6.1. ERMUSR 01-10-2012Elk River:
Municipal U
13069 Orono Parkway • P.O. Box 430
Elk River, MN 55330-0430
UTILITIES COMMISSION MEETING
Phone: 763.441.2020
Fax: 763.441.8099
www. elkrivemtilities. com
TO: FROM:
Elk River Municipal Utilities Commission Troy Adams, P.E. -Utilities Director
John Dietz -Chair
Daryl Thompson -Vice Chair
Al Nadeau -Trustee
MEETING DATE: AGENDA ITEM NUMBER:
Janu 10, 2012 6.1
SUBJECT:
Staff U dates -Utilities Director
DISCUSSION:
ERMU hosted a training for the Sherburne County Community Emergency Response Team
(CERT) eazly in January 2012. CERT was established to develop and train citizens for
emergency prepazedness and response in the event of a disaster. A tour of our Power Plant was
provided with a brief history on the plant and ERMU. Steve Ziemer, our Plant Operator /
Mechanic, did an excellent job conducting the plant tour and answering questions. It goes
without saying; he has also done an excellent job maintaining our plant over the past decade.
The power plant is an important facility because of its "black start" capabilities. After the tour,
Michael Thiry, a Foreperson in the electric department, gave a presentation on electric safety.
Wade Lovelette, our Technical Services Superintendent, coordinated and help with the tour and
training. This was a great opportunity for ERMU to contribute back to our community and staff
did a great job. Attached is a thank you from Dave Pikal the Assistant Director of Sherburne
County Emergency Services.
We aze in the process of registering with the Economic Development Association of Minnesota
(EDAM). This will be an opportunity to work with the City to promote and mazket Elk River
and ERMU.
In late 2011, the Commission asked staff to reseazch restrictions and regulations for signage on
the Power Plant. The only restriction would be size. The signage would be limited to 96 squaze
feet. Staff will bring options and estimated costs to the Commission in the neaz future for further
discussion.
PBMwwEREB BY
~A~~~~
P OWE 0. E O T O S F R V F
Adams, Troy
From: Dave Pikal <Dave.Pikal~co.sherburne.mn.us>
Sent: Thursday, January 05, 2012 10:42 AM
To: Adams, Troy; Lovelette, Wade
Subject: CERT
Good Morning,
Just want to thank you both and your team for the tour last night of your facility. The group greatly
appreciated the opportunity in seeing and herring about Elk Rivers generating plants along with the electrical
safety presentation. As possible first responders it is important that our responders are aware of all the
possible dangers when helping there family and community.
Thanks again.
wave 1n'ikaC
Assistant Director
Sherburne County Emergency Services
COM-L
13880 Business Center Drive
Elk River, MN 55330-4609
763-765-3531
Dave.Pikal(c~co. Sherburne.mn.us
Elk River
Municipal Utilities
UTILITIES CONIMISSION MEETING
p R ~ E R E R B'I
~~~~~~
P p W E 0. E D T O S E R V E
TO: FROM:
Elk River Municipal Utilities Commission Theresa Slominski -Finance and Office
John Dietz -Chair Manager
Daryl Thompson -Vice Chair
AI Nadeau -Trustee
MEETING DATE: AGENDA ITEM NUMBER:
Januaz 10, 2012 6.1
SUBJECT:
Staff U dates -Finance and Office Mana er
DISCUSSION:
We had 970 credit card payment transactions in December, compared to 1,035 in November.
The fee for November should be $2,182.50.
The new interface that will allow customers to obtain their account balance information, view
bills, and make and schedule payments online, will be introduced to customers with Januazy's
billing.
Inventory for the electric department (with the exception of the wire) was done on December
20s', 2011; for the water department January 3`d, 2012; and for the security department January
5~', 2012. All went well and an auditor was on site for a short duration of the electric count. The
preliminary audit fieldwork will be Monday, January 9a' with Mark Ebensteiner and Andy Berg
on site for the day. The actual audit fieldwork dates have been set for Mazch 151 and 2"d
Water Conservation Points
5 pts Install SMART Controller (ERMU staff to validate qualified equipment
1 pt Install Eco-hrigation heads or drip lines (ERMU staff to validate qualified equipment)
8 pts Rain Garden/Xeriscape/Eco-Grass/Native grassesBlack dirdrock gardens (ERMU to
validate size and location prior to installation)
3 pts Annual nrigation inspection (ERMU staff validate all recommendations of annual
assessment that have been implemented)
5 pts Actively participate in Project Conserve
5 pts Install water efficient faucets, toilets, urinals, shower heads, clothes washer, dishwasher
(ERMU staff to validate qualified equipment)
Attached for reference: Water Conservation Rebate Application
WATER CONSERVATION REBATE
Elk River;
Municipal U
APPLICATION
ff you have questions, please call 763-441-2020, 8:OOAM to 4:30 PM Mon-Fri.
(OFFICE USE ONLI~
REBATE VERIFICATION:
Inspection
Time: Inspector:
pts Smart Controller pts Sprinkler Heads pts Landscaping Irrigation System Assessment
pts Water Conserving Indoor Equipment pts Participate in ProjeM Conserve TOTAL POINTS
Program Requirements: t) Commercial customer using more than to% of the previous yeazs winter average plus 4o units, z) Copy of
Invoice or sales receipt for all equipment, 3) Maximum water credit for Smart Controllers is go% of installed cost up to $goo dollars for cus-
tomers using greater than z5o units $25o for customers using less than 25o units, 4) Maximum water credit for sprinkler heads or drip sys-
tems is So% up to a maximum of $50o per year, 5) All water credit rebates are contingent on ERMU verification and approval, 6) customer
must attain ro water conservation points (WCP) to participate in the program.
ACCOUNT INFORMATION:
NAME ON WATER ACCOUNT:
ACCOUNT
ACCOUNT HOLDER PHONE #:
APPLICANT INFORMATION:
Name of person
Day Phone:
Billing Address:
Installation Address:
IRRIGATION INFORMATION:
Property Type (circle one): Association/Multi-family
Irrigation System Installation Year:
Installation Person/Company:
Smart Controller (5 Water Conservation Points)
Smart Controller Installation
Smart Controller Brand:
(Copy of invoice with application required)
Model No.
Sprinkler Heads or Drip System (t Water Conservation Point for each head or drip line)
Type of Sprinkler Heads (circle one): Pop-Up Impact Rotors Drip line
Installation Date: (Copy of invoice with application required)
Irrigation System Brand: Model No.
Cell
City
State _ Zip
MN Zip
Commercial
Number of Zones:
PHONE
Irrigation System Assessment: (3 Water Conservation Points)
Name of Company Performing Assessment:
Technician Name:
Please provide an itemized copy of the original invoice with this form.
Phone Number
Assessment must include: Check all data sensors to ensure they are operational, program controller, inspect for leaks in heads and
distribution pipes, check for proper alignment of sprinkler heads
Landscaping: (8 Water Conservation Points)
Type of landscaping changes (circle al] that apply): Eco-Grass
Please Describe "Other'
Square Footage of Area:
Native/Prairie Grass Rain Gazden Black Dirt
Xeriscape Other
(area must be larger than Soo square feet to qualify)
Installation Person/Company: Phone:
Please provide an itemized copy of the original invoice and a simple sketch of work done with this form.
Water Conserving Indoor Equipment: (Water Conservation Points, See Below)
Type equipment installed (circle all that apply: Shower Head (t WCP) Toilets/Urinals (i WCP each)
Clothes Washer (z WCP) Dishwasher (z WCP)
Rock Gazden
Pre-Wash Dish Sprayer (t WCP) Faucet Aerators (t WCP all faucets)
(Requirements: Shower head t.S gpm or less, Toilets i.z8 gpf/Urinals o.S gpf, Clothes Washer s S.S Water Factor,
Dishwasher 4.zS gallons/cycle, pre-rinse Sprayer i.6 gpm, and Faucet Aerator < 2.~5 gpm)
Installation Date: (Copy of invoice with application required)
Type of Equipment Brand Name
t.
z.
3•
4•
5•
6.
7~
MAIL TO:
Model No. WCPs
Elk River Municipal Utilities, C/O WATER CONSERVATION REBATE, P.O. Box 430, Elk River, MN 55330
Elk River
Municipal Utilities
UTILITIES COMMISSION MEETING
POwEREO er
P p W E 0. E D T O S E R V E
TO: FROM:
Elk River Municipal Utilities Commission Mark Fuchs
John Dietz, Chair Line Superintendent
Daryl Thompson, Vice Chair
Al Nadeau, Trustee
MEETING DATE: AGENDA ITEM NUMBER:
January 10, 2012 6.1
SUBJECT:
Staff Updates
DISCUSSION:
• Finished working on the 5`h Street and Baldwin Avenue rebuild project until the frost
comes out m sprang.
• Finished going through and fixing street lights that have a photo eye controller and feed
multiple lights at one time.
• Started working on converting Islandview Drive from 2400 volts to 7200 volts. We had
placed the underground wire earlier in the year and are now working on projects that can
be done when the ground is frozen.
• Continue helping the street department trim trees in some developments.
• Started tree trimming ourselves.
• Completed the inventory count and are working with office to make sure everything is
correct.
• I attended the technical and operations conference that MMUA puts on. A few of the
classes I attended were the new product trade show, weather technology, developing
effective standard operating procedures and accident review for the year. It was a very
good conference.
Elk Riv
Municipal Utilities
UTILITIES COMMISSION MEETING
puwl`eEO sr
a~V~~
P O W E R E D T O S E R V E
TO: FROM:
Elk River Municipal Utilities Commission Wade Lovelette-Superintendent of Technical
John Dietz, Chair Services
Daryl Thompson, Vice Chair
Al Nadeau, Trustee
MEETING DATE: AGENDA ITEM NUMBER:
Janu 10, 2012 6.1
SUBJECT:
Staff Updates -Superintendent of Technical Services
• The Locating department had a total of 99 locate tickets for the month of December, three
of them being emergency tickets.
• In December, the Security Systems Department had a total of 76 phone contacts, 12 new
systems quoted, nine system sales made, 10 installs completed, 25 service calls made and
12 personal visits.
• The Meter shop continues changing electric and water meters. Meter Techs assisted the
Line Department in changing out a substation feeder re-closer and controller. The
controller had to be sent back because of a malfunction and the re-closer had to be sent
back because of internal loose parts.
• Staff is doing home energy audits.
• The power plant staff did the monthly run of the generators. Engines ran well. We are
still waiting for Ex-Line to come and help our staff repair the fuel problem on Engine #3.
• I attended the Technical & Operations Conference last month. Besides attending the new
products trade show, I learned about what is happening with Renewable energy, getting a
better score next time on the RP3 report, and then a little bit on smart grid.