced or set only (no waste or vent piping), the fee for each such fixture shall be Six Dollars ($6.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed £Lxtures, which are to be installed or set later, a fee of Six Dollars ($6.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (c) For the purpose of this article, a plumbing fixture shall be taken to mean and include any sink, laundw tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK-UP PERMIT Building Sewer Plant .............................................................................. $18.00 Curb Stop Water Connection Permit ..................................................... $21.00 Abandoning or Repairing Water Service Permit .................................. $21.00 Storm Sewer Connection Permit and Inspection Fee ............................ $18.00 ALTERATIONS~ REPAIRS City of Elk River Plumbing Permit Fees-Exhibit D Page 2 For each permit for the alteration or repairing of existing plumbing work not included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated cost of such proposed work. For each additional Five Hundred Dollars ($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty- five Cents ($6.25) shall be added to the above described fee for such permit. b&z\ord-plum.doc