6.1. ERMUSR STAFF UPDATES 11-15-2011Elk River
Municipal Utilities
13069 Orono Parkway • P.O. Box 430
Elk River, MN 55330-0430
UTILITIES COMMISSION MEETING
POwEA~'`EUD81
~~ i ~1~
P OH' E R E D T O S c n-
Phone: 763.441.2020
Fax: 763.441.8099
TO: FROM:
Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director
John Dietz -Chair
Daryl Thompson -Vice Chair
Al Nadeau -Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 15, 2011 6.1
SUBJECT:
Staff U dates -Utilities Director
DISCUSSION:
The 2012 American Public Power Association Legislative Rally in Washington, D.C. will be
held March 12 - 14. In the past, the Minnesota municipal utilities meet with our elected officials
on the last day of the event. This is an opportuniTy to take the stories from Main Street Elk River
directly to our elected officials with the aggregate support of municipal public power. During
this rally's Legislative and Resolutions Committee, ERMU also has the opportunity to vote on
APPA's policy on legislation, regulation, and other federal issues. It is important to have ERMU
and Minnesota municipal public power represented in APPA policy. The 2012 budget reflects 3
from ERMU attending this rally. Rooms became available on November 1 and have already
been reserved.
Staff requested quotes for frost trenching for the upcoming winter season. Midwest Diversified
Utilities was the low bidder. The bid sheet is attached for reference.
At the October 2011 Utilities Commission meeting, the Commission directed staff to look into
the Elk River Dam and the possibility of transferring it to the City of Elk River. In conjunction
with City staff, ERMU staff has requested and received two quotes for dam inspections. This
dam engineering inspection is actually a line item in the City's public works 2011 budget. Upon
completion of a dam inspection, a replacement value and the on-going insurance cost can be
determined. The dam is currently insured through general liability that the Utilities pay for.
Also through the dam inspection process, an updated maintenance plan for the dam will be
established. After the inspection, the Utilities and the City will be able to determine the most
cost effective way to manage and operate the dam in the future that will be fair and equitable for
the citizens and utility customers.
~~
m
Also at the October 2011 Utilities Commission meeting, the Commission directed staff to look
into signage for the Power Plant. Staff is working on this and will bring information to the
Commission at a future meeting.
Attached is a letter from Minnesota Municipal Utilities Association (MMUA) thanking Mark
Fuchs for being an instructor for the 2012 MMUA Overhead School.
Also attached for your reading are two articles from APPA:
• Voters in Boulder, Colo., approve ballot measures that could lead to a new public power
utility -Public Power Daily -Thursday, November 3, 2011
• North Dakota Sues Minnesota over law restricting electricity imports due to carbon
emissions -Public Power Daily, Friday November 4 2011
~,
c
N v
O
V
N
a ~ „ ~ m
m
M
Z p
i ~
_ ~ ~
~ y .r c c
O
Ol ~
U/ ~ i
N O
~ ..d+
j
'~ N
H O
O M m ~ M ` d O
7. y .
~
' C
~
~
N
O ~
~ a ~ Z F- IL W
N
y ~ ~
M
.N
O ~ ~
~
~
t 2 0 0
~ ~ ~ O ~ 0 0 0 0 0 0
N (p
m 0
d
3 M _
~ N
~ ~ ~ W 1n to tl~ ~
'
0
g
~
°
C
O
O
~ _
>
~
d
fa
»
f»
v~
»
fn
»
N
O a
l' 1 m r
ti
"'~
c d
m t+J
~O
O
N
fl v
~ ~
Z ~
W c
~
C .
'p, o ~ °'~ ~ o v~ o ~n u~ l0 ~n
O
fI y Z
~ aD
N O
~ O
'~ I~ O
O N I~ ~ .-
D
O ( (O O r C
C/~ ~
~ U
~ ~
~ ~
~ ~
~ ~
m d
Vi
~
fA
f9
fR
E9
(A
~ L -
•n.l
~ C7
+r
"
r~ 3
N
{(j
I~ 1 W Z
ry OA d M ~ O
a
~ ~ J ~
~ Y
J N N
O
~
~
~
~ ~ ~ ~
O ~ ~
~ ~O V
a
~ I~
~
t0 f~
(O O
f
(O
•{~ L N R O y
~ O
O ~ ~
d
F f0 ~ ~ ~ M 2' E9 f9 f9 E9 M E9 fA
ba N
h
~ ~
a
I
a ~
~ O
O O
y w i w
N
F~ ~ o
0
~ U1 ~ ~ [V CO C' O (O
~ ~ .- N c7 (h
W d o A
~A~~~.~/
iiiiv~~
Minnesota Municipal Utilities Association
October 7, 2011
TO: Mark Fuchs
Elk River Municipal Utilities
13069 Orono Pkwy. P.O. Box 430
Elk River, MN 55330
FROM: Kevin Thompson
MMUA Training Center
1004 Michigan Road
Marshall, MN 56258
Dear Mark:
I would like to express our appreciation from the Mike Willetts and myself for taking time out of your
already busy schedule to be instructor at the 2012 MMUA Overhead School!
In looking at the reviews this was one of the best training sessions we have had in the history of the
MMUA Training Center. We are very pleased that you found time to assist in the instruction of the
"2012 Overhead School"!
MMUA is fortunate to have members like Elk River Municipal Utilities that have talented staff like you!
Thank you,
~ ~~
Kevin Thompson
MMAU Training Center Coordinator
3025 Harbor Lane North • Suite 400 • Plymouth, MN 55447-5142.763.551.1230.800.422.0119 (MN) • Fax 763.551.0459 • www.mmua.org
Voters in Boulder, Colo., approve ballot measures that could lead to a new public power u... Page 1 of 2
Public Power Ouily
Tbunday, November 3, 2°11
Voters in Boulder, Colo., approve ballot measures that could
lead to a new public power utility
Public power may be coming to Boulder, Colo.
Residents of the Colorado community on Nov. 1 approved two ballot measures that will allow the city
to continue to explore the possibility of purchasing Xcel Energy's distribution system and forming a
city-owned electric utility.
Ballot measure 2C, which authorizes the creation of such a utility if customer rates would be the same
as those Xcel Energy is charging at the time of acquisition, passed with 51.78% of the total vote. A
companion measure, 2B, provides the funding necessary to determine the actual costs of buying
Xcel's system and starting a local utility. It passed with support from 50.27% of voters, the city said.
While the margins are narrow, the city attorney said the results are not close enough, as defined in
local statutes, to trigger an automatic recount.
Xcel spent about $950,000 to fight the measures, while supporters spent about $87,500, according to
the local newspaper, the Daily Camera. The total spent so far makes the fight over these ballot
measures the most expensive political issue in Boulder's history, the newspaper said.
"This vote shows, once again, that the Boulder community wants to chart a new course -one that
makes cleaner energy a priority while also taking into account other core values, such as rates,
reliability and a desire for more control," said City Manager Jane S. Brautigam. "We need to
recognize, however, that this was a close decision. There aze still a lot of questions and concerns that
we need to address. The city is committed to moving forward in a deliberate, but measured,
thoughtful and inclusive way."
The impetus behind this particular effort to create a municipal utility appears to be driven in large part
by a desire for cleaner, more renewable sources of energy.
A telephone survey this summer found that Boulder voters support creation of a city-owned electric
utility by a wide margin and that residents overwhelmingly want a reduction in carbon emissions.
Seventy-one percent of survey respondents said they support municipalization and said they thought
the city would be better than Xcel Energy at offering renewable sources of energy and at reducing
carbon emissions. A smaller, but majority, percentage (57%) thought the city would do a better job
than Xcel Energy at finding innovative solutions to energy problems.
Ninety-one percent of those surveyed said they would support an increase of between 5% and "as
much as it takes" in their monthly electric bills to reduce carbon emissions and/or increase renewable
sources of energy. (See the Aup. 22 Public Power Daily.)
The vote in favor of the ballot measures "does not mean that municipalization is imminent," the city
said in a press release. "A decision about whether to form a local electric utility has yet to be made."
http://www.naylometwork.com/app-ppd/articles/print-V2.asp?aid=158485 11/7/2011
Voters in Boulder, Colo., approve ballot measures that could lead to a new public power u... Page 2 of 2
No bonds will be issued "until full information on costs is available and a careful analysis of these
decisions occurs," the city said. Boulder officials said they believe it will take three to five years to
complete this process.
In the meantime, Xcel Energy will continue to provide electricity to Boulder customers.
The city manager encouraged community members on all sides of this issue to remain engaged in the
ongoing conversation.
"I wish to thank both supporters and opponents of the measures," Brautigam said. "Together, they
raised the level of public discussion and understanding about the city's options with regard to our
shared energy goals. This kind of public participation is part of what makes Boulder special -and is
one of our greatest strengths as we continue our research."
Among the supporters of the ballot measures was Earth Day Founder Denis Hayes, who said, "The
most innovative utilities in the nation are municipal utilities: Austin, Eugene, Seattle, Sacramento. I'd
expect Boulder will follow (or lead) the munis, and it will give Colorado an independent standard
against which to measure Xcel."
In an Oct. 29 article, the New York Times said proponents of ballot issues 2C and 2B "say that the
utility industry desperately fears a public awakening, and that a John Brown-like raid on a monopoly
in one place could galvanize electricity consumers all across the nation to push for change."
Boulder said it will spend the next several weeks laying the groundwork for additional engineering
work, starting negotiations with Xcel Energy and determining what steps can be taken in the
meantime to help the community achieve its goals. A roundtable discussion with the newly elected
City Council is scheduled for Dec. 6. More information about the city's effort to form a municipal
utility is posted on the city's website. -JEANNINE ANDERSON
Copyri&ht O 2011, Amencen Public Power Associafion
http://www.naylornetwork.com/app-ppd/articles/print-V2.asp?aid=158485 11/7/2011
North Dakota sues Minnesota over law restricting electricity imports due to carbon emissi... Page 1 of 1
Public Pawer Daily
Friday, November d, 1011
North Dakota sues Minnesota over law restricting electricity
imports due to carbon emissions
North Dakota has filed a lawsuit against Minnesota over its Next Generation Energy Act of 2007
(NGEA), which imposes restrictions on carbon dioxide emissions from the generation of electricity
imported into and consumed in Minnesota. "Minnesota's Next Generation Energy Act has direct and
serious consequences for North Dakota," said Attorney General Wayne Stenehjem.
Missouri River Energy Services joined the state and others in the suit. "NGEA restricts MRES from
considering all options when choosing the least-cost resources for our 24 municipal electric utility
members in Minnesota as well as for our 36 other municipal electric utility members in the states of
Iowa, North Dakota, and South Dakota," MRES CEO Tom Heller said. Two other electric utilities
(Basin Electric Power Cooperative and Minnkota Power Cooperative), two coal companies (The
North American Coal Corp. and Great Northern Properties Ltd. Partnership), as well as the Lignite
Energy Council, also joined the suit.
The Minnesota law presumes that human carbon dioxide emissions are a cause of global warming and
"imposes restrictions on carbon dioxide emissions from out-of--state energy sources as a purely
symbolic gesture that could only have negligible impact toward actually achieving the purpose of
reducing greenhouse gases on a global scale," North Dakota said in its Nov. 2 complaint filed in the
U.S. District Court for Minnesota.
North Dakota alleges that the NGEA violates the Commerce Clause of the
United States Constitution, unconstitutionally interfering with North Dakota's energy production.
Minnesota improperly seeks to control and regulate new energy facilities, as well as the expansion
and refurbishment of existing energy facilities, located in North Dakota and other states, the
complaint said.
The complaint also alleges that the Minnesota law favors new large energy projects in Minnesota or
Minnesota-based businesses with new large energy projects to the detriment ofNorth Dakota and
other out-of--state interests and entities.
"It is unfortunate it has come to this," said Stenehjem. Over the last four years, North Dakota officials
have made every effort to convince Minnesota officials to rescind the law, he said. The Minnesota
Legislature voted to repeal the law, but the governor vetoed the legislation, he noted.
Copyright ®2011, American Public Power Association
http://www.naylornetwork.com/app-ppd/articles/print-V2.asp?aid=158490 11/7/2011
Elk River
Municipal U
13069 Orono Parkway • P.O. Box 430
Elk River, MN 5 5 3 30-0430
UTILITIES COMMISSION MEETING
P O W E fl~"' E, Bt B 1
~~ i V~~
P O`/~ E RED T O S E R`/ E
Phone: 763.441.2020
Fax: 763.441.8099
TO: FROM:
Elk River Municipal Utilities Commission Theresa Slominski -Finance and Office
John Dietz -Chair Manager
Daryl Thompson -Vice Chair
Al Nadeau -Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 15, 2011 6.1
SUBJECT:
Staff U dates -Finance Director/Office Mana er
DISCUSSION:
We had 1,156 credit card payment transactions in October, compared to 1,086 in September.
The fee for October should be $2,601. We had increased usage with the onset of the cold
weather rule deadline as we turned off people with high balances so that they are caught up
before the winter season.
The credit card interface which will allow customers to obtain their account balance information
and make payments online will be ready to test November 2152, 2011. We will be putting together
instructional information sheets to include with the bills in December to help the customers
become familiar with this new feature. We have been working on this since the beginning of
summer and will be excited to see it implemented.
Work has already begun on the audit preparations to prepare the financial statements internally
this year. We have the financials and spreadsheet links from prior years to become familiar with
and prep for the 2011 audited information. Our auditors, Abdo Eick and Meyers have been very
helpful in preparing for this transition.
Last month, an update on the Power Cost Adjustments (PCAs) was requested. A recap of the
PCAs charged to ERMU to-date, and the PCAs we have collected from customers to-date is
attached. We have approximately $325,000 that we have been charged but have not collected.
POWER COST ADJUSTMENT
WORKSHEET
(Coll from)/Ref to ' i
Collected from/ customers less
2011' Connexus (Refunded to) Connexus chg L
;Power Bill PCA l Customers _
Balance
i
--
- - -
-
_.
I -
Balan
d 9 i
January
' demand --
56,308.2 - -_ -- _
ener
9Y __
_49,10740
, -._ ____- -. -___-
______--
February-11 demand ~
25,30738
-- __ --. __-_
'I
enersv I
(12,375 74)
I - -
--
March-11 - _
demand -
17,5
57.5~5 -- - _
~
p-
-_
A ril-11 energy
demand ~
42,525.06 'I
7,902.72 - -
I __ - _. - --
i
energy
- (12,946.54)'
_ _
- - ~
May-11
demand
5169.03
i - -
~i
energy
11,650 43
- --
I
--
--_
- ~ --
--
June-11 demand ~ 8 651 22 i
energy
111,971.67
-- t
-- - -
i
Jul 11
Y- demand 290.52 _
I
energy _ __ -_
~ 40,121.07 .
{
--T
August-11I demand i _(32,448.80)_ _ 132,591.70
i ~mill
s
~
energy
18.2,_404.35_
_ _
_ _
_
_
September-11
demand
- 1
22 862.03 _ _ _
1 mil
_. energy_ _ -
October-11 demand 20 206.87
I ~ 1 mil
energy_
~ _
-_
November-11 demand
_-_-__
- _
energy
December-11 demand
_ _-
-
-
_ --
energy i
I '.
501,195.61 '
_ _ 175,660.60 (325,535.01),, (0.013) mills
-- _ _ - -
i -
25,000,000 kwh
- _ _
~
-- _ _-I'- - _.
Page 1
PUNEREU ®r
~~~V~~
P O W E R E D T O S E R E
Elk Ri
Municip al Utilitie s
UTILITIES CONIlVIISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission David Berg
John Dietz, Chair Water Superintendent
Daryl Thompson, Vice Chair
Al Nadeau, Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 15, 2011 6.1
SUBJECT:
Staff U dates
Discussion:
• The intern from the St. Cloud Tech Water & Wastewater program completed his one
week and had a lot of hands on experience while shadowing water personnel.
• Wells 8 & 9 are currently being transferred on SCADA to update the programming with
the recent re-routing project.
• The 2°d Street project has been inspected for potential water repairs; several minor things
were found and reported to the City engineer.
• Wellhead Protection (WHP) Phase II is currently in the midst of mapping and finalizing
the inventory of the moderately vulnerable area within the WHP delineation.
• We116 backwash pit repair has started; they will reconnect the backwash pipe and fill in a
washout area.
• Well 5 pump is down, a refurbished one was installed a little over a year ago and is now
being tested for the premature issue.
• Johnson tower is now winterized for the season.
• The water department recently finished a lazge meter change-out route and has continued
on with a new set. There aze approximately 400 meters left to change.
• Irrigation meter collection has begun.
Elk River:
Municipal U
s
UTILITIES COMIVIISSION MEETING
PUNEREU ®~
~~~~~~
P O W E R E D T O S E R E
TO: FROM:
Elk River Municipal Utilities Commission Mark Fuchs
John Dietz, Chair Line Superintendent
Dazyl Thompson, Vice Chair
Al Nadeau, Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 15, 2011 6.1
SUBJECT:
Staff U dates
DISCUSSION:
• Finished changing out six rusty j-boxes and removing one rusty PMH-9 switchgeaz
cabinet on Proctor Rd.
• Continue working on 6s' and 7a' Street Rebuild.
• Started working on rebuilding Sa' Street and Baldwin Ave.
• Started moving some poles at the new city garage building site.
• Had four new services.
• Removed some concrete and did some grading around the holding pond and wet land.
The city crushed the concrete for us as they were doing some of their own.
• Abra Auto Body repaired our 2002 one-ton truck that was in an accident. They found that
the brakes master cylinder had not been working properly and that is why our employee
could not stop.
At the last commission meeting I was asked to bring back some more information on the increase in the
maintenance category and the maintenance of vehicles. The category, in total, is higher by $88,343 From
the prior year. There are nineteen accounts that make up this category and the accounts making up the
majority of the increase are Maintenance of Structures, Maintenance of Underground Distribution,
Maintenance of Street Lighting, Maintenance of Meters, and Transportation Expense. For the first four
categories, the increase is project driven and the labor and materials for these projects is the biggest part
of the increase.
For Maintenance of Structures, we are very fortunate to have our staff Maintenance Person
knowledgeable and talented enough to be able to address building needs that the prior staff member could
not. Some of these projects are electrical lighting, air conditioning and heat pump unit repairs, and
flooring maintenance, which results in a different recording of the time spent by staff. However, this is
not an increase in total cost to the company. There was also some structural maintenance done by two
employees.
There is an intentional shift in focus from prior years on the Maintenance of Underground Distribution
and Maintenance of Street Lighting. As our system was built out during the previous boom years, there
was not the need for the same maintenance. There was new construction and the focus was on building
the infrastructure to support it, with the labor involved capitalized. We are now recognizing and
performing the needed maintenance on the system components as they wear some and mature. Most of
the street light maintenance is maintaining the fixtures from the lights that were originally put in by the
developers. There is also cost that comes from accidents when there is no insurance to bill and collect
from when a street light is hit.
For Maintenance of Meters, we have been working hard for a number of years to change out our old
meters to electronic meters with ERTS so that we can more easily read the meters. When we brought the
meter reading back in house, the push to finish the change outs really ramped up. We were really
dedicated to getting out there and getting this project done, and that means the manpower related to the
project is recognized here.
There are several reasons why there has been a large increase in Transportation Expense. With the
purchase of the bore rig, we had some additional costs for parts and supplies that we have not had in other
years. We redid a trailer used to carry the wire around to get additional years out of it instead of
purchasing new, so this was additional expense. In March, April, and May we had some vehicles in to be
fixed, more than we usually do, and this was related to various items: brakes, ball joints, batteries,
mufflers, and modules. There is an increased cost in the fuel this year compared to last year. This year
we purchased some new radios for the trucks to be on the same frequency as the city and the county. We
have some installation costs related to the laptop computer mounts in the vehicles that we did not have in
other years. We had increased labor costs in the spring to get the new equipment set up and we did this
instead of having it come from the factory that way, which would have been more expensive to purchase.
There is no one large expense that stands out as a definite item that increased the category. It's a lot of
smaller things that are falling under maintenance and adding up this year compared to last year.
Elk River,
Municipal Utilities
UTILITIES COMMISSION MEETING
PBWEAEU B1
A~UR~
P O W E R E D r 0 5`°
TO: FROM:
Elk River Municipal Utilities Commission Wade Lovelette-Superintendent of Technical
John Dietz, Chair Services
Daryl Thompson, Vice Chair
Al Nadeau, Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 15, 2011 6.1
SUBJECT:
Staff Updates -Superintendent of Technical Services
• The Locating department had a total of 2601ocate tickets, eight of them being emergency
tickets.
• Security Systems Department had another good month in October. The monthly totals
were not available at the time this update was prepared.
• The Mapping Department started putting the changes into the mapbook so that they are
ready to print a revised edition.
• The Meter shop continues changing electric and water meters.
• Landfill Gas Plant had a critical memory failure in a SEL Relay on engine #4. Staff had
to change the relay out and sent it to Cooper to upgrade.
• We took oil samples from substation transformers to look for abnormal gasses (we do this
on a once a year basis).
• The power plant staff did the monthly run of the generators. It went very well.