Loading...
4.4. SR 12-22-1997Howard R. Green Company CONSULTING ENGINEERS December 19, 1997 File; 230321j (0045) ITEM 4.4. Formerly MSA Consulting Enginee/.~ Mr. Pat Klaers City Administrator City of Elk River 13065 Orono Parkway P. O. Box 490 Elk River, MN 55330-0490 RE: GAGNE PROPERTY RIGHT-OF-WAY BUSINESS CENTER DRIVE IMPROVEMENTS Dear Mr. Klaers; As you are aware, we met earlier this week with Mr. Bill Gagne relative to the easement needed for the Business Center Drive improvements. Mr. Gagne indicated that he was reluctanL, at this time, to sign the easement. He indicated that he was unsure whether Mr. Chuck Christian would be able to put together an industrial project on his property and actually com:lude a purchase of the property from Mr. Gagne. Based on this information we discussed the timing of the project and concluded it would be in the City's best interest to initiate condemnation proceedings. As you are aware, there are 90 days required for a "quick take" of the property. Given time for city Council action and the attorney to prepare the legal documents, it is more realistic to think of 150 days before we would have access to Mr. Gagne's property to construct the improvements. Attached for the City Council's consideration is a resolution that would initiate the condemnation proceedings. We are hopeful that during this process, Mr. Gagne and Mr. Christian will come to a resolution on the purchase of the property and Mr. Gagne will therefore be willing to give the necessary easement. If that does not occur, this action will enable us to keep the project on the timetable laid out and begin the construction of the improvements in the late Spring cr early Summer of 1998. If you have anY questions regarding any of this information, Please call. Sincerely, Howard R. Green Company Terry J,4~l§urer, P.E. TJM/et O:~oroj~ 30321X321-1906 .dec 1326 Energy Park Drive · St. Paul. MN 55108 · 819/R44-a.~a ~- ~,~/e,, n,,,, ................... RESOLUTION FOR THE CITY OF ELK RIVER RESOLUTION 9% A RESOLUTION RELATING TO FINDING OF PUBLIC PURPOSE FOR THE ACQUISITION OF THE EASEMENT AND RIGHT-OF-WAY FOR STREET AND UTILITY IMPROVEMENTS FOR BUSINESS CENTER DRIVE there is need to continue the extension of Business Center Drive and the associated utilities westerly in the City of Elk River; and WHEREAS, the City of Elk River directed preparation of and received a feasibility study dealing with the construction of utilities and streets westerly along the Business Center Drive alignment, and held a public hearing pursuant to Minnesota Sta:~es Section 429 ~;.~!t~., to consider ordering improvements to Business Center [;,rive (the Improvements); and pursuant to the resolution numbered 97-104 ordering the improvemen~ and preparation of plans and ~ecifieations, the Elk River City Council authorized the Improvement; and WHEREAS, the City Engineer has determined the need for additional right-of-way to construct the Improvement; and the City Council of the CiLv of Elk River has determined that the Improvement and the need for additional right-of-way are in the public interest. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, that the City acquire the right, title, and interest in certain properties generally described in the attached Exhibit A as and to the extent necessary pursuant to Minnesota Statutes Section I ~. 7 et seq. for the public purpose of constructing the Improvement to Business Center Drive. Passed and adopted by the City Council of the City of Elk River, Minnesota, this 22nd day of December, 1997. ATTESTED: Henry A. Duitsman, Mayor Sandra A. Thackeray, City Clerk O:XPROJ'X230321 ink321-1905.dec.RE$OLUTION.do~ EXHIBIT A LEGAL DESCRIPTION TO THE EASEMENT TRACT: A perpetual easement for public street, utility, and drainage pu~oscs over, under, a~'~d across that part of t. he following described property: The East Half (E ih) of the Southeast Quarter (SE ~l) of Section 31, Township 33, l;ange 26, Sherburne County, Minnesota, except that part thereof platted as Sandpiper Estates and Sandpiper Estates Two. Which lies within the following described perpetual easement for street, utility, and drainage purposes. A strip of land 80.00 feet in width, over that pan of th~ East Half of the Southeast Quarter of Section 31, Township 33, Range 26, Sherbume County, Minnesota, the North line of which is contiguous with the South fight-of-way line of U.S. Highway No. 10 and $2. Said strip of land is to extend by its full width from the W~st line of said East Half' of the Southeast Quarter to the East line of said East Half of the Southeast Quarter. O:~,PRC1II2301t21 m~321-1917.nev.etsement, do~ 4 SOUTH R.O.W. LINE U.S. HIGHWAY NO. 10 &: 5211.ii=i..~ 0 200 PROPOSED STREET, UTILIT'i AND DRAINAGE EASEMENT 80.00' SANZ 'P[PER TE$ T~-O t I 6' 183RD AVE. N.W. SANDPIP ER ESTATES PROPOSED RIGHT OF WAY BUSINESS CENTER DRIVE city ~ EXHIBIT