Loading...
4.3. SR 02-17-1998Howard R. Green Company CONSULTING ENGINEERS Item 4.3. CONSULTING ENGINtERS Formerly MSA Consulting Engineers February 11, 1998 File: 802640j-0060 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P. O. Box 490 Elk River, MN 55330-0490 RE: LAKE ORONO SEDIMENT REMOVAL PROJECT Dear Council Members: As you are aware, Steve Rohlf has been working for some time on the Lake Orono Sediment Removal Project. The schedule that was prepared by Mr. Rohlf and presented to the Council, sometime ago, calls for the Feasibility Study to be authorized on February 17, 1998. The copy of that schedule is attached. By authorizing the Feasibility Study this early, it allows time for the project to be bid, assessment hearing held, and a 30 day waiting period for assessment appeals to be observed prior to awarding the contract. As you are aware, Mr. Rohlf has done a significant amount of work relative to the amount of sediment to be removed, the disposal site for this sediment and the estimated cost of the improvement. Therefore, the feasibility study will be a rather simple document only necessary to initiate the 429 improvement project process. Attached for the City Council's consideration, is a Resolution that will order the Feasibility Study for the Lake Orono Sediment Removal project. Because this is a City initiated project, this Resolution requires a 4/5's vote to be adopted. One thing that will be necessary to complete this Feasibility Study is the amount the City Council wants to assess each unit. If you have any questions, I will be in attendance at your February 17, 1998 City Council meeting. Sincerely, Howard R. Green Company Terry J. maurer, P.E. TJM/et Attachments Otproj~802640\640-1110.feb 612/644-4389 fax 612/644-9446 toll free 1326 Energy Park Drive · St. Paul, MN 55108 · LAKE ORONO IMPROVEMENT PROJECT TIME LINE January 1998 · Determination of wetlands on disposal sites, with property owner's permission, by Natural Resources Conservation Service (NRCS). · January 7 meeting with permitting governmental agencies. · Preliminary assessment role (equivalency units) by January 15 meeting. · State Disposal Systems permit (SDS) submitted to the Minnesota Pollution Control Agency (MPCA) - (180 days). · Funding from Sherburne County sought. February · Protected Waters permit submitted to the Minnesota Department of Natural Resources (DNR) - (45 days). · U.S. Army Corps of Engineer (USACE) permit submitted - (60 to 120 days). · "401 Water Quahty Certification submitted to MPCA - (60-120 days). · Environmental Assessment Worksheet (EAW) submitted to appropriate agencies - (approximately 60 days). · None Point Discharge permit (NPDES) submitted to MPCA- (permit immediate after submittal). · Feasibihty Study ordered by the City Council on 2/16/98. March · Feasibility received by City Council and Public Hearing ordered on 3/2/98. April · Public Hearing held and plans and specifications ordered by City Council on 4/13/98. · Special Projects and Challenge Grant applications to repair erosion at Orono Cemetery submitted. · DNR Protected Waters permit issued. May · Plans and Specifications approved and bids authorized by the City Council on 5/4/98. · Bids advertised for 21 days. · EAW process is completed. s:Xb&z\steverXlakoagda.doc June · USACE permit issued. · MPCA 401 Water Quality Certification completed. · Bids presented to City Council and Assessment Hearing ordered on 6/1/98. · Assessment Hearing Held on 6/29/98 - (30 day appeal period). July · MPCA SDS permit issued. · Special Projects and Challenge Grants awarded. August · City Council awards contract on 8/3/98. Lake is drained early in the month. · Start construction on 8/17/98. September October · Project completed by 10/31/98. s:\b&zXstever\lakoagda.doc RESOLUTION 98 - A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION OF THE CITY OF ELK RIVER ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATTER OF THE LAKE ORONO SEDIMENT REMOVAL IMPROVEMENT OF 1998 WHEREAS WItEREAS the City has determined that it should consider improving certain property by removing sediment buildup from Lake Orono; and Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Howard R. Green Company, Consulting Engineers who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 17th day of February, 1998. Henry A. Duitsman, Mayor ATTEST: Sandra A. Thackeray, City Clerk O:\projX230369\369-1112.feb Cay of River TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City '~~rator February 9, 1998 Lake Orono Update On December 15, 1997, a presentation was made to the City Council regarding options for a Lake Orono sedimentation improvement project. Based on available disposal sites and area of land for material, the minimum type of sedimentation removal project that would be necessary to do any long term good for the river/lake, and an acceptable range of assessments to benefited property owners, everyone seemed to agree with the Task Force recommendation of moving forward with a 1998 project that was in the $750,000 range. At the February 2, 1998, capital improvement meeting, discussion took place on a Lake Orono improvement project. Questions were raised regarding the overhead expenses for the project, the total cost of the project, the disposal areas, the assessment amounts, and the total number of assessment units. Some of the land owners along the lake will receive more than one assessment unit based on the amount of frontage which they own and based on whether or not the property can be subdivided and part of the property sold off for another home site. At this time, it appears that we will end up with a total of about 186 assessment units. This total includes 26 assessment units for city property. The 186 total units is less than the amount shown in Steve Rohlfs memo as we both believe his estimate of 201 will be reduced after additional analysis. A $750,000 project will require city participation in addition to any assessments which the city receives. The city participation or contribution will either increase or decrease slightly depending on if the overhead is less than 28 percent and if the project comes in above or below the preliminary estimate. The City Council, at a later date, can discuss how the city will finance its participation in the project. It is assumed that whatever units are assessed to the city will be paid back over a five to seven year assessment schedule. However, a contribution of $200,000 to $400,000 above and beyond the assessments can be funded by the city over time either within or outside of the levy limit. Nonetheless, all the city participation will come from tax dollars. · 441-7425 1.,06~ Orono Parkway P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 Fax: (612) Below are a number of examples on how the total cost of the project could be split up between the property owners and the city. Also attached are sample assessment schedules as prepared by Assistant City Administrator Lori Johnson. Examples $750,000 Total Project 160 Property Owner Assessment Units 26 City Owned Land Assessment Units $2,000/assessable unit $2,200/assessable unit $2,350/assessable unit $2,500/assessable unit $3,000/assessable unit 186 units @ $2,000 = $372,000 · Property owners share = $320,000 · CityShare = $52,000 Additional city contribution = $378,000 Total city participation (including assessments) = $430,000 Total property owners expense (excluding city) = $320,000 186 units @$2,200 = $409,200 · Property owners share = $352,000 * City share-- $57,200 Additional city contribution = $340,800 Total city participation (including assessments) = $398,000 Total property owners expense (excluding city) = $352,000 186 units @$2,350 = $437,100 · Property owners share = $376,000 · Cityshare = $61,100 Additional city contribution = $312,900 Total city participation (including assessments) = $374,000 Total property owners expense (excluding city) = $376,000 186 units @$2,500 = $465,000 · Property owners share = $400,000 · City share = $65,000 Additional city contribution = $285,000 Total city participation (including assessments) = $350,000 Total property owners expense (excluding city) -- $400,000 186 units @$3,000 = $558,000 · Property owners share = $480,000 * City share = $78,000 Additional city contribution = $192,000 Total city participation (including assessments) -- $270,000 Total property owners expense (excluding city) = $480,000 SAMPLE A Principal Outstanding: Interest Rate: Interest Start Date: Term: Payment Year Year 1 Year2 Year 3 Year4 Year 5 SAMPLE B Principal Outstanding: Interest Rate: Interest Start Date: Term: Payment Year Year 1 Year 2 Year 3 Year4 Year5 SAMPLE C Principal Outstanding: Interest Rate: Interest Start Date: Term: Payment Year Year 1 Year 2 Year 3 Year4 Year 5 SAMPLE D Principal Outstanding: Interest Rate: Interest Start Date: Term: Payment Year LAKE ORONO SAMPLE ASSESSMENT SCHEDULE $2,000.00 7.00% Jan. 1 5 Payment Pdncipal 540.00 400.00 512.00 400.00 484.00 400.00 456.00 400.00 428.00 400.00 Principal Interest Outstanding $2,000.00 140.00 %600.00 112.00 1,200.00 84.00 800.00 56.00 400.00 28.00 $2,420.00 $2.000.00 $420.00 $2,200.00 7.00% Jan. 1 5 Payment Pdn~pal Interest Outstanding $2,200.00 594.00 440.00 154.00 1,760.00 563.00 440.00 123.00 1,32000 532.00 440.00 92.00 880.00 502.00 440.00 62.00 440.00 471.00 440.00 31.00 $2,662.00 $2,200.00 $462.00 $2,350.00 7,00% Jan. 1 5 Pnndpal Payment Pdn~pal Interest Outstanding $2,350.00 635.00 470.00 165.00 1,880.00 602.00 470.00 132.00 1,410.00 569.00 470.00 99.00 940.00 536.00 470.00 66.00 470.00 503.00 470.00 33.00 $2,845.00 $2,350.00 $495.00 $2,500.00 7.00% Jan. 1 5 Pnncipal Payment Pdndpal Interest O~standing $2,500.00 Year 1 675.00 500.00 175.00 2,000.00 Year2 640.00 500.00 140.00 1,500.00 Year 3 605.00 500.00 105.00 1,000.00 Year 4 570.00 500.00 70.00 500.00 Year 5 535.00 500.00 35.00 $3,025.00 $2,500.00 $525.00 SAMPLE E Principal Outstanding: Interest Rate: Interest Start Date: Term: PaymentYear $3,000.00 7.00% Jan. 1 7 Payment Principal Year 1 638.57 428.57 Year 2 608.57 428.57 Year 3 578.57 428.57 Year 4 548.57 428.57 Year 5 518.57 428.57 Year 6 488.57 428.57 Year 7 458.57 428.57 Pdncipal Interest Outstanding $3.000.00 210,00 2,571.43 180,00 2.142.86 15000 1,714.29 120.00 1,285.71 90.00 857.14 60.00 428.57 30.00 $3,840.00 $3,000.00 $840.00 c..y of MEMORANDUM iver To: FROM: MAYOR AND CITY COUNCIL STEPHEN ROHLF, BUILDING ZONING ADMINISTRATOR DATE: FEBRUARY 9, 1998 ..~ SUBJECT: LAKE ORONO PROJECT Staff is proposing the assessable area for the Lake Orono project includes the shoreland from the dam as for up fiver as sediment is removed. The assessment role still needs adjustment, but the area described includes property under approximately 117 different ownerships that equal 201 equivalency units. The vast majority of the owners (102) are proposed to be assessed as one unit. The breakdown of units per owner is as follows: Owners # of units 102 ~ 1 7 @ 2 6 (between 4 & 10 units each) 39 1 @ 20 1 ~ 26 117 201 Guardian Angels is proposed at 20 equivalency units and the city is the owner with 26. Included in this packet is a memo from Pat Klaers with a recommendation on how the city's units should be treated. The numbers above are preliminary. It is estimated that approximately 20 of the 201 equivalency units need to be reviewed closer. The estimated cost of the recommended project is $750,000. Overhead was figured into this price at 28%, the same as an urban service project. The plans required for this project will not need to be as detailed as an urban service project and it will require less survey stacking and inspection. The 28% was used to add a cushion. The bids for the project may come in higher than the estimates the city received. If the overhead is less than what was estimated, the city contribution will be less. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 ° TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425